List of construction activities


After 18 days remove sheet centering
Apply oil for sheets
Apply one paint coating inside
Apply paint coating outside
Apply plaster for the gaps between sheets
Apply primer outside
Applying putty for internal walls
Applying putty for window frames
Bar bending work for beams and roof
Bore well digging
Bore Well vendors identifying
Clear any blockage in the roof pipes
Close all water and sewage pipes with temporary caps
Compound wall
Constructing sewage lines to pit
Digging pit
Digging pit for power earth
Dummy plate fixing/ electrical holders
Electric pipes
Electric pipes setup inside roof
Electric work
Electrical switches setup
Electrical wiring
Fill soil inside Plinths.
Filling cement and 40 MM Jelly on top of Soil this will be done inside plinth area
Finishing outside plumbing work and tank
Fix sheets based on water level
Fixing bathroom fittings
Fixing meters in panel board.
Fixing window frames
Foundation digging
Granite Lying
Granite tiles Laying in bathroom if you are going with this option
Hocking for the roof if not done for the pillars
House Elevation
Inverter beams
Laying electric pipes in the walls and setup electric boxes
Laying electric service wire from pole to meter board
Molding
Motor & connection to tank
Painting
Parking tiles
Pillar base or Footing
Pillars until Plinths
Plastering of outside walls
Plastering of roof and walls inside
Plinths beam concreting

Plumbing work for kitchen and bathroom


Setting up main door frame and other room door frames
Setup all window frames based on its sizes until 7 feet from the floor
Setup Indian latrine if you are going with this option
Setup kitchen platform and sink
Setup kitchen ventilator and bathroom ventilators
Setup lintel and sunshade
Setup water pipes and sewage pipes till outside of the wall
Sheet centering for beams and also roof
Site cleaning
Site Marking
Soil digging for foundation
Soil digging for Pillars
Soil digging for sump
Start carpenter work
Stone Foundation
Storing water on top of the roof
Sump construction
Sump Construction
Temporary Shed construction
Tiles laying in bathroom and kitchen for walls
Wall construction until beams
Wall construction until window frame base
Water proofing for bathrooms
White wash inside house two cotes