Вы находитесь на странице: 1из 16

OBRA:

FECHA DEL PRESUPUESTO BASE


AREA GEOGRAFICA
UBICACIN
PRESUPUESTO CONTRATADO

PRESUPUESTO:

FORMULA 1: K=0.297*(MOr / MOo) + 0.130*(GGUr / GGUo) + 0.170*(ACr /


SIMBOLO

ELEMENTO

AC

ACERO DE CONSTRUCCION CORRUGADO

BL

BLOQUE Y LADRILLO

CEMENTO PORTLAND TIPO I

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

MAD

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA

MO
MAQ

MANO DE OBRA
MAQUINARIA Y EQUIPO IMPORTADO

FACTOR ( K )

PRESUPUESTO:

FORMULA 2: K=0.303*(MOr / MOo) + 0.131*(GGUr / GGUo) + 0.169*(CERr /


SIMBOLO

ELEMENTO

AC

ACERO DE CONSTRUCCION CORRUGADO

CER

CERAMICA ESMALTADA Y SIN ESMALTAR

PIN

DOLAR

GGU

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

MAD

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA

MO
MAQ

MANO DE OBRA
MAQUINARIA Y EQUIPO IMPORTADO

FACTOR ( K )

PRESUPUESTO:

FORMULA 3: K=0.167*(MOr / MOo) + 0.130*(GGUr / GGUo) + 0.358*(AEr /


SIMBOLO

ELEMENTO

AE

ARTEFACTO DE ALUMBRADO EXTERIOR

AI

ARTEFACTO DE ALUMBRADO INTERIOR

CABLE NYY Y NKY

CM
GGU
MO

DOLAR
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MANO DE OBRA

FACTOR ( K )

PRESUPUESTO:

FORMULA 4: K=0.414*(MOr / MOo) + 0.130*(GGUr / GGUo) + 0.225*(ASGr /


SIMBOLO

ASG
CP
D
GGU
MO
MEN

ELEMENTO

APARATO SANITARIO CON GRIFERIA


CEMENTO PORTLAND TIPO I
DOLAR
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MANO DE OBRA
MAQUINARIA Y EQUIPO NACIONAL

FACTOR ( K )

FACTORES DE REAJUSTE
Mejoramiento del Servicio Educativo en la IE Jess Nazareno N 1560 del Centro Poblado Santa Vernica, Distrito

Oct-10
1
Trujillo - La Libertad
S/.
1,120,902.97

S/.

(CON IGV)

949,917.77

Estructuras

(GGUr / GGUo) + 0.170*(ACr / ACo) + 0.149*(Cr / Co) + 0.095*(BLr / BLo) + 0.088*(


COD.

Coeficiente

IU

Incidencia

I.U BASE

COTUBRE DEL 2010

03

0.110

100%

513.17

17

0.155

100%

496.97

21

0.131

100%

416.97

39

0.169

100%

354.01

43

0.057

100%

572.55

47

0.075

100%

430.83

49

0.303

100%

239.47

Arquitectura

(GGUr / GGUo) + 0.169*(CERr / CERo) + 0.155*(MADr / MADo) + 0.075*(ACr / ACo)


COD.

Coeficiente

IU

Incidencia

I.U BASE

COTUBRE DEL 2010

03

0.075

100%

513.17

24

0.169

100%

269.58

30

0.110

100%

355.30

39

0.131

100%

354.01

43

0.155

100%

572.55

47

0.303

100%

430.83

49

0.057

100%

239.47

Instalaciones Electricas

(GGUr / GGUo) + 0.358*(AEr / AEo) + 0.223*(AIr / AIo) + 0.073*(Cr / Co) + 0.049*(C


COD.

Coeficiente

IU

Incidencia

I.U BASE

COTUBRE DEL 2010

11

0.358

100%

232.19

12

0.223

100%

282.39

19

0.073

100%

663.00

30

0.049

100%

355.30

39

0.130

100%

354.01

47

0.167

100%

430.83

Instalaciones Sanitarias

(GGUr / GGUo) + 0.225*(ASGr / ASGo) + 0.082*(MENr / MENo) + 0.048*(CPr / CPo)


COD.

Coeficiente

IU

Incidencia

I.U BASE

COTUBRE DEL 2010

10

0.225

100%

319.03

21

0.048

100%

416.97

30

0.101

100%

355.30

39

0.130

100%

354.01

47

0.414

100%

430.83

48

0.082

100%

330.88

JUSTE

anta Vernica, Distrito de La Esperanza Trujillo - La Libertad

BLo) + 0.088*(MAQr / MAQo) + 0.071*(MADr / MADo)


VALO ENE 2014
Indice

VALO FEB 2014

Coef.

Indice

VALO MAR 2014

Coef.

Indice

Coef.

474.67

0.102

473.60

0.102

477.82

0.102

578.76

0.181

579.80

0.181

575.36

0.179

460.44

0.145

448.77

0.141

448.77

0.141

393.46

0.188

395.83

0.189

397.88

0.190

646.07

0.064

660.99

0.066

647.55

0.064

498.10

0.087

498.10

0.087

498.10

0.087

249.28

0.315

249.92

0.316

249.75

0.316

K. =

1.081

K. =

1.081

K. =

1.080

75*(ACr / ACo) + 0.057*(MAQr / MAQo) + 0.110*(PINr / PINo)


VALO ENE 2014
Indice

VALO FEB 2014

Coef.

Indice

VALO MAR 2014

Coef.

Indice

Coef.

474.67

0.069

473.60

0.069

477.82

0.070

246.83

0.155

247.77

0.155

247.53

0.155

381.51

0.118

383.34

0.119

383.93

0.119

393.46

0.146

395.83

0.146

397.88

0.147

646.07

0.175

660.99

0.179

647.55

0.175

498.10

0.350

498.10

0.350

498.10

0.350

249.28

0.059

249.92

0.059

249.75

0.059

K. =

1.072

K. =

1.078

K. =

1.076

Co) + 0.049*(CMr / CMo)


VALO ENE 2014
Indice

VALO FEB 2014

Coef.

Indice

VALO MAR 2014

Coef.

Indice

Coef.

207.94

0.321

208.13

0.321

207.77

0.320

300.37

0.237

300.60

0.237

300.14

0.237

681.89

0.075

685.26

0.075

679.93

0.075

381.51

0.053

383.34

0.053

383.93

0.053

393.46

0.144

395.83

0.145

397.88

0.146

498.10

0.193

498.10

0.193

498.10

0.193

K. =

1.023

K. =

1.025

K. =

1.024

48*(CPr / CPo) + 0.101*(Dr / Do)


VALO ENE 2014
Indice

VALO FEB 2014

Coef.

Indice

VALO MAR 2014

Coef.

Indice

Coef.

371.67

0.262

372.74

0.263

371.96

0.262

460.44

0.053

448.77

0.052

448.77

0.052

381.51

0.108

383.34

0.109

383.93

0.109

393.46

0.144

395.83

0.145

397.88

0.146

498.10

0.479

498.10

0.479

498.10

0.479

339.09

0.084

339.73

0.084

339.81

0.084

K. =

1.131

K. =

1.132

K. =

1.132

VALO ABR 2014


Indice

Coef.

470.04

0.101

574.78

0.179

448.77

0.141

399.44

0.191

653.80

0.065

498.10

0.087

248.50

0.314

K. =

1.078

VALO ABR 2014


Indice

Coef.

470.04

0.069

247.66

0.155

384.75

0.119

399.44

0.148

653.80

0.177

498.10

0.350

248.50

0.059

K. =

1.077

VALO ABR 2014


Indice

Coef.

206.95

0.319

299.22

0.236

668.60

0.074

384.75

0.053

399.44

0.147

498.10

0.193

K. =

1.022

VALO ABR 2014


Indice

Coef.

372.26

0.263

448.77

0.052

384.75

0.109

399.44

0.147

498.10

0.479

338.89

0.084

K. =

1.133

OBRA:
FECHA DEL PRESUPUESTO BASE
AREA GEOGRAFICA
UBICACIN
PRESUPUESTO CONTRATADO

Mejoramiento del Servicio Educativo en la IE Jess Nazareno

Oct-10
1
Trujillo - La Libertad
S/.
1,120,902.97

REINTEGRO ESTRUCTURAS
Val. Programada
Val. N

Fecha

1
2
3
4

Dec-13
Jan-14
Feb-14
Mar-14

Mes

165,203.08
206,503.70
6,270.99
0.00

REINTEGRO ARQUITECTURA
Val. Programada
Val. N

Fecha

1
2
3
4

Dec-13
Jan-14
Feb-14
Mar-14

Mes

0.00
0.00
241,533.82
129,532.23

REINTEGRO INSTALACIONES ELECTRICAS


Val. Programada
Val. N

Fecha

1
2
3
4

Dec-13
Jan-14
Feb-14
Mar-14

Mes

0.00
0.00
0.00
28,549.21

REINTEGRO INSTALACIONES ELECTRICAS


Val. Programada
Val. N

Fecha

1
2
3

Dec-13
Jan-14
Feb-14

Mes

0.00
0.00
0.00

Mar-14

48,422.46

RECALCULO DE REINTEGROS D

( Con los K del mes posterior a la Valorizacin

Servicio Educativo en la IE Jess Nazareno N 1560 del Centro Poblado Santa Vernica, Distrito de La Esperanza Trujillo - La

S/.

(CON IGV)

Val. Programada

949,917.77

Val. Ejecutada

Acumulado

Mes

Acumulado

165,203.08
371,706.78
377,977.76
377,977.76

165,203.08
206,503.70
6,270.99
0.00

165,203.08
371,706.78
377,977.76
377,977.76

Val. Programada

Val. Ejecutada

Acumulado

Mes

Acumulado

0.00
0.00
241,533.82
371,066.05

0.00
0.00
241,533.82
129,532.23

0.00
0.00
241,533.82
371,066.05

Val. Programada

Val. Ejecutada

Acumulado

Mes

Acumulado

0.00
0.00
0.00
28,549.21

0.00
0.00
0.00
28,549.21

0.00
0.00
0.00
28,549.21

Val. Programada

Val. Ejecutada

Acumulado

Mes

Acumulado

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

48,422.46

48,422.46

48,422.46

O DE REINTEGROS DEL MES

s K del mes posterior a la Valorizacin)


Distrito de La Esperanza Trujillo - La Libertad

K-1

Reaj. Programada

(mes

Rea. Ejecutada

siguiente)

Mes

Acumulado

Mes

0.081
0.081
0.080
0.078

13,412.70
16,735.96
501.61
0.00

13,412.70
30,148.66
30,650.27
30,650.27

13,412.70
16,735.96
501.61
0.00

K-1

Reaj. Programada

(mes

Rea. Ejecutada

siguiente)

Mes

Acumulado

Mes

0.072
0.078
0.076
0.077

0.00
0.00
18,397.51
10,017.96

0.00
0.00
18,397.51
28,415.47

0.00
0.00
18,397.51
10,017.96

K-1

Reaj. Programada

(mes

Rea. Ejecutada

siguiente)

Mes

Acumulado

Mes

0.023
0.025
0.024
0.022

0.00
0.00
0.00
622.68

0.00
0.00
0.00
622.68

0.00
0.00
0.00
622.68

K-1

Reaj. Programada

(mes

Rea. Ejecutada

siguiente)

Mes

Acumulado

Mes

0.131
0.132
0.132

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.133

6,434.55

6,434.55

6,434.55

Rea. Ejecutada

Reint. Autorizado

Acumulado

Mes

Acumulado

13,412.70
30,148.66
30,650.27
30,650.27

13,412.70
16,735.96
501.61
0.00

13,412.70
30,148.66
30,650.27
30,650.27

Rea. Ejecutada

Reint. Autorizado

Acumulado

Mes

Acumulado

0.00
0.00
18,397.51
28,415.47

0.00
0.00
18,397.51
10,017.96

0.00
0.00
18,397.51
28,415.47

Rea. Ejecutada

Reint. Autorizado

Acumulado

Mes

Acumulado

0.00
0.00
0.00
622.68

0.00
0.00
0.00
622.68

0.00
0.00
0.00
622.68

Rea. Ejecutada

Reint. Autorizado

Acumulado

Mes

Acumulado

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

6,434.55

6,434.55

6,434.55

Вам также может понравиться