Академический Документы
Профессиональный Документы
Культура Документы
Status -02)
Bill of material to be revised by removing redundant material code with correct
codes. (Design to finalise issue of revised
Projects)
For all redundant material list following need to be checked
Open PR
Open P.O
Inventory
Open Production Orders in which redundant material will be consumed.
Redundant material to be deleted from purchase order and new PR with correct
material code to be adopted.
Open
Open