at a temp of 37.80c
All ships irrespective of size including those of less than 500grt
Construction identifable with the ship begin
assembly of that ship has commenced atleast 50tons or 1% of mass
on or after 1st October 1994.
Note:- Ships constructed before 1st Oct 1994 are to comply with resolution MSC.5(48) ad
###
Valve closure time from initiation of v/v to valve vlosure time should not exceed
3600 U sec
LR
u is ullage volume at operating signal
m3
LR is maximum loading rate between shipm3/hr
Cofferdam,ballast or void spaces at the after end of the aftermost or forward end of the
hold spaces are excluded form Cargo area.
Cargo service space are workshop locker & store rooms of more than 2m2 in area used f
equiment
Cargo containment system
Integral tanks
Design vapour pressure should not normally exceed 0.25bar however hull scantlings are
0.7bar or less
Boiling point of cargo tanks should be below -100C
Membrane tanks:Are non self supporting tanks which consist of thin layer(membrane) supported through
by adjacent hull structure
ld not exceed