PROGRAM PENYEDIA

(L

126
43
83

RENCANA JARINGAN PI
CIMANDAR ATAS KE SPL
TRANSMISI AIR BERSIH D

PANJANG TOTAL 1

RES

SPL
RES

BP
T

PROGRAM PENYEDIAAN AIR BERSIH IKK CINEAM 5


(LIMA) DESA

RENCANA JARINGAN PIPA TRANSMISI AIR BAKU INTAKE


CIMANDAR ATAS KE SPL/RESERVOIR TOP PALASARI 2 DAN
TRANSMISI AIR BERSIH DARI SPL PALASARI 2 KE RESERVOIR
CIJULANG
PANJANG TOTAL 14 KM (SISTEM GRAVITASI)

PROGRAM PENYEDIAAN AIR BERSIH IKK CINEAM 5


(LIMA) DESA

RENCANA JARINGAN PIPA TRANSMISI AIR BAKU INTAKE


CIMANDAR ATAS KE SPL/RESERVOIR TOP PALASARI 2 DAN
TRANSMISI AIR BERSIH DARI SPL PALASARI 2 KE RESERVOIR
CIJULANG
PANJANG TOTAL 14 KM (SISTEM GRAVITASI)

Dimensions of Trench Work


1.
Open Man Power
1) Excavation by Man Power
A/2
0.1

A'/2
C/2

C'/2

0.1

Pavement

hj

hb

hs

hs

Hj

hd

1:n

joint exc.:
@

5.5 m
B/2

n=

B'/2

0.2

ND hd

hb/hs

(Sand Backfill) hs A'


m PVC/SP

(mm)

50

0.60

0.84

0.50

0.20

0.85

0.10

75

0.60

0.85

0.50

0.20

0.88

0.10

DIP

B'

hj

Hj

C'

1.12

0.70

0.20

1.05

0.70

0.68

0.88

1.13

0.70

0.20

1.08

0.70

0.69

0.89

100

0.60

0.86

0.50

0.20

0.90

0.10

D/2

1.14

0.70

0.20

1.10

0.70

0.70

0.90

150

0.90

1.00

0.50

0.20

1.25

0.10

D/2

1.28

0.70

0.20

1.45

0.70

0.72

0.92

200

0.90

1.18

0.60

0.35

1.45

0.10

D/2

1.52

0.80

0.35

1.80

0.80

0.96

1.16

250

0.90

1.20

0.60

0.35

1.50

0.10

D/2

1.54

0.80

0.35

1.85

0.80

0.98

1.18

300

1.20

1.44

0.70

0.35

1.85

0.10

D/2

1.78

0.90

0.35

2.20

0.80

1.10

1.30

400

1.20

1.48

0.70

0.35

1.95

0.10

D/2

1.82

0.90

0.35

2.30

0.80

1.14

1.34

450

1.20

1.50

0.70

0.35

2.00

0.10

D/2

1.84

0.90

0.35

2.35

0.80

1.16

1.36

500

1.20

1.58

0.70

0.50

2.20

0.10

D/2

1.98

0.90

0.50

2.70

0.80

1.30

1.50

600

1.20

1.62

0.70

0.50

2.30

0.10

D/2

2.02

0.90

0.50

2.80

0.80

1.34

1.54

700

1.20

1.66

0.70

0.50

2.40

0.10

D/2

2.06

0.90

0.50

2.90

0.80

1.38

1.58

800

1.20

1.70

0.70

0.50

2.50

0.10

D/2

2.10

0.90

0.50

3.00

0.80

1.42

1.62

900

1.20

1.74

0.70

0.50

2.60

0.10

D/2

2.14

0.90

0.50

3.10

0.80

1.46

1.66

1000

1.20

1.82

0.70

0.60

2.80

0.10

D/2

2.26

0.90

0.60

3.40

0.80

1.58

1.78

Excavation by machine
B/2
0.1

0.1
Pavement

hj

hb

hs

hs

Hj

hd

1:n

2)

joint hole:
@

ND hd

5.5 m

hb

(Sand Backfill) hs A'


m PVC/SP

(mm)

50

0.60

0.70

0.10

0.75

0.10

75

0.60

0.70

0.10

0.78

100

0.60

0.70

0.10

150

0.90

0.70

0.10

DIP

B'

hj

Hj

0.30

1.05

0.70

0.10

0.30

1.08

0.70

0.80

0.10

D/2

0.30

1.10

0.70

1.15

0.10

D/2

0.30

1.45

0.70

200

0.90

0.80

0.10

1.20

0.10

D/2

0.30

1.50

0.80

250

0.90

0.80

0.10

1.25

0.10

D/2

0.30

1.55

0.80

300

1.20

0.90

0.10

1.60

0.10

D/2

0.30

1.90

0.80

1.
1)

Open Trench
Excavation by Man Power
a. PVC
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sand Fill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2

per

10 m
b. DIP

50

75

100

150

200

250

300

0.570

0.59

0.61

0.94

1.29

1.35

1.98

0.914

0.945

0.968

1.378

1.962

2.035

2.794

6.14

6.39

6.57

9.94

13.89

14.50

20.98

3.98

4.07

4.07

6.78

8.63

8.77

14.01

0.205

0.219

0.232

0.291

0.476

0.504

0.604

0.275

0.294

0.312

0.347

0.606

0.644

0.754

2.14

2.29

2.42

2.98

4.95

5.24

6.26

0.207

0.223

0.240

0.309

0.507

0.553

0.675

0.277

0.298

0.320

0.365

0.637

0.693

0.825

2.159

2.325

2.502

3.161

5.259

5.734

6.968

7.25

7.25

7.25

7.25

8.29

8.29

9.29

Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sand Fill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2

50

75

100

150

0.570

0.594

0.612

0.938

0.914

0.945

0.968

1.378

6.14

6.39

6.57

9.94

4.73

4.90

4.97

8.10

0.132

0.139

0.146

0.159

0.177

0.187

0.196

0.214

1.38

1.45

1.52

1.66

0.136

0.143

0.154

0.177

0.179

0.191

0.204

0.232

1.41

1.49

1.6

1.84

7.25

7.25

7.25

7.25

200

250

300

1.291

1.350

1.980

1.962

2.035

2.794

13.89

14.50

20.98

10.10

10.36

15.97

0.335

0.351

0.415

0.425

0.446

0.515

3.48

3.65

4.3

0.366

0.400

0.486

0.456

0.495

0.586

3.79

4.14

5.01

8.29

8.29

9.29

2)

Excavation by Machine
a. PVC
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sandfill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2

per

10 m
b. DIP

50

75

100

150

200

250

300

0.525

0.546

0.560

0.805

0.960

1.000

1.440

0.147

0.147

0.147

0.147

0.192

0.192

0.216

5.52

5.73

5.87

8.32

9.95

10.35

14.79

3.50

3.54

3.50

5.60

6.40

6.40

9.90

0.173

0.188

0.202

0.227

0.289

0.311

0.379

0.147

0.147

0.147

0.147

0.192

0.192

0.216

2.00

2.15

2.29

2.54

3.24

3.46

4.18

0.175

0.192

0.210

0.245

0.320

0.360

0.450

0.147

0.147

0.147

0.147

0.192

0.192

0.216

2.02

2.19

2.37

2.72

3.55

3.95

4.89

9.00

9.00

9.00

9.00

10.00

10.00

11.00

Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sandfill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2

50

75

100

150

0.560
0.147
5.87
4.51
0.101
0.147
1.28
0.109
0.147
1.36
9.00

0.805
0.147
8.32
6.73
0.114
0.147
1.41
0.132
0.147
1.59
9.00

200

250

300

0.960
0.192
9.95
7.85
0.144
0.192
1.79
0.175
0.192
2.1
10.00

1.000
0.192
10.35
7.96
0.155
0.192
1.90
0.204
0.192
2.39
10.00

1.440
0.216
14.79
11.79
0.190
0.216
2.29
0.261
0.216
3.00
11.00

2.

Sheeted Trench
a. Steel Pipe
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing
Shuttering
Pavement

per
Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3
m3
m3
m2

10 m

200

250

300

350

400

450

500

600

700

800

900

1000

3.420
0.504
35.12
25.20
0.869
0.504
9.61
0.900
0.504
9.92
2.16
0.072
0.450
2.10

3.608
0.518
37.02
25.91
0.968
0.518
10.62
1.017
0.518
11.11
2.16
0.072
0.450
2.15

3.800
0.532
38.97
26.60
1.069
0.532
11.66
1.140
0.532
12.37
2.16
0.072
0.450
2.20

3.998
0.546
40.97
27.31
1.171
0.546
12.70
1.267
0.546
13.66
2.43
0.072
0.450
2.25

4.200
0.560
43.02
28.00
1.274
0.560
13.76
1.400
0.560
15.02
2.43
0.072
0.450
2.30

4.408
0.574
45.12
28.70
1.379
0.574
14.83
1.538
0.574
16.42
2.43
0.072
0.450
2.35

4.620
0.840
47.73
28.27
1.484
0.840
16.37
1.680
0.840
19.46
3.15
0.225
1.296
2.40

5.060
0.880
52.20
30.80
1.697
0.880
18.57
1.980
0.880
21.40
3.15
0.225
1.296
2.50

5.520
0.920
56.87
32.20
1.915
0.920
20.82
2.300
0.920
24.67
3.15
0.225
1.296
2.60

6.000
0.960
61.75
33.60
2.138
0.960
23.13
2.640
0.960
28.15
3.15
0.225
1.296
2.70

6.500
1.000
66.82
35.00
2.364
1.000
25.46
3.000
1.000
31.82
3.60
0.225
1.296
2.80

7.020
1.040
72.09
36.40
2.595
1.040
27.84
3.380
1.040
35.69
4.00
0.225
1.296
2.90

200

250

300

350

400

450

500

600

700

800

900

1000

3.420
0.504
35.12
28.65
0.524
0.504
6.16
0.555
0.504
6.47
2.16
0.072

3.608
0.518
37.02
29.82
0.577
0.518
6.71
0.626
0.518
7.20
2.16
0.072

3.800
0.532
38.97
30.99
0.630
0.532
7.27
0.701
0.532
7.98
2.16
0.072

3.998
0.546
40.97
32.19
0.683
0.546
7.82
0.779
0.546
8.78
2.43
0.072

4.200
0.560
43.02
33.37
0.737
0.560
8.39
0.863
0.560
9.65
2.43
0.072

4.408
0.574
45.12
34.57
0.792
0.574
8.96
0.951
0.574
10.55
2.43
0.072

4.620
0.840
47.73
35.77
0.847
0.840
10.00
1.043
0.840
11.96
3.15
0.225

5.060
0.880
52.20
38.18
0.959
0.880
11.19
1.242
0.880
14.02
3.15
0.225

5.520
0.920
56.87
40.62
1.073
0.920
12.40
1.458
0.920
16.25
3.15
0.225

6.000
0.960
61.75
43.09
1.189
0.960
13.64
1.691
0.960
18.66
3.15
0.225

6.500
1.000
66.82
45.57
1.307
1.000
14.89
1.943
1.000
21.25
3.60
0.225

7.020
1.040
72.090
48.07
1.428
1.040
16.17
2.213
1.040
24.02
4.00
0.225

b. DIP
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing

Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m2
m3

Support
Pavement

m3
m2

0.450
2.10

0.450
2.15

0.450
2.20

0.450
2.25

0.450
2.30

0.450
2.35

1.296
2.40

1.296
2.50

1.296
2.60

1.296
2.70

1.296
2.80

1.296
2.90

Sheeted Trench
0.15

B/2

0.15

Bracing

Bracing

Shuttering

1:n

Sheet pile
Shuttering

hj

hb

hs

hs

H'

hd

Sheet pile

2.

joint hole:
`@
5.5 m

ND hd

hb

hj

H'

Sheet Pile
PVC/SP DIP length thick

Brcing & Shuttering


Bracing Shutter stages Note

(Sand Backfill) hs

(mm)

cm

cm

cm

200

1.5

1.80

0.2

1.90

0.35

2.25

0.80

0.1

D/2

2.4

4.5

12

15

nos
1 wooden sheet

pile
250

1.5

1.85

0.2

1.95

0.35

2.30

0.80

0.1

D/2

2.4

4.5

12

15

1 wooden support

300

1.5

1.90

0.2

2.00

0.35

2.35

0.80

0.1

D/2

2.4

4.5

12

15

350

1.5

1.95

0.2

2.05

0.35

2.40

0.80

0.1

D/2

2.7

4.5

12

15

400

1.5

2.00

0.2

2.10

0.35

2.45

0.80

0.1

D/2

2.7

4.5

12

15

450

1.5

2.05

0.2

2.15

0.35

2.50

0.80

0.1

D/2

2.7

4.5

12

15

1
steel sheet pile

500

1.5

2.10

0.2

2.20

0.50

2.70

0.80

0.1

D/2

3.5

4.5

15

18

2 b=25cm

pipe support
600

1.5

2.20

0.2

2.30

0.50

2.80

0.80

0.1

D/2

3.5

4.5

15

18

700

1.5

2.30

0.2

2.40

0.50

2.90

0.80

0.1

D/2

3.5

4.5

15

18

800

1.5

2.40

0.2

2.50

0.50

3.00

0.80

0.1

D/2

3.5

4.5

15

18

900

1.5

2.50

0.2

2.60

0.50

3.10

0.80

0.1

D/2

4.0

4.5

15

18

1000

1.5

2.60

0.2

2.70

0.50

3.20

0.80

0.1

D/2

4.0

5.0

15

18

1100

1.5

2.70

0.2

2.80

0.50

3.30

0.8

0.1

D/2

4.0

5.0

15

18

1200

1.5

2.80

0.2

2.90

0.50

3.40

0.8

0.1

D/2

4.0

5.0

15

18

Wooden Sheet Pile:

5 times use

Wooden Bracing:
Wooden Shuttering

5 times use
10 times use

A1 SHEETED TRENCH

2.00m

ONE - BRACING

JOINT HOLE SECTION

JOINT HOLE
SECTION

d1

2.00m

DOLKEN WOOD 100

JOINT HOLE SECTION


GENERAL SECTION

DETAIL I

IWF.100x100x6x8

D/2 D/2

PL. PIPE LINE

H'

H'

d1'

DETAIL

MECHANICAL JOINT

d2
d2'

300

STRUT - 1

Hd
d1
( COVER DEPTH )
1000
300
D
( PIPE DIA )

IWF.100x100x6x8

(L)

(L)

LONGITUDINAL SECTION

H'

200

H ( Sheet Pile Length )

GENERAL
SECTION

GENERAL SECTION

d 1'

CROSS SECTION

2.00m

d2

DOLKEN WOOD 100


d2'

SHEET PILE

DETAIL I
A

joint hole:
`@
5.5 m

50 GSP PIPE
2.00m

2.00m

TOP VIEW

2.00m

IWF.100x100x6x8
50 GSP PIPE

50 GSP PIPE

50 GSP PIPE
2.00m

2.00m

2.00m

TOP VIEW

ND hd

hb

H'

H"

d1

d2

d1'

d2'

Sheet Pile
PVC/SP DIP length thick

Brcing & Shuttering


Bracing Shutter stages

(Sand Backfill) hs

(mm)

200

1.5

0.90

0.2

1.90

0.35

2.25

0.80

0.40

0.50

0.20

0.40

0.1

D/2

2.80

10

6.17

17.2

250

1.5

0.95

0.2

1.95

0.35

2.30

0.80

0.40

0.50

0.20

0.40

0.1

D/2

2.85

10

6.17

17.2

300

1.5

1.00

0.2

2.00

0.35

2.35

0.80

0.40

0.50

0.20

0.40

0.1

D/2

2.90

10

6.17

17.2

350

1.5

1.05

0.2

2.05

0.35

2.40

0.80

0.40

0.50

0.20

0.40

0.1

D/2

2.95

10

6.17

17.2

400

1.5

1.10

0.2

2.10

0.35

2.45

0.80

0.40

0.50

0.20

0.40

0.1

D/2

3.00

10

6.17

17.2

450

1.5

1.15

0.2

2.15

0.35

2.50

0.80

0.40

0.50

0.20

0.40

0.1

D/2

3.05

10

6.17

17.2

500

1.5

1.50

0.2

2.20

0.50

2.70

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.20

10

6.17

17.2

600

1.5

1.60

0.2

2.30

0.50

2.80

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.30

10

6.17

17.2

700

1.5

1.70

0.2

2.40

0.50

2.90

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.40

10

6.17

17.2

800

1.5

1.80

0.2

2.50

0.50

3.00

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.50

10

6.17

17.2

900

1.5

1.90

0.2

2.60

0.50

3.10

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.60

10

6.17

17.2

1000

1.5

2.00

0.2

2.70

0.50

3.20

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.70

10

6.17

17.2

1100

1.5

2.10

0.2

2.80

0.50

3.30

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.80

10

6.17

17.2

1200

1.5

2.20

0.2

2.90

0.50

3.40

1.00

0.40

0.60

0.20

0.50

0.1

D/2

3.90

10

6.17

17.2

Wooden Sheet Pile:

5 times use

Wooden Bracing:
Wooden Shuttering

5 times use
10 times use

cm 50 cm IWF100cm

nos

2.00m

GENERAL SECTION
d1

d 1'

JOINT HOLE SECTION

2.00m

2.00m

DOLKEN WOOD 100

JOINT HOLE SECTION


GENERAL SECTION

DETAIL I

MECHANICAL JOINT
PL. PIPE LINE

d2'

d2

H'

H'

D/2 D/2

IWF.100x100x6x8

(L)

(L)

LONGITUDINAL SECTION

DOLKEN WOOD 100

DETAIL I
50 GSP PIPE
2.00m

2.00m

TOP VIEW

2.00m

IWF.100x100x6x8
50 GSP PIPE

50 GSP PIPE

50 GSP PIPE
2.00m

2.00m

2.00m

TOP VIEW

Brcing & Shuttering


Steel & Note
Bolt Kg
13.2 wooden sheet

pile
13.2 Pipe support

IWF Sutering
13.2
13.2
13.2
13.2

wooden sheet
13.2 dia = 10 cm

GSP pipe support


13.2 IWF Sutering
13.2
13.2
13.2
13.2
13.2
13.2

2.

Sheeted Trench
a. Steel Pipe
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing (GSP Pipe)
Steel C & Bolt 16
Shuttering
Pavement

per

10 m

Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3
m'

200

250

300

350

400

450

500

600

700

800

900

1000

1.710
0.252
17.56
12.60
0.419
0.252
4.65
0.450
0.252
4.96
1.12
0.270

1.853
0.266
19.01
13.31
0.473
0.266
5.21
0.522
0.266
5.70
1.14
0.285

2.000
0.280
20.51
14.00
0.529
0.280
5.80
0.600
0.280
6.51
1.16
0.300

2.153
0.294
22.06
14.71
0.586
0.294
6.39
0.682
0.294
7.35
1.18
0.32

2.310
0.308
23.66
15.40
0.644
0.308
7.00
0.770
0.308
8.26
1.20
0.33

2.473
0.322
25.32
16.10
0.704
0.322
7.63
0.863
0.322
9.22
1.22
0.35

3.300
0.750
34.36
19.79
1.004
0.750
11.40
1.200
0.750
14.57
1.28
0.53

3.680
0.800
38.25
22.40
1.157
0.800
13.02
1.440
0.800
15.85
1.32
0.56

4.080
0.850
42.35
23.80
1.315
0.850
14.70
1.700
0.850
18.55
1.36
0.60

4.500
0.900
46.64
25.20
1.478
0.900
16.42
1.980
0.900
21.44
1.40
0.63

4.940
0.950
51.13
26.60
1.644
0.950
18.17
2.280
0.950
24.53
1.44
0.67

5.400
1.000
55.82
28.00
1.815
1.000
19.97
2.600
1.000
27.82
1.48 5 times Usage.
0.70 20 times Usage.

Kg/m

1.188

1.188

1.188

1.188

1.188

1.188

1.188

1.188

1.188

1.188

1.188

1.188 20 times Usage.

Kg/m
m2

17.2
1.20

17.2
1.25

17.2
1.30

17.2
1.35

17.2
1.40

17.2
1.45

17.2
1.80

17.2
1.90

17.2
2.00

17.2
2.10

17.2
2.20

17.2 20 times Usage.


2.30

200

250

300

350

400

450

500

600

700

800

900

1.710
0.252
17.56
14.25
0.254
0.252
3.00
0.285
0.252
3.31
1.12

1.853
0.266
19.01
15.20
0.284
0.266
3.32
0.333
0.266
3.81
1.14

2.000
0.280
20.51
16.14
0.315
0.280
3.66
0.386
0.280
4.37
1.16

2.153
0.294
22.06
17.11
0.346
0.294
3.99
0.442
0.294
4.95
1.18

2.310
0.308
23.66
18.07
0.377
0.308
4.33
0.503
0.308
5.59
1.20

2.473
0.322
25.32
19.05
0.409
0.322
4.68
0.568
0.322
6.27
1.22

3.300
0.750
34.36
25.27
0.577
0.750
7.13
0.773
0.750
9.09
1.28

3.680
0.800
38.25
27.38
0.659
0.800
8.04
0.942
0.800
10.87
1.32

4.080
0.850
42.35
29.52
0.743
0.850
8.98
1.128
0.850
12.83
1.36

4.500
0.900
46.64
31.69
0.829
0.900
9.93
1.331
0.900
14.95
1.40

b. DIP
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile

Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3

1000

4.940 5.400
0.950 1.000
51.13 55.820
33.87 36.07
0.917 1.008
0.950 1.000
10.90 11.90
1.553 1.793
0.950 1.000
17.26 19.75
1.44
1.48

Bracing
Steel C & Bolt 16
Support
Pavement

m'
Kg/m
Kg/m
m2

0.27
1.19
17.2
1.20

0.29
1.19
17.2
1.25

0.30
1.19
17.2
1.30

0.32
1.19
17.2
1.35

0.33
1.19
17.2
1.40

0.35
1.19
17.2
1.45

0.53
1.19
17.2
1.80

0.56
1.19
17.2
1.90

0.60
1.19
17.2
2.00

0.63
1.19
17.2
2.10

0.67
1.19
17.2
2.20

0.70
1.19
17.2
2.30

Perhitungan Galian, Urugan dan Pemadatan


Tabel Galian Pipa
No.

( mm )

T
(m)

L
(m)

t
(m)

A pipa
( m2 )

25

0.700

0.325

0.275

0.00049

40

0.700

0.340

0.290

0.00126

50

0.700

0.350

0.300

0.00196

75

1.000

0.375

0.325

0.00442

100

1.000

0.400

0.350

0.00785

150

1.200

0.450

0.400

0.01767

200

1.200

0.500

0.450

0.03142

250

1.400

0.550

0.500

0.04909

300

1.9500

0.600

0.600

0.07069

10

350

2.0000

0.650

0.650

0.09621

11

400

2.0500

0.700

0.700

0.12566

12

450

2.1000

0.750

0.750

0.15904

13

500

2.1500

0.800

0.800

0.19635

14

600

2.2500

0.900

0.900

0.28274

15

700

2.3500

1.000

1.000

0.38485

16

800

2.4500

1.100

1.100

0.50265

15

VOLUME GALIAN PIPA / 1 m'


Vgp =
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =

L x T x 1 m'
0.3250
0.3400
0.3500
0.3750
0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000

X
X
X
X
X
X
X
X
X
X
X
X
X

0.7000
0.7000
0.7000
1.0000
1.0000
1.2000
1.2000
1.4000
1.9500
2.0000
2.0500
2.1000
2.1500

=
=
=
=
=
=
=
=
=
=
=
=
=
=

LT

m3

0.2275 m3
0.2380 m3
0.2450 m3
0.3750 m3
0.4000 m3
0.5400 m3
0.6000 m3
0.7700 m3
1.1700 m3
1.3000 m3
1.4350 m3
1.5750 m3
1.7200 m3

600 =
700 =
800 =

0.9000
1.0000
1.1000

X
X
X

2.2500
2.3500
2.4500

=
=
=

2.0250 m3
2.3500 m3
2.6950 m3

VOLUME URUGAN PASIR / 1 m'

Vups = ( (t x L ) - A ) x 1 m'
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0.2750
0.2900
0.3000
0.3250
0.3500
0.4000
0.4500
0.5000
0.6000
0.6500
0.7000
0.7500
0.8000
0.9000
1.0000
1.1000

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

0.3250
0.3400
0.3500
0.3750
0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000
0.9000
1.0000
1.1000

=
-

..
0.00049
0.00126
0.00196
0.00442
0.00785
0.01767
0.03142
0.04909
0.07069
0.09621
0.12566
0.15904
0.19635
0.28274
0.38485
0.50265

m3
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

0.0889
0.0973
0.1030
0.1175
0.1321
0.1623
0.1936
0.2259
0.2893
0.3263
0.3643
0.4035
0.4437
0.5273
0.6152
0.7073

datan

T
15

10

15

T
15

10

15

15

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

T
15

10

15

15

VOLUME URUGAN & PEMADATAN / 1 m'

Galian Tanah :
Vupd = Vgp - ( L x t ) x 1 m'
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0.2275
0.2380
0.2450
0.3750
0.4000
0.5400
0.6000
0.7700
1.1700
1.3000
1.4350
1.5750
1.7200
2.0250
2.3500
2.6950

0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100

..

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

0.275
0.290
0.300
0.325
0.350
0.400
0.450
0.500
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100

m3
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

0.1381
0.1394
0.1400
0.2531
0.2600
0.3600
0.3750
0.4950
0.8100
0.8775
0.9450
1.0125
1.0800
1.2150
1.3500
1.4850

Galian Rabat & Paving :


Vupd = (Vgp - ( L x t )) - ( 0,1 x L ) x 1 m'
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0.138
0.139
0.140
0.253
0.260
0.360
0.375
0.495
0.810
0.878
0.945
1.013
1.080
1.215
1.350
1.485

0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

=
0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

0.1056
0.1054
0.1050
0.2156
0.2200
0.3150
0.3250
0.4400
0.7500
0.8125
0.8750
0.9375
1.0000
1.1250
1.2500
1.3750

Galian Aspal :
Vupd = (Vgp - ( L x t )) - ( 0,45 x L ) x 1 m'
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0.253
0.260
0.360
0.375
0.495
0.810
0.878
0.945
1.013
1.080
1.215
1.350
1.485

0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450

X
X
X
X
X
X
X
X
X
X
X
X
X

0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100

=
=
=
=
=
=
=
=
=
=
=
=
=
=

0.0844
0.0800
0.1575
0.1500
0.2475
0.5400
0.5855
0.6300
0.6755
0.7200
0.8100
0.9000
0.9900

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

T
15

10

15

15

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

0.1

T
15

10

15

15

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

0.45

T
15

10

15

15

VOLUME PERBAIKAN /m'


Perbaikan Rabat tebal 5 cm
Vpb =
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0,050 x L
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

=
0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

0,05L
0.0163
0.0170
0.0175
0.0188
0.0200
0.0225
0.0250
0.0275
0.0300
0.0325
0.0350
0.0375
0.0400
0.0450
0.0500
0.0550

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

Perbaikan Paving

Vpb =

m2
0.1

25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

0.325 m2
0.340 m2
0.350 m2
0.375 m2
0.400 m2
0.450 m2
0.500 m2
0.550 m2
0.600 m2
0.650 m2
0.700 m2
0.750 m2
0.800 m2
0.900 m2
1.000 m2
1.100 m2

15

10

15

15

Perbaikan Aspal

Vpb =
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =

m2

0.325 m2
0.340 m2
0.350 m2
0.375 m2
0.400 m2
0.450 m2
0.500 m2
0.550 m2
0.600 m2
0.650 m2
0.700 m2
0.750 m2
0.800 m2
0.900 m2
1.000 m2
1.100 m2

PEMBUANGAN SISA TANAH /m'


300 =
0.071 m2
350 =
0.096 m2
400 =
0.126 m2
450 =
0.159 m2
500 =
0.196 m2
600 =
0.283 m2
700 =
0.385 m2
800 =
0.502 m2

0.1

15

10

15

15

0.05

T
15

10

15

15

BASIC PRICE OF WAGES, RENT EQUIPMENT AND BUILDING MATERIAL


WEST SEMARANG WATER SUPPLY PROJECT

No

Description Work

Unit

Unit Price
(Rp.)

Basic Price of Wages


1

Foreman

day

45,000.00

Chief of Skill Labour

day

47,000.00

Skill Mason/masonry

day

42,000.00

Skill Carpenter

day

42,000.00

Skill Painter

day

42,000.00

Pipe Fitter

day

42,000.00

Electric Worker

day

42,000.00

Mechanical Worker

day

50,000.00

Welder

day

75,000.00

10

Re-bar Bender

day

42,000.00

11

Labour

day

32,000.00

12

Heavy equipment operator

day

50,000.00

13

Assistance of Heavy equipment operator

day

45,000.00

14

Guardsman

day

35,000.00

15

Driver

day

25,000.00

No

II

Description Work

Unit

Unit Price
(Rp.)

Basic Price of Building Material


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Selected material for soil backfill


Sandy gravel
backfill sand
Sand for concrete/masonry
River stone15-20 cm
Concrete gravel
Crushed stone 5-7 cm
Crushed stone 3 - 4 cm
Crushed stone 1 - 2,5 cm
Stone ash
Brick
Paving Block
Portland Cement PC 50 kg
White Portland Cement 50 kg
Dolken 10-12 cm, l = 4 m
Fire wood
Formwork wood
Wood beam class (Kruing)
Wood board class (Kruing)
Wood beam Class (Kamper)
Wood board Class (Kamper)
Wood beam Class (Bangkirai)
Wood board Class (Bangkirai)
Wooden Sheet Pile t=4.5cm x 2.4m
Multiplex 9 mm
Triplex 4 mm
Plywood 3 mm
Clear galss 5 mm
Ryben glass 5 mm
Welding rod
Reinforced Bar(re-bar)
Deformed Bar(de-bar)
Concrete wire
Barbed wire
Nail
Hotmix HRS t : 4 cm
Hotmix HRS t : 5 cm
Hotmix HRS t : 6 cm
Hotmix HRS t : 7 cm
Cool asphalt
Caporite
Clean water
kerosin
Gasoline
Diesel
Pre-stress concrete pile dia. 30 cm

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
seed
seed
zak
zak
each
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
sheet
sheet
sheet
sq.m
sq.m
kg
kg
kg
kg
roll
kg
m2
m2
m2
m2
kg
kg
cu.m
cu.m
lt
lt
m'

45,000.00
120,000.00
70,000.00
140,000.00
120,000.00
210,000.00
155,000.00
175,000.00
175,000.00
130,000.00
325.00
1,800.00
49,500.00
75,500.00
26,000.00
150,000.00
650,000.00
4,800,000.00
5,500,000.00
6,000,000.00
6,800,000.00
7,000,000.00
7,800,000.00
6,000,000.00
105,000.00
50,000.00
40,000.00
63,000.00
72,000.00
48,300.00
8,750.00
10,000.00
15,000.00
75,000.00
14,000.00
62,500.00
75,000.00
90,000.00
105,000.00
7,200.00
10,350.00
8,500.00
4,200.00
4,500.00
4,500.00
414,000.00

No

Description Work

III

Unit

Unit Price
(Rp.)

Basic Price of Rent of Equipment


Pipe hidrostatic test equipment
Complete jack hammer
Concrete mixer & vibrator
Stamper
Excavator
Welding machine 250 A
Pipe fitter equiment
Compaction Roller
Asphal sprayer

day
day
day
day
hour
day
day
hour
hour

99,187.50
264,500.00
165,312.50
99,187.50
330,625.00
627,000.00
79,350.00
231,437.50
297,562.50

10

Grindstone machine

hour

19,837.50

11

HDPE Pipe Welding Machine

hour

165,312.50

12

Generator

hour

165,312.50

13

Truck Crane Capasity 2 ton

day

1,140,000.00

14

Truck Crane Capasity 5 ton

day

1,729,000.00

15

Truck Crane Capasity 10 ton

day

3,287,000.00

16

Dump truck 4 ton

day

997,500.00

17

Cargo Truck 2 ton

day

997,500.00

18

Cargo Truck 4 ton

day

1,330,000.00

19

Cargo Truck 10 ton

day

1,795,500.00

20

Pipe Cutter

day

71,500.00

21

Re-barbender

day

40,000.00

22

Pile Hammer Machine

hour

462,875.00

23

Water Pump

hour

150,000.00

1
2
3
4
5
6
7
8
9

Valve Assembly H 500 - 1000mm


1) Dimensions

Valve Type: Short Body Butterfly Valve

lf
Tw

b2
300

b B
bs
b1
Tw
lf

Tw
lf

a
L

Tw
lf'

100

ts

h1
P

h H

Q
h2
q

tb

ls
Tw
lf

a
L

Tw
lf'

Valve Assembly Horizontal 500 - 1000mm


PN10
D
L
B
H
a
b
h
b2

Valve Type: Short Body Butterfly Valve


unit: mm
b1
h2
h1
tw
lf
lf'
ls

bs

tb

ts

le1

le

Le

be

500

2600

2500

2800

2100

2000

2250

1200

800

800

1450

250

200

240

900 1100.1

300

250

1.00

4.60

7.50

3.20

600

2600

2500

2800

2100

2000

2250

1200

800

800

1450

250

200

240

900 1100.1

300

250

1.00

4.60

7.50

3.20

700

2700

2600

2900

2200

2100

2350

1250

850

850

1500

250

200

240

900 1150.2

300

250

1.00

4.70

7.70

3.25

800

2800

3100

3000

2300

2600

2450

1700

900

900

1550

250

200

240

900 1200.2

300

250

1.00

4.80

7.90

3.70

900

2900

3200

3100

2400

2700

2550

1700

1000

950

1600

250

200

240

900 1250.2

300

250

1.00

4.90

8.10

3.70

1000

2900

3300

3200

2400

2800

2650

1800

1000

1000

1650

250

200

240

1000 1300.3

300

250

1.00

4.90

8.20

3.80

butterfly valve:

Horrizontal,

Construction
D

Pipe Installation

Earth Work
Excav.
Backfill

Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work

Re-bar

cu.m

cu.m

cu.m

cu.m

cu.m

cu.m

sq.m

Ton

500

31.03

16.26

14.78

2.21

0.74

8.75

32.76

0.875

600

31.03

16.26

14.78

2.21

0.74

8.75

32.76

700

32.85

16.20

16.65

2.29

0.76

9.50

800

35.96

14.54

21.42

2.66

0.89

900

37.76

13.95

23.81

2.72

0.91

Scaff.
sq.m

Miscellaneous
T. Supp. V.Supp. Manhole
nos

Lowering &
Step

Centering

cu.m

cu.m

m'

4.2

0.32

0.545

7.00

3.13

0.875

4.2

0.32

0.545

7.00

3.13

35.36

0.9501

4.6

0.35

0.595

8.00

3.20

11.39

41.38

1.1389

6.0

0.46

0.648

8.00

3.26

12.24

44.30

1.2244

6.5

0.50

0.703

8.00

3.33

1000

39.6

14.09

25.51

2.79

0.93

12.82

46.40

1.2816

6.7

0.52

0.845

Temporary suport
Valve suport

9.00

3.33

Valve Assembly Horizontal 300 - 450mm


PN10
D
L
B
H
a
b
h

Valve Type: Short Body Butterfly Valve


unit: mm
b1
h2
h1
tw
lf
lf'
ls

b2

bs

tb

ts

le1

le

Le

be

300

2200

1900

2350

1800

1500

1900

850

650

450

1450

200

200

240

900 750.03

250

200

1.00

4.20

6.65

2.85

350

2200

2000

2425

1800

1600

1975

900

700

500

1475

200

200

240

900 800.04

250

200

1.00

4.20

6.73

2.90

400

2400

2000

2450

2000

1600

2000

900

700

500

1500

200

200

240

900 800.05

250

200

1.00

4.40

6.95

2.90

450

2400

2100

2525

2000

1700

2075

950

750

550

1525

200

200

240

900

250

200

1.00

4.40

7.03

2.95

850

butterfly valve:

Horrizontal,

Construction

Pipe Installation

Earth Work

Foundation

Concrete Work
W.Floor

Concrete
Work

cu.m

cu.m

cu.m

sq.m

Ton

8.04

1.80

0.60

4.69

21.97

15.51

8.79

1.83

0.61

4.98

25.12

15.42

9.70

1.91

0.64

26.18

15.63

10.56

1.95

0.65

Excav.

Backfill

Disposal

cu.m

cu.m

cu.m

300

23.28

15.23

350

24.30

400
450

Gravel

Lowering &

Miscellaneous

Form

Re-bar

Scaff.

T. Supp.

V.Supp.

Manhole

sq.m

cu.m

cu.m

0.47

2.70

0.21

0.25

6.00

2.86

23.25

0.50

2.88

0.22

0.29

6.00

2.86

5.36

24.76

0.54

3.20

0.25

0.29

6.00

2.99

5.67

26.13

0.57

3.40

7.00

2.99

0.26
0.33
Temporary suport
Valve suport

nos

Step

Centering

m'

Earth Work

Be

he

He

6.10

2.70

2.90

6.10

2.70

2.90

6.25

2.80

3.00

6.80

2.90

3.10

6.90

3.00

3.20

7.10

3.10

3.30

Short body
Pipe Installation

Lowering & Setting Valve

1,000
Flang Jointing

Centering

Mechnical
Jointing

pl

nos

nos

3.13

3.13

3.20

3.26

3.33

3.33

Be

he

He

5.30

2.25

2.45

5.43

2.33

2.53

5.45

2.35

2.55

5.58

2.43

2.63

Short body
Pipe Installation

Lowering & Setting Valve

1,000
Flang Jointing

Centering

Mechnical
Jointing

pl

nos

nos

2.86

2.86

2.99

2.99

le1

Be

be

le1

Earth Work

le
Le

He

he

Slope
1 * 0.5

0.05
0.15

He

he
0.2
Work Floor
Gravel Layer

Gate Valve Assembl 500 - 1000mm


1) Dimensions

Valve Type: Short Body Butterfly Valve

le1

le
Le

Work floor 0.05


Gravel Layer 0.15

0.2

He

he

Slopwe
1*0.5

Be

be

le1

Gate Valve Assembly Horizont500 - 1000mm


PN10
D
L
B
hd
H
a
b
tw

Valve Type: Short Body Butterfly Valve


unit: mm
lf
ls
tb
ts
le1
le
Le

be

Be

he

He

100

1300

1300

1500

1900

1000

1000

150

200

350

200

150

0.50

2.30

4.65

2.30

4.65

2.15

2.35

150

1300

1300

1500

1950

1000

1000

150

200

375

200

150

0.50

2.30

4.70

2.30

4.70

2.20

2.40

200

1300

1300

1500

2000

1000

1000

150

200

400

200

150

0.50

2.30

4.75

2.30

4.75

2.25

2.45

250

1300

1300

1500

2050

1000

1000

150

200

425

200

150

0.50

2.30

4.80

2.30

4.80

2.30

2.50

Gate valve:

Horrizontal,

Short body
Pipe Installation

Construction
D

Earth Work
Excav.
Backfill

Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work

cu.m

cu.m

cu.m

cu.m

cu.m

cu.m

sq.m

100

16.333

3.972

12.361

0.794

0.265

0.338

16.200

150

16.800

4.056

12.744

0.794

0.265

0.338

200

17.273

4.141

13.132

0.794

0.265

250

17.750

4.225

13.525

0.794

0.265

Re-bar
Ton

Scaff.

Miscellaneous
T. Supp. V.Supp. Manhole
nos

Lowering & Setting Valve


Step
m'

Centering

pl

sq.m

cu.m

cu.m

33.800

1.000

0.077

0.350

6.00

1.50

16.600

0.034

1.000

0.077

0.375

6.00

1.50

0.338

17.000

0.034

1.000

0.077

0.400

6.00

1.50

0.338

17.400

0.034

1.000

0.077

0.425

6.00

1.50

Flang Jointing

1,000
Flang Jointing

Mechnical
Jointing

nos

nos
1

Air Valve Assembly


1) Dimensions

200-350 & 400 - 1000mm

Air Valve Type:

Short Body Butterfly Gate Valve

le1

le
Le

Work floor 0.05


Gravel Layer 0.15

0.2

He

he

Slopwe
1*0.5

Be

be

le1

Gate Valve Assembly


PN10
D
L
B

200 - 350mm
H

tw

Gate Valve Type:


tf

tb

ts

Short Body Butterfly Gate Valve


unit: mm
le
Le
be
Be
he
He

le1

(100-450) - 80

790

990

700

350

550

120

100

150

115

0.50

1.79

2.86

1.99

3.06

0.87

1.07

(450-1000) - 100

896

1196

800

456

756

120

100

150

115

0.50

1.90

3.06

2.20

3.36

0.97

1.17

Gate valve:

Horrizontal,

Short body
Pipe Installation

Construction
Earth Work
Excav.
Backfill

Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work

cu.m

cu.m

cu.m

cu.m

cu.m

cu.m

sq.m

100

5.160

0.833

4.327

0.534

0.178

0.156

2.153

150

6.124

1.248

4.876

0.625

0.208

0.214

3.263

Re-bar
Ton

Scaff.

Lowering & Setting Valve Flang Jointing

Miscellaneous
T. Supp. Manhole
Step

sq.m

cu.m

23.463

0.193

0.015

32.148

0.345

0.026

Centering

m'

0.89

1.00

nos

pl

1,000
Flang Jointing

Mechnical
Jointing

nos

nos

Thrust Bloc Analysis


1 Thrust Force
P (tm2)
Dia (mm)
PN10

PN16

90Bend(t)
PN10

PN16

45Bend(t)
PN10

PN16

22.5Bend(t)
PN10

PN16

100

0.79

1.26

1.12

1.78

0.60

0.96

0.31

0.49

0.15

0.25

150

1.77

2.83

2.50

4.00

1.35

2.17

0.69

1.10

0.35

0.55

200

3.14

5.02

4.44

7.10

2.40

3.84

1.23

1.96

0.62

0.98

250

4.91

7.85

6.94

11.10

3.76

6.01

1.92

3.06

0.96

1.54

300

7.07

11.3

10.00

15.98

5.41

8.65

2.76

4.41

1.39

2.22

350

9.62

15.39

13.60

21.76

7.36

11.78

3.75

6.01

1.89

3.02

400

12.56

20.1

17.76

28.43

9.61

15.38

4.90

7.84

2.46

3.94

450

15.9

25.43

22.49

35.96

12.17

19.46

6.20

9.92

3.12

4.99

500

19.63

31.4

27.76

44.41

15.02

24.03

7.66

12.25

3.85

6.16

600

28.26

45.22

39.97

63.95

21.63

34.61

11.03

17.64

5.54

8.86

700

38.47

61.54

54.40

87.03

29.44

47.10

15.01

24.01

7.54 12.06

800

50.24

80.38

71.05 113.67

38.45

61.52

19.60

31.36

9.85 15.76

900

63.59 101.74

89.93 143.88

48.67

77.87

24.81

39.70

12.47 19.95

11.25Bend(t)

PN10 PN16

1000

78.5

125.6

111.01 177.62

60.08

96.13

30.63

49.01

15.39 24.62

1100

94.99 151.98

134.33 214.93

72.71 116.33

37.07

59.30

18.62 29.79

1200

113.04 180.86

159.86 255.77

86.52 138.43

44.11

70.57

22.16 35.46

1300

132.67 212.26

187.62 300.18

101.55 162.46

51.77

82.82

26.01 41.61

1400

153.86 246.18

217.59 348.15

117.76 188.43

60.04

96.06

30.16 48.26

1500

176.63

249.79 399.65

135.19 216.30

68.92 110.27

34.63 55.40

282.6

B'

PN =

10 kg/cm2

Thrust Block -Bend (1)


90 Bend

100

C
G

Dia

B'

C'

D'

Thrust Block Construction


h

Dia.

E.Work
mm

100

0.23

0.26

0.28

0.16

0.19

0.27

0.08

0.10

0.13

0.21

0.15

0.15

100 included

150

0.34

0.38

0.43

0.24

0.29

0.40

0.12

0.15

0.19

0.31

0.15

0.15

150 in

200

0.670

1.493

1.493

0.972

0.972

0.420

0.210

0.200

0.470

0.600

0.150

0.300

200

included

250

0.720

2.001

2.001

1.454

1.454

0.438

0.192

0.225

0.495

0.650

0.150

0.300

250

in

300

0.810

2.199

2.199

1.590

1.590

0.567

0.283

0.250

0.560

0.700

0.150

0.300

300

Trench

350

1.060

2.706

2.706

1.922

1.922

0.656

0.266

0.375

0.685

0.750

0.150

0.300

350

Work

400

1.130

2.865

2.865

2.032

2.032

0.700

0.280

0.400

0.730

1.000

0.200

0.400

400

450

1.230

3.373

3.373

2.465

2.465

0.718

0.262

0.425

0.805

1.050

0.200

0.400

450

500

1.310

3.301

3.301

2.337

2.337

0.805

0.315

0.450

0.860

1.100

0.200

0.400

500

600

1.480

4.155

4.155

3.078

3.078

0.926

0.356

0.500

0.980

1.250

0.300

0.450

600

700

1.660

4.941

4.941

3.734

3.734

1.031

0.391

0.550

1.110

1.400

0.300

0.500

700

800

1.890

5.377

5.377

3.788

3.788

1.136

0.710

0.600

1.290

1.600

0.300

0.600

800

900

2.120

5.813

5.813

4.244

4.244

1.141

0.460

0.650

1.470

1.800

0.300

0.700

900

1000

2.520

6.437

6.437

4.520

4.520

1.276

0.425

0.700

1.820

1.900

0.300

0.700

1000

gravel t=

0.15 m

Gravel Lyer Concrete Work


m3

Concrete

Form

0.019

0.024

0.034

0.043

0.081

0.312

0.250

1.030

3.512

0.368

1.579

5.052

0.442

2.092

6.092

0.573

3.556

8.125

1.077

5.411

11.778

1.329

7.167

14.459

1.364

7.715

14.948

2.953

12.342

21.501

R-bar

3.942

18.203

28.731

4.842

25.438

35.818

5.863

34.528

43.893

6.730

47.265

51.305

Thrust Block -Bend (1)


45 Bend

PN =

10 kg/cm2
B

H
T

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Dia

B'

C'

D'

200

0.45

0.50

0.50

0.14

0.14

250

0.50

0.66

0.66

0.33

0.33

300

0.55

0.67

0.67

0.32

350

0.60

0.83

0.83

400

0.85

0.89

450

0.95

500

Thrust Block Construction


Dia.
E.Work
mm

0.20

0.25

0.40

0.15

0.10

200

0.23

0.28

0.45

0.15

0.10

250 included

0.32

0.25

0.30

0.50

0.15

0.10

300 in

0.46

0.46

0.28

0.33

0.55

0.15

0.10

350 Trench

0.89

0.45

0.45

0.30

0.35

0.60

0.20

0.10

400 Work

0.91

0.91

0.59

0.59

0.33

0.38

0.65

0.20

0.10

450

0.95

0.94

0.94

0.63

0.63

0.40

0.45

0.75

0.20

0.10

500

600

1.05

1.16

1.16

0.62

0.62

0.45

0.50

0.90

0.30

0.15

600

700

1.05

1.33

1.33

0.58

0.58

0.50

0.55

1.00

0.30

0.15

700

800

1.15

1.60

1.60

0.76

0.76

0.55

0.60

1.10

0.30

0.15

800

900

1.30

1.72

1.72

0.89

0.89

0.65

0.65

1.20

0.30

0.15

900

1000

1.40

1.94

1.94

1.12

1.12

0.70

0.70

1.30

0.30

0.15

1000

GRAVEL
OR ROCK

gravel t=
Gravel Lyer Concrete Work
m3
Concrete

0.15 m
Form

0.019

0.095

0.512

0.050

0.174

0.891

0.053

0.202

0.990

0.083

0.302

1.419

0.153

0.515

1.608

0.224

0.688

1.950

0.239

0.811

2.355

0.391

1.179

3.204

0.365

1.271

3.820

0.524

1.800

5.192

0.694

2.412

6.264

0.941

3.167

7.956

R-bar

Thrust Block -Bend (1)


22.5 Bend

PN =

10 kg/cm2

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Dia

B'

C'

D'

400

0.50

0.46

0.46

0.34

0.34

450

0.55

0.51

0.51

0.38

0.38

500

0.85

0.47

0.47

0.32

600

0.95

0.63

0.63

700

0.95

0.74

800

1.05

900
1000

Thrust Block Construction


Dia.
E.Work
mm

0.30

0.30

0.60

0.20

0.10

400 Work

0.38

0.33

0.65

0.20

0.10

450 included

0.32

0.40

0.35

0.70

0.20

0.10

500 in

0.64

0.64

0.45

0.40

0.80

0.30

0.10

600 Trench

0.74

0.55

0.55

0.50

0.45

0.90

0.30

0.10

700 Work

0.90

0.90

0.96

0.96

0.55

0.50

1.00

0.30

0.10

800

0.95

1.01

1.01

0.78

0.78

0.60

0.55

1.10

0.30

0.10

900

1.05

1.22

1.22

0.97

0.97

0.65

0.60

1.20

0.30

0.10

1000

gravel t=
Gravel Lyer Concrete Work
m3
Concrete

0.15 m
Form

0.068

0.140

0.960

0.084

0.177

1.157

0.109

0.315

1.106

0.365

0.606

2.032

0.314

0.607

2.322

0.605

1.019

3.720

0.445

0.732

3.938

0.611

1.040

5.256

R-bar

Thrust Block -Bend (1)


11.5 Bend

PN =

10 kg/cm2

H
T

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Dia

B'

C'

D'

800

1.40

0.68

0.68

0.45

0.45

900

1.60

0.74

0.74

0.59

0.59

1000

1.70

0.80

0.80

0.63

0.63

Thrust Block Construction


Dia.
E.Work
mm

0.60

0.80

1.00

0.30

0.45

800

0.65

0.95

1.55

0.30

0.45

900

0.70

1.00

1.65

0.30

0.45

1000

gravel t=
Gravel Lyer Concrete Work
m3
Concrete

0.15 m
Form

0.378

1.014

2.260

0.566

2.453

4.123

0.643

2.889

4.719

R-bar

Thrust Bloc Analysis


1 Thrust Force
P (tm2)
Dia (mm)
PN10

PN16

90Bend(t)
PN10

PN16

45Bend(t)
PN10

PN16

22.5Bend(t)
PN10

PN16

100

0.79

1.26

1.12

1.78

0.60

0.96

0.31

0.49

0.15

0.25

150

1.77

2.83

2.50

4.00

1.35

2.17

0.69

1.10

0.35

0.55

200

3.14

5.02

4.44

7.10

2.40

3.84

1.23

1.96

0.62

0.98

250

4.91

7.85

6.94

11.10

3.76

6.01

1.92

3.06

0.96

1.54

300

7.07

11.3

10.00

15.98

5.41

8.65

2.76

4.41

1.39

2.22

350

9.62

15.39

13.60

21.76

7.36

11.78

3.75

6.01

1.89

3.02

400

12.56

20.1

17.76

28.43

9.61

15.38

4.90

7.84

2.46

3.94

450

15.9

25.43

22.49

35.96

12.17

19.46

6.20

9.92

3.12

4.99

500

19.63

31.4

27.76

44.41

15.02

24.03

7.66

12.25

3.85

6.16

600

28.26

45.22

39.97

63.95

21.63

34.61

11.03

17.64

5.54

8.86

700

38.47

61.54

54.40

87.03

29.44

47.10

15.01

24.01

7.54 12.06

800

50.24

80.38

71.05 113.67

38.45

61.52

19.60

31.36

9.85 15.76

900

63.59 101.74

89.93 143.88

48.67

77.87

24.81

39.70

12.47 19.95

11.25Bend(t)

PN10 PN16

1000

78.5

125.6

111.01 177.62

60.08

96.13

30.63

49.01

15.39 24.62

1100

94.99 151.98

134.33 214.93

72.71 116.33

37.07

59.30

18.62 29.79

1200

113.04 180.86

159.86 255.77

86.52 138.43

44.11

70.57

22.16 35.46

1300

132.67 212.26

187.62 300.18

101.55 162.46

51.77

82.82

26.01 41.61

1400

153.86 246.18

217.59 348.15

117.76 188.43

60.04

96.06

30.16 48.26

1500

176.63

249.79 399.65

135.19 216.30

68.92 110.27

34.63 55.40

282.6

B'

PN =

10 kg/cm2

Thrust Block -Bend (1)


90 Bend

100

C
G

Dia

B'

C'

D'

Thrust Block Construction


h

Dia.

E.Work
mm

Gravel Lyer
m3

100

0.23

0.26

0.28

0.16

0.19

0.27

0.08

0.10

0.13

0.21

0.15

0.15

100 included

0.019

150

0.34

0.38

0.43

0.24

0.29

0.40

0.12

0.15

0.19

0.31

0.15

0.15

150 in

0.043

200

0.59

0.83

0.57

0.39

0.38

0.35

0.14

0.20

0.39

0.45

0.15

0.15

200 Trench

0.090

250

0.65

1.16

0.57

0.69

0.41

0.41

0.16

0.23

0.43

0.50

0.15

0.15

250 Work

0.127

300

0.72

1.27

0.64

0.75

0.45

0.46

0.18

0.25

0.47

0.55

0.15

0.15

300

0.154

350

0.93

1.55

0.72

0.89

0.42

0.59

0.20

0.38

0.56

0.60

0.15

0.15

350

0.196

400

1.00

1.51

0.73

0.80

0.80

0.63

0.21

0.40

0.60

0.75

0.20

0.15

400

0.351

450

1.06

1.68

1.68

0.95

0.95

0.69

0.23

0.43

0.64

0.80

0.20

0.15

450

0.494

500

1.14

1.86

1.86

1.07

1.07

0.78

0.28

0.45

0.69

0.90

0.20

0.20

500

0.623

600

1.31

2.18

2.18

1.26

1.26

0.84

0.28

0.50

0.81

1.05

0.30

0.25

600

1.259

700

1.43

2.63

2.63

1.65

1.65

0.96

0.32

0.55

0.88

1.15

0.30

0.25

700

1.699

800

1.66

3.12

3.12

1.76

1.76

1.07

0.64

0.60

1.06

1.30

0.30

0.30

800

2.234

900

1.82

3.41

3.41

2.14

2.14

1.24

0.46

0.65

1.17

1.40

0.30

0.30

900

2.691

1000

2.05

3.80

3.80

2.35

2.35

1.35

0.50

0.70

1.35

1.50

0.30

0.30

1000

3.181

gravel t=

0.15 m

Concrete Work
Concrete

Form

0.024

0.034

0.081

0.312

0.312

1.103

0.468

1.562

0.606

1.900

1.007

2.633

1.462

3.756

2.128

5.225

2.871

6.711

4.369

9.263

R-bar

6.204

12.416

9.482

16.696

12.253

20.212

16.187

24.216

Thrust Block -Bend (1)


45 Bend

PN =

10 kg/cm2
B

H
d

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Dia

B'

C'

D'

200

0.50

0.72

0.72

0.24

0.24

250

0.55

0.88

0.88

0.53

0.53

300

0.60

0.94

0.94

0.52

350

0.65

1.11

1.11

400

0.85

1.24

450

0.95

500

Thrust Block Construction


Dia.
E.Work Gravel Lyer
mm
m3

0.20

0.30

0.55

0.15

0.10

200

0.036

0.23

0.33

0.65

0.15

0.10

250 included

0.087

0.52

0.25

0.35

0.70

0.15

0.10

300 in

0.094

0.66

0.66

0.28

0.38

0.75

0.15

0.10

350 Trench

0.129

1.24

0.70

0.70

0.30

0.45

0.90

0.20

0.10

400 Work

0.238

1.27

1.27

0.84

0.84

0.43

0.53

1.05

0.20

0.10

450

0.319

0.95

1.28

1.28

0.93

0.93

0.45

0.55

1.10

0.20

0.10

500

0.353

600

1.05

1.59

1.59

0.87

0.87

0.50

0.70

1.20

0.30

0.15

600

0.548

700

1.30

1.86

1.86

0.86

0.86

0.55

0.75

1.30

0.30

0.15

700

0.671

800

1.40

2.23

2.23

1.09

1.09

0.60

0.80

1.40

0.30

0.15

800

0.916

900

1.60

2.39

2.39

1.32

1.32

0.62

0.95

1.55

0.30

0.15

900

1.267

1000

1.70

2.71

2.71

1.65

1.65

0.70

1.00

1.65

0.30

0.15

1000

1.683

Concrete Work
Concrete

Form

0.234

1.056

0.435

1.833

0.510

2.044

0.693

2.655

1.240

3.492

1.769

4.431

1.876

4.862

2.404

5.904

3.551

7.072

4.839

9.296

6.842

11.501

8.807

14.388

R-bar

Thrust Block -Bend (1)

PN =

10 kg/cm2

22.5 Bend
B

H
T

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Thrust Block Construction


Dia

B'

C'

D'

Dia.

E.Work
mm

Gravel Lyer
m3

400

0.60

0.59

0.59

0.44

0.44

0.30

0.45

0.90

0.20

0.40

400 Work

0.106

450

0.65

0.60

0.60

0.42

0.42

0.43

0.43

1.05

0.20

0.40

450 included

0.109

500

0.85

0.61

0.61

0.41

0.41

0.45

0.55

1.10

0.20

0.40

500 in

0.139

600

0.95

0.79

0.79

0.55

0.55

0.50

0.70

1.20

0.30

0.40

600 Trench

0.314

700

0.95

0.95

0.95

0.69

0.69

0.55

0.75

1.30

0.30

0.40

700 Work

0.393

800

1.05

1.11

1.11

0.83

0.83

0.60

0.80

1.40

0.30

0.40

800

0.523

900

1.30

1.19

1.19

0.87

0.87

0.65

0.95

1.55

0.30

0.45

900

0.679

1000

1.40

1.35

1.35

1.01

1.01

0.70

1.00

1.65

0.30

0.45

1000

0.848

gravel t=

0.15 m

Concrete Work
Concrete

Form

0.427

1.854

0.534

2.142

0.754

2.244

1.149

3.216

1.395

4.264

1.877

5.432

2.841

6.386

3.599

7.788

R-bar

Thrust Block -Bend (1)

PN =

10 kg/cm2

11.5 Bend
B

H
T

COMPACTED GRAVEL
OR ROCK

C
CONCRETE

Thrust Block Construction


Dia

B'

C'

D'

Dia.

E.Work

Gravel Lyer

mm

m3

800

1.40

0.68

0.68

0.54

0.54

0.60

0.80

1.40

0.30

0.40

800

0.454

900

1.60

0.74

0.74

0.59

0.59

0.65

0.95

1.55

0.30

0.45

900

0.566

1000

1.70

0.80

0.80

0.63

0.63

0.70

1.00

1.65

0.30

0.45

1000

0.643

gravel t=

0.15 m

Concrete Work
Concrete

Form

1.778

3.416

2.453

4.123

2.889

4.719

R-bar

SUMMARY OF VALVE ASSEMBLY (Installation)


Works
1.

Main Valve Assembly

2.

Blow-off Assembly

3.

Air Valve Assembly


Works

1.

Main Valve Assembly

2.

Blow-off Assembly

3.

Air Valve Assembly

50

75

100

150

200

250

300

350

191,300

196,400

303,200

530,000

734,800

1,068,900

24,258,000

25,716,000

400

450

500

600

700

800

900

1000

27,912,000

29,527,000

36,226,000

38,180,000

40,989,000

44,786,000

55,494,000

60,328,000

VALVE ASSEMBLY
1)
W/Surface Box
Dia.
Materials
(mm) Valve
no.

1F Short Pipe

Surface Box/Manhole

Socket

Total

no.

Rp

nos.

Rp

nos.

Rp

50
1
2,000,000
1
75
1
2,550,000
1
100
1
3,400,000
1
150
1
5,780,000
1
200
1
8,760,000
1
250
1
13,400,000
1
Dia.
Construction
(mm) Excavation
Backfill

1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000

2
2
2
2
2
2

45,000
88,000
122,000
398,000
563,000
773,000

2
2
2
2
2
2

50,000
101,000
141,000
346,000
704,000
985,000

Rp

m3

Rp/m3

m3

15,300

50
0.1
75
0.1
100
0.1
150
0.2
200
0.3
250
0.5
Dia.
Installation
(mm) Valve
no

50
75
100
150
200
250

1
1
1
1
1
1
note:

1,500
1,500
1,500
3,100
4,600
7,700

Disposal
Rp/m3
76,400

Rp/m3

m3

50,300

Rp/m

nos.

Concrete (Lean Concrete)


Rp/m3

13,900
1
2,400
4
5,500
18,900
1
2,500
4
5,500
24,000
1
2,800
4
9,100
37,200
1
3,800
4
11,000
50,600
1
6,200
4
11,000
69,700
1
6,200
4
11,000
earth work for valve assembly includes only additional excavation, and
backfill and disposal are included in trench work

Rp.
38,300
43,400
63,200
85,000
100,800
119,900

Form
Rp/m3

m2

552,400

0.1
0.1
0.16
0.33
0.51
0.83
Sub-total

Rp

m3

69,300

Jointing (RR J.)

Lowering & centering


Rp

m3

Gravel Layer

3,190,000
3,928,000
4,926,000
8,268,000
12,294,000
17,916,000

55,200
55,200
88,400
182,300
281,700
458,500
Total
Rp.
191,300
196,400
303,200
530,000
734,800
1,068,900

Re-bar
Rp/m2

kg

99,400

0.9
0.9
1.4
2.4
3.2
4.4

89,500
89,500
139,200
238,600
318,100
437,400

VALVE ASSEMBLY
2)
W/Valve Chamber
Dia.
Materials
(mm) Valve

FL & Spigot/Bell

Manhole Cover

Collar

Total

no.

Rp

no.

Rp

set

Rp

nos.

Rp

1
1
1
1

17,100,000
23,500,000
33,100,000
41,800,000

1
1
1
1

1,500,000
1,500,000
1,500,000
1,500,000

1
1
1
1

4,850,000
5,910,000
7,230,000
8,590,000

2
2
2
2

2,500,000
3,120,000
3,740,000
4,440,000

28,500,000
37,200,000
49,300,000
60,800,000

500
1
153,000,000
1
600
1
162,000,000
1
700
1
187,000,000
1
800
1
204,000,000
1
900
1
238,000,000
1
1000
1
264,000,000
1
Dia.
Construction
(mm) Excavation
Backfill

1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000

1
1
1
1
1
1

10,700,000
14,600,000
19,800,000
23,900,000
31,000,000
38,200,000

2
2
2
2
2
2

4,770,000
6,130,000
8,700,000
10,600,000
13,700,000
17,100,000

174,700,000
190,400,000
225,700,000
250,600,000
297,900,000
337,900,000

300
350
400
450

m3

Rp/m3

m3

15,300

Disposal
Rp/m3

m3

76,400

Gravel Layer
Rp/m3

m3

50,300

Lean Concrete
Rp/m3

m3

69,300

Concrete
Rp/m3

m3

552,400

Form
Rp/m3

m2

628,000

300
350
400
450

72
77
81
86

1,102,000
1,178,000
1,239,000
1,316,000

58
62
65
69

4,431,000
4,737,000
4,966,000
5,272,000

14
15
16
17

704,000
755,000
805,000
855,000

2.7
2.8
2.9
3.0

187,000
194,000
201,000
208,000

0.9
0.9
1.0
1.0

497,000
497,000
552,000
552,000

5.7
6.0
6.4
6.8

3,580,000
3,768,000
4,019,000
4,270,000

36.6
38.8
43.0
43.7

500
600
700
800
900
1000

114
125
135
151
176
193

1,744,000
1,913,000
2,066,000
2,310,000
2,693,000
2,953,000

96
105
113
127
146
160

7,334,000
8,022,000
8,633,000
9,703,000
11,154,000
12,224,000

18
20
22
24
30
33

905,000
1,006,000
1,107,000
1,207,000
1,509,000
1,660,000

2.7
2.9
3.0
3.1
3.4
3.5

187,000
201,000
208,000
215,000
236,000
243,000

0.9
1.0
1.0
1.0
1.1
1.2

497,000
552,000
552,000
552,000
608,000
663,000

7.6
8.4
8.9
9.7
13.0
14.0

4,773,000
5,275,000
5,589,000
6,092,000
8,164,000
8,792,000

48.7
53.7
59.8
63.1
71.5
77.7

Dia.
(mm)

Installation
Valve

Mech J.

Lowering & centering

Sub-total

Total
Rp.

Rp.

16,600
16,600
18,400
20,300

158,000
216,000
712,000
827,000

24,258,000
25,716,000
27,912,000
29,527,000

22,100
25,800
29,500
38,700
44,200
51,600

926,000
1,080,000
1,189,000
1,286,000
1,394,000
1,728,000

36,226,000
38,180,000
40,989,000
44,786,000
55,494,000
60,328,000

no

Rp

Rp/m

nos.

Rp

300
350
400
450

1
1
1
1

104,600
148,500
626,600
725,600

2.8
2.8
2.9
2.9

18,900
24,000
29,400
35,100

7
7
7
7

500
600
700
800
900
1000

1
1
1
1
1
1

753,800
886,900
973,400
1,049,000
1,124,000
1,200,000

2.8
2.9
3.0
3.0
3.2
3.2

61,600
66,700
71,800
78,900
84,400
165,000

7
7
7
7
7
7

Miscellaneou Sub-total
Rp/kg

5%

13,600

7,000
7,000
11,000
21,000
30,000
45,000

153,000
153,000
240,000
445,000
634,000
949,000

Re-bar
Rp/m2

Miscellaneous Sub-total
kg

99,400

Rp/kg

10%

13,600

3,638,000
3,857,000
4,274,000
4,344,000

570
600
640
680

7,752,000
8,160,000
8,704,000
9,248,000

2,189,000
2,315,000
2,476,000
2,607,000

24,100,000
25,500,000
27,200,000
28,700,000

4,841,000
5,338,000
5,944,000
6,272,000
7,107,000
7,723,000

870
840
890
970
1300
1400

11,832,000
11,424,000
12,104,000
13,192,000
17,680,000
19,040,000

3,211,000
3,373,000
3,620,000
3,954,000
4,915,000
5,330,000

35,300,000
37,100,000
39,800,000
43,500,000
54,100,000
58,600,000

Valve Assembly
1) Dimensions

100 - 250 with Surface Balve Box

Type of Valve:

Gate Valve

2) Stability Analysis
Dia.
Pressure
mm
ton

Thrust Block
B

q1

Earth Pressure
q2

Friction
F

Reaction
R

S. Factor

100

0.8

0.55

0.50

0.55

2.40

5.04

1.02

0.20

1.2

1.53

150

1.8

0.90

0.60

0.60

2.40

6.72

2.46

0.40

2.9

1.59

200

3.1

1.10

0.75

0.60

2.40

7.68

4.16

0.60

4.8

1.54

250

4.9

1.30

0.90

0.70

2.40

8.64

6.46

0.90

7.4

1.50

Unit Cost
Dia (mm) Materials
G.V.
Surface B. 1F Pipe Sleeve J.
100
1
1
2
2
150
1
1
2
2
200
1
1
2
2
250
1
1
2
2

Cooping Concrete
d= 250 mm
h= 150 mm

0.6

0.5

RCP dia.100mm
q1
D

100
150
200
250

1.05
1.40
1.60
1.80

0.25
0.55
0.70
0.85

0.50
0.60
0.75
0.90

0.55
0.60
0.60
0.70

P.Fitter G.Worker

Sleeve J.
Foreman

0.8
0.85
0.9
0.95

V (m3) Thrust Concrete


Cap Concrete
extra concrete
form concrete
0.1
0.15
1.2
0.01
0.2
0.32
2.2
0.01
0.3
0.50
3.0
0.01
0.5
0.82
4.2
0.01

P
H

0.1

q2

Cap. Con. Installation

Total

0.05
Dia (mm) Excavation

Construction
Excavation Thrust

Total

Dia (mm) Installation


Gate Valve
Foreman
100
150
200
250

P.Fitter G.Worker

form
0.2
0.2
0.2
0.2

Grand
Total

Construction
Earth Work
Foundation
Concrete Work
D Excav. Backfill Disposal Gravel
W.Floor Concrete WForm

Re-bar

Miscellaneous
T. Supp. V.Supp. Manhole Step

Scaff.

Pipe Installation
Lowering & Valve
Centering
Setting
m

m3

m3

m3

m3

m3

m3

m2

ton

m2

m3

m3

nos

nos

300

71.8

58

13.8

2.71

0.9

5.7

36.59

0.57

31.1

7.9

0.23

2.8

350

76.6

61.70

14.9

2.77

0.92

6.00

38.80

0.60

32.6

8.7

0.28

2.77

80.5

64.5

16.0

2.90

0.97

6.43

42.96

0.64

33.9

9.6

0.29

2.93

85.7

68.7

17.0

2.97

0.99

6.77

43.73

0.68

35.4

10.5

0.35

2.9

400
450

Flang
Jointing
pl
nos

Mechnical
Jointing
nos

le1

le

Le

be

Be

he

He

300

1.00

4.20

6.65

3.90

6.35

2.25

2.45

350

1.00

4.20

6.73

4.00

6.53

2.33

2.53

400

1.00

4.40

6.95

4.00

6.55

2.35

2.55

450

1.00

4.40

7.03

4.10

6.73

2.43

2.63

Valve Assembly
1) Dimensions

300 - 450mm

Valve Type: Gate Valve

lf
C2

tw

ls
ls1

ls2
b2

C1

D
b B

bs

b1

tw
lf
tw l1 l2
l

l3

l4
L

l5

tw
l

100

ts

h1
P

h H

h2
hs

tb
h'
ls
lf

tw

L'

tw lf

B
le1

le

Be

be

le1

Earth Work

Le

0.2
Work Floor
Gravel Layer

0.05
0.15

He

he

Slope
1 * 0.5

Valve Assembly
1) Dimensions

500 - 1000mm

Valve Type: Short Body Butterfly Valve

lf
C2

tw

ls
ls1

ls2
b2

C1

D
b B

bs

b1

tw
lf
tw l1 l2
l

l3

l4
L

l5

tw
l

100

ts

h1
P

h H

h2
hs

tb
h'
ls
lf

tw

L'

tw lf

PN10
D ts

tb

tw

b1

b2

l1

500

200

350

200

750

950

1700

2100

600

200

350

200

800

1000

1800

2200

700

200

350

200

850

1050

1900

2300

800

200

350

200

900

1100

2000

2400

900
1000

200
200

400
400

250
250

950
1000

1150
1200

2100
2200

2600
2700

l2

l3

230

170

200

170

240

180

230

250

210

190

200

250

230

200

230

250

210

210

220

250

220

220

240

250

l4

l5

L'

520
230

750
750

300

750
750

350

800
800

1650

bs

hs

2050

300

500

1850

750

3150

270

430

700

1100

400

1800

2200

300

500

1900

800

3250

380

470

850

1200

400

1850

2250

300

500

1950

850

3350

350

500

850

1300

400

1900

2300

300

500

2000

1000

3550

380

520

900

1400

500

400

2000

2500

300

500

2050

1100

3750

370

530

900

1500

550

2600

300

500

2100

1200

3900

390

610

1000

1600

600

1850
400

2100

butterfly valve:
Material List
DIP Straight Pipe Fittings
D Length Number 1F Bell

m
no.
500
500
500
500
1.9
0.5
1
600
600
600
600
1.93
0.5
1
700
700
700
700
2.0
0.5
1
800
800
800
800
2.0
0.5
1
900
900
900
900
2.12
1
1
1000 1000 1000

ls

1750

600
410

h2

1700
350

600
330

h1

1650

600
320

1550
300

600
300

lf

1450

560
270

unit: mm
ls1
ls2

Weight of Fittings
2 3 Collar
I
1F Spigot Collar
1F Spigot 1F Soket

kg
kg
kg
500
500
500
109
87.0
96.0
1
3
1
107
103
157
600
600
600
140
115
135
1
3
1
146
151
204
700
700
700
185
162
185
1
3
1
184
196
256
800
800
800
225
205
233
1
3
1
223
241
315
900
900
900
278
252
280
1
3
1
270
290
393
1000 1000 1000
348
317
339

Vertical, Short body

1000

2.14

348

353

464

hs
400
400
400
500
550
600

Construction
Earth Work
Foundation
Concrete Work
D Excav. Backfill Disposal Gravel
W.Floor Concrete WForm

Re-bar

Miscellaneous
T. Supp. V.Supp. Manhole Step

Scaff.

Pipe Installation
Lowering & Valve
Centering
Setting
m

pl

m3

m3

m3

m3

m3

m3

m2

ton

m2

m3

m3

nos

nos

500

114.2

96.4

17.8

2.74

0.91

7.56

48.72

0.76

41.2

11.2

0.37

2.82

600

125.0

104.70

20.3

2.90

0.97

8.35

53.72

0.84

44.2

13.1

0.50

2.93

700

134.5

112.6

21.9

3.00

1.00

8.91

59.75

0.89

46.5

14.5

0.52

2.95

800

151.3

127.1

24.3

3.11

1.04

9.65

63.13

0.97

50.3

16.6

0.73

10

2.98

900

175.7

146.1

29.6

3.38

1.13

12.98

71.54

1.30

56.1

20.5

0.84

10

3.17

1000

192.9

160.09

32.81

3.53

1.18

14.02

77.70

1.40

59.9

23.2

1.10

11

3.19

Flang
Jointing
nos

Mechnical
Jointing
nos
2

B
le1

le

Be

be

le1

Earth Work

Le

0.2
Work Floor
Gravel Layer

le1

le

Le

0.05
0.15

be

Be

he

He

500

1.00

4.05

7.30

4.10

7.35

3.05

3.25

600

1.00

4.20

7.55

4.20

7.55

3.15

3.35

He

he

Slope
1 * 0.5

700

1.00

4.25

7.70

4.30

7.75

3.25

3.45

800

1.00

4.30

7.95

4.40

8.05

3.45

3.65

900

1.00

4.50

8.35

4.60

8.45

3.65

3.85

1000

1.00

4.60

8.60

4.70

8.70

3.80

4.00

Valve Assembly -Blow Off

Gate Valve Assembly Type Blow - OFF


Type L
B
H
a
b

tw

tf

tb

ts

1.30

1.30

1.75

1.00

1.00

0.15

0.10

0.20

1.00

1.00

1.00

4.00

1.00

0.75

le1

Le

Be

He

0.08 ##

1.90

1.90

1.75

0.20

1.60

1.40

1.00

0.20 ##

1.40

0.75

Construction Type Blow - OFF


Type

Earth Work
Excav.
Backfill

Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work

cu.m

cu.m

cu.m

cu.m

cu.m

9.318

2.958

6.360

0.085

0.169

cu.m

1.838 ###

sq.m

Re-bar
Ton

183.82

Sc
aff
. sq.m

1.690

Lowering & Setting Valve Flang Jointing


Centering

Jointing

m
12.00

Mechnical

pl
1

nos
4

nos
1

4.990

1.000

3.990

0.050

6.830

3.000

3.830

0.200 ###

0.100 ###
2.717

2.000

12.00

3.000

12.00

Valve Assembly -Air Valve


Dia.
Air valve Construction
(mm)
mm Gravel Layer
m3

Lean Concrete
Rp/m3

m3

69,300

50
75
100
150
200
250
Dia.
(mm)

13
0.18
13
0.18
20
0.18
20
0.18
25
0.18
25
0.18
Air valve Installation
mm Valve
no

50
75
100
150
200
250

13
13
20
20
25
25

1
1
1
1
1
1
note:

12,500
12,500
12,500
12,500
12,500
12,500

Concrete (Lean Concrete)


Rp/m3

0.06
0.06
0.06
0.06
0.06
0.06

33,100
33,100
33,100
33,100
33,100
33,100

Re-bar

Rp/m3

552,400

m2

62,800

0.46
0.46
0.46
0.46
0.46
0.46

28,900
28,900
28,900
28,900
28,900
28,900

Rp/m

nos.

Rp/m2

Miscellan

kg

Rp/kg

99,400

4.16
4.16
4.16
4.16
4.16
4.16

Jointing (RR J.)

Lowering & centering


Rp

m3

Form

Rp

12,600
1
2,400
4
5,500
12,600
1
2,500
4
5,500
12,600
1
2,800
4
9,100
12,600
1
3,800
4
11,000
12,600
1
6,200
4
11,000
12,600
1
6,200
4
11,000
earth work for valve assembly (air valve) includes in trench work

413,500
413,500
413,500
413,500
413,500
413,500
Sub-total
Rp.
37,000
37,100
51,800
60,400
62,800
62,800

5%

13,600

625,600
625,600
625,600
625,600
625,600
625,600

46
46

46
46
46
46
Total

Rp.
1,206,000
1,206,100
1,220,800
1,229,400
1,231,800
1,231,800

55,700
55,700
55,700
55,700
55,700
55,700

Valve Assembly -Air Valve


Dia.
Air valve Construction
(mm)
mm Gravel Layer
m3

Lean Concrete
Rp/m3

Concrete

m3

69,300

Rp/m3

Form

m3

552,400

Re-bar

Rp/m3

m2

628,000

Rp/m2

Miscellan

kg

Rp/kg

99,400

10%

13,600

300
350
400
450

75
75
100
100

0.3
0.3
0.3
0.3

21,000
21,000
21,000
21,000

0.9
0.9
0.9
0.9

497,000
497,000
497,000
497,000

0.89
0.89
0.89
0.89

559,000
559,000
559,000
559,000

4.68
4.68
4.68
4.68

465,000
465,000
465,000
465,000

89
89
89
89

1,210,000
1,210,000
1,210,000
1,210,000

275,000
275,000
275,000
275,000

500
600
700
800
900
1000

100
100
100
100
100
150

0.3
0.3
0.3
0.3
0.3
0.3

21,000
21,000
21,000
21,000
21,000
21,000

0.9
0.9
0.9
0.9
0.9
0.9

497,000
497,000
497,000
497,000
497,000
497,000

0.89
0.89
0.89
0.89
0.89
0.89

559,000
559,000
559,000
559,000
559,000
559,000

4.68
4.68
4.68
4.68
4.68
4.68

465,000
465,000
465,000
465,000
465,000
465,000

89
89
89
89
89
89

1,210,000
1,210,000
1,210,000
1,210,000
1,210,000
1,210,000

275,000
275,000
275,000
275,000
275,000
275,000

Dia.
(mm)

Air valve Installation


mm Valve

Mech J.

Lowering & centering

no

Rp

Rp/m

nos.

Rp

Sub-total
Rp.

Total
Rp.

300
350
400
450

75
75
100
100

1
1
1
1

38,600
38,600
52,300
52,300

2.8
2.8
2.9
2.9

18,900
24,000
29,400
35,100

7
7
7
7

16,600
16,600
18,400
20,300

92,000
106,000
138,000
154,000

3,119,000
3,133,000
3,165,000
3,181,000

500
600
700
800
900
1000

100
100
100
100
100
150

1
1
1
1
1
1

52,300
52,300
52,300
52,300
52,300
75,700

2.8
2.9
3.0
3.0
3.2
3.2

61,600
66,700
71,800
78,900
84,400
165,000

7
7
7
7
7
7

22,100
25,800
29,500
38,700
44,200
51,600

225,000
246,000
268,000
289,000
322,000
604,000

3,252,000
3,273,000
3,295,000
3,316,000
3,349,000
3,631,000

note:

earth work for valve assembly (air valve) includes in trench work

Sub-total

1,169,000
1,169,000
1,169,000
1,169,000
1,169,000
1,169,000

Sub-total

3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000

Lined Drain Ditch Crossing


TRENCH
WIDTH

EXIST.
LINE
DRAIN

ROAD WAY SURFACE

MIN
1000

TYP

MIN
300

PLAIN CONCRETE

POUR AGAINST
UNDISTURBED SOIL

LINED DRAIN DITCH CROSSING


Lined Drain =
Dia

14

1.00
B

B
-

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

3.00

1.00

1.00

0.30

400 in

0.450

2.62

600

1.20

3.00

1.20

1.00

0.30

600

0.540

3.47

1000

1.60

3.00

1.60

1.00

0.30

1000

0.720

5.33

Lined Drain =
Dia

2.00
B

T-Min

Thrust Block Construction


gravel t=
Dia.
E.Work Gravel Lyer Concrete Work
mm

m3

Concrete

400

1.00

4.00

1.00

1.50

0.30

400 in

0.600

3.50

600

1.20

4.00

1.20

1.50

0.30

600

0.720

4.63

1000

1.60

4.00

1.60

1.50

0.30

1000

0.960

7.10

14 @

Lined Drain Ditch Crossing


TRENCH
WIDTH

EXIST.
LINE
DRAIN

ROAD WAY SURFACE

MIN
1000

TYP

MIN
300

PLAIN CONCRETE

POUR AGAINST
UNDISTURBED SOIL

LINED DRAIN DITCH CROSSING

Lined Drain =
Dia

14

3.00
B

B
-

Thrust Block Construction


H

T-Min

Dia.

E.Work

gravel t=

Gravel Lyer Concrete Work

mm

m3

Concrete

400

1.00

5.00

1.00

2.00

0.30

400 in

0.750

4.37

600

1.20

5.00

1.20

2.00

0.30

600

0.900

5.79

1000

1.60

5.00

1.60

2.00

0.30

1000

1.200

8.88

Lined Drain =
Dia

4.00
B

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

6.00

1.00

2.50

0.30

400 in

0.900

5.25

600

1.20

6.00

1.20

2.50

0.30

600

1.080

6.94

1000

1.60

6.00

1.60

2.50

0.30

1000

1.440

10.65

TRENCH
WIDTH

T
D SOIL

300 D 300

14 @ 500

0.15 m
Form
m2

Box Culvert
m'

R-bar
Kg

2.000

0.800

41.445

2.400

1.056

48.940

3.200

1.664

63.932

0.15 m
Form
Box Culvert
m'
m2

R-bar
Kg

2.000

1.900

54.840

2.400

2.100

64.754

3.200

2.500

84.582

TRENCH
WIDTH

300 D 300

14 @ 500

GAINST
URBED SOIL

0.15 m
Form
m2

Box Culvert
m'

R-bar
Kg

2.000

2.200

68.236

2.400

2.400

80.568

3.200

2.800

105.231

0.15 m
Form
m2

Box Culvert
m'

R-bar
Kg

2.000

2.500

81.632

2.400

2.700

96.381

3.200

3.100

125.881

Unlined Drain Ditch Crossing


A
300

300

D 14 @ 200

GROUND SURFACE

300

MIN
1000

CONCRETE ENCASEMENT

C
-

METHOD

1.00
B

MIN
300

MIN
300

* 1)

D 14 @
POUR AGAINTS
UNDISTURBED SOIL

FULL CONCRETE
ENCASEMENT

UNLINED DRAIN DITCH CROSSING

Dia

LOOP 19 @ 30

TYP

Unlined Drain =

BA
h

EXIST.
DRAIN

: MATERIAL PLACED IN EACH LAYER NOT


EXCEEEDING 200 mm IN THICKNESS
AND COMPACTED BY APPROVED MECHANICAL ME

Thrust Block Construction


H

T-Min

Dia.

E.Work

gravel t=

Gravel Lyer Concrete Work

mm

m3

Concrete

400

1.00

3.00

1.00

1.00

0.30

400 in

0.450

2.62

600

1.20

3.00

1.20

1.00

0.30

600

0.540

3.47

1000

1.60

3.00

1.60

1.00

0.30

1000

0.720

5.33

Lined Drain =
Dia

2.00
B

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

4.00

1.00

1.00

0.30

400 in

0.600

3.50

600

1.20

4.00

1.20

1.00

0.30

600

0.720

4.63

1000

1.60

4.00

1.60

1.00

0.30

1000

0.960

7.10

Lined Drain Ditch Crossing


A
300

300

D 14 @ 200

GROUND SURFACE

300

MIN
1000

CONCRETE ENCASEMENT

C
-

METHOD

3.00
B

D
MIN
300

MIN
300

* 1)

D1
POUR AGAINTS
UNDISTURBED SOIL

FULL CONCRETE
ENCASEMENT

UNLINED DRAIN DITCH CROSSING

Dia

LOOP 19 @

TYP

Lined Drain =

B
h

EXIST.
DRAIN

: MATERIAL PLACED IN EACH LAYER NOT


EXCEEEDING 200 mm IN THICKNESS
AND COMPACTED BY APPROVED MECHANICAL M

Thrust Block Construction


H

T-Min

Dia.

E.Work

gravel t=

Gravel Lyer Concrete Work

mm

m3

Concrete

400

1.00

5.00

1.00

1.00

0.30

400 in

0.750

4.37

600

1.20

5.00

1.20

1.00

0.30

600

0.900

5.79

1000

1.60

5.00

1.60

1.00

0.30

1000

1.200

8.88

Lined Drain =
Dia

4.00
B

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

6.00

1.00

1.00

0.30

400 in

0.900

5.25

600

1.20

6.00

1.20

1.00

0.30

600

1.080

6.94

1000

1.60

6.00

1.60

1.00

0.30

1000

1.440

10.65

D 14 @ 200

BACKFILL

LOOP 19 @ 300

D 14 @ 3000

AGAINTS
TURBED SOIL

NCASEMENT

AYER NOT
NESS
ED MECHANICAL METHODS.

0.15 m
Form

R-bar

m2

Kg

2.000

96.285

2.400

114.662

3.200

151.415

0.15 m
Form

R-bar

m2

Kg

2.000

127.961

2.400

152.382

3.200

201.226

00

D 14 @ 200

BACKFILL

LOOP 19 @ 300

D 14 @ 3000

R AGAINTS
ISTURBED SOIL

ENCASEMENT

LAYER NOT
CKNESS
VED MECHANICAL METHODS.

0.15 m
Form

R-bar

m2

Kg

2.000

159.636

2.400

190.103

3.200

251.037

0.15 m
Form

R-bar

m2

Kg

2.000

191.312

2.400

227.824

3.200

300.848

BOX CULVERT Crossing

TRENCH
WIDTH

L
ROAD WAY EXIST.
SURFACE

ROAD WAY SURFACE

LINE
DRAIN
Min
1.0m
Typ

MIN
1000

EXIST
CULVERT

TYP

MIN
300
300
Min

PLAIN CONCRETE
PLAIN CONCRETE

POUR AGAINST
UNDISTURBED SOIL

BOX CULVERT CROSSING


D
LINED
DRAIN DITCH CROSSING
Lined Drain =
Dia

14

1.00
B

B
-

Thrust Block Construction


H

T-Min

Dia.

E.Work

gravel t=

Gravel Lyer Concrete Work

mm

m3

Concrete

400

1.00

3.00

1.00

1.00

0.30

400 included

0.450

2.62

600

1.20

3.00

1.20

1.00

0.30

600

0.540

3.47

1000

1.60

3.00

1.60

1.00

0.30

1000

0.720

5.33

Lined Drain =
Dia

2.00
B

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

4.00

1.00

1.50

0.30

400 in

0.600

3.50

600

1.20

4.00

1.20

1.50

0.30

600

0.720

4.63

1000

1.60

4.00

1.60

1.50

0.30

1000

0.960

7.10

14 @

BOX CULVERT Crossing

TRENCH
WIDTH

L
ROAD WAY EXIST.
SURFACE

ROAD WAY SURFACE

LINE
DRAIN
Min
1.0m
Typ

MIN
1000

EXIST
CULVERT

TYP

MIN
300
300
Min

PLAIN CONCRETE
PLAIN CONCRETE

POUR AGAINST
UNDISTURBED SOIL

BOX CULVERT CROSSING


D
LINED
DRAIN DITCH CROSSING
Lined Drain =
Dia

14

3.00
B

B
-

Thrust Block Construction


H

T-Min

Dia.

E.Work

gravel t=

Gravel Lyer Concrete Work

mm

m3

Concrete

400

1.00

5.00

1.00

2.00

0.30

400 in

0.750

4.37

600

1.20

5.00

1.20

2.00

0.30

600

0.900

5.79

1000

1.60

5.00

1.60

2.00

0.30

1000

1.200

8.88

Lined Drain =
Dia

4.00
B

Thrust Block Construction


H

T-Min

Dia.

E.Work
mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

6.00

1.00

2.50

0.30

400 in

0.900

5.25

600

1.20

6.00

1.20

2.50

0.30

600

1.080

6.94

1000

1.60

6.00

1.60

2.50

0.30

1000

1.440

10.65

14 @

TRENCH
WIDTH

T
D SOIL

300 D 300

14 @ 500

0.15 m
Form
m2

Miscellaneous
Box Culvert
Pavement
m'

R-bar
Kg

2.000

4.800

1.600

41.44

2.400

5.400

1.800

48.94

3.200

6.600

2.200

63.93

0.15
Form
m2

m
Miscellaneous
Box Culvert
Pavement
m'

R-bar
Kg

2.000

7.600

1.900

54.84

2.400

8.400

2.100

64.75

3.200

10.000

2.500

84.58

TRENCH
WIDTH

ST
ED SOIL

300 D 300

14 @ 500

0.15
Form
m2

m
Miscellaneous
Box Culvert
Pavement
m'

R-bar
Kg

2.000

11.000

2.200

68.24

2.400

12.000

2.400

80.57

3.200

14.000

2.800

105.23

0.15
Form
m2

m
Miscellaneous
Box Culvert
Pavement
m'

R-bar
Kg

2.000

15.000

2.500

81.63

2.400

16.200

2.700

96.38

3.200

18.600

3.100

125.88

BOX CULVERT (Future) Crossing

EXIST.
LINE
DRAIN

BOX
CULVERT
( FUTURE )

ROAD WAY SURFACE

MIN
1000

300
min

MIN
300

PLAIN CONCRETE

L=10M

POUR AGAINST
UNDISTURBED SO

E
LINED DRAIN DITCH CROSSING

BOX CULVERT (FUTURE) CROSSING

Lined Drain =
Dia

10.00
B

14

PLAIN CONCRETE

TYP

B
-

Thrust Block Construction


H

T-Min

Dia.

E.Work

mm

gravel t=

Gravel Lyer Concrete Work


m3

Concrete

400

1.00

10.00

1.00

1.00

0.30

400 in

1.500

8.74

600

1.20

10.00

1.20

1.00

0.30

600

1.800

11.57

1000

1.60

10.00

1.60

1.00

0.30

1000

2.400

17.75

TRENCH
WIDTH

300 D 300

14

POUR AGAINST
UNDISTURBED SOIL

14 @ 500

0.15 m
Form
m2

Miscellaneous
Box Culvert
Pavement
m'

R-bar
Kg

2.000

16.000

1.600

135.21

2.400

18.000

1.800

159.64

3.200

22.000

2.200

208.48

Unit Price Analysis Transport Pipe : PVC

No.

Dia

Length Weight

(mm) (inch)

Up-to

(m/bar) (Kg/bar) (mnt)

Time Work
Labour
Equipments.
*Efective
Crane
Down
Worker
Time
Amount
Worker
Fee
wards.
fee
(set) (set/hour) Rental
(mnt) (mnt) (Hour) (Hour) man/hour (Rp.) (Rp./bar)
(Rp.)

Rental
Equitment
(Rp./bar)

Amount
Price
(Rp./bar)

Pipe
Amount
in Truck
(bar)

50

2"

7.3

3.6

6.6

0.11

0.13

0.26

1,207

1,206.86

200

80

3"

13.2

4.3

3.6

7.9

0.13

0.16

0.32

1,445

1,444.57

110

100

4"

20.5

6.2

5.2

11.4

0.19

0.23

0.46

2,085

2,084.57

64

150

6"

40.2

10.2

8.5

18.7

0.31

0.37

0.75

3,419

3,419.43

34

200

8"

60.8

5.8

4.8

10.6

0.18

0.21

0.42

1,938

0.21

34,526

34,525.71

36,464.00

20

250

10"

92.9

7.6

6.3

13.9

0.23

0.28

0.56

2,542

0.28

45,274

45,274.29

47,816.00

16

300

12"

131.8

8.9

7.4

16.3

0.27

0.33

0.65

2,981

0.33

53,091

53,091.43

56,072.00

14

Criterion :

Up-to Pipe
Downwards Pipe
*Efective Time
Time efektive work
Fee Worker
Fee Driver

Note : Rite Hour = The dura


Manpower
Machin
2" - 6" 3" - 12"; 2 ton
Kg/mnt
: 4 - 5 14 - 24
: 3 - 10 10 - 19
: Including difficulty factor 20%
:
7 hour/day
:
4,571
Rp./Hour :
:
7,143
Rp./Hour :

Rental Crane 2 ton :


Rental Truck 4 ton :

162,857
190,000

Rp./Hour
Rp./Hour

32,000
50,000

Rp./day
Rp./day

** Unit Price

: Including Advantage :

10%

Rental of Truck
Expense go
down to go
once transport.
Rental
up.
(Rp.)
once (Hour)
(Rp.)

Driver

Amount Price
Transportation
Driver
Driver fee
of Pipe
once (Hour)
(Rp.)
(Rp./once)

Unit Price
Transport of
Pipe
(Rp./m')

241,371.43

760,000.0

4 28,571.4

1,031,149.71

859.29

158,902.86

760,000.0

4 28,571.4

948,918.86

1,437.76

133,412.57

760,000.0

4 28,571.4

924,068.57

2,406.43

116,260.57

760,000.0

4 28,571.4

908,251.43

4,452.21

729,280.00

760,000.0

4 28,571.4

1,554,315.43

12,952.63

765,056.00

760,000.0

4 28,571.4

1,601,443.43

16,681.70

785,008.00

760,000.0

4 28,571.4

1,629,651.43

19,400.61

Note : Rite Hour = The duration rent, including loading and unloading time and journey.

Unit Price Analysis Instalation Pipe : PVC/RRJ


Sistem Conec
: Mechanical Joint (MJ)/ Flange Joint (FJ)
Unit
: M'

No.

Dia

Length Weight Down


wards.
(m/bar) (Kg/bar) (mnt)

(mm) (inch)

Time Work
Labour
*Efective
Instal
Fee
Fee
Time
Amount
Fore man
Pipe Fitter
Pipe
Foreman
Fitter
(mnt) (mnt) (Hour) (Hour) (man) (Hour)
(Rp.)
(man) (Hour) (Rp.)

Amount Price of La
Fee
Wolker
(man) (Hour) (Rp.)
(Rp./bar)
Wolker

50

2"

7.3

6.2

12.2

18.4

0.31

0.37

0.37

1,682

0.37

1,682

0.74

3,365

6,729.14

80

3"

13.2

8.3

14.2

22.5

0.38

0.45

0.45

2,057

0.45

2,057

0.90

4,114

8,228.57

100

4"

20.5

10.4

14.8

25.2

0.42

0.50

0.50

2,304

0.50

2,304

1.01

4,608

9,216.00

150

6"

40.2

13.1

20.5

33.6

0.56

0.67

0.67

3,072

0.67

3,072

1.34

6,144

12,288.00

200

8"

60.8

14.7

20.9

35.6

0.59

0.71

0.71

3,255

0.71

3,255

2.14

9,765

16,274.29

250

10"

92.9

18.5

23.6

42.1

0.70

0.84

0.84

3,849

0.84

3,849

2.53

11,547

19,245.71

300

12"

131.8

21.8

29.4

51.2

0.85

1.02

1.02

4,681

1.02

4,681

3.07

14,043

23,405.71

Criterion :

Up-to Pipe
Downwards Pipe

Note : Rite Hour = The dura


Manpower
Machin
2" - 6" 3" - 12"; 2 ton
Kg/mnt
: 3-5
6-8
: 1-3
4-5

*Efective Time
Time efektive work
Fee Worker
Fee Driver

: Including difficulty factor 20%


:
7 hour/day
:
4,571
Rp./Hour :
:
7,143
Rp./Hour :

Tackel
Tripod

:
:

500.00
4,500.00

Rp./Hour
Rp./Hour

32,000 Rp./day
50,000 Rp./day

** Unit Price

: Including Advantage :

10%

Amount Price of Labour


(Rp./m')

Equipments.
Tackel
Tripod
(set/ hour)
Rental
(set/ hour)
Rental
(set) (hour)
(set) (hour)
(Rp.)
(Rp.)

(Rp./m')

**) Unit Price


Instalation
Pipe
(Rp./bar)

Amount Price of
Labour
(Rp./bar)

1,121.52

0.37

184.00

184.00

30.67

1,152.19

1,371.43

0.45

225.00

225.00

37.50

1,408.93

1,536.00

0.50

252.00

252.00

42.00

1,578.00

2,048.00

0.67

336.00

336.00

56.00

2,104.00

2,712.38

1.42

712.00

0.71

3,204.00

3,916.00

652.67

3,365.05

3,207.62

1.68

842.00

0.84

3,789.00

4,631.00

771.83

3,979.45

3,900.95

2.05

1,024.00

1.02

4,608.00

5,632.00

938.67

4,839.62

Note : Rite Hour = The duration rent, including loading and unloading time and journey.

Unit Price Analysis Transport Pipe : PVC

No.

Dia

Length

(mm) (inch)

(m/bar)

*Efective
Weight
Time
(Kg/bar)

(Hour)

Labour
Worker

Fee

man/hour

(Rp.)

Equip
ments.
Crane
(set/hour)

Rental of
Driver
Pipe
Truck
Amount
Driver
in Truck once transport.
(bar)
once (Hour) once (Hour)

50

2"

7.30

0.13

2.00

0.26

200.00

1.00

4.00

1.00

4.00

80

3"

13.20

0.16

2.00

0.32

110.00

1.00

4.00

1.00

4.00

100

4"

20.50

0.23

2.00

0.46

64.00

1.00

4.00

1.00

4.00

150

6"

40.20

0.37

2.00

0.75

34.00

1.00

4.00

1.00

4.00

200

8"

60.80

0.21

2.00

0.42

0.21

20.00

1.00

4.00

1.00

4.00

250

10"

92.90

0.28

2.00

0.56

0.28

16.00

1.00

4.00

1.00

4.00

300

12"

131.80

0.33

2.00

0.65

0.33

14.00

1.00

4.00

1.00

4.00

Unit Price Analysis Instalation Pipe : PVC/RRJ


Sistem Conec
: Mechanical Joint (MJ)/ Flange Joint (FJ)
Unit
: M'

No.

Dia

Length

*Efective
Time

(mm)

(m/bar)

(Hour)

Labour

Equipments.
Tackel
Tripod
Fore man
Pipe Fitter
Wolker
(set/ hour)
(set/ hour)
(man) (Hour) (man) (Hour) (man) (Hour) (set) (hour) (set) (hour)

50

0.37

0.37

0.37

0.74

0.37

80

0.45

0.45

0.45

0.90

0.45

100

0.50

0.50

0.50

1.01

0.50

150

0.67

0.67

0.67

1.34

0.67

200

0.71

0.71

0.71

2.14

1.42

0.71

250

0.84

0.84

0.84

2.53

1.68

0.84

300

1.02

1.02

1.02

3.07

2.05

1.02

Unit Price Analysis Instalasi of Pipe : DCIP


Sistem Conec
: Mechanical Joint (MJ)/ Flange Joint (FJ)
Unit
: M'
Time Work
No.

Dia

Length Weight

(mm) (inch)
(m/bar)

Down
wards.
(Kg/bar) (mnt)

Conec Pipe
(mnt)

Amount
(mnt)

(Hour)

*Efective
Time
(Hour)

Labour
Fore man

Pipe Fitter

Wolker

(man) (Hour) (man) (Hour) (man) (Hour)

Equipments.
Key Snugly.
Trackel
Tripod / Cra
(set/ hour)
(set/ hour)
(set/ hour
(set) (hour) (set) (hour) (set)

80

3"

60.0

12.0

14.0

26.0

0.43

0.52

0.52

0.52

1.56

0.52

###

100

4"

72.0

13.2

17.4

30.6

0.51

0.61

0.61

0.61

1.84

0.61

###

150

6"

137.5

23.3

25.0

48.3

0.81

0.97

0.97

0.97

2.90

1.93

1 Tp

200

8"

185.0

25.3

29.7

55.0

0.92

1.10

1.10

1.10

4.40

2.20

1 Tp

250

10"

240.0

29.0

33.0

62.0

1.03

1.24

1.24

1.24

4.96

2.48

2 Tp

300

12"

378.0

15.8

21.3

37.1

0.62

0.74

0.74

0.74

2.97

1.48

1 Cr2

350

12"

483.0

17.4

21.5

38.9

0.65

0.78

0.78

0.78

3.11

1.56

1 Cr2

400

12"

570.0

18.6

22.7

41.3

0.69

0.83

0.83

1.65

3.30

1.65

1 Cr2

450

12"

678.0

20.0

25.7

45.7

0.76

0.91

0.91

1.83

3.66

1.83

1 Cr2

10

500

12"

780.0

21.2

26.9

48.1

0.80

0.96

0.96

1.92

3.85

1.92

1 Cr2

11

600

12"

1,014.0

21.5

31.4

52.9

0.88

1.06

1.06

2.12

4.23

3.17

1 Cr5

12

800

12"

1,590.0

25.8

35.9

61.7

1.03

1.23

1.23

2.47

4.94

3.70

1 Cr5

13

900

12"

1,914.0

25.9

37.4

63.3

1.06

1.27

1.27

2.53

5.06

3.80

1 Cr5

14

1000

12"

2,262.0

28.6

38.5

67.1

1.12

1.34

1.34

2.68

6.71

4.03

1 Cr5

15

1100

12"

2,865.0

31.5

43.3

74.8

1.25

1.50

1.50

2.99

7.48

4.49

1 Cr5

16

1200

12"

3,048.0

32.0

45.0

77.0

1.28

1.54

1.54

3.08

7.70

4.62

1 Cr5

Equipments.
Tripod / Crane
(set/ hour)
(hour)
0.97
1.10
2.48
0.74
0.78
0.83
0.91
0.96
1.06
1.23
1.27
1.34
1.50
1.54

Unit Price Analysis Transport Pipe : STEEL

No.

Dia

Length

(mm) (inch)

(m/bar)

Weight

Up-to

(Kg/bar)

(mnt)

Time Work
Down
Amount
wards.
(mnt)

(mnt)

Labour
*Efective
Time Worker Fee Worker
fee
man/
(Rp./
(Hour) (Hour)
(Rp.)
hour
bar)

(set)

Equipments.
Crane
Rental

(set/hour)

(Rp.)

100

4"

35.0

4.2

3.5

7.7

0.1

0.15

0.31

1,408

150

6"

78.0

2.4

2.0

4.4

0.1

0.09

0.18

805

0.09

14,331

200

8"

126.0

3.5

2.9

6.4

0.1

0.13

0.26

1,170

0.13

20,846

250

10"

190.0

4.1

3.4

7.5

0.1

0.15

0.30

1,371

0.15

24,429

300

12"

262.0

6.8

5.7

12.5

0.2

0.25

0.75

3,429

0.25

40,714

350

12"

267.0

7.7

6.4

14.1

0.2

0.28

0.85

3,867

0.28

45,926

400

12"

330.0

9.7

8.1

17.8

0.3

0.36

1.07

4,882

0.36

57,977

450

12"

424.0

11.0

9.2

20.2

0.3

0.40

1.21

5,541

0.40

65,794

500

12"

529.0

13.4

11.2

24.6

0.4

0.49

1.48

6,747

0.49

80,126

10

600

12"

777.0

6.2

5.2

11.4

0.2

0.23

0.68

3,127

0.23

56,316

11

800

12"

1,132.0

6.8

5.7

12.5

0.2

0.25

0.75

3,429

0.25

61,750

12

900

12"

1,275.0

9.2

7.7

16.9

0.3

0.34

1.01

4,635

0.34

83,486

13

1000

12"

1,653.0

10.0

8.3

18.3

0.3

0.37

1.10

5,019

0.37

90,402

14

1100

12"

1,762.0

18.6

15.5

34.1

0.6

0.68

2.05

9,353

0.68

168,454

15

1200

12"

1,844.0

19.7

16.4

36.1

0.6

0.72

2.17

9,902

0.72

178,334

Criterion :
Manpower
80-100mm

Machin
150-250 ; 300-600

Kg/mnt
Up-to Pipe
Downwards Pipe

:
:

12
10

18
15

*Efective Time
Time efektive work
Fee Worker
Fee Driver

: Including difficulty factor :


20%
:
7
hour/day
:
4,571.43
Rp./Hour :
:
7,142.86
Rp./Hour :

Rental Crane 2 ton


Rental Crane 5 ton
Rental Truck 4 ton
Rental Truck 10 ton

:
:
:
:

** Unit Price

: Including Advantage :

162,857.14
247,000.00
190,000.00
256,500.00

90
75

Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
10%

32,000.0
50,000.0

Rp./day
Rp./day

.
Rental
Equitment
(Rp./bar)

(Rp./bar)
-

Driver

Rental of Truck
Expense go
Amount of Pipe Amount
down to go
Expence
in Truck
once transport.
Rental
up.
(bar)

(Rp.)

once

(Hour)

(Rp.)

Driver
once

(Hour)

Driver fee

Unit Price
Transporta
tion of Pipe

(Rp.)

(Rp./once)

1,408.00

72

101,376.00

760,000.0

28,571.4

891,355.43

14,331.43

15,136.00

27

408,672.00

760,000.0

28,571.4

1,212,379.43

20,845.71

22,016.00

19

418,304.00

760,000.0

28,571.4

1,228,891.43

24,428.57

25,800.00

16

412,800.00

760,000.0

28,571.4

1,227,171.43

40,714.29

44,142.86

10

441,428.57

760,000.0

28,571.4

1,274,142.86

45,925.71

49,793.14

448,138.29

760,000.0

28,571.4

1,286,502.86

57,977.14

62,859.43

440,016.00

760,000.0

28,571.4

1,291,446.86

65,794.29

71,334.86

428,009.14

760,000.0

28,571.4

1,287,915.43

80,125.71

86,873.14

434,365.71

760,000.0

28,571.4

1,309,810.29

56,316.00

59,442.86

178,328.57

1,026,000.0

28,571.4

1,292,342.86

61,750.00

65,178.57

195,535.71

1,026,000.0

28,571.4

1,315,285.71

83,486.00

88,121.43

176,242.86

1,026,000.0

28,571.4

1,318,935.71

90,402.00

95,421.43

190,842.86

1,026,000.0

28,571.4

1,340,835.71

168,454.00

177,807.14

177,807.14

1,026,000.0

28,571.4

1,410,185.71

178,334.00

188,235.71

188,235.71

1,026,000.0

28,571.4

1,431,042.86

Note : Rite Hour = The duration rent, including loading and unloading time and journey.

Unit Price
Transport of
Pipe m'
(Rp./m')
2,063.32
7,483.82
10,779.75
12,783.04
21,235.71
23,824.13
30,748.73
35,775.43
43,660.34
71,796.83
73,071.43
109,911.31
111,736.31
235,030.95
238,507.14

Unit Price Analysis Transport Pipe : PVC

No.

Dia
(mm)

Weight
(Kg/bar)

*Efective
Time
(Hour)

Labour

Rental of
Pipe
Truck
Amount
once
transport.
in Truck

Equip ments.

Fee

Crane

(Rp.)

(set/hour)

(bar)

once

Driver
Driver

(Hour) once (Hour)

100

35.0

0.15

0.31

72.00

1.00

4.00

1.00

4.00

150

78.0

0.09

0.18

1.00

0.09

27.00

1.00

4.00

1.00

4.00

200

126.0

0.13

0.26

1.00

0.13

19.00

1.00

4.00

1.00

4.00

250

190.0

0.15

0.30

1.00

0.15

16.00

1.00

4.00

1.00

4.00

300

262.0

0.25

0.75

1.00

0.25

10.00

1.00

4.00

1.00

4.00

350

267.0

0.28

0.85

1.00

0.28

9.00

1.00

4.00

1.00

4.00

400

330.0

0.36

1.07

1.00

0.36

7.00

1.00

4.00

1.00

4.00

450

424.0

0.40

1.21

1.00

0.40

6.00

1.00

4.00

1.00

4.00

500

529.0

0.49

1.48

1.00

0.49

5.00

1.00

4.00

1.00

4.00

10

600

777.0

0.23

0.68

1.00

0.23

3.00

1.00

4.00

1.00

4.00

11

800

1,132.0

0.25

0.75

1.00

0.25

3.00

1.00

4.00

1.00

4.00

12

900

1,275.0

0.34

1.01

1.00

0.34

2.00

1.00

4.00

1.00

4.00

13

1000

1,653.0

0.37

1.10

1.00

0.37

2.00

1.00

4.00

1.00

4.00

14

1100

1,762.0

0.68

2.05

1.00

0.68

1.00

1.00

4.00

1.00

4.00

15

1200

1,844.0

0.72

2.17

1.00

0.72

1.00

1.00

4.00

1.00

4.00

Unit Price Analysis Testing Pipe


Type Pipe
: All
Unit
: Seed
Time Work
No.

Unit Water
Test

Dia

(mm) (inch)

(m/bar)

Conec.
Eqiuip.
(mnt)

Water
Discard
Test
Content
Water
Pipe 1
Test 1
Test
(mnt)

(mnt)

Amount
Testing 1

Labour
Testing /
Flushing 2

(mnt)

*Efective
Time

Amount
(mnt)

(Hour)

(Hour)

Foreman

Pipe Fitter

Piple
amount

unit /
hour

Amount

Piple
amount

unit /
hour

(man)

(Hour)

(Rp.)

(man)

(Hour)

50

2"

0.98

89.0

25.4

160.0

14.6

129.0

159.0

288.0

4.8

5.76

5.76

37,029

5.76

80

3"

2.51

90.0

25.0

160.0

15.2

130.2

161.2

291.4

4.9

5.83

5.83

37,466

5.83

100

4"

3.93

91.0

26.4

160.0

17.5

134.9

164.9

299.8

5.0

6.00

6.00

38,546

6.00

150

6"

8.84

92.0

30.5

160.0

18.7

141.2

171.2

312.4

5.2

6.25

6.25

40,166

6.25

200

8"

15.71

94.0

53.4

160.0

26.2

173.6

203.6

377.2

6.3

7.54

7.54

48,497

7.54

250

10"

24.54

95.0

82.8

160.0

40.9

218.7

248.7

467.4

7.8

9.35

9.35

60,094

9.35

300

12"

35.34

96.0

117.8

160.0

58.9

272.7

302.7

575.4

9.6

11.51

11.51

73,980

11.51

350

12"

43.11

98.0

160.4

160.0

80.2

338.6

368.5

707.1

11.8

14.14

14.14

90,913

14.14

400

12"

62.83

100.0

209.4

160.0

104.7

414.1

444.2

858.3

14.3

17.17

17.17

110,353

17.17

10

450

12"

79.52

105.0

205.0

160.0

132.5

442.5

532.6

975.1

16.3

19.50

19.50

125,370

19.50

11

500

12"

93.17

110.0

265.1

160.0

163.6

538.7

630.9

1,169.6

19.5

23.39

23.39

150,377

23.39

12

600

12"

141.37

1,250.0

337.2

160.0

39.6

1,626.8

1,408.8

3,035.6

50.6

60.71

60.71

390,291

60.71

13

800

12"

251.33

1,250.0

140.7

160.0

70.4

1,461.1

1,501.1

2,962.2

49.4

59.24

59.24

380,854

59.24

14

900

12"

313.09

1,250.0

178.1

160.0

88.1

1,516.2

1,557.2

3,073.4

51.2

61.47

61.47

395,151

61.47

15

1000

12"

372.7

1,250.0

219.9

160.0

110.0

1,579.9

1,619.9

3,199.8

53.3

64.00

64.00

411,403

64.00

16

1100

12"

475.17

1,250.0

365.1

160.0

133.0

1,748.1

1,689.1

3,437.2

57.3

68.74

68.74

441,926

68.74

17

1200

12"

585.49

Criterion :
- Testing done 3 (tri) Phase

- Capacities pump filler


- Capacities pump filler

1,260.0

316.7

158.3

1,735.0

1,765.0

3,500.0

58.3

70.00

70.00

450,000

: Test I
: 500 m'
: Test II
: 500 m'
: Plushing : 3 minute/100 m' Pipe

Metode Test

: 0.005 cu.m/second
: 0.01 cu.m/second

Installation of appliance consist of : Checking pipe as long as 500 m'


: Closing pipe whereas, mean 4 second
: Installing lasing / jack at dot close
: Installing lasing / Vrangkring at body Pipe
: Installing pump test and at grader
Testing Pipe
: Pumping 10 minute
: Perception 2.5 hour
45,000.0 Rp./day
42,000.0 Rp./day
32,000.0 Rp./day

*Efective Time
Time efektive work
Fee Foremen
Fee Pipe Fitter
Fee Worker
Rental
Key Snugly.
Tackel
Tripod
Rental Crane 2 ton
Rental Crane 5 ton

: Including difficulty factor :


:
7
hour/day
:
6,428.57 Rp./Hour :
:
6,000.00 Rp./Hour :
:
4,571.43 Rp./Hour :

** Unit Price

: Including Advantage :

:
:
:
:
:

160.0

11,335.71
500.00
4,500.00
162,857.14
247,000.00

20%

Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour

Rental
Water Pump
Water Pump Test

10%

: - Dia < 600 mm : Konfensional (All pipe Loaded water)


: - Dia < 600 mm : Using "Test band" (Only at joint, 84 dot / 500 m')

:
:

21,428.57
14,169.64

Rp./Hour
Rp./Hour

70.00

Labour
Pipe Fitter

Wolker

Piple
Amount
amount
(Rp.)

(man)

Amount Price of Labour

unit /
hour

Amount

(Hour)

(Rp.)

(Rp./500m')

(Rp./m')

34,560

5.76

26,331

97,920.00

195.84

34,968

5.83

26,642

99,076.00

198.15

35,976

6.00

27,410

101,932.00

203.86

37,488

6.25

28,562

106,216.00

212.43

45,264

7.54

34,487

128,248.00

256.50

56,088

9.35

42,734

158,916.00

317.83

69,048

11.51

52,608

195,636.00

391.27

84,852

14.14

64,649

240,414.00

480.83

102,996

17.17

78,473

291,822.00

583.64

117,012

19.50

89,152

331,534.00

663.07

140,352

23.39

106,935

397,664.00

795.33

364,272

60.71

277,541

1,032,104.00

2,064.21

355,464

59.24

270,830

1,007,148.00

2,014.30

368,808

61.47

280,997

1,044,956.00

2,089.91

383,976

64.00

292,553

1,087,932.00

2,175.86

412,464

68.74

314,258

1,168,648.00

2,337.30

420,000

70.00

320,000

1,190,000.00

2,380.00

Equipments.
Key Snugly.
Amount
unit / hour
Appliances.
(set)

(hour)

Tackel

Tripod / Crane

Water Pump

Rental

Amount
Appliances.

unit /
hour

Rental

Amount
Appliances.

unit /
hour

Rental

(Rp.)

(set)

(hour)

(Rp.)

(set)

(hour)

(Rp.)

Amount
unit / hour
Appliances.
(set)

(hour)

Pump Te
Rental

Amount
Appliances.

(Rp.)

(set)

17.28

195,881.14

23.04

11,520.00

Tp

5.76

25,920.00

11.52

246,857.14

17.48

198,193.63

23.31

11,656.00

Tp

5.83

26,226.00

11.66

249,771.43

17.99

203,906.83

23.98

11,992.00

Tp

6.00

26,982.00

11.99

256,971.43

18.74

212,476.63

24.99

12,496.00

Tp

6.25

28,116.00

12.50

267,771.43

22.63

256,549.89

30.18

15,088.00

Tp

7.54

33,948.00

15.09

323,314.29

28.04

317,898.77

37.39

18,696.00

Tp

9.35

42,066.00

18.70

400,628.57

46.03

521,805.60

69.05

34,524.00

Tp

11.51

51,786.00

23.02

493,200.00

56.57

641,238.69

84.85

42,426.00

Tp

14.14

63,639.00

28.28

606,085.71

68.66

778,355.49

103.00

51,498.00

Tp

17.17

77,247.00

34.33

735,685.71

78.01

884,276.40

117.01

58,506.00

Tp

19.50

87,759.00

39.00

835,800.00

93.57

1,060,660.11

140.35

70,176.00

Tp

23.39

105,264.00

46.78

1,002,514.29

303.56

3,441,069.43

485.70

242,848.00

Cr2

60.71

9,887,382.86

121.42

2,601,942.86

296.22

3,357,865.29

473.95

236,976.00

Cr2

59.24

9,648,308.57

118.49

2,539,028.57

307.34

3,483,918.43

491.74

245,872.00

Cr2

61.47

10,010,502.86

122.94

2,634,342.86

319.98

3,627,201.86

511.97

255,984.00

Cr2

64.00

10,422,205.71

127.99

2,742,685.71

343.72

3,896,311.71

549.95

274,976.00

Cr2

68.74

11,195,451.43

137.49

2,946,171.43

350.00

3,967,500.00

560.00

280,000.00

Cr2

Note : Rite Hour = The duration rent, including loading and unloading time and journey.

70.00

11,400,000.00

140.00

3,000,000.00

Rental of Equipments
Pump Testing
unit /
hour

Rental

Amount

Amount / m'

(hour)

(Rp.)

(Rp./500m')

(Rp./m')

Amount of
Expence

Amount of
Testing
Pipe

(Rp./m')

(Rp./bar)

5.76

81,617.14

561,795.43

1,123.59

1,319.43

1,451.37

5.83

82,580.68

568,427.74

1,136.86

1,335.01

1,468.51

6.00

84,961.18

584,813.44

1,169.63

1,373.49

1,510.84

6.25

88,531.93

609,391.99

1,218.78

1,431.22

1,574.34

7.54

106,895.79

735,795.96

1,471.59

1,728.09

1,900.90

9.35

132,457.82

911,747.16

1,823.49

2,141.33

2,355.46

11.51

163,064.25

1,264,379.85

2,528.76

2,920.03

3,212.03

14.14

200,387.09

1,553,776.49

3,107.55

3,588.38

3,947.22

17.17

243,236.09

1,886,022.29

3,772.04

4,355.69

4,791.26

19.50

276,336.38

2,142,677.78

4,285.36

4,948.42

5,443.27

23.39

331,456.29

2,570,070.69

5,140.14

5,935.47

6,529.02

60.71

860,267.36

17,033,510.50

34,067.02

36,131.23

39,744.35

59.24

839,466.32

16,621,644.75

33,243.29

35,257.59

38,783.34

61.47

870,979.61

17,245,615.75

34,491.23

36,581.14

40,239.26

64.00

906,800.46

17,954,877.75

35,909.76

38,085.62

41,894.18

68.74

974,077.93

19,286,988.50

38,573.98

40,911.27

45,002.40

70.00

991,875.00

19,639,375.00

39,278.75

41,658.75

45,824.63

Unit Price Analysis Testing Pipe


Type Pipe
: All
Unit
: Seed

No.

Unit
Water
Test

Dia

(mm) (inch) (m/bar)

Equipments.

Labour
*Efective
Time
(Hour)

Foreman

Pipe Fitter

Wolker

Key Snugly.
Tackel
Tripod / Crane
Amount
Amount
Piple
Piple
Piple
unit / hour
unit / hour
unit / hour Appliance unit / hour Appliance unit / hour Amount Appliances.
amount
amount
amount
s.
s.
(set)
(hour)
(set)
(hour)
(set)
(man)
(Hour)
(man)
(Hour)
(man)
(Hour)

50

2"

0.98

5.76

5.76

5.76

5.76

17.28

23.04

Tp

80

3"

2.51

5.83

5.83

5.83

5.83

17.48

23.31

Tp

100

4"

3.93

6.00

6.00

6.00

6.00

17.99

23.98

Tp

150

6"

8.84

6.25

6.25

6.25

6.25

18.74

24.99

Tp

200

8"

15.71

7.54

7.54

7.54

7.54

22.63

30.18

Tp

250

10"

24.54

9.35

9.35

9.35

9.35

28.04

37.39

Tp

300

12"

35.34

11.51

11.51

11.51

11.51

46.03

69.05

Tp

350

12"

43.11

14.14

14.14

14.14

14.14

56.57

84.85

Tp

400

12"

62.83

17.17

17.17

17.17

17.17

68.66

103.00

Tp

10

450

12"

79.52

19.50

19.50

19.50

19.50

78.01

117.01

Tp

11

500

12"

93.17

23.39

23.39

23.39

23.39

93.57

140.35

Tp

12

600

12"

141.37

60.71

60.71

60.71

60.71

303.56

485.70

Cr2

13

800

12"

251.33

59.24

59.24

59.24

59.24

296.22

473.95

Cr2

14

900

12"

313.09

61.47

61.47

61.47

61.47

307.34

491.74

Cr2

15

1000

12"

372.7

64.00

64.00

64.00

64.00

319.98

511.97

Cr2

16

1100

12"

475.17

68.74

68.74

68.74

68.74

343.72

549.95

Cr2

17

1200

12"

585.49

70.00

70.00

70.00

70.00

350.00

560.00

Cr2

Equipments.
Tripod / Crane

Water Pump
Amount
unit /
unit / hour Appliance
hour
s.
(hour)
(set)
(hour)

Pump Testing
Amount
unit /
Appliance
hour
s.
(set)
(hour)

5.76

11.52

5.76

5.83

11.66

5.83

6.00

11.99

6.00

6.25

12.50

6.25

7.54

15.09

7.54

9.35

18.70

9.35

11.51

23.02

11.51

14.14

28.28

14.14

17.17

34.33

17.17

19.50

39.00

19.50

23.39

46.78

23.39

60.71

121.42

60.71

59.24

118.49

59.24

61.47

122.94

61.47

64.00

127.99

64.00

68.74

137.49

68.74

70.00

140.00

70.00

Unit Price Analysis Testing Pipe


Type Pipe
: All
Unit
: Seed
Time Work
No.

Unit Water
Test

Dia

(mm) (inch)

(m/bar)

Conec.
Eqiuip.
(mnt)

Water
Discard
Test
Content
Water
Pipe 1
Test 1
Test
(mnt)

(mnt)

Amount
Testing 1

Labour
Testing /
Flushing 2

(mnt)

*Efective
Time

Amount
(mnt)

(Hour)

(Hour)

Foreman

Pipe Fitter

Piple
amount

unit /
hour

Amount

Piple
amount

unit /
hour

(man)

(Hour)

(Rp.)

(man)

(Hour)

50

2"

0.98

89.0

25.4

160.0

14.6

129.0

159.0

288.0

4.8

5.76

5.76

37,029

5.76

80

3"

2.51

90.0

25.0

160.0

15.2

130.2

161.2

291.4

4.9

5.83

5.83

37,466

5.83

100

4"

3.93

91.0

26.4

160.0

17.5

134.9

164.9

299.8

5.0

6.00

6.00

38,546

6.00

150

6"

8.84

92.0

30.5

160.0

18.7

141.2

171.2

312.4

5.2

6.25

6.25

40,166

6.25

200

8"

15.71

94.0

53.4

160.0

26.2

173.6

203.6

377.2

6.3

7.54

7.54

48,497

7.54

250

10"

24.54

95.0

82.8

160.0

40.9

218.7

248.7

467.4

7.8

9.35

9.35

60,094

9.35

300

12"

35.34

96.0

117.8

160.0

58.9

272.7

302.7

575.4

9.6

11.51

11.51

73,980

11.51

350

12"

43.11

98.0

160.4

160.0

80.2

338.6

368.5

707.1

11.8

14.14

14.14

90,913

14.14

400

12"

62.83

100.0

209.4

160.0

104.7

414.1

444.2

858.3

14.3

17.17

17.17

110,353

17.17

10

450

12"

79.52

105.0

205.0

160.0

132.5

442.5

532.6

975.1

16.3

19.50

19.50

125,370

19.50

11

500

12"

93.17

110.0

265.1

160.0

163.6

538.7

630.9

1,169.6

19.5

23.39

23.39

150,377

23.39

12

600

12"

141.37

1,250.0

337.2

160.0

39.6

1,626.8

1,408.8

3,035.6

50.6

60.71

60.71

390,291

60.71

13

800

12"

251.33

1,250.0

140.7

160.0

70.4

1,461.1

1,501.1

2,962.2

49.4

59.24

59.24

380,854

59.24

14

900

12"

313.09

1,250.0

178.1

160.0

88.1

1,516.2

1,557.2

3,073.4

51.2

61.47

61.47

395,151

61.47

15

1000

12"

372.7

1,250.0

219.9

160.0

110.0

1,579.9

1,619.9

3,199.8

53.3

64.00

64.00

411,403

64.00

16

1100

12"

475.17

1,250.0

365.1

160.0

133.0

1,748.1

1,689.1

3,437.2

57.3

68.74

68.74

441,926

68.74

17

1200

12"

585.49

Criterion :
- Testing done 3 (tri) Phase

- Capacities pump filler


- Capacities pump filler

1,260.0

316.7

158.3

1,735.0

1,765.0

3,500.0

58.3

70.00

70.00

450,000

: Test I
: 500 m'
: Test II
: 500 m'
: Plushing : 3 minute/100 m' Pipe

Metode Test

: 0.005 cu.m/second
: 0.01 cu.m/second

Installation of appliance consist of : Checking pipe as long as 500 m'


: Closing pipe whereas, mean 4 second
: Installing lasing / jack at dot close
: Installing lasing / Vrangkring at body Pipe
: Installing pump test and at grader
Testing Pipe
: Pumping 10 minute
: Perception 2.5 hour
45,000.0 Rp./day
42,000.0 Rp./day
32,000.0 Rp./day

*Efective Time
Time efektive work
Fee Foremen
Fee Pipe Fitter
Fee Worker
Rental
Key Snugly.
Tackel
Tripod
Rental Crane 2 ton
Rental Crane 5 ton

: Including difficulty factor :


:
7
hour/day
:
6,428.57 Rp./Hour :
:
6,000.00 Rp./Hour :
:
4,571.43 Rp./Hour :

** Unit Price

: Including Advantage :

:
:
:
:
:

160.0

11,335.71
500.00
4,500.00
162,857.14
247,000.00

20%

Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour

Rental
Water Pump
Water Pump Test

10%

: - Dia < 600 mm : Konfensional (All pipe Loaded water)


: - Dia < 600 mm : Using "Test band" (Only at joint, 84 dot / 500 m')

:
:

21,428.57
14,169.64

Rp./Hour
Rp./Hour

70.00

Equipments.

Labour
Pipe Fitter

Wolker

Key Snugly.

Amount Price of Labour

Amount

Piple
amount

unit /
hour

Amount

(Rp.)

(man)

(Hour)

(Rp.)

Amount
unit / hour
Appliances.
(Rp./500m')

(Rp./m')

(set)

(hour)

Tackel

Tripod / Crane

Rental

Amount
Appliances.

unit /
hour

Rental

Amount
Appliances.

unit /
hour

(Rp.)

(set)

(hour)

(Rp.)

(set)

(hour)

34,560

5.76

26,331

97,920.00

195.84

17.28

195,881.14

23.04

11,520.00

Tp

5.76

34,968

5.83

26,642

99,076.00

198.15

17.48

198,193.63

23.31

11,656.00

Tp

5.83

35,976

6.00

27,410

101,932.00

203.86

17.99

203,906.83

23.98

11,992.00

Tp

6.00

37,488

6.25

28,562

106,216.00

212.43

18.74

212,476.63

24.99

12,496.00

Tp

6.25

45,264

7.54

34,487

128,248.00

256.50

22.63

256,549.89

30.18

15,088.00

Tp

7.54

56,088

9.35

42,734

158,916.00

317.83

28.04

317,898.77

37.39

18,696.00

Tp

9.35

69,048

11.51

52,608

195,636.00

391.27

46.03

521,805.60

69.05

34,524.00

Tp

11.51

84,852

14.14

64,649

240,414.00

480.83

56.57

641,238.69

84.85

42,426.00

Tp

14.14

102,996

17.17

78,473

291,822.00

583.64

68.66

778,355.49

103.00

51,498.00

Tp

17.17

117,012

19.50

89,152

331,534.00

663.07

78.01

884,276.40

117.01

58,506.00

Tp

19.50

140,352

23.39

106,935

397,664.00

795.33

93.57

1,060,660.11

140.35

70,176.00

Tp

23.39

364,272

60.71

277,541

1,032,104.00

2,064.21

303.56

3,441,069.43

485.70

242,848.00

Cr2

60.71

355,464

59.24

270,830

1,007,148.00

2,014.30

296.22

3,357,865.29

473.95

236,976.00

Cr2

59.24

368,808

61.47

280,997

1,044,956.00

2,089.91

307.34

3,483,918.43

491.74

245,872.00

Cr2

61.47

383,976

64.00

292,553

1,087,932.00

2,175.86

319.98

3,627,201.86

511.97

255,984.00

Cr2

64.00

412,464

68.74

314,258

1,168,648.00

2,337.30

343.72

3,896,311.71

549.95

274,976.00

Cr2

68.74

420,000

70.00

320,000

1,190,000.00

2,380.00

350.00

3,967,500.00

560.00

280,000.00

Cr2

Note : Rite Hour = The duration rent, including loading and unloading time and journey.

70.00

Equipments.

Rental of Equipments

Tripod / Crane

Water Pump
Rental
(Rp.)

Amount
unit / hour
Appliances.
(set)

(hour)

Pump Testing
Rental

Amount
Appliances.

unit /
hour

Rental

Amount

Amount / m'

(Rp.)

(set)

(hour)

(Rp.)

(Rp./500m')

(Rp./m')

Amount of
Expence

Amount of
Testing
Pipe

(Rp./m')

(Rp./bar)

25,920.00

11.52

246,857.14

5.76

81,617.14

561,795.43

1,123.59

1,319.43

1,451.37

26,226.00

11.66

249,771.43

5.83

82,580.68

568,427.74

1,136.86

1,335.01

1,468.51

26,982.00

11.99

256,971.43

6.00

84,961.18

584,813.44

1,169.63

1,373.49

1,510.84

28,116.00

12.50

267,771.43

6.25

88,531.93

609,391.99

1,218.78

1,431.22

1,574.34

33,948.00

15.09

323,314.29

7.54

106,895.79

735,795.96

1,471.59

1,728.09

1,900.90

42,066.00

18.70

400,628.57

9.35

132,457.82

911,747.16

1,823.49

2,141.33

2,355.46

51,786.00

23.02

493,200.00

11.51

163,064.25

1,264,379.85

2,528.76

2,920.03

3,212.03

63,639.00

28.28

606,085.71

14.14

200,387.09

1,553,776.49

3,107.55

3,588.38

3,947.22

77,247.00

34.33

735,685.71

17.17

243,236.09

1,886,022.29

3,772.04

4,355.69

4,791.26

87,759.00

39.00

835,800.00

19.50

276,336.38

2,142,677.78

4,285.36

4,948.42

5,443.27

105,264.00

46.78

1,002,514.29

23.39

331,456.29

2,570,070.69

5,140.14

5,935.47

6,529.02

9,887,382.86

121.42

2,601,942.86

60.71

860,267.36

17,033,510.50

34,067.02

36,131.23

39,744.35

9,648,308.57

118.49

2,539,028.57

59.24

839,466.32

16,621,644.75

33,243.29

35,257.59

38,783.34

10,010,502.86

122.94

2,634,342.86

61.47

870,979.61

17,245,615.75

34,491.23

36,581.14

40,239.26

10,422,205.71

127.99

2,742,685.71

64.00

906,800.46

17,954,877.75

35,909.76

38,085.62

41,894.18

11,195,451.43

137.49

2,946,171.43

68.74

974,077.93

19,286,988.50

38,573.98

40,911.27

45,002.40

11,400,000.00

140.00

3,000,000.00

70.00

991,875.00

19,639,375.00

39,278.75

41,658.75

45,824.63

Unit Price Analysis Testing Pipe


Type Pipe
: All
Unit
: Seed

No.

Unit
Water
Test

Dia

(mm) (inch) (m/bar)

Equipments.

Labour
*Efective
Time
(Hour)

Foreman

Pipe Fitter

Wolker

Key Snugly.
Tackel
Tripod / Crane
Amount
Amount
Piple
Piple
Piple
unit / hour
unit / hour
unit / hour Appliance unit / hour Appliance unit / hour Amount Appliances.
amount
amount
amount
s.
s.
(set)
(hour)
(set)
(hour)
(set)
(man)
(Hour)
(man)
(Hour)
(man)
(Hour)

50

2"

0.98

5.76

5.76

5.76

5.76

17.28

23.04

Tp

80

3"

2.51

5.83

5.83

5.83

5.83

17.48

23.31

Tp

100

4"

3.93

6.00

6.00

6.00

6.00

17.99

23.98

Tp

150

6"

8.84

6.25

6.25

6.25

6.25

18.74

24.99

Tp

200

8"

15.71

7.54

7.54

7.54

7.54

22.63

30.18

Tp

250

10"

24.54

9.35

9.35

9.35

9.35

28.04

37.39

Tp

300

12"

35.34

11.51

11.51

11.51

11.51

46.03

69.05

Tp

350

12"

43.11

14.14

14.14

14.14

14.14

56.57

84.85

Tp

400

12"

62.83

17.17

17.17

17.17

17.17

68.66

103.00

Tp

10

450

12"

79.52

19.50

19.50

19.50

19.50

78.01

117.01

Tp

11

500

12"

93.17

23.39

23.39

23.39

23.39

93.57

140.35

Tp

12

600

12"

141.37

60.71

60.71

60.71

60.71

303.56

485.70

Cr2

13

800

12"

251.33

59.24

59.24

59.24

59.24

296.22

473.95

Cr2

14

900

12"

313.09

61.47

61.47

61.47

61.47

307.34

491.74

Cr2

15

1000

12"

372.7

64.00

64.00

64.00

64.00

319.98

511.97

Cr2

16

1100

12"

475.17

68.74

68.74

68.74

68.74

343.72

549.95

Cr2

17

1200

12"

585.49

70.00

70.00

70.00

70.00

350.00

560.00

Cr2

Equipments.
Tripod / Crane

Water Pump
Amount
unit /
unit / hour Appliance
hour
s.
(hour)
(set)
(hour)

Pump Testing
Amount
unit /
Appliance
hour
s.
(set)
(hour)

5.76

11.52

5.76

5.83

11.66

5.83

6.00

11.99

6.00

6.25

12.50

6.25

7.54

15.09

7.54

9.35

18.70

9.35

11.51

23.02

11.51

14.14

28.28

14.14

17.17

34.33

17.17

19.50

39.00

19.50

23.39

46.78

23.39

60.71

121.42

60.71

59.24

118.49

59.24

61.47

122.94

61.47

64.00

127.99

64.00

68.74

137.49

68.74

70.00

140.00

70.00

Dimensions of Trench Work


1.
Open Man Power
1) Excavation by Man Power
A/2
0.1

A'/2
C/2

C'/2

0.1

Pavement

hs

H-hb

hd

1:n

hb

D/2

D
joint exc.:
@
n=

A
5.5 m
0.2

B
`
B/2

B'/2
Le

ND hd

hb

A/2

B/2

hs

m PVC/SP

(mm)

150
200
250
300
350
400
450
500
600
700
800
900
1000

0.90

0.175

0.35

0.20

1.10

0.60

0.30

1.25

0.10

1.20

0.175

0.35

0.20

1.20

0.60

0.30

1.60

0.10

1.20

0.175

0.35

0.20

1.30

0.60

0.30

1.65

1.20

0.175

0.35

0.20

1.30

0.60

0.30

1.20

0.175

0.35

0.20

1.50

0.80

1.20

0.175

0.35

0.20

1.50

0.80

1.20

0.175

0.35

0.20

1.50

1.50

0.350

0.50

0.20

1.50

0.350

0.50

1.50

0.350

0.50

1.50

0.350

1.50
1.50

ND hd

L
B'/2

(Sand Backfill) hs A'/2

DIP

D/2

1.40

0.80

D/2

1.70

1.00

0.10

D/2

1.70

1.00

1.70

0.10

D/2

1.70

1.00

0.30

1.75

0.10

D/2

1.80

1.00

0.30

1.80

0.10

D/2

2.00

1.20

0.80

0.30

1.85

0.10

D/2

2.00

1.20

2.10

1.20

0.30

2.20

0.10

D/2

2.20

1.20

0.20

2.30

1.40

0.30

2.30

0.10

D/2

2.40

1.40

0.20

2.40

1.40

0.30

2.40

0.10

D/2

2.50

1.40

0.50

0.20

2.60

1.60

0.30

2.50

0.10

D/2

2.70

1.60

0.350

0.50

0.20

2.60

1.60

0.30

2.60

0.10

D/2

2.80

1.60

0.350

0.60

0.20

2.90

1.80

0.30

2.70

0.10

D/2

3.00

1.80

hb

A/2

B/2

hs

(Sand Backfill) hs A'/2

B'/2

m PVC/SP

(mm)

400
450
500
600
700
800
900
1000

3.64

0.175

0.35

0.20

1.05

0.40

0.30

4.30

0.10

3.64

0.175

0.35

0.20

1.10

0.40

0.30

4.40

3.64

0.350

0.50

0.20

1.20

0.60

0.30

3.64

0.350

0.50

0.20

1.25

0.70

0.30

3.64

0.350

0.50

0.20

1.25

0.70

3.48

0.350

0.50

0.20

1.30

3.48

0.350

0.50

0.20

3.48

0.350

0.60

0.20

DIP

D/2

2.46

0.60

0.10

D/2

2.50

0.60

4.40

0.10

D/2

2.56

0.60

4.50

0.10

D/2

2.70

0.70

0.30

4.60

0.10

D/2

2.74

0.70

0.80

0.30

4.60

0.10

D/2

2.84

0.80

1.35

0.80

0.30

4.70

0.10

D/2

2.88

0.80

1.40

0.90

0.30

4.80

0.10

D/2

3.06

0.90

Hj
H
Hj

C/2

C'/2

0.35

1.40

0.90

1.10

0.35

1.75

0.92

1.32

0.35

1.80

0.94

1.34

0.35

1.85

0.96

1.36

0.35

1.90

1.18

1.38

0.35

1.95

1.20

1.60

0.35

2.00

1.22

1.62

0.50

2.50

1.64

1.64

0.50

2.60

1.88

1.88

0.50

2.70

1.92

1.92

0.50

2.80

2.16

2.16

0.50

2.90

2.20

2.20

0.60

3.10

2.44

2.44

Hj

C/2

C'/2

0.35

4.65

0.80

1.00

0.35

4.75

0.82

1.02

0.50

4.90

1.04

1.04

0.50

5.00

1.18

1.18

0.50

5.10

1.22

1.22

0.50

5.10

1.36

1.36

0.50

5.20

1.40

1.40

0.60

5.40

1.54

1.54