Introduction:

During the butane transfer to the HGU, the transfer pump (G-0016B) tripped every
time when the old sphere was disabled. Due to this is was not possible to provide
the HGU with an uninterrupted feed.
Action:
After the HGU was S/D the possibility was taken to do some tests to find the reason
for the trips. The first test was done on the 15th of December. The pump was
started on circulation and a few switches has been done between D-0029 and D0028 and every time when the old sphere was disabled the pump tripped.
At 16 December a second test was done following the procedure witch was made in
the meantime and the reason for the trips was found in a combined afford of the
people involved.
The procedure will by adjusted to assure an un-interrupted feed for the HGU.
Levels of the spheres before and after the tests:
D-0028 before: 3908 after: 5996
D-0029 before: 17117 after: 14467