HUMAN RESOURCE MANAGEMENT
(PGPM 12)
SUBMITTED TO:
NATIONAL INSTITUTE OF CONTRUCTION
MANAGEMENT
& RESEARCH (NICMAR) PUNE.
SCHOOL OF DISTANCE EDUCATION
(SODE)
By
Mr. abc
(PGDPM)
Reg.no.-abc
PGPM12
Page 1
HUMAN
RESOURCE
MANAGEMENT
PGPM12
Page 2
CONTENTS
SR.NO.
1
2
3
4
DESCRIPTION
ASSIGNMENT.
UNDERSTANDING THE MAIN PROBLEM.
REASONS OF VARIOUS PROBLEM
NEEDS AND THEIR FULFILLMENT AT
PAGE NO.
4
4
4
5
SITE
SUGGESTED METHOD FOR HYGIENE
FACTORS
SUGGESTED METHOD FOR
7
8
MOTIVATIONAL FACTORS
RECOMMENDATION TO MANAGEMENT
BIBLIOGRAPHY/ READINGS
8
9
PGPM12
Page 3
ASSIGNMENT:
You are a Project Manager on site where work for 3K.m. long Tunnel has been
undertaken. The site is remote and takes about 2 days travel to nearest
town. Supervisors, Technicians & Skilled Workers are engaged in dangerous /
hazardous work. Absenteeism due to sickness, quarrels, drinking are adding
to less output of work and chances of accidents on site are increasing.
Management has urged to do something so that time targets can be
achieved. Discuss how will you tackle the problem and increase the output of
the work.
Page 4
NEEDS AND THEIR FULFILMENT ON SITE: Lack of Manpower Management (or) Planning
PGPM12
Page 5
o time frame.
Working out the labour component in various parameters of the project
.by using constants to workout labour requirement Classifying and
categorizing labour requirement and various jobs by level of skill,
responsibility, nature of work etc. Determine the duration of each job
or task at every stage of project.
Estimate the number of manpower required in view of the anticipated
of absenteeism and labour turnover and the stability factor.
After understanding the factors stated above, following
principles should be applied
o Care and skill should be exercised in the selection of employees.
o Introduction to the job should be friendly, skillful and adequate.
o Each employee should be made to feel that his efforts are really
appreciated.
Administrative setup
Based on the construction programme and various other norms, the
administrative set up is worked out for completion of project.
Un-Hygienic surroundings & Temporary Accommodation
Before Starting of the project Management has to well plan because this
project is long duration so manpower involved will be more it is the one of
the preliminary need for the employees & workers.
Lack of Medication
Management should send a medical team to site and they should stay there
till completion of project. They should be supplied necessary equipments and
medical kits so that they can manage any hazardous situation i.e. any
sudden accidents they can handle the situation, any epidemic occurred they
can overcome that situation. By this work will be smoothly progressed and
number of workers absenteeism will be reduced. Worker who is sick will be
taken care by medical team he will be recovered quickly and he can start
doing the work so that manpower problem is solved.
Lack of healthy food:
Place is completely isolated from town so management should take step
forward by giving healthy food to staff and worker with low cost.
Lack of Discipline at site:
Management should setup some rules and regulation regarding work such
as:
PGPM12
Page 6
SUGGESTION METHODS FOR HYGIENE FACTORS:Management has to well plan for the temporary shelters in such a way that
number of workers will be involved in the project and how many shelters are
required and for different category of employees will be working at site and
different types of shelters should be constructed with different facility what
all materials required for construction any how much time required to
construct it so that all those thing should be completed before starting of
project, Management should built temporary shelters for the workers who will
be working at site because the site is at remote area workers cannot be able
to say at their home and come for work it is the preliminary requirement for
the workers so management has to take extra precautions, A site office also
be built with all necessary requirements, drinking water should be good
because most of diseases are spread by water so it is important step to
taken care by management.
PGPM12
Page 7
PGPM12
Page 8
RECOMMENDATIONS TO MANAEGMENT:Management always do cost cutting by not providing basic needs to staff and
worker, saving money with less safety equipment, not providing good facility
of transportation and accommodation.
Project manager shall relies to Management due to above points staff are
leaving job or not doing their work with willingness and more time and
money are getting involved in interview of new people and their training and
before we make good system of work its getting brock up due to issues
which is very small in compared to companies goal and target.