1 Application carrige of liquified gases having a vapour pressure exceeding 2.

8b
a
b
c

3
4
5

at a temp of 37.80c
All ships irrespective of size including those of less than 500grt
Construction identifable with the ship begin
assembly of that ship has commenced atleast 50tons or 1% of mass
on or after 1st October 1994.
Note:- Ships constructed before 1st Oct 1994 are to comply with resolution MSC.5(48) ad
###
Valve closure time from initiation of v/v to valve vlosure time should not exceed
3600 U sec
LR
u is ullage volume at operating signal
m3
LR is maximum loading rate between shipm3/hr
Cofferdam,ballast or void spaces at the after end of the aftermost or forward end of the
hold spaces are excluded form Cargo area.
Cargo service space are workshop locker & store rooms of more than 2m2 in area used f
equiment
Cargo containment system
Integral tanks
Design vapour pressure should not normally exceed 0.25bar however hull scantlings are
0.7bar or less
Boiling point of cargo tanks should be below -100C
Membrane tanks:Are non self supporting tanks which consist of thin layer(membrane) supported through
by adjacent hull structure

sure exceeding 2.8bar absolute

esolution MSC.5(48) adopted

ld not exceed

or forward end of the forwrd most

an 2m2 in area used for cargo

ver hull scantlings are increased

e) supported through insulation

Вам также может понравиться