Вы находитесь на странице: 1из 2
(rctode Te methodology ofthe restoration of heck Toundation Bal of he untenance Westie fr Iniake Gate ff ‘oad on the maintenance testi is offset in both X & ¥ direction. Review the Gosign Ll alculaton considering te same. How the load on the maintonance veste transfer Irom foundation bal to the concrete isnot clear Detal of the same needs to be included with design caleustion. [Review the weight of the gatevbalast jae pact bad Toro Gosigh the mantenance vestle Talos ¢ soo00/2 Foundation late proposed = gax80em Sess Sp) SRG RET TTT] (Catcuaton of he base plate) Int in order. Furnish the alculation of base pat in tne itn 15-800 Ircude We deca eatouaton oF ow loending moment [Duc w arrangement ofthe maintenance resi the inside [Bonnet cover sie} bots of the luase plate subject to pressive loed snd outside subject to tense load. Review fe calculation of oading onthe bot accorcinay Load on bate No ofbokson each Lead on each bots Foundation bot prosoeed pees Tnaieate the tar athe proposes bat, Terao stress -assa/s.08 ‘ere ceTER NO. ae ~cqppan] SvI]se Ler] m3) Pagesd | B OMMETALS | Desi Calaaon of Fourdaton Bots oat ImeRAPROJECTS Lr. | "Septet War Maks Gate for Kotla HEP [Fos may nor be wana) Jat te proposed Jwoldng arrangement ot lanchor wih base plate (Revue sifene: doa © vIEW"HA pace NOL avaIADTG a Ske Tar ripping anc installation af roposed base pate. Rotor rno-11 of Brg, No-OMIL! IKHEPNGIST R7 fr the some, io the bottom base plato 3 Not be welded on many )ucicescaanen| ‘eau LETER NO. ate

Вам также может понравиться