Вы находитесь на странице: 1из 2

Work Order

Work Order NO : 000001

Work Trade :Mechanical

Work Order Status : Closed

Work Type : Corrective

Work priority : Emergency


Assigned to : FET Collage
Received by : ibraheem khress
Abu shgair
Received Data/Time :

Requester : Dr khaleel
Phone Number :

PM Target Start Data :

PM Target End Data :

Problem Description : Slide movement and accuracy


Note to Technician : inspection the lubricant and wear particle
Failure Code : 1

Check list No:

Asset No : 1,2,3,4

Location NO : 2

Asset Name : Fagor Turning


Case description
Stop the machine Prolong tine

Location Name : CNC LAB


Action Taken

Prevention Taken

Clean the old grease-1


Greasing and Lubrication -2
Move axis-3
Greasing and Lubrication -4
Warm up the axis -5

Part and labor Details

**D=Direct Issue , I = Inventory

Data and Time work was started


Time :

Data :

Data and Time work was completed

Data :

Certification and Work Completion


Name and Signature of Technician/Engineer
Name

Signature
Data :
Time :
Please rate our services :
1-Poor
Excellent

Time :

Name and Signature of Requester/Supervisor


Name

Signature
Data :
Time :

2-Fair

3-Good

4-Very Good

5-

Work Order
Work Order NO : 000001
Work Order Status : Open
Work priority : Normal
PM checklist Daily
Checklist No : 1
Checklist Desc:
1- Lubricant the machine
2- clean the machine after usage

Work Trade :Mechanical


Work Type : Prevention

Вам также может понравиться