Академический Документы
Профессиональный Документы
Культура Документы
(L
126
43
83
RENCANA JARINGAN PI
CIMANDAR ATAS KE SPL
TRANSMISI AIR BERSIH D
PANJANG TOTAL 1
RES
SPL
RES
BP
T
A'/2
C/2
C'/2
0.1
Pavement
hj
hb
hs
hs
Hj
hd
1:n
joint exc.:
@
5.5 m
B/2
n=
B'/2
0.2
ND hd
hb/hs
(mm)
50
0.60
0.84
0.50
0.20
0.85
0.10
75
0.60
0.85
0.50
0.20
0.88
0.10
DIP
B'
hj
Hj
C'
1.12
0.70
0.20
1.05
0.70
0.68
0.88
1.13
0.70
0.20
1.08
0.70
0.69
0.89
100
0.60
0.86
0.50
0.20
0.90
0.10
D/2
1.14
0.70
0.20
1.10
0.70
0.70
0.90
150
0.90
1.00
0.50
0.20
1.25
0.10
D/2
1.28
0.70
0.20
1.45
0.70
0.72
0.92
200
0.90
1.18
0.60
0.35
1.45
0.10
D/2
1.52
0.80
0.35
1.80
0.80
0.96
1.16
250
0.90
1.20
0.60
0.35
1.50
0.10
D/2
1.54
0.80
0.35
1.85
0.80
0.98
1.18
300
1.20
1.44
0.70
0.35
1.85
0.10
D/2
1.78
0.90
0.35
2.20
0.80
1.10
1.30
400
1.20
1.48
0.70
0.35
1.95
0.10
D/2
1.82
0.90
0.35
2.30
0.80
1.14
1.34
450
1.20
1.50
0.70
0.35
2.00
0.10
D/2
1.84
0.90
0.35
2.35
0.80
1.16
1.36
500
1.20
1.58
0.70
0.50
2.20
0.10
D/2
1.98
0.90
0.50
2.70
0.80
1.30
1.50
600
1.20
1.62
0.70
0.50
2.30
0.10
D/2
2.02
0.90
0.50
2.80
0.80
1.34
1.54
700
1.20
1.66
0.70
0.50
2.40
0.10
D/2
2.06
0.90
0.50
2.90
0.80
1.38
1.58
800
1.20
1.70
0.70
0.50
2.50
0.10
D/2
2.10
0.90
0.50
3.00
0.80
1.42
1.62
900
1.20
1.74
0.70
0.50
2.60
0.10
D/2
2.14
0.90
0.50
3.10
0.80
1.46
1.66
1000
1.20
1.82
0.70
0.60
2.80
0.10
D/2
2.26
0.90
0.60
3.40
0.80
1.58
1.78
Excavation by machine
B/2
0.1
0.1
Pavement
hj
hb
hs
hs
Hj
hd
1:n
2)
joint hole:
@
ND hd
5.5 m
hb
(mm)
50
0.60
0.70
0.10
0.75
0.10
75
0.60
0.70
0.10
0.78
100
0.60
0.70
0.10
150
0.90
0.70
0.10
DIP
B'
hj
Hj
0.30
1.05
0.70
0.10
0.30
1.08
0.70
0.80
0.10
D/2
0.30
1.10
0.70
1.15
0.10
D/2
0.30
1.45
0.70
200
0.90
0.80
0.10
1.20
0.10
D/2
0.30
1.50
0.80
250
0.90
0.80
0.10
1.25
0.10
D/2
0.30
1.55
0.80
300
1.20
0.90
0.10
1.60
0.10
D/2
0.30
1.90
0.80
1.
1)
Open Trench
Excavation by Man Power
a. PVC
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sand Fill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2
per
10 m
b. DIP
50
75
100
150
200
250
300
0.570
0.59
0.61
0.94
1.29
1.35
1.98
0.914
0.945
0.968
1.378
1.962
2.035
2.794
6.14
6.39
6.57
9.94
13.89
14.50
20.98
3.98
4.07
4.07
6.78
8.63
8.77
14.01
0.205
0.219
0.232
0.291
0.476
0.504
0.604
0.275
0.294
0.312
0.347
0.606
0.644
0.754
2.14
2.29
2.42
2.98
4.95
5.24
6.26
0.207
0.223
0.240
0.309
0.507
0.553
0.675
0.277
0.298
0.320
0.365
0.637
0.693
0.825
2.159
2.325
2.502
3.161
5.259
5.734
6.968
7.25
7.25
7.25
7.25
8.29
8.29
9.29
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sand Fill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2
50
75
100
150
0.570
0.594
0.612
0.938
0.914
0.945
0.968
1.378
6.14
6.39
6.57
9.94
4.73
4.90
4.97
8.10
0.132
0.139
0.146
0.159
0.177
0.187
0.196
0.214
1.38
1.45
1.52
1.66
0.136
0.143
0.154
0.177
0.179
0.191
0.204
0.232
1.41
1.49
1.6
1.84
7.25
7.25
7.25
7.25
200
250
300
1.291
1.350
1.980
1.962
2.035
2.794
13.89
14.50
20.98
10.10
10.36
15.97
0.335
0.351
0.415
0.425
0.446
0.515
3.48
3.65
4.3
0.366
0.400
0.486
0.456
0.495
0.586
3.79
4.14
5.01
8.29
8.29
9.29
2)
Excavation by Machine
a. PVC
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sandfill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2
per
10 m
b. DIP
50
75
100
150
200
250
300
0.525
0.546
0.560
0.805
0.960
1.000
1.440
0.147
0.147
0.147
0.147
0.192
0.192
0.216
5.52
5.73
5.87
8.32
9.95
10.35
14.79
3.50
3.54
3.50
5.60
6.40
6.40
9.90
0.173
0.188
0.202
0.227
0.289
0.311
0.379
0.147
0.147
0.147
0.147
0.192
0.192
0.216
2.00
2.15
2.29
2.54
3.24
3.46
4.18
0.175
0.192
0.210
0.245
0.320
0.360
0.450
0.147
0.147
0.147
0.147
0.192
0.192
0.216
2.02
2.19
2.37
2.72
3.55
3.95
4.89
9.00
9.00
9.00
9.00
10.00
10.00
11.00
Diameter
Work Items
unit
Excavation-1
m3/m
Excavation-2
m3/pl
Excavation
m3
Backfilling
m3
Sand Fill-1
m3/m
Sand Fill-2
m3/pl
Sandfill
m3
Disposal-1
m3/m
Disposal-2
m3/pl
Disposal
m3
Pavement
m2
50
75
100
150
0.560
0.147
5.87
4.51
0.101
0.147
1.28
0.109
0.147
1.36
9.00
0.805
0.147
8.32
6.73
0.114
0.147
1.41
0.132
0.147
1.59
9.00
200
250
300
0.960
0.192
9.95
7.85
0.144
0.192
1.79
0.175
0.192
2.1
10.00
1.000
0.192
10.35
7.96
0.155
0.192
1.90
0.204
0.192
2.39
10.00
1.440
0.216
14.79
11.79
0.190
0.216
2.29
0.261
0.216
3.00
11.00
2.
Sheeted Trench
a. Steel Pipe
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing
Shuttering
Pavement
per
Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3
m3
m3
m2
10 m
200
250
300
350
400
450
500
600
700
800
900
1000
3.420
0.504
35.12
25.20
0.869
0.504
9.61
0.900
0.504
9.92
2.16
0.072
0.450
2.10
3.608
0.518
37.02
25.91
0.968
0.518
10.62
1.017
0.518
11.11
2.16
0.072
0.450
2.15
3.800
0.532
38.97
26.60
1.069
0.532
11.66
1.140
0.532
12.37
2.16
0.072
0.450
2.20
3.998
0.546
40.97
27.31
1.171
0.546
12.70
1.267
0.546
13.66
2.43
0.072
0.450
2.25
4.200
0.560
43.02
28.00
1.274
0.560
13.76
1.400
0.560
15.02
2.43
0.072
0.450
2.30
4.408
0.574
45.12
28.70
1.379
0.574
14.83
1.538
0.574
16.42
2.43
0.072
0.450
2.35
4.620
0.840
47.73
28.27
1.484
0.840
16.37
1.680
0.840
19.46
3.15
0.225
1.296
2.40
5.060
0.880
52.20
30.80
1.697
0.880
18.57
1.980
0.880
21.40
3.15
0.225
1.296
2.50
5.520
0.920
56.87
32.20
1.915
0.920
20.82
2.300
0.920
24.67
3.15
0.225
1.296
2.60
6.000
0.960
61.75
33.60
2.138
0.960
23.13
2.640
0.960
28.15
3.15
0.225
1.296
2.70
6.500
1.000
66.82
35.00
2.364
1.000
25.46
3.000
1.000
31.82
3.60
0.225
1.296
2.80
7.020
1.040
72.09
36.40
2.595
1.040
27.84
3.380
1.040
35.69
4.00
0.225
1.296
2.90
200
250
300
350
400
450
500
600
700
800
900
1000
3.420
0.504
35.12
28.65
0.524
0.504
6.16
0.555
0.504
6.47
2.16
0.072
3.608
0.518
37.02
29.82
0.577
0.518
6.71
0.626
0.518
7.20
2.16
0.072
3.800
0.532
38.97
30.99
0.630
0.532
7.27
0.701
0.532
7.98
2.16
0.072
3.998
0.546
40.97
32.19
0.683
0.546
7.82
0.779
0.546
8.78
2.43
0.072
4.200
0.560
43.02
33.37
0.737
0.560
8.39
0.863
0.560
9.65
2.43
0.072
4.408
0.574
45.12
34.57
0.792
0.574
8.96
0.951
0.574
10.55
2.43
0.072
4.620
0.840
47.73
35.77
0.847
0.840
10.00
1.043
0.840
11.96
3.15
0.225
5.060
0.880
52.20
38.18
0.959
0.880
11.19
1.242
0.880
14.02
3.15
0.225
5.520
0.920
56.87
40.62
1.073
0.920
12.40
1.458
0.920
16.25
3.15
0.225
6.000
0.960
61.75
43.09
1.189
0.960
13.64
1.691
0.960
18.66
3.15
0.225
6.500
1.000
66.82
45.57
1.307
1.000
14.89
1.943
1.000
21.25
3.60
0.225
7.020
1.040
72.090
48.07
1.428
1.040
16.17
2.213
1.040
24.02
4.00
0.225
b. DIP
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing
Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m2
m3
Support
Pavement
m3
m2
0.450
2.10
0.450
2.15
0.450
2.20
0.450
2.25
0.450
2.30
0.450
2.35
1.296
2.40
1.296
2.50
1.296
2.60
1.296
2.70
1.296
2.80
1.296
2.90
Sheeted Trench
0.15
B/2
0.15
Bracing
Bracing
Shuttering
1:n
Sheet pile
Shuttering
hj
hb
hs
hs
H'
hd
Sheet pile
2.
joint hole:
`@
5.5 m
ND hd
hb
hj
H'
Sheet Pile
PVC/SP DIP length thick
(Sand Backfill) hs
(mm)
cm
cm
cm
200
1.5
1.80
0.2
1.90
0.35
2.25
0.80
0.1
D/2
2.4
4.5
12
15
nos
1 wooden sheet
pile
250
1.5
1.85
0.2
1.95
0.35
2.30
0.80
0.1
D/2
2.4
4.5
12
15
1 wooden support
300
1.5
1.90
0.2
2.00
0.35
2.35
0.80
0.1
D/2
2.4
4.5
12
15
350
1.5
1.95
0.2
2.05
0.35
2.40
0.80
0.1
D/2
2.7
4.5
12
15
400
1.5
2.00
0.2
2.10
0.35
2.45
0.80
0.1
D/2
2.7
4.5
12
15
450
1.5
2.05
0.2
2.15
0.35
2.50
0.80
0.1
D/2
2.7
4.5
12
15
1
steel sheet pile
500
1.5
2.10
0.2
2.20
0.50
2.70
0.80
0.1
D/2
3.5
4.5
15
18
2 b=25cm
pipe support
600
1.5
2.20
0.2
2.30
0.50
2.80
0.80
0.1
D/2
3.5
4.5
15
18
700
1.5
2.30
0.2
2.40
0.50
2.90
0.80
0.1
D/2
3.5
4.5
15
18
800
1.5
2.40
0.2
2.50
0.50
3.00
0.80
0.1
D/2
3.5
4.5
15
18
900
1.5
2.50
0.2
2.60
0.50
3.10
0.80
0.1
D/2
4.0
4.5
15
18
1000
1.5
2.60
0.2
2.70
0.50
3.20
0.80
0.1
D/2
4.0
5.0
15
18
1100
1.5
2.70
0.2
2.80
0.50
3.30
0.8
0.1
D/2
4.0
5.0
15
18
1200
1.5
2.80
0.2
2.90
0.50
3.40
0.8
0.1
D/2
4.0
5.0
15
18
5 times use
Wooden Bracing:
Wooden Shuttering
5 times use
10 times use
A1 SHEETED TRENCH
2.00m
ONE - BRACING
JOINT HOLE
SECTION
d1
2.00m
DETAIL I
IWF.100x100x6x8
D/2 D/2
H'
H'
d1'
DETAIL
MECHANICAL JOINT
d2
d2'
300
STRUT - 1
Hd
d1
( COVER DEPTH )
1000
300
D
( PIPE DIA )
IWF.100x100x6x8
(L)
(L)
LONGITUDINAL SECTION
H'
200
GENERAL
SECTION
GENERAL SECTION
d 1'
CROSS SECTION
2.00m
d2
SHEET PILE
DETAIL I
A
joint hole:
`@
5.5 m
50 GSP PIPE
2.00m
2.00m
TOP VIEW
2.00m
IWF.100x100x6x8
50 GSP PIPE
50 GSP PIPE
50 GSP PIPE
2.00m
2.00m
2.00m
TOP VIEW
ND hd
hb
H'
H"
d1
d2
d1'
d2'
Sheet Pile
PVC/SP DIP length thick
(Sand Backfill) hs
(mm)
200
1.5
0.90
0.2
1.90
0.35
2.25
0.80
0.40
0.50
0.20
0.40
0.1
D/2
2.80
10
6.17
17.2
250
1.5
0.95
0.2
1.95
0.35
2.30
0.80
0.40
0.50
0.20
0.40
0.1
D/2
2.85
10
6.17
17.2
300
1.5
1.00
0.2
2.00
0.35
2.35
0.80
0.40
0.50
0.20
0.40
0.1
D/2
2.90
10
6.17
17.2
350
1.5
1.05
0.2
2.05
0.35
2.40
0.80
0.40
0.50
0.20
0.40
0.1
D/2
2.95
10
6.17
17.2
400
1.5
1.10
0.2
2.10
0.35
2.45
0.80
0.40
0.50
0.20
0.40
0.1
D/2
3.00
10
6.17
17.2
450
1.5
1.15
0.2
2.15
0.35
2.50
0.80
0.40
0.50
0.20
0.40
0.1
D/2
3.05
10
6.17
17.2
500
1.5
1.50
0.2
2.20
0.50
2.70
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.20
10
6.17
17.2
600
1.5
1.60
0.2
2.30
0.50
2.80
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.30
10
6.17
17.2
700
1.5
1.70
0.2
2.40
0.50
2.90
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.40
10
6.17
17.2
800
1.5
1.80
0.2
2.50
0.50
3.00
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.50
10
6.17
17.2
900
1.5
1.90
0.2
2.60
0.50
3.10
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.60
10
6.17
17.2
1000
1.5
2.00
0.2
2.70
0.50
3.20
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.70
10
6.17
17.2
1100
1.5
2.10
0.2
2.80
0.50
3.30
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.80
10
6.17
17.2
1200
1.5
2.20
0.2
2.90
0.50
3.40
1.00
0.40
0.60
0.20
0.50
0.1
D/2
3.90
10
6.17
17.2
5 times use
Wooden Bracing:
Wooden Shuttering
5 times use
10 times use
cm 50 cm IWF100cm
nos
2.00m
GENERAL SECTION
d1
d 1'
2.00m
2.00m
DETAIL I
MECHANICAL JOINT
PL. PIPE LINE
d2'
d2
H'
H'
D/2 D/2
IWF.100x100x6x8
(L)
(L)
LONGITUDINAL SECTION
DETAIL I
50 GSP PIPE
2.00m
2.00m
TOP VIEW
2.00m
IWF.100x100x6x8
50 GSP PIPE
50 GSP PIPE
50 GSP PIPE
2.00m
2.00m
2.00m
TOP VIEW
pile
13.2 Pipe support
IWF Sutering
13.2
13.2
13.2
13.2
wooden sheet
13.2 dia = 10 cm
2.
Sheeted Trench
a. Steel Pipe
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Bracing (GSP Pipe)
Steel C & Bolt 16
Shuttering
Pavement
per
10 m
Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3
m'
200
250
300
350
400
450
500
600
700
800
900
1000
1.710
0.252
17.56
12.60
0.419
0.252
4.65
0.450
0.252
4.96
1.12
0.270
1.853
0.266
19.01
13.31
0.473
0.266
5.21
0.522
0.266
5.70
1.14
0.285
2.000
0.280
20.51
14.00
0.529
0.280
5.80
0.600
0.280
6.51
1.16
0.300
2.153
0.294
22.06
14.71
0.586
0.294
6.39
0.682
0.294
7.35
1.18
0.32
2.310
0.308
23.66
15.40
0.644
0.308
7.00
0.770
0.308
8.26
1.20
0.33
2.473
0.322
25.32
16.10
0.704
0.322
7.63
0.863
0.322
9.22
1.22
0.35
3.300
0.750
34.36
19.79
1.004
0.750
11.40
1.200
0.750
14.57
1.28
0.53
3.680
0.800
38.25
22.40
1.157
0.800
13.02
1.440
0.800
15.85
1.32
0.56
4.080
0.850
42.35
23.80
1.315
0.850
14.70
1.700
0.850
18.55
1.36
0.60
4.500
0.900
46.64
25.20
1.478
0.900
16.42
1.980
0.900
21.44
1.40
0.63
4.940
0.950
51.13
26.60
1.644
0.950
18.17
2.280
0.950
24.53
1.44
0.67
5.400
1.000
55.82
28.00
1.815
1.000
19.97
2.600
1.000
27.82
1.48 5 times Usage.
0.70 20 times Usage.
Kg/m
1.188
1.188
1.188
1.188
1.188
1.188
1.188
1.188
1.188
1.188
1.188
Kg/m
m2
17.2
1.20
17.2
1.25
17.2
1.30
17.2
1.35
17.2
1.40
17.2
1.45
17.2
1.80
17.2
1.90
17.2
2.00
17.2
2.10
17.2
2.20
200
250
300
350
400
450
500
600
700
800
900
1.710
0.252
17.56
14.25
0.254
0.252
3.00
0.285
0.252
3.31
1.12
1.853
0.266
19.01
15.20
0.284
0.266
3.32
0.333
0.266
3.81
1.14
2.000
0.280
20.51
16.14
0.315
0.280
3.66
0.386
0.280
4.37
1.16
2.153
0.294
22.06
17.11
0.346
0.294
3.99
0.442
0.294
4.95
1.18
2.310
0.308
23.66
18.07
0.377
0.308
4.33
0.503
0.308
5.59
1.20
2.473
0.322
25.32
19.05
0.409
0.322
4.68
0.568
0.322
6.27
1.22
3.300
0.750
34.36
25.27
0.577
0.750
7.13
0.773
0.750
9.09
1.28
3.680
0.800
38.25
27.38
0.659
0.800
8.04
0.942
0.800
10.87
1.32
4.080
0.850
42.35
29.52
0.743
0.850
8.98
1.128
0.850
12.83
1.36
4.500
0.900
46.64
31.69
0.829
0.900
9.93
1.331
0.900
14.95
1.40
b. DIP
Work Items
Excavation-1
Excavation-2
Excavation
Backfilling
Sand Fill-1
Sand Fill-2
Sandfill
Disposal-1
Disposal-2
Disposal
Sheet Pile
Diameter
unit
m3/m
m3/pl
m3
m3
m3/m
m3/pl
m3
m3/m
m3/pl
m3
m3
1000
4.940 5.400
0.950 1.000
51.13 55.820
33.87 36.07
0.917 1.008
0.950 1.000
10.90 11.90
1.553 1.793
0.950 1.000
17.26 19.75
1.44
1.48
Bracing
Steel C & Bolt 16
Support
Pavement
m'
Kg/m
Kg/m
m2
0.27
1.19
17.2
1.20
0.29
1.19
17.2
1.25
0.30
1.19
17.2
1.30
0.32
1.19
17.2
1.35
0.33
1.19
17.2
1.40
0.35
1.19
17.2
1.45
0.53
1.19
17.2
1.80
0.56
1.19
17.2
1.90
0.60
1.19
17.2
2.00
0.63
1.19
17.2
2.10
0.67
1.19
17.2
2.20
0.70
1.19
17.2
2.30
( mm )
T
(m)
L
(m)
t
(m)
A pipa
( m2 )
25
0.700
0.325
0.275
0.00049
40
0.700
0.340
0.290
0.00126
50
0.700
0.350
0.300
0.00196
75
1.000
0.375
0.325
0.00442
100
1.000
0.400
0.350
0.00785
150
1.200
0.450
0.400
0.01767
200
1.200
0.500
0.450
0.03142
250
1.400
0.550
0.500
0.04909
300
1.9500
0.600
0.600
0.07069
10
350
2.0000
0.650
0.650
0.09621
11
400
2.0500
0.700
0.700
0.12566
12
450
2.1000
0.750
0.750
0.15904
13
500
2.1500
0.800
0.800
0.19635
14
600
2.2500
0.900
0.900
0.28274
15
700
2.3500
1.000
1.000
0.38485
16
800
2.4500
1.100
1.100
0.50265
15
L x T x 1 m'
0.3250
0.3400
0.3500
0.3750
0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000
X
X
X
X
X
X
X
X
X
X
X
X
X
0.7000
0.7000
0.7000
1.0000
1.0000
1.2000
1.2000
1.4000
1.9500
2.0000
2.0500
2.1000
2.1500
=
=
=
=
=
=
=
=
=
=
=
=
=
=
LT
m3
0.2275 m3
0.2380 m3
0.2450 m3
0.3750 m3
0.4000 m3
0.5400 m3
0.6000 m3
0.7700 m3
1.1700 m3
1.3000 m3
1.4350 m3
1.5750 m3
1.7200 m3
600 =
700 =
800 =
0.9000
1.0000
1.1000
X
X
X
2.2500
2.3500
2.4500
=
=
=
2.0250 m3
2.3500 m3
2.6950 m3
Vups = ( (t x L ) - A ) x 1 m'
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =
0.2750
0.2900
0.3000
0.3250
0.3500
0.4000
0.4500
0.5000
0.6000
0.6500
0.7000
0.7500
0.8000
0.9000
1.0000
1.1000
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0.3250
0.3400
0.3500
0.3750
0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000
0.9000
1.0000
1.1000
=
-
..
0.00049
0.00126
0.00196
0.00442
0.00785
0.01767
0.03142
0.04909
0.07069
0.09621
0.12566
0.15904
0.19635
0.28274
0.38485
0.50265
m3
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.0889
0.0973
0.1030
0.1175
0.1321
0.1623
0.1936
0.2259
0.2893
0.3263
0.3643
0.4035
0.4437
0.5273
0.6152
0.7073
datan
T
15
10
15
T
15
10
15
15
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
T
15
10
15
15
Galian Tanah :
Vupd = Vgp - ( L x t ) x 1 m'
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =
0.2275
0.2380
0.2450
0.3750
0.4000
0.5400
0.6000
0.7700
1.1700
1.3000
1.4350
1.5750
1.7200
2.0250
2.3500
2.6950
0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100
..
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0.275
0.290
0.300
0.325
0.350
0.400
0.450
0.500
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100
m3
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.1381
0.1394
0.1400
0.2531
0.2600
0.3600
0.3750
0.4950
0.8100
0.8775
0.9450
1.0125
1.0800
1.2150
1.3500
1.4850
0.138
0.139
0.140
0.253
0.260
0.360
0.375
0.495
0.810
0.878
0.945
1.013
1.080
1.215
1.350
1.485
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
=
0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.1056
0.1054
0.1050
0.2156
0.2200
0.3150
0.3250
0.4400
0.7500
0.8125
0.8750
0.9375
1.0000
1.1250
1.2500
1.3750
Galian Aspal :
Vupd = (Vgp - ( L x t )) - ( 0,45 x L ) x 1 m'
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =
0.253
0.260
0.360
0.375
0.495
0.810
0.878
0.945
1.013
1.080
1.215
1.350
1.485
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
0.450
X
X
X
X
X
X
X
X
X
X
X
X
X
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.0844
0.0800
0.1575
0.1500
0.2475
0.5400
0.5855
0.6300
0.6755
0.7200
0.8100
0.9000
0.9900
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
T
15
10
15
15
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
0.1
T
15
10
15
15
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
0.45
T
15
10
15
15
0,050 x L
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
=
0.325
0.340
0.350
0.375
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
0.900
1.000
1.100
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0,05L
0.0163
0.0170
0.0175
0.0188
0.0200
0.0225
0.0250
0.0275
0.0300
0.0325
0.0350
0.0375
0.0400
0.0450
0.0500
0.0550
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Perbaikan Paving
Vpb =
m2
0.1
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =
0.325 m2
0.340 m2
0.350 m2
0.375 m2
0.400 m2
0.450 m2
0.500 m2
0.550 m2
0.600 m2
0.650 m2
0.700 m2
0.750 m2
0.800 m2
0.900 m2
1.000 m2
1.100 m2
15
10
15
15
Perbaikan Aspal
Vpb =
25 =
40 =
50 =
75 =
100 =
150 =
200 =
250 =
300 =
350 =
400 =
450 =
500 =
600 =
700 =
800 =
m2
0.325 m2
0.340 m2
0.350 m2
0.375 m2
0.400 m2
0.450 m2
0.500 m2
0.550 m2
0.600 m2
0.650 m2
0.700 m2
0.750 m2
0.800 m2
0.900 m2
1.000 m2
1.100 m2
0.1
15
10
15
15
0.05
T
15
10
15
15
No
Description Work
Unit
Unit Price
(Rp.)
Foreman
day
45,000.00
day
47,000.00
Skill Mason/masonry
day
42,000.00
Skill Carpenter
day
42,000.00
Skill Painter
day
42,000.00
Pipe Fitter
day
42,000.00
Electric Worker
day
42,000.00
Mechanical Worker
day
50,000.00
Welder
day
75,000.00
10
Re-bar Bender
day
42,000.00
11
Labour
day
32,000.00
12
day
50,000.00
13
day
45,000.00
14
Guardsman
day
35,000.00
15
Driver
day
25,000.00
No
II
Description Work
Unit
Unit Price
(Rp.)
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
seed
seed
zak
zak
each
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
sheet
sheet
sheet
sq.m
sq.m
kg
kg
kg
kg
roll
kg
m2
m2
m2
m2
kg
kg
cu.m
cu.m
lt
lt
m'
45,000.00
120,000.00
70,000.00
140,000.00
120,000.00
210,000.00
155,000.00
175,000.00
175,000.00
130,000.00
325.00
1,800.00
49,500.00
75,500.00
26,000.00
150,000.00
650,000.00
4,800,000.00
5,500,000.00
6,000,000.00
6,800,000.00
7,000,000.00
7,800,000.00
6,000,000.00
105,000.00
50,000.00
40,000.00
63,000.00
72,000.00
48,300.00
8,750.00
10,000.00
15,000.00
75,000.00
14,000.00
62,500.00
75,000.00
90,000.00
105,000.00
7,200.00
10,350.00
8,500.00
4,200.00
4,500.00
4,500.00
414,000.00
No
Description Work
III
Unit
Unit Price
(Rp.)
day
day
day
day
hour
day
day
hour
hour
99,187.50
264,500.00
165,312.50
99,187.50
330,625.00
627,000.00
79,350.00
231,437.50
297,562.50
10
Grindstone machine
hour
19,837.50
11
hour
165,312.50
12
Generator
hour
165,312.50
13
day
1,140,000.00
14
day
1,729,000.00
15
day
3,287,000.00
16
day
997,500.00
17
day
997,500.00
18
day
1,330,000.00
19
day
1,795,500.00
20
Pipe Cutter
day
71,500.00
21
Re-barbender
day
40,000.00
22
hour
462,875.00
23
Water Pump
hour
150,000.00
1
2
3
4
5
6
7
8
9
lf
Tw
b2
300
b B
bs
b1
Tw
lf
Tw
lf
a
L
Tw
lf'
100
ts
h1
P
h H
Q
h2
q
tb
ls
Tw
lf
a
L
Tw
lf'
bs
tb
ts
le1
le
Le
be
500
2600
2500
2800
2100
2000
2250
1200
800
800
1450
250
200
240
900 1100.1
300
250
1.00
4.60
7.50
3.20
600
2600
2500
2800
2100
2000
2250
1200
800
800
1450
250
200
240
900 1100.1
300
250
1.00
4.60
7.50
3.20
700
2700
2600
2900
2200
2100
2350
1250
850
850
1500
250
200
240
900 1150.2
300
250
1.00
4.70
7.70
3.25
800
2800
3100
3000
2300
2600
2450
1700
900
900
1550
250
200
240
900 1200.2
300
250
1.00
4.80
7.90
3.70
900
2900
3200
3100
2400
2700
2550
1700
1000
950
1600
250
200
240
900 1250.2
300
250
1.00
4.90
8.10
3.70
1000
2900
3300
3200
2400
2800
2650
1800
1000
1000
1650
250
200
240
1000 1300.3
300
250
1.00
4.90
8.20
3.80
butterfly valve:
Horrizontal,
Construction
D
Pipe Installation
Earth Work
Excav.
Backfill
Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work
Re-bar
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
sq.m
Ton
500
31.03
16.26
14.78
2.21
0.74
8.75
32.76
0.875
600
31.03
16.26
14.78
2.21
0.74
8.75
32.76
700
32.85
16.20
16.65
2.29
0.76
9.50
800
35.96
14.54
21.42
2.66
0.89
900
37.76
13.95
23.81
2.72
0.91
Scaff.
sq.m
Miscellaneous
T. Supp. V.Supp. Manhole
nos
Lowering &
Step
Centering
cu.m
cu.m
m'
4.2
0.32
0.545
7.00
3.13
0.875
4.2
0.32
0.545
7.00
3.13
35.36
0.9501
4.6
0.35
0.595
8.00
3.20
11.39
41.38
1.1389
6.0
0.46
0.648
8.00
3.26
12.24
44.30
1.2244
6.5
0.50
0.703
8.00
3.33
1000
39.6
14.09
25.51
2.79
0.93
12.82
46.40
1.2816
6.7
0.52
0.845
Temporary suport
Valve suport
9.00
3.33
b2
bs
tb
ts
le1
le
Le
be
300
2200
1900
2350
1800
1500
1900
850
650
450
1450
200
200
240
900 750.03
250
200
1.00
4.20
6.65
2.85
350
2200
2000
2425
1800
1600
1975
900
700
500
1475
200
200
240
900 800.04
250
200
1.00
4.20
6.73
2.90
400
2400
2000
2450
2000
1600
2000
900
700
500
1500
200
200
240
900 800.05
250
200
1.00
4.40
6.95
2.90
450
2400
2100
2525
2000
1700
2075
950
750
550
1525
200
200
240
900
250
200
1.00
4.40
7.03
2.95
850
butterfly valve:
Horrizontal,
Construction
Pipe Installation
Earth Work
Foundation
Concrete Work
W.Floor
Concrete
Work
cu.m
cu.m
cu.m
sq.m
Ton
8.04
1.80
0.60
4.69
21.97
15.51
8.79
1.83
0.61
4.98
25.12
15.42
9.70
1.91
0.64
26.18
15.63
10.56
1.95
0.65
Excav.
Backfill
Disposal
cu.m
cu.m
cu.m
300
23.28
15.23
350
24.30
400
450
Gravel
Lowering &
Miscellaneous
Form
Re-bar
Scaff.
T. Supp.
V.Supp.
Manhole
sq.m
cu.m
cu.m
0.47
2.70
0.21
0.25
6.00
2.86
23.25
0.50
2.88
0.22
0.29
6.00
2.86
5.36
24.76
0.54
3.20
0.25
0.29
6.00
2.99
5.67
26.13
0.57
3.40
7.00
2.99
0.26
0.33
Temporary suport
Valve suport
nos
Step
Centering
m'
Earth Work
Be
he
He
6.10
2.70
2.90
6.10
2.70
2.90
6.25
2.80
3.00
6.80
2.90
3.10
6.90
3.00
3.20
7.10
3.10
3.30
Short body
Pipe Installation
1,000
Flang Jointing
Centering
Mechnical
Jointing
pl
nos
nos
3.13
3.13
3.20
3.26
3.33
3.33
Be
he
He
5.30
2.25
2.45
5.43
2.33
2.53
5.45
2.35
2.55
5.58
2.43
2.63
Short body
Pipe Installation
1,000
Flang Jointing
Centering
Mechnical
Jointing
pl
nos
nos
2.86
2.86
2.99
2.99
le1
Be
be
le1
Earth Work
le
Le
He
he
Slope
1 * 0.5
0.05
0.15
He
he
0.2
Work Floor
Gravel Layer
le1
le
Le
0.2
He
he
Slopwe
1*0.5
Be
be
le1
be
Be
he
He
100
1300
1300
1500
1900
1000
1000
150
200
350
200
150
0.50
2.30
4.65
2.30
4.65
2.15
2.35
150
1300
1300
1500
1950
1000
1000
150
200
375
200
150
0.50
2.30
4.70
2.30
4.70
2.20
2.40
200
1300
1300
1500
2000
1000
1000
150
200
400
200
150
0.50
2.30
4.75
2.30
4.75
2.25
2.45
250
1300
1300
1500
2050
1000
1000
150
200
425
200
150
0.50
2.30
4.80
2.30
4.80
2.30
2.50
Gate valve:
Horrizontal,
Short body
Pipe Installation
Construction
D
Earth Work
Excav.
Backfill
Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
sq.m
100
16.333
3.972
12.361
0.794
0.265
0.338
16.200
150
16.800
4.056
12.744
0.794
0.265
0.338
200
17.273
4.141
13.132
0.794
0.265
250
17.750
4.225
13.525
0.794
0.265
Re-bar
Ton
Scaff.
Miscellaneous
T. Supp. V.Supp. Manhole
nos
Centering
pl
sq.m
cu.m
cu.m
33.800
1.000
0.077
0.350
6.00
1.50
16.600
0.034
1.000
0.077
0.375
6.00
1.50
0.338
17.000
0.034
1.000
0.077
0.400
6.00
1.50
0.338
17.400
0.034
1.000
0.077
0.425
6.00
1.50
Flang Jointing
1,000
Flang Jointing
Mechnical
Jointing
nos
nos
1
le1
le
Le
0.2
He
he
Slopwe
1*0.5
Be
be
le1
200 - 350mm
H
tw
tb
ts
le1
(100-450) - 80
790
990
700
350
550
120
100
150
115
0.50
1.79
2.86
1.99
3.06
0.87
1.07
(450-1000) - 100
896
1196
800
456
756
120
100
150
115
0.50
1.90
3.06
2.20
3.36
0.97
1.17
Gate valve:
Horrizontal,
Short body
Pipe Installation
Construction
Earth Work
Excav.
Backfill
Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
sq.m
100
5.160
0.833
4.327
0.534
0.178
0.156
2.153
150
6.124
1.248
4.876
0.625
0.208
0.214
3.263
Re-bar
Ton
Scaff.
Miscellaneous
T. Supp. Manhole
Step
sq.m
cu.m
23.463
0.193
0.015
32.148
0.345
0.026
Centering
m'
0.89
1.00
nos
pl
1,000
Flang Jointing
Mechnical
Jointing
nos
nos
PN16
90Bend(t)
PN10
PN16
45Bend(t)
PN10
PN16
22.5Bend(t)
PN10
PN16
100
0.79
1.26
1.12
1.78
0.60
0.96
0.31
0.49
0.15
0.25
150
1.77
2.83
2.50
4.00
1.35
2.17
0.69
1.10
0.35
0.55
200
3.14
5.02
4.44
7.10
2.40
3.84
1.23
1.96
0.62
0.98
250
4.91
7.85
6.94
11.10
3.76
6.01
1.92
3.06
0.96
1.54
300
7.07
11.3
10.00
15.98
5.41
8.65
2.76
4.41
1.39
2.22
350
9.62
15.39
13.60
21.76
7.36
11.78
3.75
6.01
1.89
3.02
400
12.56
20.1
17.76
28.43
9.61
15.38
4.90
7.84
2.46
3.94
450
15.9
25.43
22.49
35.96
12.17
19.46
6.20
9.92
3.12
4.99
500
19.63
31.4
27.76
44.41
15.02
24.03
7.66
12.25
3.85
6.16
600
28.26
45.22
39.97
63.95
21.63
34.61
11.03
17.64
5.54
8.86
700
38.47
61.54
54.40
87.03
29.44
47.10
15.01
24.01
7.54 12.06
800
50.24
80.38
71.05 113.67
38.45
61.52
19.60
31.36
9.85 15.76
900
63.59 101.74
89.93 143.88
48.67
77.87
24.81
39.70
12.47 19.95
11.25Bend(t)
PN10 PN16
1000
78.5
125.6
111.01 177.62
60.08
96.13
30.63
49.01
15.39 24.62
1100
94.99 151.98
134.33 214.93
72.71 116.33
37.07
59.30
18.62 29.79
1200
113.04 180.86
159.86 255.77
86.52 138.43
44.11
70.57
22.16 35.46
1300
132.67 212.26
187.62 300.18
101.55 162.46
51.77
82.82
26.01 41.61
1400
153.86 246.18
217.59 348.15
117.76 188.43
60.04
96.06
30.16 48.26
1500
176.63
249.79 399.65
135.19 216.30
68.92 110.27
34.63 55.40
282.6
B'
PN =
10 kg/cm2
100
C
G
Dia
B'
C'
D'
Dia.
E.Work
mm
100
0.23
0.26
0.28
0.16
0.19
0.27
0.08
0.10
0.13
0.21
0.15
0.15
100 included
150
0.34
0.38
0.43
0.24
0.29
0.40
0.12
0.15
0.19
0.31
0.15
0.15
150 in
200
0.670
1.493
1.493
0.972
0.972
0.420
0.210
0.200
0.470
0.600
0.150
0.300
200
included
250
0.720
2.001
2.001
1.454
1.454
0.438
0.192
0.225
0.495
0.650
0.150
0.300
250
in
300
0.810
2.199
2.199
1.590
1.590
0.567
0.283
0.250
0.560
0.700
0.150
0.300
300
Trench
350
1.060
2.706
2.706
1.922
1.922
0.656
0.266
0.375
0.685
0.750
0.150
0.300
350
Work
400
1.130
2.865
2.865
2.032
2.032
0.700
0.280
0.400
0.730
1.000
0.200
0.400
400
450
1.230
3.373
3.373
2.465
2.465
0.718
0.262
0.425
0.805
1.050
0.200
0.400
450
500
1.310
3.301
3.301
2.337
2.337
0.805
0.315
0.450
0.860
1.100
0.200
0.400
500
600
1.480
4.155
4.155
3.078
3.078
0.926
0.356
0.500
0.980
1.250
0.300
0.450
600
700
1.660
4.941
4.941
3.734
3.734
1.031
0.391
0.550
1.110
1.400
0.300
0.500
700
800
1.890
5.377
5.377
3.788
3.788
1.136
0.710
0.600
1.290
1.600
0.300
0.600
800
900
2.120
5.813
5.813
4.244
4.244
1.141
0.460
0.650
1.470
1.800
0.300
0.700
900
1000
2.520
6.437
6.437
4.520
4.520
1.276
0.425
0.700
1.820
1.900
0.300
0.700
1000
gravel t=
0.15 m
Concrete
Form
0.019
0.024
0.034
0.043
0.081
0.312
0.250
1.030
3.512
0.368
1.579
5.052
0.442
2.092
6.092
0.573
3.556
8.125
1.077
5.411
11.778
1.329
7.167
14.459
1.364
7.715
14.948
2.953
12.342
21.501
R-bar
3.942
18.203
28.731
4.842
25.438
35.818
5.863
34.528
43.893
6.730
47.265
51.305
PN =
10 kg/cm2
B
H
T
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
Dia
B'
C'
D'
200
0.45
0.50
0.50
0.14
0.14
250
0.50
0.66
0.66
0.33
0.33
300
0.55
0.67
0.67
0.32
350
0.60
0.83
0.83
400
0.85
0.89
450
0.95
500
0.20
0.25
0.40
0.15
0.10
200
0.23
0.28
0.45
0.15
0.10
250 included
0.32
0.25
0.30
0.50
0.15
0.10
300 in
0.46
0.46
0.28
0.33
0.55
0.15
0.10
350 Trench
0.89
0.45
0.45
0.30
0.35
0.60
0.20
0.10
400 Work
0.91
0.91
0.59
0.59
0.33
0.38
0.65
0.20
0.10
450
0.95
0.94
0.94
0.63
0.63
0.40
0.45
0.75
0.20
0.10
500
600
1.05
1.16
1.16
0.62
0.62
0.45
0.50
0.90
0.30
0.15
600
700
1.05
1.33
1.33
0.58
0.58
0.50
0.55
1.00
0.30
0.15
700
800
1.15
1.60
1.60
0.76
0.76
0.55
0.60
1.10
0.30
0.15
800
900
1.30
1.72
1.72
0.89
0.89
0.65
0.65
1.20
0.30
0.15
900
1000
1.40
1.94
1.94
1.12
1.12
0.70
0.70
1.30
0.30
0.15
1000
GRAVEL
OR ROCK
gravel t=
Gravel Lyer Concrete Work
m3
Concrete
0.15 m
Form
0.019
0.095
0.512
0.050
0.174
0.891
0.053
0.202
0.990
0.083
0.302
1.419
0.153
0.515
1.608
0.224
0.688
1.950
0.239
0.811
2.355
0.391
1.179
3.204
0.365
1.271
3.820
0.524
1.800
5.192
0.694
2.412
6.264
0.941
3.167
7.956
R-bar
PN =
10 kg/cm2
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
Dia
B'
C'
D'
400
0.50
0.46
0.46
0.34
0.34
450
0.55
0.51
0.51
0.38
0.38
500
0.85
0.47
0.47
0.32
600
0.95
0.63
0.63
700
0.95
0.74
800
1.05
900
1000
0.30
0.30
0.60
0.20
0.10
400 Work
0.38
0.33
0.65
0.20
0.10
450 included
0.32
0.40
0.35
0.70
0.20
0.10
500 in
0.64
0.64
0.45
0.40
0.80
0.30
0.10
600 Trench
0.74
0.55
0.55
0.50
0.45
0.90
0.30
0.10
700 Work
0.90
0.90
0.96
0.96
0.55
0.50
1.00
0.30
0.10
800
0.95
1.01
1.01
0.78
0.78
0.60
0.55
1.10
0.30
0.10
900
1.05
1.22
1.22
0.97
0.97
0.65
0.60
1.20
0.30
0.10
1000
gravel t=
Gravel Lyer Concrete Work
m3
Concrete
0.15 m
Form
0.068
0.140
0.960
0.084
0.177
1.157
0.109
0.315
1.106
0.365
0.606
2.032
0.314
0.607
2.322
0.605
1.019
3.720
0.445
0.732
3.938
0.611
1.040
5.256
R-bar
PN =
10 kg/cm2
H
T
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
Dia
B'
C'
D'
800
1.40
0.68
0.68
0.45
0.45
900
1.60
0.74
0.74
0.59
0.59
1000
1.70
0.80
0.80
0.63
0.63
0.60
0.80
1.00
0.30
0.45
800
0.65
0.95
1.55
0.30
0.45
900
0.70
1.00
1.65
0.30
0.45
1000
gravel t=
Gravel Lyer Concrete Work
m3
Concrete
0.15 m
Form
0.378
1.014
2.260
0.566
2.453
4.123
0.643
2.889
4.719
R-bar
PN16
90Bend(t)
PN10
PN16
45Bend(t)
PN10
PN16
22.5Bend(t)
PN10
PN16
100
0.79
1.26
1.12
1.78
0.60
0.96
0.31
0.49
0.15
0.25
150
1.77
2.83
2.50
4.00
1.35
2.17
0.69
1.10
0.35
0.55
200
3.14
5.02
4.44
7.10
2.40
3.84
1.23
1.96
0.62
0.98
250
4.91
7.85
6.94
11.10
3.76
6.01
1.92
3.06
0.96
1.54
300
7.07
11.3
10.00
15.98
5.41
8.65
2.76
4.41
1.39
2.22
350
9.62
15.39
13.60
21.76
7.36
11.78
3.75
6.01
1.89
3.02
400
12.56
20.1
17.76
28.43
9.61
15.38
4.90
7.84
2.46
3.94
450
15.9
25.43
22.49
35.96
12.17
19.46
6.20
9.92
3.12
4.99
500
19.63
31.4
27.76
44.41
15.02
24.03
7.66
12.25
3.85
6.16
600
28.26
45.22
39.97
63.95
21.63
34.61
11.03
17.64
5.54
8.86
700
38.47
61.54
54.40
87.03
29.44
47.10
15.01
24.01
7.54 12.06
800
50.24
80.38
71.05 113.67
38.45
61.52
19.60
31.36
9.85 15.76
900
63.59 101.74
89.93 143.88
48.67
77.87
24.81
39.70
12.47 19.95
11.25Bend(t)
PN10 PN16
1000
78.5
125.6
111.01 177.62
60.08
96.13
30.63
49.01
15.39 24.62
1100
94.99 151.98
134.33 214.93
72.71 116.33
37.07
59.30
18.62 29.79
1200
113.04 180.86
159.86 255.77
86.52 138.43
44.11
70.57
22.16 35.46
1300
132.67 212.26
187.62 300.18
101.55 162.46
51.77
82.82
26.01 41.61
1400
153.86 246.18
217.59 348.15
117.76 188.43
60.04
96.06
30.16 48.26
1500
176.63
249.79 399.65
135.19 216.30
68.92 110.27
34.63 55.40
282.6
B'
PN =
10 kg/cm2
100
C
G
Dia
B'
C'
D'
Dia.
E.Work
mm
Gravel Lyer
m3
100
0.23
0.26
0.28
0.16
0.19
0.27
0.08
0.10
0.13
0.21
0.15
0.15
100 included
0.019
150
0.34
0.38
0.43
0.24
0.29
0.40
0.12
0.15
0.19
0.31
0.15
0.15
150 in
0.043
200
0.59
0.83
0.57
0.39
0.38
0.35
0.14
0.20
0.39
0.45
0.15
0.15
200 Trench
0.090
250
0.65
1.16
0.57
0.69
0.41
0.41
0.16
0.23
0.43
0.50
0.15
0.15
250 Work
0.127
300
0.72
1.27
0.64
0.75
0.45
0.46
0.18
0.25
0.47
0.55
0.15
0.15
300
0.154
350
0.93
1.55
0.72
0.89
0.42
0.59
0.20
0.38
0.56
0.60
0.15
0.15
350
0.196
400
1.00
1.51
0.73
0.80
0.80
0.63
0.21
0.40
0.60
0.75
0.20
0.15
400
0.351
450
1.06
1.68
1.68
0.95
0.95
0.69
0.23
0.43
0.64
0.80
0.20
0.15
450
0.494
500
1.14
1.86
1.86
1.07
1.07
0.78
0.28
0.45
0.69
0.90
0.20
0.20
500
0.623
600
1.31
2.18
2.18
1.26
1.26
0.84
0.28
0.50
0.81
1.05
0.30
0.25
600
1.259
700
1.43
2.63
2.63
1.65
1.65
0.96
0.32
0.55
0.88
1.15
0.30
0.25
700
1.699
800
1.66
3.12
3.12
1.76
1.76
1.07
0.64
0.60
1.06
1.30
0.30
0.30
800
2.234
900
1.82
3.41
3.41
2.14
2.14
1.24
0.46
0.65
1.17
1.40
0.30
0.30
900
2.691
1000
2.05
3.80
3.80
2.35
2.35
1.35
0.50
0.70
1.35
1.50
0.30
0.30
1000
3.181
gravel t=
0.15 m
Concrete Work
Concrete
Form
0.024
0.034
0.081
0.312
0.312
1.103
0.468
1.562
0.606
1.900
1.007
2.633
1.462
3.756
2.128
5.225
2.871
6.711
4.369
9.263
R-bar
6.204
12.416
9.482
16.696
12.253
20.212
16.187
24.216
PN =
10 kg/cm2
B
H
d
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
Dia
B'
C'
D'
200
0.50
0.72
0.72
0.24
0.24
250
0.55
0.88
0.88
0.53
0.53
300
0.60
0.94
0.94
0.52
350
0.65
1.11
1.11
400
0.85
1.24
450
0.95
500
0.20
0.30
0.55
0.15
0.10
200
0.036
0.23
0.33
0.65
0.15
0.10
250 included
0.087
0.52
0.25
0.35
0.70
0.15
0.10
300 in
0.094
0.66
0.66
0.28
0.38
0.75
0.15
0.10
350 Trench
0.129
1.24
0.70
0.70
0.30
0.45
0.90
0.20
0.10
400 Work
0.238
1.27
1.27
0.84
0.84
0.43
0.53
1.05
0.20
0.10
450
0.319
0.95
1.28
1.28
0.93
0.93
0.45
0.55
1.10
0.20
0.10
500
0.353
600
1.05
1.59
1.59
0.87
0.87
0.50
0.70
1.20
0.30
0.15
600
0.548
700
1.30
1.86
1.86
0.86
0.86
0.55
0.75
1.30
0.30
0.15
700
0.671
800
1.40
2.23
2.23
1.09
1.09
0.60
0.80
1.40
0.30
0.15
800
0.916
900
1.60
2.39
2.39
1.32
1.32
0.62
0.95
1.55
0.30
0.15
900
1.267
1000
1.70
2.71
2.71
1.65
1.65
0.70
1.00
1.65
0.30
0.15
1000
1.683
Concrete Work
Concrete
Form
0.234
1.056
0.435
1.833
0.510
2.044
0.693
2.655
1.240
3.492
1.769
4.431
1.876
4.862
2.404
5.904
3.551
7.072
4.839
9.296
6.842
11.501
8.807
14.388
R-bar
PN =
10 kg/cm2
22.5 Bend
B
H
T
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
B'
C'
D'
Dia.
E.Work
mm
Gravel Lyer
m3
400
0.60
0.59
0.59
0.44
0.44
0.30
0.45
0.90
0.20
0.40
400 Work
0.106
450
0.65
0.60
0.60
0.42
0.42
0.43
0.43
1.05
0.20
0.40
450 included
0.109
500
0.85
0.61
0.61
0.41
0.41
0.45
0.55
1.10
0.20
0.40
500 in
0.139
600
0.95
0.79
0.79
0.55
0.55
0.50
0.70
1.20
0.30
0.40
600 Trench
0.314
700
0.95
0.95
0.95
0.69
0.69
0.55
0.75
1.30
0.30
0.40
700 Work
0.393
800
1.05
1.11
1.11
0.83
0.83
0.60
0.80
1.40
0.30
0.40
800
0.523
900
1.30
1.19
1.19
0.87
0.87
0.65
0.95
1.55
0.30
0.45
900
0.679
1000
1.40
1.35
1.35
1.01
1.01
0.70
1.00
1.65
0.30
0.45
1000
0.848
gravel t=
0.15 m
Concrete Work
Concrete
Form
0.427
1.854
0.534
2.142
0.754
2.244
1.149
3.216
1.395
4.264
1.877
5.432
2.841
6.386
3.599
7.788
R-bar
PN =
10 kg/cm2
11.5 Bend
B
H
T
COMPACTED GRAVEL
OR ROCK
C
CONCRETE
B'
C'
D'
Dia.
E.Work
Gravel Lyer
mm
m3
800
1.40
0.68
0.68
0.54
0.54
0.60
0.80
1.40
0.30
0.40
800
0.454
900
1.60
0.74
0.74
0.59
0.59
0.65
0.95
1.55
0.30
0.45
900
0.566
1000
1.70
0.80
0.80
0.63
0.63
0.70
1.00
1.65
0.30
0.45
1000
0.643
gravel t=
0.15 m
Concrete Work
Concrete
Form
1.778
3.416
2.453
4.123
2.889
4.719
R-bar
2.
Blow-off Assembly
3.
1.
2.
Blow-off Assembly
3.
50
75
100
150
200
250
300
350
191,300
196,400
303,200
530,000
734,800
1,068,900
24,258,000
25,716,000
400
450
500
600
700
800
900
1000
27,912,000
29,527,000
36,226,000
38,180,000
40,989,000
44,786,000
55,494,000
60,328,000
VALVE ASSEMBLY
1)
W/Surface Box
Dia.
Materials
(mm) Valve
no.
1F Short Pipe
Surface Box/Manhole
Socket
Total
no.
Rp
nos.
Rp
nos.
Rp
50
1
2,000,000
1
75
1
2,550,000
1
100
1
3,400,000
1
150
1
5,780,000
1
200
1
8,760,000
1
250
1
13,400,000
1
Dia.
Construction
(mm) Excavation
Backfill
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
1,000,000
2
2
2
2
2
2
45,000
88,000
122,000
398,000
563,000
773,000
2
2
2
2
2
2
50,000
101,000
141,000
346,000
704,000
985,000
Rp
m3
Rp/m3
m3
15,300
50
0.1
75
0.1
100
0.1
150
0.2
200
0.3
250
0.5
Dia.
Installation
(mm) Valve
no
50
75
100
150
200
250
1
1
1
1
1
1
note:
1,500
1,500
1,500
3,100
4,600
7,700
Disposal
Rp/m3
76,400
Rp/m3
m3
50,300
Rp/m
nos.
13,900
1
2,400
4
5,500
18,900
1
2,500
4
5,500
24,000
1
2,800
4
9,100
37,200
1
3,800
4
11,000
50,600
1
6,200
4
11,000
69,700
1
6,200
4
11,000
earth work for valve assembly includes only additional excavation, and
backfill and disposal are included in trench work
Rp.
38,300
43,400
63,200
85,000
100,800
119,900
Form
Rp/m3
m2
552,400
0.1
0.1
0.16
0.33
0.51
0.83
Sub-total
Rp
m3
69,300
m3
Gravel Layer
3,190,000
3,928,000
4,926,000
8,268,000
12,294,000
17,916,000
55,200
55,200
88,400
182,300
281,700
458,500
Total
Rp.
191,300
196,400
303,200
530,000
734,800
1,068,900
Re-bar
Rp/m2
kg
99,400
0.9
0.9
1.4
2.4
3.2
4.4
89,500
89,500
139,200
238,600
318,100
437,400
VALVE ASSEMBLY
2)
W/Valve Chamber
Dia.
Materials
(mm) Valve
FL & Spigot/Bell
Manhole Cover
Collar
Total
no.
Rp
no.
Rp
set
Rp
nos.
Rp
1
1
1
1
17,100,000
23,500,000
33,100,000
41,800,000
1
1
1
1
1,500,000
1,500,000
1,500,000
1,500,000
1
1
1
1
4,850,000
5,910,000
7,230,000
8,590,000
2
2
2
2
2,500,000
3,120,000
3,740,000
4,440,000
28,500,000
37,200,000
49,300,000
60,800,000
500
1
153,000,000
1
600
1
162,000,000
1
700
1
187,000,000
1
800
1
204,000,000
1
900
1
238,000,000
1
1000
1
264,000,000
1
Dia.
Construction
(mm) Excavation
Backfill
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1
1
1
1
1
1
10,700,000
14,600,000
19,800,000
23,900,000
31,000,000
38,200,000
2
2
2
2
2
2
4,770,000
6,130,000
8,700,000
10,600,000
13,700,000
17,100,000
174,700,000
190,400,000
225,700,000
250,600,000
297,900,000
337,900,000
300
350
400
450
m3
Rp/m3
m3
15,300
Disposal
Rp/m3
m3
76,400
Gravel Layer
Rp/m3
m3
50,300
Lean Concrete
Rp/m3
m3
69,300
Concrete
Rp/m3
m3
552,400
Form
Rp/m3
m2
628,000
300
350
400
450
72
77
81
86
1,102,000
1,178,000
1,239,000
1,316,000
58
62
65
69
4,431,000
4,737,000
4,966,000
5,272,000
14
15
16
17
704,000
755,000
805,000
855,000
2.7
2.8
2.9
3.0
187,000
194,000
201,000
208,000
0.9
0.9
1.0
1.0
497,000
497,000
552,000
552,000
5.7
6.0
6.4
6.8
3,580,000
3,768,000
4,019,000
4,270,000
36.6
38.8
43.0
43.7
500
600
700
800
900
1000
114
125
135
151
176
193
1,744,000
1,913,000
2,066,000
2,310,000
2,693,000
2,953,000
96
105
113
127
146
160
7,334,000
8,022,000
8,633,000
9,703,000
11,154,000
12,224,000
18
20
22
24
30
33
905,000
1,006,000
1,107,000
1,207,000
1,509,000
1,660,000
2.7
2.9
3.0
3.1
3.4
3.5
187,000
201,000
208,000
215,000
236,000
243,000
0.9
1.0
1.0
1.0
1.1
1.2
497,000
552,000
552,000
552,000
608,000
663,000
7.6
8.4
8.9
9.7
13.0
14.0
4,773,000
5,275,000
5,589,000
6,092,000
8,164,000
8,792,000
48.7
53.7
59.8
63.1
71.5
77.7
Dia.
(mm)
Installation
Valve
Mech J.
Sub-total
Total
Rp.
Rp.
16,600
16,600
18,400
20,300
158,000
216,000
712,000
827,000
24,258,000
25,716,000
27,912,000
29,527,000
22,100
25,800
29,500
38,700
44,200
51,600
926,000
1,080,000
1,189,000
1,286,000
1,394,000
1,728,000
36,226,000
38,180,000
40,989,000
44,786,000
55,494,000
60,328,000
no
Rp
Rp/m
nos.
Rp
300
350
400
450
1
1
1
1
104,600
148,500
626,600
725,600
2.8
2.8
2.9
2.9
18,900
24,000
29,400
35,100
7
7
7
7
500
600
700
800
900
1000
1
1
1
1
1
1
753,800
886,900
973,400
1,049,000
1,124,000
1,200,000
2.8
2.9
3.0
3.0
3.2
3.2
61,600
66,700
71,800
78,900
84,400
165,000
7
7
7
7
7
7
Miscellaneou Sub-total
Rp/kg
5%
13,600
7,000
7,000
11,000
21,000
30,000
45,000
153,000
153,000
240,000
445,000
634,000
949,000
Re-bar
Rp/m2
Miscellaneous Sub-total
kg
99,400
Rp/kg
10%
13,600
3,638,000
3,857,000
4,274,000
4,344,000
570
600
640
680
7,752,000
8,160,000
8,704,000
9,248,000
2,189,000
2,315,000
2,476,000
2,607,000
24,100,000
25,500,000
27,200,000
28,700,000
4,841,000
5,338,000
5,944,000
6,272,000
7,107,000
7,723,000
870
840
890
970
1300
1400
11,832,000
11,424,000
12,104,000
13,192,000
17,680,000
19,040,000
3,211,000
3,373,000
3,620,000
3,954,000
4,915,000
5,330,000
35,300,000
37,100,000
39,800,000
43,500,000
54,100,000
58,600,000
Valve Assembly
1) Dimensions
Type of Valve:
Gate Valve
2) Stability Analysis
Dia.
Pressure
mm
ton
Thrust Block
B
q1
Earth Pressure
q2
Friction
F
Reaction
R
S. Factor
100
0.8
0.55
0.50
0.55
2.40
5.04
1.02
0.20
1.2
1.53
150
1.8
0.90
0.60
0.60
2.40
6.72
2.46
0.40
2.9
1.59
200
3.1
1.10
0.75
0.60
2.40
7.68
4.16
0.60
4.8
1.54
250
4.9
1.30
0.90
0.70
2.40
8.64
6.46
0.90
7.4
1.50
Unit Cost
Dia (mm) Materials
G.V.
Surface B. 1F Pipe Sleeve J.
100
1
1
2
2
150
1
1
2
2
200
1
1
2
2
250
1
1
2
2
Cooping Concrete
d= 250 mm
h= 150 mm
0.6
0.5
RCP dia.100mm
q1
D
100
150
200
250
1.05
1.40
1.60
1.80
0.25
0.55
0.70
0.85
0.50
0.60
0.75
0.90
0.55
0.60
0.60
0.70
P.Fitter G.Worker
Sleeve J.
Foreman
0.8
0.85
0.9
0.95
P
H
0.1
q2
Total
0.05
Dia (mm) Excavation
Construction
Excavation Thrust
Total
P.Fitter G.Worker
form
0.2
0.2
0.2
0.2
Grand
Total
Construction
Earth Work
Foundation
Concrete Work
D Excav. Backfill Disposal Gravel
W.Floor Concrete WForm
Re-bar
Miscellaneous
T. Supp. V.Supp. Manhole Step
Scaff.
Pipe Installation
Lowering & Valve
Centering
Setting
m
m3
m3
m3
m3
m3
m3
m2
ton
m2
m3
m3
nos
nos
300
71.8
58
13.8
2.71
0.9
5.7
36.59
0.57
31.1
7.9
0.23
2.8
350
76.6
61.70
14.9
2.77
0.92
6.00
38.80
0.60
32.6
8.7
0.28
2.77
80.5
64.5
16.0
2.90
0.97
6.43
42.96
0.64
33.9
9.6
0.29
2.93
85.7
68.7
17.0
2.97
0.99
6.77
43.73
0.68
35.4
10.5
0.35
2.9
400
450
Flang
Jointing
pl
nos
Mechnical
Jointing
nos
le1
le
Le
be
Be
he
He
300
1.00
4.20
6.65
3.90
6.35
2.25
2.45
350
1.00
4.20
6.73
4.00
6.53
2.33
2.53
400
1.00
4.40
6.95
4.00
6.55
2.35
2.55
450
1.00
4.40
7.03
4.10
6.73
2.43
2.63
Valve Assembly
1) Dimensions
300 - 450mm
lf
C2
tw
ls
ls1
ls2
b2
C1
D
b B
bs
b1
tw
lf
tw l1 l2
l
l3
l4
L
l5
tw
l
100
ts
h1
P
h H
h2
hs
tb
h'
ls
lf
tw
L'
tw lf
B
le1
le
Be
be
le1
Earth Work
Le
0.2
Work Floor
Gravel Layer
0.05
0.15
He
he
Slope
1 * 0.5
Valve Assembly
1) Dimensions
500 - 1000mm
lf
C2
tw
ls
ls1
ls2
b2
C1
D
b B
bs
b1
tw
lf
tw l1 l2
l
l3
l4
L
l5
tw
l
100
ts
h1
P
h H
h2
hs
tb
h'
ls
lf
tw
L'
tw lf
PN10
D ts
tb
tw
b1
b2
l1
500
200
350
200
750
950
1700
2100
600
200
350
200
800
1000
1800
2200
700
200
350
200
850
1050
1900
2300
800
200
350
200
900
1100
2000
2400
900
1000
200
200
400
400
250
250
950
1000
1150
1200
2100
2200
2600
2700
l2
l3
230
170
200
170
240
180
230
250
210
190
200
250
230
200
230
250
210
210
220
250
220
220
240
250
l4
l5
L'
520
230
750
750
300
750
750
350
800
800
1650
bs
hs
2050
300
500
1850
750
3150
270
430
700
1100
400
1800
2200
300
500
1900
800
3250
380
470
850
1200
400
1850
2250
300
500
1950
850
3350
350
500
850
1300
400
1900
2300
300
500
2000
1000
3550
380
520
900
1400
500
400
2000
2500
300
500
2050
1100
3750
370
530
900
1500
550
2600
300
500
2100
1200
3900
390
610
1000
1600
600
1850
400
2100
butterfly valve:
Material List
DIP Straight Pipe Fittings
D Length Number 1F Bell
m
no.
500
500
500
500
1.9
0.5
1
600
600
600
600
1.93
0.5
1
700
700
700
700
2.0
0.5
1
800
800
800
800
2.0
0.5
1
900
900
900
900
2.12
1
1
1000 1000 1000
ls
1750
600
410
h2
1700
350
600
330
h1
1650
600
320
1550
300
600
300
lf
1450
560
270
unit: mm
ls1
ls2
Weight of Fittings
2 3 Collar
I
1F Spigot Collar
1F Spigot 1F Soket
kg
kg
kg
500
500
500
109
87.0
96.0
1
3
1
107
103
157
600
600
600
140
115
135
1
3
1
146
151
204
700
700
700
185
162
185
1
3
1
184
196
256
800
800
800
225
205
233
1
3
1
223
241
315
900
900
900
278
252
280
1
3
1
270
290
393
1000 1000 1000
348
317
339
1000
2.14
348
353
464
hs
400
400
400
500
550
600
Construction
Earth Work
Foundation
Concrete Work
D Excav. Backfill Disposal Gravel
W.Floor Concrete WForm
Re-bar
Miscellaneous
T. Supp. V.Supp. Manhole Step
Scaff.
Pipe Installation
Lowering & Valve
Centering
Setting
m
pl
m3
m3
m3
m3
m3
m3
m2
ton
m2
m3
m3
nos
nos
500
114.2
96.4
17.8
2.74
0.91
7.56
48.72
0.76
41.2
11.2
0.37
2.82
600
125.0
104.70
20.3
2.90
0.97
8.35
53.72
0.84
44.2
13.1
0.50
2.93
700
134.5
112.6
21.9
3.00
1.00
8.91
59.75
0.89
46.5
14.5
0.52
2.95
800
151.3
127.1
24.3
3.11
1.04
9.65
63.13
0.97
50.3
16.6
0.73
10
2.98
900
175.7
146.1
29.6
3.38
1.13
12.98
71.54
1.30
56.1
20.5
0.84
10
3.17
1000
192.9
160.09
32.81
3.53
1.18
14.02
77.70
1.40
59.9
23.2
1.10
11
3.19
Flang
Jointing
nos
Mechnical
Jointing
nos
2
B
le1
le
Be
be
le1
Earth Work
Le
0.2
Work Floor
Gravel Layer
le1
le
Le
0.05
0.15
be
Be
he
He
500
1.00
4.05
7.30
4.10
7.35
3.05
3.25
600
1.00
4.20
7.55
4.20
7.55
3.15
3.35
He
he
Slope
1 * 0.5
700
1.00
4.25
7.70
4.30
7.75
3.25
3.45
800
1.00
4.30
7.95
4.40
8.05
3.45
3.65
900
1.00
4.50
8.35
4.60
8.45
3.65
3.85
1000
1.00
4.60
8.60
4.70
8.70
3.80
4.00
tw
tf
tb
ts
1.30
1.30
1.75
1.00
1.00
0.15
0.10
0.20
1.00
1.00
1.00
4.00
1.00
0.75
le1
Le
Be
He
0.08 ##
1.90
1.90
1.75
0.20
1.60
1.40
1.00
0.20 ##
1.40
0.75
Earth Work
Excav.
Backfill
Foundation
Concrete Work
Concrete
Disposal Gravel
W.Floor
Form
Work
cu.m
cu.m
cu.m
cu.m
cu.m
9.318
2.958
6.360
0.085
0.169
cu.m
1.838 ###
sq.m
Re-bar
Ton
183.82
Sc
aff
. sq.m
1.690
Jointing
m
12.00
Mechnical
pl
1
nos
4
nos
1
4.990
1.000
3.990
0.050
6.830
3.000
3.830
0.200 ###
0.100 ###
2.717
2.000
12.00
3.000
12.00
Lean Concrete
Rp/m3
m3
69,300
50
75
100
150
200
250
Dia.
(mm)
13
0.18
13
0.18
20
0.18
20
0.18
25
0.18
25
0.18
Air valve Installation
mm Valve
no
50
75
100
150
200
250
13
13
20
20
25
25
1
1
1
1
1
1
note:
12,500
12,500
12,500
12,500
12,500
12,500
0.06
0.06
0.06
0.06
0.06
0.06
33,100
33,100
33,100
33,100
33,100
33,100
Re-bar
Rp/m3
552,400
m2
62,800
0.46
0.46
0.46
0.46
0.46
0.46
28,900
28,900
28,900
28,900
28,900
28,900
Rp/m
nos.
Rp/m2
Miscellan
kg
Rp/kg
99,400
4.16
4.16
4.16
4.16
4.16
4.16
m3
Form
Rp
12,600
1
2,400
4
5,500
12,600
1
2,500
4
5,500
12,600
1
2,800
4
9,100
12,600
1
3,800
4
11,000
12,600
1
6,200
4
11,000
12,600
1
6,200
4
11,000
earth work for valve assembly (air valve) includes in trench work
413,500
413,500
413,500
413,500
413,500
413,500
Sub-total
Rp.
37,000
37,100
51,800
60,400
62,800
62,800
5%
13,600
625,600
625,600
625,600
625,600
625,600
625,600
46
46
46
46
46
46
Total
Rp.
1,206,000
1,206,100
1,220,800
1,229,400
1,231,800
1,231,800
55,700
55,700
55,700
55,700
55,700
55,700
Lean Concrete
Rp/m3
Concrete
m3
69,300
Rp/m3
Form
m3
552,400
Re-bar
Rp/m3
m2
628,000
Rp/m2
Miscellan
kg
Rp/kg
99,400
10%
13,600
300
350
400
450
75
75
100
100
0.3
0.3
0.3
0.3
21,000
21,000
21,000
21,000
0.9
0.9
0.9
0.9
497,000
497,000
497,000
497,000
0.89
0.89
0.89
0.89
559,000
559,000
559,000
559,000
4.68
4.68
4.68
4.68
465,000
465,000
465,000
465,000
89
89
89
89
1,210,000
1,210,000
1,210,000
1,210,000
275,000
275,000
275,000
275,000
500
600
700
800
900
1000
100
100
100
100
100
150
0.3
0.3
0.3
0.3
0.3
0.3
21,000
21,000
21,000
21,000
21,000
21,000
0.9
0.9
0.9
0.9
0.9
0.9
497,000
497,000
497,000
497,000
497,000
497,000
0.89
0.89
0.89
0.89
0.89
0.89
559,000
559,000
559,000
559,000
559,000
559,000
4.68
4.68
4.68
4.68
4.68
4.68
465,000
465,000
465,000
465,000
465,000
465,000
89
89
89
89
89
89
1,210,000
1,210,000
1,210,000
1,210,000
1,210,000
1,210,000
275,000
275,000
275,000
275,000
275,000
275,000
Dia.
(mm)
Mech J.
no
Rp
Rp/m
nos.
Rp
Sub-total
Rp.
Total
Rp.
300
350
400
450
75
75
100
100
1
1
1
1
38,600
38,600
52,300
52,300
2.8
2.8
2.9
2.9
18,900
24,000
29,400
35,100
7
7
7
7
16,600
16,600
18,400
20,300
92,000
106,000
138,000
154,000
3,119,000
3,133,000
3,165,000
3,181,000
500
600
700
800
900
1000
100
100
100
100
100
150
1
1
1
1
1
1
52,300
52,300
52,300
52,300
52,300
75,700
2.8
2.9
3.0
3.0
3.2
3.2
61,600
66,700
71,800
78,900
84,400
165,000
7
7
7
7
7
7
22,100
25,800
29,500
38,700
44,200
51,600
225,000
246,000
268,000
289,000
322,000
604,000
3,252,000
3,273,000
3,295,000
3,316,000
3,349,000
3,631,000
note:
earth work for valve assembly (air valve) includes in trench work
Sub-total
1,169,000
1,169,000
1,169,000
1,169,000
1,169,000
1,169,000
Sub-total
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
3,027,000
EXIST.
LINE
DRAIN
MIN
1000
TYP
MIN
300
PLAIN CONCRETE
POUR AGAINST
UNDISTURBED SOIL
14
1.00
B
B
-
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
3.00
1.00
1.00
0.30
400 in
0.450
2.62
600
1.20
3.00
1.20
1.00
0.30
600
0.540
3.47
1000
1.60
3.00
1.60
1.00
0.30
1000
0.720
5.33
Lined Drain =
Dia
2.00
B
T-Min
m3
Concrete
400
1.00
4.00
1.00
1.50
0.30
400 in
0.600
3.50
600
1.20
4.00
1.20
1.50
0.30
600
0.720
4.63
1000
1.60
4.00
1.60
1.50
0.30
1000
0.960
7.10
14 @
EXIST.
LINE
DRAIN
MIN
1000
TYP
MIN
300
PLAIN CONCRETE
POUR AGAINST
UNDISTURBED SOIL
Lined Drain =
Dia
14
3.00
B
B
-
T-Min
Dia.
E.Work
gravel t=
mm
m3
Concrete
400
1.00
5.00
1.00
2.00
0.30
400 in
0.750
4.37
600
1.20
5.00
1.20
2.00
0.30
600
0.900
5.79
1000
1.60
5.00
1.60
2.00
0.30
1000
1.200
8.88
Lined Drain =
Dia
4.00
B
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
6.00
1.00
2.50
0.30
400 in
0.900
5.25
600
1.20
6.00
1.20
2.50
0.30
600
1.080
6.94
1000
1.60
6.00
1.60
2.50
0.30
1000
1.440
10.65
TRENCH
WIDTH
T
D SOIL
300 D 300
14 @ 500
0.15 m
Form
m2
Box Culvert
m'
R-bar
Kg
2.000
0.800
41.445
2.400
1.056
48.940
3.200
1.664
63.932
0.15 m
Form
Box Culvert
m'
m2
R-bar
Kg
2.000
1.900
54.840
2.400
2.100
64.754
3.200
2.500
84.582
TRENCH
WIDTH
300 D 300
14 @ 500
GAINST
URBED SOIL
0.15 m
Form
m2
Box Culvert
m'
R-bar
Kg
2.000
2.200
68.236
2.400
2.400
80.568
3.200
2.800
105.231
0.15 m
Form
m2
Box Culvert
m'
R-bar
Kg
2.000
2.500
81.632
2.400
2.700
96.381
3.200
3.100
125.881
300
D 14 @ 200
GROUND SURFACE
300
MIN
1000
CONCRETE ENCASEMENT
C
-
METHOD
1.00
B
MIN
300
MIN
300
* 1)
D 14 @
POUR AGAINTS
UNDISTURBED SOIL
FULL CONCRETE
ENCASEMENT
Dia
LOOP 19 @ 30
TYP
Unlined Drain =
BA
h
EXIST.
DRAIN
T-Min
Dia.
E.Work
gravel t=
mm
m3
Concrete
400
1.00
3.00
1.00
1.00
0.30
400 in
0.450
2.62
600
1.20
3.00
1.20
1.00
0.30
600
0.540
3.47
1000
1.60
3.00
1.60
1.00
0.30
1000
0.720
5.33
Lined Drain =
Dia
2.00
B
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
4.00
1.00
1.00
0.30
400 in
0.600
3.50
600
1.20
4.00
1.20
1.00
0.30
600
0.720
4.63
1000
1.60
4.00
1.60
1.00
0.30
1000
0.960
7.10
300
D 14 @ 200
GROUND SURFACE
300
MIN
1000
CONCRETE ENCASEMENT
C
-
METHOD
3.00
B
D
MIN
300
MIN
300
* 1)
D1
POUR AGAINTS
UNDISTURBED SOIL
FULL CONCRETE
ENCASEMENT
Dia
LOOP 19 @
TYP
Lined Drain =
B
h
EXIST.
DRAIN
T-Min
Dia.
E.Work
gravel t=
mm
m3
Concrete
400
1.00
5.00
1.00
1.00
0.30
400 in
0.750
4.37
600
1.20
5.00
1.20
1.00
0.30
600
0.900
5.79
1000
1.60
5.00
1.60
1.00
0.30
1000
1.200
8.88
Lined Drain =
Dia
4.00
B
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
6.00
1.00
1.00
0.30
400 in
0.900
5.25
600
1.20
6.00
1.20
1.00
0.30
600
1.080
6.94
1000
1.60
6.00
1.60
1.00
0.30
1000
1.440
10.65
D 14 @ 200
BACKFILL
LOOP 19 @ 300
D 14 @ 3000
AGAINTS
TURBED SOIL
NCASEMENT
AYER NOT
NESS
ED MECHANICAL METHODS.
0.15 m
Form
R-bar
m2
Kg
2.000
96.285
2.400
114.662
3.200
151.415
0.15 m
Form
R-bar
m2
Kg
2.000
127.961
2.400
152.382
3.200
201.226
00
D 14 @ 200
BACKFILL
LOOP 19 @ 300
D 14 @ 3000
R AGAINTS
ISTURBED SOIL
ENCASEMENT
LAYER NOT
CKNESS
VED MECHANICAL METHODS.
0.15 m
Form
R-bar
m2
Kg
2.000
159.636
2.400
190.103
3.200
251.037
0.15 m
Form
R-bar
m2
Kg
2.000
191.312
2.400
227.824
3.200
300.848
TRENCH
WIDTH
L
ROAD WAY EXIST.
SURFACE
LINE
DRAIN
Min
1.0m
Typ
MIN
1000
EXIST
CULVERT
TYP
MIN
300
300
Min
PLAIN CONCRETE
PLAIN CONCRETE
POUR AGAINST
UNDISTURBED SOIL
14
1.00
B
B
-
T-Min
Dia.
E.Work
gravel t=
mm
m3
Concrete
400
1.00
3.00
1.00
1.00
0.30
400 included
0.450
2.62
600
1.20
3.00
1.20
1.00
0.30
600
0.540
3.47
1000
1.60
3.00
1.60
1.00
0.30
1000
0.720
5.33
Lined Drain =
Dia
2.00
B
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
4.00
1.00
1.50
0.30
400 in
0.600
3.50
600
1.20
4.00
1.20
1.50
0.30
600
0.720
4.63
1000
1.60
4.00
1.60
1.50
0.30
1000
0.960
7.10
14 @
TRENCH
WIDTH
L
ROAD WAY EXIST.
SURFACE
LINE
DRAIN
Min
1.0m
Typ
MIN
1000
EXIST
CULVERT
TYP
MIN
300
300
Min
PLAIN CONCRETE
PLAIN CONCRETE
POUR AGAINST
UNDISTURBED SOIL
14
3.00
B
B
-
T-Min
Dia.
E.Work
gravel t=
mm
m3
Concrete
400
1.00
5.00
1.00
2.00
0.30
400 in
0.750
4.37
600
1.20
5.00
1.20
2.00
0.30
600
0.900
5.79
1000
1.60
5.00
1.60
2.00
0.30
1000
1.200
8.88
Lined Drain =
Dia
4.00
B
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
6.00
1.00
2.50
0.30
400 in
0.900
5.25
600
1.20
6.00
1.20
2.50
0.30
600
1.080
6.94
1000
1.60
6.00
1.60
2.50
0.30
1000
1.440
10.65
14 @
TRENCH
WIDTH
T
D SOIL
300 D 300
14 @ 500
0.15 m
Form
m2
Miscellaneous
Box Culvert
Pavement
m'
R-bar
Kg
2.000
4.800
1.600
41.44
2.400
5.400
1.800
48.94
3.200
6.600
2.200
63.93
0.15
Form
m2
m
Miscellaneous
Box Culvert
Pavement
m'
R-bar
Kg
2.000
7.600
1.900
54.84
2.400
8.400
2.100
64.75
3.200
10.000
2.500
84.58
TRENCH
WIDTH
ST
ED SOIL
300 D 300
14 @ 500
0.15
Form
m2
m
Miscellaneous
Box Culvert
Pavement
m'
R-bar
Kg
2.000
11.000
2.200
68.24
2.400
12.000
2.400
80.57
3.200
14.000
2.800
105.23
0.15
Form
m2
m
Miscellaneous
Box Culvert
Pavement
m'
R-bar
Kg
2.000
15.000
2.500
81.63
2.400
16.200
2.700
96.38
3.200
18.600
3.100
125.88
EXIST.
LINE
DRAIN
BOX
CULVERT
( FUTURE )
MIN
1000
300
min
MIN
300
PLAIN CONCRETE
L=10M
POUR AGAINST
UNDISTURBED SO
E
LINED DRAIN DITCH CROSSING
Lined Drain =
Dia
10.00
B
14
PLAIN CONCRETE
TYP
B
-
T-Min
Dia.
E.Work
mm
gravel t=
Concrete
400
1.00
10.00
1.00
1.00
0.30
400 in
1.500
8.74
600
1.20
10.00
1.20
1.00
0.30
600
1.800
11.57
1000
1.60
10.00
1.60
1.00
0.30
1000
2.400
17.75
TRENCH
WIDTH
300 D 300
14
POUR AGAINST
UNDISTURBED SOIL
14 @ 500
0.15 m
Form
m2
Miscellaneous
Box Culvert
Pavement
m'
R-bar
Kg
2.000
16.000
1.600
135.21
2.400
18.000
1.800
159.64
3.200
22.000
2.200
208.48
No.
Dia
Length Weight
(mm) (inch)
Up-to
Time Work
Labour
Equipments.
*Efective
Crane
Down
Worker
Time
Amount
Worker
Fee
wards.
fee
(set) (set/hour) Rental
(mnt) (mnt) (Hour) (Hour) man/hour (Rp.) (Rp./bar)
(Rp.)
Rental
Equitment
(Rp./bar)
Amount
Price
(Rp./bar)
Pipe
Amount
in Truck
(bar)
50
2"
7.3
3.6
6.6
0.11
0.13
0.26
1,207
1,206.86
200
80
3"
13.2
4.3
3.6
7.9
0.13
0.16
0.32
1,445
1,444.57
110
100
4"
20.5
6.2
5.2
11.4
0.19
0.23
0.46
2,085
2,084.57
64
150
6"
40.2
10.2
8.5
18.7
0.31
0.37
0.75
3,419
3,419.43
34
200
8"
60.8
5.8
4.8
10.6
0.18
0.21
0.42
1,938
0.21
34,526
34,525.71
36,464.00
20
250
10"
92.9
7.6
6.3
13.9
0.23
0.28
0.56
2,542
0.28
45,274
45,274.29
47,816.00
16
300
12"
131.8
8.9
7.4
16.3
0.27
0.33
0.65
2,981
0.33
53,091
53,091.43
56,072.00
14
Criterion :
Up-to Pipe
Downwards Pipe
*Efective Time
Time efektive work
Fee Worker
Fee Driver
162,857
190,000
Rp./Hour
Rp./Hour
32,000
50,000
Rp./day
Rp./day
** Unit Price
: Including Advantage :
10%
Rental of Truck
Expense go
down to go
once transport.
Rental
up.
(Rp.)
once (Hour)
(Rp.)
Driver
Amount Price
Transportation
Driver
Driver fee
of Pipe
once (Hour)
(Rp.)
(Rp./once)
Unit Price
Transport of
Pipe
(Rp./m')
241,371.43
760,000.0
4 28,571.4
1,031,149.71
859.29
158,902.86
760,000.0
4 28,571.4
948,918.86
1,437.76
133,412.57
760,000.0
4 28,571.4
924,068.57
2,406.43
116,260.57
760,000.0
4 28,571.4
908,251.43
4,452.21
729,280.00
760,000.0
4 28,571.4
1,554,315.43
12,952.63
765,056.00
760,000.0
4 28,571.4
1,601,443.43
16,681.70
785,008.00
760,000.0
4 28,571.4
1,629,651.43
19,400.61
Note : Rite Hour = The duration rent, including loading and unloading time and journey.
No.
Dia
(mm) (inch)
Time Work
Labour
*Efective
Instal
Fee
Fee
Time
Amount
Fore man
Pipe Fitter
Pipe
Foreman
Fitter
(mnt) (mnt) (Hour) (Hour) (man) (Hour)
(Rp.)
(man) (Hour) (Rp.)
Amount Price of La
Fee
Wolker
(man) (Hour) (Rp.)
(Rp./bar)
Wolker
50
2"
7.3
6.2
12.2
18.4
0.31
0.37
0.37
1,682
0.37
1,682
0.74
3,365
6,729.14
80
3"
13.2
8.3
14.2
22.5
0.38
0.45
0.45
2,057
0.45
2,057
0.90
4,114
8,228.57
100
4"
20.5
10.4
14.8
25.2
0.42
0.50
0.50
2,304
0.50
2,304
1.01
4,608
9,216.00
150
6"
40.2
13.1
20.5
33.6
0.56
0.67
0.67
3,072
0.67
3,072
1.34
6,144
12,288.00
200
8"
60.8
14.7
20.9
35.6
0.59
0.71
0.71
3,255
0.71
3,255
2.14
9,765
16,274.29
250
10"
92.9
18.5
23.6
42.1
0.70
0.84
0.84
3,849
0.84
3,849
2.53
11,547
19,245.71
300
12"
131.8
21.8
29.4
51.2
0.85
1.02
1.02
4,681
1.02
4,681
3.07
14,043
23,405.71
Criterion :
Up-to Pipe
Downwards Pipe
*Efective Time
Time efektive work
Fee Worker
Fee Driver
Tackel
Tripod
:
:
500.00
4,500.00
Rp./Hour
Rp./Hour
32,000 Rp./day
50,000 Rp./day
** Unit Price
: Including Advantage :
10%
Equipments.
Tackel
Tripod
(set/ hour)
Rental
(set/ hour)
Rental
(set) (hour)
(set) (hour)
(Rp.)
(Rp.)
(Rp./m')
Amount Price of
Labour
(Rp./bar)
1,121.52
0.37
184.00
184.00
30.67
1,152.19
1,371.43
0.45
225.00
225.00
37.50
1,408.93
1,536.00
0.50
252.00
252.00
42.00
1,578.00
2,048.00
0.67
336.00
336.00
56.00
2,104.00
2,712.38
1.42
712.00
0.71
3,204.00
3,916.00
652.67
3,365.05
3,207.62
1.68
842.00
0.84
3,789.00
4,631.00
771.83
3,979.45
3,900.95
2.05
1,024.00
1.02
4,608.00
5,632.00
938.67
4,839.62
Note : Rite Hour = The duration rent, including loading and unloading time and journey.
No.
Dia
Length
(mm) (inch)
(m/bar)
*Efective
Weight
Time
(Kg/bar)
(Hour)
Labour
Worker
Fee
man/hour
(Rp.)
Equip
ments.
Crane
(set/hour)
Rental of
Driver
Pipe
Truck
Amount
Driver
in Truck once transport.
(bar)
once (Hour) once (Hour)
50
2"
7.30
0.13
2.00
0.26
200.00
1.00
4.00
1.00
4.00
80
3"
13.20
0.16
2.00
0.32
110.00
1.00
4.00
1.00
4.00
100
4"
20.50
0.23
2.00
0.46
64.00
1.00
4.00
1.00
4.00
150
6"
40.20
0.37
2.00
0.75
34.00
1.00
4.00
1.00
4.00
200
8"
60.80
0.21
2.00
0.42
0.21
20.00
1.00
4.00
1.00
4.00
250
10"
92.90
0.28
2.00
0.56
0.28
16.00
1.00
4.00
1.00
4.00
300
12"
131.80
0.33
2.00
0.65
0.33
14.00
1.00
4.00
1.00
4.00
No.
Dia
Length
*Efective
Time
(mm)
(m/bar)
(Hour)
Labour
Equipments.
Tackel
Tripod
Fore man
Pipe Fitter
Wolker
(set/ hour)
(set/ hour)
(man) (Hour) (man) (Hour) (man) (Hour) (set) (hour) (set) (hour)
50
0.37
0.37
0.37
0.74
0.37
80
0.45
0.45
0.45
0.90
0.45
100
0.50
0.50
0.50
1.01
0.50
150
0.67
0.67
0.67
1.34
0.67
200
0.71
0.71
0.71
2.14
1.42
0.71
250
0.84
0.84
0.84
2.53
1.68
0.84
300
1.02
1.02
1.02
3.07
2.05
1.02
Dia
Length Weight
(mm) (inch)
(m/bar)
Down
wards.
(Kg/bar) (mnt)
Conec Pipe
(mnt)
Amount
(mnt)
(Hour)
*Efective
Time
(Hour)
Labour
Fore man
Pipe Fitter
Wolker
Equipments.
Key Snugly.
Trackel
Tripod / Cra
(set/ hour)
(set/ hour)
(set/ hour
(set) (hour) (set) (hour) (set)
80
3"
60.0
12.0
14.0
26.0
0.43
0.52
0.52
0.52
1.56
0.52
###
100
4"
72.0
13.2
17.4
30.6
0.51
0.61
0.61
0.61
1.84
0.61
###
150
6"
137.5
23.3
25.0
48.3
0.81
0.97
0.97
0.97
2.90
1.93
1 Tp
200
8"
185.0
25.3
29.7
55.0
0.92
1.10
1.10
1.10
4.40
2.20
1 Tp
250
10"
240.0
29.0
33.0
62.0
1.03
1.24
1.24
1.24
4.96
2.48
2 Tp
300
12"
378.0
15.8
21.3
37.1
0.62
0.74
0.74
0.74
2.97
1.48
1 Cr2
350
12"
483.0
17.4
21.5
38.9
0.65
0.78
0.78
0.78
3.11
1.56
1 Cr2
400
12"
570.0
18.6
22.7
41.3
0.69
0.83
0.83
1.65
3.30
1.65
1 Cr2
450
12"
678.0
20.0
25.7
45.7
0.76
0.91
0.91
1.83
3.66
1.83
1 Cr2
10
500
12"
780.0
21.2
26.9
48.1
0.80
0.96
0.96
1.92
3.85
1.92
1 Cr2
11
600
12"
1,014.0
21.5
31.4
52.9
0.88
1.06
1.06
2.12
4.23
3.17
1 Cr5
12
800
12"
1,590.0
25.8
35.9
61.7
1.03
1.23
1.23
2.47
4.94
3.70
1 Cr5
13
900
12"
1,914.0
25.9
37.4
63.3
1.06
1.27
1.27
2.53
5.06
3.80
1 Cr5
14
1000
12"
2,262.0
28.6
38.5
67.1
1.12
1.34
1.34
2.68
6.71
4.03
1 Cr5
15
1100
12"
2,865.0
31.5
43.3
74.8
1.25
1.50
1.50
2.99
7.48
4.49
1 Cr5
16
1200
12"
3,048.0
32.0
45.0
77.0
1.28
1.54
1.54
3.08
7.70
4.62
1 Cr5
Equipments.
Tripod / Crane
(set/ hour)
(hour)
0.97
1.10
2.48
0.74
0.78
0.83
0.91
0.96
1.06
1.23
1.27
1.34
1.50
1.54
No.
Dia
Length
(mm) (inch)
(m/bar)
Weight
Up-to
(Kg/bar)
(mnt)
Time Work
Down
Amount
wards.
(mnt)
(mnt)
Labour
*Efective
Time Worker Fee Worker
fee
man/
(Rp./
(Hour) (Hour)
(Rp.)
hour
bar)
(set)
Equipments.
Crane
Rental
(set/hour)
(Rp.)
100
4"
35.0
4.2
3.5
7.7
0.1
0.15
0.31
1,408
150
6"
78.0
2.4
2.0
4.4
0.1
0.09
0.18
805
0.09
14,331
200
8"
126.0
3.5
2.9
6.4
0.1
0.13
0.26
1,170
0.13
20,846
250
10"
190.0
4.1
3.4
7.5
0.1
0.15
0.30
1,371
0.15
24,429
300
12"
262.0
6.8
5.7
12.5
0.2
0.25
0.75
3,429
0.25
40,714
350
12"
267.0
7.7
6.4
14.1
0.2
0.28
0.85
3,867
0.28
45,926
400
12"
330.0
9.7
8.1
17.8
0.3
0.36
1.07
4,882
0.36
57,977
450
12"
424.0
11.0
9.2
20.2
0.3
0.40
1.21
5,541
0.40
65,794
500
12"
529.0
13.4
11.2
24.6
0.4
0.49
1.48
6,747
0.49
80,126
10
600
12"
777.0
6.2
5.2
11.4
0.2
0.23
0.68
3,127
0.23
56,316
11
800
12"
1,132.0
6.8
5.7
12.5
0.2
0.25
0.75
3,429
0.25
61,750
12
900
12"
1,275.0
9.2
7.7
16.9
0.3
0.34
1.01
4,635
0.34
83,486
13
1000
12"
1,653.0
10.0
8.3
18.3
0.3
0.37
1.10
5,019
0.37
90,402
14
1100
12"
1,762.0
18.6
15.5
34.1
0.6
0.68
2.05
9,353
0.68
168,454
15
1200
12"
1,844.0
19.7
16.4
36.1
0.6
0.72
2.17
9,902
0.72
178,334
Criterion :
Manpower
80-100mm
Machin
150-250 ; 300-600
Kg/mnt
Up-to Pipe
Downwards Pipe
:
:
12
10
18
15
*Efective Time
Time efektive work
Fee Worker
Fee Driver
:
:
:
:
** Unit Price
: Including Advantage :
162,857.14
247,000.00
190,000.00
256,500.00
90
75
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
10%
32,000.0
50,000.0
Rp./day
Rp./day
.
Rental
Equitment
(Rp./bar)
(Rp./bar)
-
Driver
Rental of Truck
Expense go
Amount of Pipe Amount
down to go
Expence
in Truck
once transport.
Rental
up.
(bar)
(Rp.)
once
(Hour)
(Rp.)
Driver
once
(Hour)
Driver fee
Unit Price
Transporta
tion of Pipe
(Rp.)
(Rp./once)
1,408.00
72
101,376.00
760,000.0
28,571.4
891,355.43
14,331.43
15,136.00
27
408,672.00
760,000.0
28,571.4
1,212,379.43
20,845.71
22,016.00
19
418,304.00
760,000.0
28,571.4
1,228,891.43
24,428.57
25,800.00
16
412,800.00
760,000.0
28,571.4
1,227,171.43
40,714.29
44,142.86
10
441,428.57
760,000.0
28,571.4
1,274,142.86
45,925.71
49,793.14
448,138.29
760,000.0
28,571.4
1,286,502.86
57,977.14
62,859.43
440,016.00
760,000.0
28,571.4
1,291,446.86
65,794.29
71,334.86
428,009.14
760,000.0
28,571.4
1,287,915.43
80,125.71
86,873.14
434,365.71
760,000.0
28,571.4
1,309,810.29
56,316.00
59,442.86
178,328.57
1,026,000.0
28,571.4
1,292,342.86
61,750.00
65,178.57
195,535.71
1,026,000.0
28,571.4
1,315,285.71
83,486.00
88,121.43
176,242.86
1,026,000.0
28,571.4
1,318,935.71
90,402.00
95,421.43
190,842.86
1,026,000.0
28,571.4
1,340,835.71
168,454.00
177,807.14
177,807.14
1,026,000.0
28,571.4
1,410,185.71
178,334.00
188,235.71
188,235.71
1,026,000.0
28,571.4
1,431,042.86
Note : Rite Hour = The duration rent, including loading and unloading time and journey.
Unit Price
Transport of
Pipe m'
(Rp./m')
2,063.32
7,483.82
10,779.75
12,783.04
21,235.71
23,824.13
30,748.73
35,775.43
43,660.34
71,796.83
73,071.43
109,911.31
111,736.31
235,030.95
238,507.14
No.
Dia
(mm)
Weight
(Kg/bar)
*Efective
Time
(Hour)
Labour
Rental of
Pipe
Truck
Amount
once
transport.
in Truck
Equip ments.
Fee
Crane
(Rp.)
(set/hour)
(bar)
once
Driver
Driver
100
35.0
0.15
0.31
72.00
1.00
4.00
1.00
4.00
150
78.0
0.09
0.18
1.00
0.09
27.00
1.00
4.00
1.00
4.00
200
126.0
0.13
0.26
1.00
0.13
19.00
1.00
4.00
1.00
4.00
250
190.0
0.15
0.30
1.00
0.15
16.00
1.00
4.00
1.00
4.00
300
262.0
0.25
0.75
1.00
0.25
10.00
1.00
4.00
1.00
4.00
350
267.0
0.28
0.85
1.00
0.28
9.00
1.00
4.00
1.00
4.00
400
330.0
0.36
1.07
1.00
0.36
7.00
1.00
4.00
1.00
4.00
450
424.0
0.40
1.21
1.00
0.40
6.00
1.00
4.00
1.00
4.00
500
529.0
0.49
1.48
1.00
0.49
5.00
1.00
4.00
1.00
4.00
10
600
777.0
0.23
0.68
1.00
0.23
3.00
1.00
4.00
1.00
4.00
11
800
1,132.0
0.25
0.75
1.00
0.25
3.00
1.00
4.00
1.00
4.00
12
900
1,275.0
0.34
1.01
1.00
0.34
2.00
1.00
4.00
1.00
4.00
13
1000
1,653.0
0.37
1.10
1.00
0.37
2.00
1.00
4.00
1.00
4.00
14
1100
1,762.0
0.68
2.05
1.00
0.68
1.00
1.00
4.00
1.00
4.00
15
1200
1,844.0
0.72
2.17
1.00
0.72
1.00
1.00
4.00
1.00
4.00
Unit Water
Test
Dia
(mm) (inch)
(m/bar)
Conec.
Eqiuip.
(mnt)
Water
Discard
Test
Content
Water
Pipe 1
Test 1
Test
(mnt)
(mnt)
Amount
Testing 1
Labour
Testing /
Flushing 2
(mnt)
*Efective
Time
Amount
(mnt)
(Hour)
(Hour)
Foreman
Pipe Fitter
Piple
amount
unit /
hour
Amount
Piple
amount
unit /
hour
(man)
(Hour)
(Rp.)
(man)
(Hour)
50
2"
0.98
89.0
25.4
160.0
14.6
129.0
159.0
288.0
4.8
5.76
5.76
37,029
5.76
80
3"
2.51
90.0
25.0
160.0
15.2
130.2
161.2
291.4
4.9
5.83
5.83
37,466
5.83
100
4"
3.93
91.0
26.4
160.0
17.5
134.9
164.9
299.8
5.0
6.00
6.00
38,546
6.00
150
6"
8.84
92.0
30.5
160.0
18.7
141.2
171.2
312.4
5.2
6.25
6.25
40,166
6.25
200
8"
15.71
94.0
53.4
160.0
26.2
173.6
203.6
377.2
6.3
7.54
7.54
48,497
7.54
250
10"
24.54
95.0
82.8
160.0
40.9
218.7
248.7
467.4
7.8
9.35
9.35
60,094
9.35
300
12"
35.34
96.0
117.8
160.0
58.9
272.7
302.7
575.4
9.6
11.51
11.51
73,980
11.51
350
12"
43.11
98.0
160.4
160.0
80.2
338.6
368.5
707.1
11.8
14.14
14.14
90,913
14.14
400
12"
62.83
100.0
209.4
160.0
104.7
414.1
444.2
858.3
14.3
17.17
17.17
110,353
17.17
10
450
12"
79.52
105.0
205.0
160.0
132.5
442.5
532.6
975.1
16.3
19.50
19.50
125,370
19.50
11
500
12"
93.17
110.0
265.1
160.0
163.6
538.7
630.9
1,169.6
19.5
23.39
23.39
150,377
23.39
12
600
12"
141.37
1,250.0
337.2
160.0
39.6
1,626.8
1,408.8
3,035.6
50.6
60.71
60.71
390,291
60.71
13
800
12"
251.33
1,250.0
140.7
160.0
70.4
1,461.1
1,501.1
2,962.2
49.4
59.24
59.24
380,854
59.24
14
900
12"
313.09
1,250.0
178.1
160.0
88.1
1,516.2
1,557.2
3,073.4
51.2
61.47
61.47
395,151
61.47
15
1000
12"
372.7
1,250.0
219.9
160.0
110.0
1,579.9
1,619.9
3,199.8
53.3
64.00
64.00
411,403
64.00
16
1100
12"
475.17
1,250.0
365.1
160.0
133.0
1,748.1
1,689.1
3,437.2
57.3
68.74
68.74
441,926
68.74
17
1200
12"
585.49
Criterion :
- Testing done 3 (tri) Phase
1,260.0
316.7
158.3
1,735.0
1,765.0
3,500.0
58.3
70.00
70.00
450,000
: Test I
: 500 m'
: Test II
: 500 m'
: Plushing : 3 minute/100 m' Pipe
Metode Test
: 0.005 cu.m/second
: 0.01 cu.m/second
*Efective Time
Time efektive work
Fee Foremen
Fee Pipe Fitter
Fee Worker
Rental
Key Snugly.
Tackel
Tripod
Rental Crane 2 ton
Rental Crane 5 ton
** Unit Price
: Including Advantage :
:
:
:
:
:
160.0
11,335.71
500.00
4,500.00
162,857.14
247,000.00
20%
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rental
Water Pump
Water Pump Test
10%
:
:
21,428.57
14,169.64
Rp./Hour
Rp./Hour
70.00
Labour
Pipe Fitter
Wolker
Piple
Amount
amount
(Rp.)
(man)
unit /
hour
Amount
(Hour)
(Rp.)
(Rp./500m')
(Rp./m')
34,560
5.76
26,331
97,920.00
195.84
34,968
5.83
26,642
99,076.00
198.15
35,976
6.00
27,410
101,932.00
203.86
37,488
6.25
28,562
106,216.00
212.43
45,264
7.54
34,487
128,248.00
256.50
56,088
9.35
42,734
158,916.00
317.83
69,048
11.51
52,608
195,636.00
391.27
84,852
14.14
64,649
240,414.00
480.83
102,996
17.17
78,473
291,822.00
583.64
117,012
19.50
89,152
331,534.00
663.07
140,352
23.39
106,935
397,664.00
795.33
364,272
60.71
277,541
1,032,104.00
2,064.21
355,464
59.24
270,830
1,007,148.00
2,014.30
368,808
61.47
280,997
1,044,956.00
2,089.91
383,976
64.00
292,553
1,087,932.00
2,175.86
412,464
68.74
314,258
1,168,648.00
2,337.30
420,000
70.00
320,000
1,190,000.00
2,380.00
Equipments.
Key Snugly.
Amount
unit / hour
Appliances.
(set)
(hour)
Tackel
Tripod / Crane
Water Pump
Rental
Amount
Appliances.
unit /
hour
Rental
Amount
Appliances.
unit /
hour
Rental
(Rp.)
(set)
(hour)
(Rp.)
(set)
(hour)
(Rp.)
Amount
unit / hour
Appliances.
(set)
(hour)
Pump Te
Rental
Amount
Appliances.
(Rp.)
(set)
17.28
195,881.14
23.04
11,520.00
Tp
5.76
25,920.00
11.52
246,857.14
17.48
198,193.63
23.31
11,656.00
Tp
5.83
26,226.00
11.66
249,771.43
17.99
203,906.83
23.98
11,992.00
Tp
6.00
26,982.00
11.99
256,971.43
18.74
212,476.63
24.99
12,496.00
Tp
6.25
28,116.00
12.50
267,771.43
22.63
256,549.89
30.18
15,088.00
Tp
7.54
33,948.00
15.09
323,314.29
28.04
317,898.77
37.39
18,696.00
Tp
9.35
42,066.00
18.70
400,628.57
46.03
521,805.60
69.05
34,524.00
Tp
11.51
51,786.00
23.02
493,200.00
56.57
641,238.69
84.85
42,426.00
Tp
14.14
63,639.00
28.28
606,085.71
68.66
778,355.49
103.00
51,498.00
Tp
17.17
77,247.00
34.33
735,685.71
78.01
884,276.40
117.01
58,506.00
Tp
19.50
87,759.00
39.00
835,800.00
93.57
1,060,660.11
140.35
70,176.00
Tp
23.39
105,264.00
46.78
1,002,514.29
303.56
3,441,069.43
485.70
242,848.00
Cr2
60.71
9,887,382.86
121.42
2,601,942.86
296.22
3,357,865.29
473.95
236,976.00
Cr2
59.24
9,648,308.57
118.49
2,539,028.57
307.34
3,483,918.43
491.74
245,872.00
Cr2
61.47
10,010,502.86
122.94
2,634,342.86
319.98
3,627,201.86
511.97
255,984.00
Cr2
64.00
10,422,205.71
127.99
2,742,685.71
343.72
3,896,311.71
549.95
274,976.00
Cr2
68.74
11,195,451.43
137.49
2,946,171.43
350.00
3,967,500.00
560.00
280,000.00
Cr2
Note : Rite Hour = The duration rent, including loading and unloading time and journey.
70.00
11,400,000.00
140.00
3,000,000.00
Rental of Equipments
Pump Testing
unit /
hour
Rental
Amount
Amount / m'
(hour)
(Rp.)
(Rp./500m')
(Rp./m')
Amount of
Expence
Amount of
Testing
Pipe
(Rp./m')
(Rp./bar)
5.76
81,617.14
561,795.43
1,123.59
1,319.43
1,451.37
5.83
82,580.68
568,427.74
1,136.86
1,335.01
1,468.51
6.00
84,961.18
584,813.44
1,169.63
1,373.49
1,510.84
6.25
88,531.93
609,391.99
1,218.78
1,431.22
1,574.34
7.54
106,895.79
735,795.96
1,471.59
1,728.09
1,900.90
9.35
132,457.82
911,747.16
1,823.49
2,141.33
2,355.46
11.51
163,064.25
1,264,379.85
2,528.76
2,920.03
3,212.03
14.14
200,387.09
1,553,776.49
3,107.55
3,588.38
3,947.22
17.17
243,236.09
1,886,022.29
3,772.04
4,355.69
4,791.26
19.50
276,336.38
2,142,677.78
4,285.36
4,948.42
5,443.27
23.39
331,456.29
2,570,070.69
5,140.14
5,935.47
6,529.02
60.71
860,267.36
17,033,510.50
34,067.02
36,131.23
39,744.35
59.24
839,466.32
16,621,644.75
33,243.29
35,257.59
38,783.34
61.47
870,979.61
17,245,615.75
34,491.23
36,581.14
40,239.26
64.00
906,800.46
17,954,877.75
35,909.76
38,085.62
41,894.18
68.74
974,077.93
19,286,988.50
38,573.98
40,911.27
45,002.40
70.00
991,875.00
19,639,375.00
39,278.75
41,658.75
45,824.63
No.
Unit
Water
Test
Dia
Equipments.
Labour
*Efective
Time
(Hour)
Foreman
Pipe Fitter
Wolker
Key Snugly.
Tackel
Tripod / Crane
Amount
Amount
Piple
Piple
Piple
unit / hour
unit / hour
unit / hour Appliance unit / hour Appliance unit / hour Amount Appliances.
amount
amount
amount
s.
s.
(set)
(hour)
(set)
(hour)
(set)
(man)
(Hour)
(man)
(Hour)
(man)
(Hour)
50
2"
0.98
5.76
5.76
5.76
5.76
17.28
23.04
Tp
80
3"
2.51
5.83
5.83
5.83
5.83
17.48
23.31
Tp
100
4"
3.93
6.00
6.00
6.00
6.00
17.99
23.98
Tp
150
6"
8.84
6.25
6.25
6.25
6.25
18.74
24.99
Tp
200
8"
15.71
7.54
7.54
7.54
7.54
22.63
30.18
Tp
250
10"
24.54
9.35
9.35
9.35
9.35
28.04
37.39
Tp
300
12"
35.34
11.51
11.51
11.51
11.51
46.03
69.05
Tp
350
12"
43.11
14.14
14.14
14.14
14.14
56.57
84.85
Tp
400
12"
62.83
17.17
17.17
17.17
17.17
68.66
103.00
Tp
10
450
12"
79.52
19.50
19.50
19.50
19.50
78.01
117.01
Tp
11
500
12"
93.17
23.39
23.39
23.39
23.39
93.57
140.35
Tp
12
600
12"
141.37
60.71
60.71
60.71
60.71
303.56
485.70
Cr2
13
800
12"
251.33
59.24
59.24
59.24
59.24
296.22
473.95
Cr2
14
900
12"
313.09
61.47
61.47
61.47
61.47
307.34
491.74
Cr2
15
1000
12"
372.7
64.00
64.00
64.00
64.00
319.98
511.97
Cr2
16
1100
12"
475.17
68.74
68.74
68.74
68.74
343.72
549.95
Cr2
17
1200
12"
585.49
70.00
70.00
70.00
70.00
350.00
560.00
Cr2
Equipments.
Tripod / Crane
Water Pump
Amount
unit /
unit / hour Appliance
hour
s.
(hour)
(set)
(hour)
Pump Testing
Amount
unit /
Appliance
hour
s.
(set)
(hour)
5.76
11.52
5.76
5.83
11.66
5.83
6.00
11.99
6.00
6.25
12.50
6.25
7.54
15.09
7.54
9.35
18.70
9.35
11.51
23.02
11.51
14.14
28.28
14.14
17.17
34.33
17.17
19.50
39.00
19.50
23.39
46.78
23.39
60.71
121.42
60.71
59.24
118.49
59.24
61.47
122.94
61.47
64.00
127.99
64.00
68.74
137.49
68.74
70.00
140.00
70.00
Unit Water
Test
Dia
(mm) (inch)
(m/bar)
Conec.
Eqiuip.
(mnt)
Water
Discard
Test
Content
Water
Pipe 1
Test 1
Test
(mnt)
(mnt)
Amount
Testing 1
Labour
Testing /
Flushing 2
(mnt)
*Efective
Time
Amount
(mnt)
(Hour)
(Hour)
Foreman
Pipe Fitter
Piple
amount
unit /
hour
Amount
Piple
amount
unit /
hour
(man)
(Hour)
(Rp.)
(man)
(Hour)
50
2"
0.98
89.0
25.4
160.0
14.6
129.0
159.0
288.0
4.8
5.76
5.76
37,029
5.76
80
3"
2.51
90.0
25.0
160.0
15.2
130.2
161.2
291.4
4.9
5.83
5.83
37,466
5.83
100
4"
3.93
91.0
26.4
160.0
17.5
134.9
164.9
299.8
5.0
6.00
6.00
38,546
6.00
150
6"
8.84
92.0
30.5
160.0
18.7
141.2
171.2
312.4
5.2
6.25
6.25
40,166
6.25
200
8"
15.71
94.0
53.4
160.0
26.2
173.6
203.6
377.2
6.3
7.54
7.54
48,497
7.54
250
10"
24.54
95.0
82.8
160.0
40.9
218.7
248.7
467.4
7.8
9.35
9.35
60,094
9.35
300
12"
35.34
96.0
117.8
160.0
58.9
272.7
302.7
575.4
9.6
11.51
11.51
73,980
11.51
350
12"
43.11
98.0
160.4
160.0
80.2
338.6
368.5
707.1
11.8
14.14
14.14
90,913
14.14
400
12"
62.83
100.0
209.4
160.0
104.7
414.1
444.2
858.3
14.3
17.17
17.17
110,353
17.17
10
450
12"
79.52
105.0
205.0
160.0
132.5
442.5
532.6
975.1
16.3
19.50
19.50
125,370
19.50
11
500
12"
93.17
110.0
265.1
160.0
163.6
538.7
630.9
1,169.6
19.5
23.39
23.39
150,377
23.39
12
600
12"
141.37
1,250.0
337.2
160.0
39.6
1,626.8
1,408.8
3,035.6
50.6
60.71
60.71
390,291
60.71
13
800
12"
251.33
1,250.0
140.7
160.0
70.4
1,461.1
1,501.1
2,962.2
49.4
59.24
59.24
380,854
59.24
14
900
12"
313.09
1,250.0
178.1
160.0
88.1
1,516.2
1,557.2
3,073.4
51.2
61.47
61.47
395,151
61.47
15
1000
12"
372.7
1,250.0
219.9
160.0
110.0
1,579.9
1,619.9
3,199.8
53.3
64.00
64.00
411,403
64.00
16
1100
12"
475.17
1,250.0
365.1
160.0
133.0
1,748.1
1,689.1
3,437.2
57.3
68.74
68.74
441,926
68.74
17
1200
12"
585.49
Criterion :
- Testing done 3 (tri) Phase
1,260.0
316.7
158.3
1,735.0
1,765.0
3,500.0
58.3
70.00
70.00
450,000
: Test I
: 500 m'
: Test II
: 500 m'
: Plushing : 3 minute/100 m' Pipe
Metode Test
: 0.005 cu.m/second
: 0.01 cu.m/second
*Efective Time
Time efektive work
Fee Foremen
Fee Pipe Fitter
Fee Worker
Rental
Key Snugly.
Tackel
Tripod
Rental Crane 2 ton
Rental Crane 5 ton
** Unit Price
: Including Advantage :
:
:
:
:
:
160.0
11,335.71
500.00
4,500.00
162,857.14
247,000.00
20%
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rp./Hour
Rental
Water Pump
Water Pump Test
10%
:
:
21,428.57
14,169.64
Rp./Hour
Rp./Hour
70.00
Equipments.
Labour
Pipe Fitter
Wolker
Key Snugly.
Amount
Piple
amount
unit /
hour
Amount
(Rp.)
(man)
(Hour)
(Rp.)
Amount
unit / hour
Appliances.
(Rp./500m')
(Rp./m')
(set)
(hour)
Tackel
Tripod / Crane
Rental
Amount
Appliances.
unit /
hour
Rental
Amount
Appliances.
unit /
hour
(Rp.)
(set)
(hour)
(Rp.)
(set)
(hour)
34,560
5.76
26,331
97,920.00
195.84
17.28
195,881.14
23.04
11,520.00
Tp
5.76
34,968
5.83
26,642
99,076.00
198.15
17.48
198,193.63
23.31
11,656.00
Tp
5.83
35,976
6.00
27,410
101,932.00
203.86
17.99
203,906.83
23.98
11,992.00
Tp
6.00
37,488
6.25
28,562
106,216.00
212.43
18.74
212,476.63
24.99
12,496.00
Tp
6.25
45,264
7.54
34,487
128,248.00
256.50
22.63
256,549.89
30.18
15,088.00
Tp
7.54
56,088
9.35
42,734
158,916.00
317.83
28.04
317,898.77
37.39
18,696.00
Tp
9.35
69,048
11.51
52,608
195,636.00
391.27
46.03
521,805.60
69.05
34,524.00
Tp
11.51
84,852
14.14
64,649
240,414.00
480.83
56.57
641,238.69
84.85
42,426.00
Tp
14.14
102,996
17.17
78,473
291,822.00
583.64
68.66
778,355.49
103.00
51,498.00
Tp
17.17
117,012
19.50
89,152
331,534.00
663.07
78.01
884,276.40
117.01
58,506.00
Tp
19.50
140,352
23.39
106,935
397,664.00
795.33
93.57
1,060,660.11
140.35
70,176.00
Tp
23.39
364,272
60.71
277,541
1,032,104.00
2,064.21
303.56
3,441,069.43
485.70
242,848.00
Cr2
60.71
355,464
59.24
270,830
1,007,148.00
2,014.30
296.22
3,357,865.29
473.95
236,976.00
Cr2
59.24
368,808
61.47
280,997
1,044,956.00
2,089.91
307.34
3,483,918.43
491.74
245,872.00
Cr2
61.47
383,976
64.00
292,553
1,087,932.00
2,175.86
319.98
3,627,201.86
511.97
255,984.00
Cr2
64.00
412,464
68.74
314,258
1,168,648.00
2,337.30
343.72
3,896,311.71
549.95
274,976.00
Cr2
68.74
420,000
70.00
320,000
1,190,000.00
2,380.00
350.00
3,967,500.00
560.00
280,000.00
Cr2
Note : Rite Hour = The duration rent, including loading and unloading time and journey.
70.00
Equipments.
Rental of Equipments
Tripod / Crane
Water Pump
Rental
(Rp.)
Amount
unit / hour
Appliances.
(set)
(hour)
Pump Testing
Rental
Amount
Appliances.
unit /
hour
Rental
Amount
Amount / m'
(Rp.)
(set)
(hour)
(Rp.)
(Rp./500m')
(Rp./m')
Amount of
Expence
Amount of
Testing
Pipe
(Rp./m')
(Rp./bar)
25,920.00
11.52
246,857.14
5.76
81,617.14
561,795.43
1,123.59
1,319.43
1,451.37
26,226.00
11.66
249,771.43
5.83
82,580.68
568,427.74
1,136.86
1,335.01
1,468.51
26,982.00
11.99
256,971.43
6.00
84,961.18
584,813.44
1,169.63
1,373.49
1,510.84
28,116.00
12.50
267,771.43
6.25
88,531.93
609,391.99
1,218.78
1,431.22
1,574.34
33,948.00
15.09
323,314.29
7.54
106,895.79
735,795.96
1,471.59
1,728.09
1,900.90
42,066.00
18.70
400,628.57
9.35
132,457.82
911,747.16
1,823.49
2,141.33
2,355.46
51,786.00
23.02
493,200.00
11.51
163,064.25
1,264,379.85
2,528.76
2,920.03
3,212.03
63,639.00
28.28
606,085.71
14.14
200,387.09
1,553,776.49
3,107.55
3,588.38
3,947.22
77,247.00
34.33
735,685.71
17.17
243,236.09
1,886,022.29
3,772.04
4,355.69
4,791.26
87,759.00
39.00
835,800.00
19.50
276,336.38
2,142,677.78
4,285.36
4,948.42
5,443.27
105,264.00
46.78
1,002,514.29
23.39
331,456.29
2,570,070.69
5,140.14
5,935.47
6,529.02
9,887,382.86
121.42
2,601,942.86
60.71
860,267.36
17,033,510.50
34,067.02
36,131.23
39,744.35
9,648,308.57
118.49
2,539,028.57
59.24
839,466.32
16,621,644.75
33,243.29
35,257.59
38,783.34
10,010,502.86
122.94
2,634,342.86
61.47
870,979.61
17,245,615.75
34,491.23
36,581.14
40,239.26
10,422,205.71
127.99
2,742,685.71
64.00
906,800.46
17,954,877.75
35,909.76
38,085.62
41,894.18
11,195,451.43
137.49
2,946,171.43
68.74
974,077.93
19,286,988.50
38,573.98
40,911.27
45,002.40
11,400,000.00
140.00
3,000,000.00
70.00
991,875.00
19,639,375.00
39,278.75
41,658.75
45,824.63
No.
Unit
Water
Test
Dia
Equipments.
Labour
*Efective
Time
(Hour)
Foreman
Pipe Fitter
Wolker
Key Snugly.
Tackel
Tripod / Crane
Amount
Amount
Piple
Piple
Piple
unit / hour
unit / hour
unit / hour Appliance unit / hour Appliance unit / hour Amount Appliances.
amount
amount
amount
s.
s.
(set)
(hour)
(set)
(hour)
(set)
(man)
(Hour)
(man)
(Hour)
(man)
(Hour)
50
2"
0.98
5.76
5.76
5.76
5.76
17.28
23.04
Tp
80
3"
2.51
5.83
5.83
5.83
5.83
17.48
23.31
Tp
100
4"
3.93
6.00
6.00
6.00
6.00
17.99
23.98
Tp
150
6"
8.84
6.25
6.25
6.25
6.25
18.74
24.99
Tp
200
8"
15.71
7.54
7.54
7.54
7.54
22.63
30.18
Tp
250
10"
24.54
9.35
9.35
9.35
9.35
28.04
37.39
Tp
300
12"
35.34
11.51
11.51
11.51
11.51
46.03
69.05
Tp
350
12"
43.11
14.14
14.14
14.14
14.14
56.57
84.85
Tp
400
12"
62.83
17.17
17.17
17.17
17.17
68.66
103.00
Tp
10
450
12"
79.52
19.50
19.50
19.50
19.50
78.01
117.01
Tp
11
500
12"
93.17
23.39
23.39
23.39
23.39
93.57
140.35
Tp
12
600
12"
141.37
60.71
60.71
60.71
60.71
303.56
485.70
Cr2
13
800
12"
251.33
59.24
59.24
59.24
59.24
296.22
473.95
Cr2
14
900
12"
313.09
61.47
61.47
61.47
61.47
307.34
491.74
Cr2
15
1000
12"
372.7
64.00
64.00
64.00
64.00
319.98
511.97
Cr2
16
1100
12"
475.17
68.74
68.74
68.74
68.74
343.72
549.95
Cr2
17
1200
12"
585.49
70.00
70.00
70.00
70.00
350.00
560.00
Cr2
Equipments.
Tripod / Crane
Water Pump
Amount
unit /
unit / hour Appliance
hour
s.
(hour)
(set)
(hour)
Pump Testing
Amount
unit /
Appliance
hour
s.
(set)
(hour)
5.76
11.52
5.76
5.83
11.66
5.83
6.00
11.99
6.00
6.25
12.50
6.25
7.54
15.09
7.54
9.35
18.70
9.35
11.51
23.02
11.51
14.14
28.28
14.14
17.17
34.33
17.17
19.50
39.00
19.50
23.39
46.78
23.39
60.71
121.42
60.71
59.24
118.49
59.24
61.47
122.94
61.47
64.00
127.99
64.00
68.74
137.49
68.74
70.00
140.00
70.00
A'/2
C/2
C'/2
0.1
Pavement
hs
H-hb
hd
1:n
hb
D/2
D
joint exc.:
@
n=
A
5.5 m
0.2
B
`
B/2
B'/2
Le
ND hd
hb
A/2
B/2
hs
m PVC/SP
(mm)
150
200
250
300
350
400
450
500
600
700
800
900
1000
0.90
0.175
0.35
0.20
1.10
0.60
0.30
1.25
0.10
1.20
0.175
0.35
0.20
1.20
0.60
0.30
1.60
0.10
1.20
0.175
0.35
0.20
1.30
0.60
0.30
1.65
1.20
0.175
0.35
0.20
1.30
0.60
0.30
1.20
0.175
0.35
0.20
1.50
0.80
1.20
0.175
0.35
0.20
1.50
0.80
1.20
0.175
0.35
0.20
1.50
1.50
0.350
0.50
0.20
1.50
0.350
0.50
1.50
0.350
0.50
1.50
0.350
1.50
1.50
ND hd
L
B'/2
DIP
D/2
1.40
0.80
D/2
1.70
1.00
0.10
D/2
1.70
1.00
1.70
0.10
D/2
1.70
1.00
0.30
1.75
0.10
D/2
1.80
1.00
0.30
1.80
0.10
D/2
2.00
1.20
0.80
0.30
1.85
0.10
D/2
2.00
1.20
2.10
1.20
0.30
2.20
0.10
D/2
2.20
1.20
0.20
2.30
1.40
0.30
2.30
0.10
D/2
2.40
1.40
0.20
2.40
1.40
0.30
2.40
0.10
D/2
2.50
1.40
0.50
0.20
2.60
1.60
0.30
2.50
0.10
D/2
2.70
1.60
0.350
0.50
0.20
2.60
1.60
0.30
2.60
0.10
D/2
2.80
1.60
0.350
0.60
0.20
2.90
1.80
0.30
2.70
0.10
D/2
3.00
1.80
hb
A/2
B/2
hs
B'/2
m PVC/SP
(mm)
400
450
500
600
700
800
900
1000
3.64
0.175
0.35
0.20
1.05
0.40
0.30
4.30
0.10
3.64
0.175
0.35
0.20
1.10
0.40
0.30
4.40
3.64
0.350
0.50
0.20
1.20
0.60
0.30
3.64
0.350
0.50
0.20
1.25
0.70
0.30
3.64
0.350
0.50
0.20
1.25
0.70
3.48
0.350
0.50
0.20
1.30
3.48
0.350
0.50
0.20
3.48
0.350
0.60
0.20
DIP
D/2
2.46
0.60
0.10
D/2
2.50
0.60
4.40
0.10
D/2
2.56
0.60
4.50
0.10
D/2
2.70
0.70
0.30
4.60
0.10
D/2
2.74
0.70
0.80
0.30
4.60
0.10
D/2
2.84
0.80
1.35
0.80
0.30
4.70
0.10
D/2
2.88
0.80
1.40
0.90
0.30
4.80
0.10
D/2
3.06
0.90
Hj
H
Hj
C/2
C'/2
0.35
1.40
0.90
1.10
0.35
1.75
0.92
1.32
0.35
1.80
0.94
1.34
0.35
1.85
0.96
1.36
0.35
1.90
1.18
1.38
0.35
1.95
1.20
1.60
0.35
2.00
1.22
1.62
0.50
2.50
1.64
1.64
0.50
2.60
1.88
1.88
0.50
2.70
1.92
1.92
0.50
2.80
2.16
2.16
0.50
2.90
2.20
2.20
0.60
3.10
2.44
2.44
Hj
C/2
C'/2
0.35
4.65
0.80
1.00
0.35
4.75
0.82
1.02
0.50
4.90
1.04
1.04
0.50
5.00
1.18
1.18
0.50
5.10
1.22
1.22
0.50
5.10
1.36
1.36
0.50
5.20
1.40
1.40
0.60
5.40
1.54
1.54