DEBIT DETAILS

SL.NO:

DESCRIPTION

Manhours for
modification
(Hrs)

SAR NO:

SAR DATE

SAR-WHRB-1

22.12.08

HOPPER BELOW ECONOMISER

348

SAR-WHRB-2

23.12.08

WHRB SADDLE FDN DESCRIPANCY

366

SAR-WHRB-6

20.03.09

MAIN DOWNCOMER SUPPORT

80

SAR-WHRB-7

25.03.09

DC4/1 & DC 4/2

SAR-WHRB-8

20.04.09

SUPERHEATED PIPING FOULING


WITH BRACING

40

SAR-WHRB-9

20.04.09

SILENCER SUPPORTING
STRUCTURE MODIFICATION

112

SAR-WHRB-10

15.05.09

RISER PIPES FROM EVA-III TOP


HRD FOUND SHORT IN LENGTH

SAR-WHRB-10A 15.01.09

EVA COILS & SUPERHEATER COILS


FOUND DAMAGE IN
TRANSPORTATION

SAR-WHRB-11

15.05.09

EVAPORATOR-III CROSS OVER


PIPES

10

SAR-WHRB-12

20.06.09

PURLINS ARE NOT AVAILABLE AT


EACH CORNERS FOR COVERING
THE CANOPY SHEETS

11

SAR-WHRB-13

20.06.09

RISER PIPES FROM EVA-II TOP HRD


FOUND SHORT IN LENGTH

12

SAR-WHRB-14

20.06.09

RISE PIPE 3/1 FOULING WITH


BRACING

180

13

SAR-WHRB-15

27.07.09

ATTEMPERATOR PIPING

14

SAR-WHRB-16

20.06.09

RISER PIPE 6/2

15

SAR-WHRB-17

20.06.09

DOWNCOMER SUPPORT BEAMS


SPLICING

16

SAR-WHRB-18

20.06.09

R 5/2 & R 2/1

17

SAR-WHRB-19

02.07.09

SEALING PLATES ARE NOT


AVAILABLE ON INTERMEDIATE
PANELS

128

18

SAR-WHRB-20

30.06.09

PLATFORM SHIFTED FOR


POSITIONED DRUM SAFETY VALVE

60

19

SAR-WHRB-21

12.07.09

RISER PIPES FOULING WITH


BRACING

120

20

SAR-WHRB-22

20.07.09

SHIELDING PLATE CONTOUR NOT


MATCHING

88

21

SAR-WHRB-23

20.07.09

SPR 14 & SPR-17 FOULING WITH


1-VBR-1 & 1-VBR-3

84

22

SAR-WHRB-27

12.08.09

SUP-05 & SUP-10,BEAMS FOUND


SHORT IN LENGTH, HENCE
SPLICING DONE

56

23

SAR-WHRB-29

12.08.09

SUPPORT CLAMP MODIFICATION


OF SPR-20

32

24

SAR-WHRB-30

12.08.09

INLET DUCT SUPPORTING


STRUCTURE

25

SAR-WHRB-31

12.08.09

THERMOWELL STUB MODIFICATION

274

26

SAR-WHRB-32

12.08.09

LRSB-2 FOULING WITH BRACING

56

27

SAR-WHRB-33

12.08.09

ECO TO ESP DUCT NO. D2


MODIFICATION

118

28

SAR-WHRB-34

12.08.09

SILENCER PIPING MODIFICATION

60

29

SAR-WHRB-C

10.08.09

ECO TO ESP DUCT NO.D7


MODIFICATION

173

30

SAR-WHRB-D

10.11.09

HAND RAILING MODIFICATION

196

31

SAR-WHRB-A

13.07.09

FEED WATER LINE MODIFICATION /


TERMINAL POINT

EBIT DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Structural
Material
Amount in
Extra Inch Joint cost
Cost
Rs.
dia welding @ 1000/Debit to
involved @
( to include
involved per inch dia
Rs.45/- per
all cost)
Kg

15660.00

2000.00

17660.00

B&H

16470.00

1500.00

17970.00 CLIENT

3600.00

3600.00

B&H

0.00

16

16000.00

16000.00

B&H

1800.00

1800.00

B&H

5040.00

5040.00

B&H

0.00

24

24000.00

24000.00

B&H

0.00

21

21000.00

21000.00

B&H

0.00

32

32000.00

32000.00

B&H

8100.00

4500.00

12600.00

B&H

0.00

16

16000.00

16000.00

B&H

0.00

6000.00

6000.00

B&H

0.00

6000.00

6000.00

B&H

0.00

6000.00

6000.00

B&H

2700.00

2700.00

B&H

0.00

12

12000.00

12000.00

B&H

5760.00

2700

8460.00

B&H

2700.00

2700.00

B&H

5400.00

5400.00

B&H

3960.00

3960.00

B&H

3780.00

3780.00

B&H

2520.00

2520.00

B&H

1440.00

1440.00

B&H

0.00

0.00

B&H

12330.00

12330.00

B&H

2520.00

2520.00

B&H

5310.00

5310.00

B&H

0.00

32

32000.00

32000.00

B&H

7785.00

8550

16335.00 POWER

8820.00

8820.00 POWER

0.00

9000.00

9000.00

TOTAL

314945.00

B&H

DEBIT DETAILS

SL.NO:

DESCRIPTION

Manhours for
modification
(Hrs)

SAR NO:

SAR DATE

SAR-AFBC-1/
MDR-30

07.01.09

AFBC COLUMN BK2 FOUND BEND


IN TRANSPORTATION

636

SAR-AFBC-2

12.01.09

AFBC COLUMN BK2 BASE PLATE


ORIENTATION CHANGED

120

SAR-AFBC-3

19.02.09

ECONOMISER SUPPORT BOTTOM


FRAME MODIFICATION

24

SAR-AFBC-4

26.04.09

MAN HOLE DOORS COVERS ON


RHS WW PANEL FOULING WITH
PLATFORM

SAR-AFBC-5

20.04.09

ECONOMISER CUM APH HOPPER


PLATE FOULING WITH CIVIL
STRUCTURE BEAM

100

SAR-AFBC-6

10.06.09

PURLINS ARE NOT AVAILABLE AT


EACH CORNERS FOR COVERING
THE CANOPY SHEETS

180

SAR-AFBC-7

10.06.09

APH TO PLENUM DUCT


MODIFICATION

80

SAR-AFBC-8

10.06.09

MAIN DOWNCOMER FOULING WITH


PLATFORM BEAMS ON BOTH SIDE

SAR-AFBC-9

10.06.09

SA DUCT FOULING WITH BRACKET


BKT2

11

SAR-AFBC-11

02.09.09

DOWNCOMER PIPE DC-5 FOULING


WITH STRUCTURAL BRACING

13

SAR-AFBC-13

24.09.09

RISER PIPE MODIFICATION

15

SAR-AFBC-15

10.06.09

BUNKER BEAMS SPLICED AT 6


PLACES

35

16

SAR-AFBC-16

02.09.09

DOWNCOMER PIPE DC-7,8,12


FOULING WITH STRUCTURAL
BEAMS & CIVIL BEAMS

17

SAR-AFBC-17

05.10.09

MISC. PR. PART SUPPORT OF PRI.


SH COILS IS NOT MATCHING WITH
TUBE OD.

18

SAR-AFBC-18

05.10.09

INTEGRAL PIPING-III LINE


MODIFICATION

19

SAR-AFBC-19

19.10.09

PIPING SUPPORT FOR INTEGRAL


PIPING

12

29

SAR-AFBC-I

10.11.09

HAND RAIL POST MODIFICATION

232

30

SAR-AFBC-J

07.12.09

FUEL FEED CHUTE TOP FLANGE


MODIFICATION

120

31

SAR-WHRB-K

08.12.09

HARDWARE PURCHASE FOR FUEL


FEED CHUTE BOTTOM FLANGE

DEBIT DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Amount in
Extra Inch Joint cost
T&P/ Crane Rs.
dia welding @ 1000/Debit to
Charges
( to include
involved per inch dia
all cost)

Material
Cost
involved

28620.00

12840.00

5400.00

3465.00

3500.00

1080.00

1080.00

B&H

0.00

0.00

B&H

4500.00

4500.00

9000.00

B&H

8100.00

4500.00

12600.00

B&H

3600.00

B&H

3600.00

41460.00

B&H

12365.00 POWER

0.00

0.00

B&H

0.00

0.00

B&H

24

24000.00

24000.00

B&H

28

28000.00

28000.00

B&H

1575.00

4275.00

5850.00

B&H

72

72000.00

72000.00

B&H

0.00

B&H

12

12000.00

12000.00

B&H

540.00

1485.00

2025.00

B&H

10440.00

5400.00

5400.00

B&H

2000.00

B&H

TOTAL

241820.00

0.00

2000.00

10440.00 POWER

It involves
drilling
work

DEBIT DETAILS

SL.NO:

SAR NO:

SAR DATE

DESCRIPTION

Manhours for
modification
(Hrs)

MDR NO.-26 &27 13.12.08

COLLECTING PLATE DAMAGE IN


TRANSPORTATION

368

SAR-ESP-1

29.01.09

ESP BEARING PLATE SIZE


MODIFICATION

329

MAIL SENT TO
H.O

28.03.09

COLLECTING PLATE ASSLY


HARDWARE PARTIALLY SUPPLIED
BY ENVIRO. SO LOCALLY
PURCHASED

SAR NO.ENV/HD/7733/00 07.06.09


2/06/09

PENT HOUSE COLUMN STICH


WELDING TO BE FULL WELDED

130

SAR-ESP-2

STAIRCASE TO DISCHARGE
HOPPER PLATFORM MODIFICATION

16

19.10.09

DETAILS
Manhour
Cost
involved
(@Rs 45/per Hour)

Material
Cost
involved

16560.00

14805.00

Amount in
T&P/ Crane Rs.
Debit to
Charges
( to include
all cost)
1500.00

18060.00 ENVIRO

6900.00

21705.00 ENVIRO

7800.00

7800.00 ENVIRO

5850.00

5850.00 ENVIRO

720.00

720.00 ENVIRO
TOTAL

54135.00