1.0 Main Information


Document Number

INT-011-WPL-00

Main Work Center

System Condition

Equipment stopped

Frequency

Duration (hours)

Instrumentation

4.hr

2.0 Applicable for


Ref

Equipment Tag Number

Equipment Description service


Radial vibration probe

3.0 HSE Considerations


Work Permit Name
Safe Wok permit

Activity
Apply PTW one day before

4.0 Procedure

NOTE
Use proper PPE (disposable respirator, nitrile gloves, safety glasses, hard hat, and
safety boots) as we will deal with chemicals such as corrosion transformer 763
(Chesterton).
STEP

ACTION

1.

Apply permit to work.

2.

Open permit to work.

3.

Override / inhibit signals.

4.

Disconnect probe extension cable.

5.

Remove probe and check it.

6.
7.

Reinstate probe and check gap voltage adjusting in -10VDC.


Secure lock nut and reinstate extension cable.

8.

Verify gap voltage on BN 3500 rack.

9.

Close permit to work.

5.0 Special Tools


Special Tool Description
Not Required

Quantity

Units

Remarks

6.0 Spare Parts & Consumables


Material Code

Material Description

Quantity

Units

7.0 Manpower
Department
Instrumentation

Craft
Instrument Technician

Number
2

Duration (h)

8.0 Reference Documents