Вы находитесь на странице: 1из 45

Homogeneous Traffic Section

Section No.

From

To

Start Km

1
2

Raipur
Kharora

Kharora
Balodabazar

11.00
40.00

Homogenous Section No.

Homogenous Section Name

Raipur-Kharora
From
To

Chainage (Km)
Length
Avg Carriageway Width (m)

Left
Right
MT
NMT

Avg Shoulder Width (m)


AADT
Existing Rise+Fall (m/km)
Existing Avg Horizontal Curve (deg/km)
Existing Speed Limit (km/hr)
Site Altitute above msl (m)
Existing Drain Type
Wearing Course
Existing Pavement
Composition & Thickness

Base Course

Sub-Base
1.35 Avg Deflection (mm) from BBD
Existing SNP
Avg CBR Values (%)
Existing Avg Roughness, IRI (m/Km)
Existing Cracking Area (%)
Existing Ravelled Area (%)
Existing No. of Potholes (No./Km)
Existing Edge Break Area (Sq m/Km)
Existing Edge Drop/Step (mm)
Existing Mean Rut Depth (mm)
Existing Texture depth (mm)
Existing Skid Resistance (SCRIM 50 Km/hr)
Existing Drainage Condition
Existing Relative Compaction (%)

VDF Values

Overlay
Proposed
Pavement
Composition
& Thickness

Widening

SDBC (mm)
BM (mm)
WMM (mm)
WBM (mm)
GSB (mm)

11.0
40.0
29
7.0
1.5
1.5
5502
442
1.3
15.8
40
260

94
#DIV/0!
195
217
3.537
8.0
3.5
6.2.
2.0
3.0
25.0
0.0
25.0
2.5
0.6

Bus
LGV
2-Axle
3-Axle
MAV
BC (mm)
DBM (mm)
BC (mm)
DBM (mm)
Base (mm)
Sub-Base (mm)

86
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Proposed
Pavement
Composition
& Thickness
Reconstruction/New
Construction

BC (mm)
DBM (mm)
Base (mm)
Sub-Base (mm)

Proposed SNP

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Economic
Financial
Economic
Patching (per
sqm)
Financial
Unit Cost
Edge Repair (per Economic
sqm)
Financial
Economic
Crack Sealing
(per sqm)
Financial
Roughness to achieved after maintenance, IRI
(m/Km)
Mean Rut Depth to Achieved after maintenance
(mm)
Overlay

Maintenance

Unit Cost

Reconstruction/N Economic
ew Construction
Financial
(per km)

Annual Cost Stream (%)

Improvement

1
2
3
4
5

Salvage Value (%)


Roughness after improvement, IRI (m/Km)
Mean rut depth after improvement (mm)
Skid Resistance after improvement (SCRIM at 50km
Surface Texture after improvement (mm)
Rise+Fall (m/km)
Number of Rise & Falls per km
Horizontal Curve (deg/km)
Superelevation (%)
Speed Limit (km/hr)

15

0.32
8.842
100

2.7737459075

End Km

Length

40.00
84.00

29.00
44.00

2
Kharora-Balodabazar
40
84.0
44
5.5
1.5
1.5
3930
529
1.7
20.2
40
260

99
#DIV/0!
228
179
3.531
8
3.1
7.30
1.20
5.00
30
0
20
2.5
0.6
87
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

AADT
MT
5502
3930

NMT
442
529

#DIV/0!

15

0.077
38.45
100

Material / Layer
Asphaltic Condrete (AC) - SDBC, BC
Dense Bituminous Macadam - BM
Wet Mix Macadam (WMM) - WBM
Granular Sub Base

Structural Coeff
(ai)
0.42
0.35
0.14
0.11

Drainage Coeff
(mi)
1.00
1.00
1.10
1.10

HDM-4 Inputs for Muzaffarpur-Barauani (NH-28)

Chainage
From

To

11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
54.0
55.0
56.0
57.0
58.0
59.0
60.0
61.0
62.0
63.0
64.0
65.0
66.0
67.0
68.0
69.0
70.0
71.0
72.0
73.0
74.0
75.0
76.0
77.0
78.0
79.0
80.0
81.0
82.0
83.0
84.0
73.6

12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
54.0
55.0
56.0
57.0
58.0
59.0
60.0
61.0
62.0
63.0
64.0
65.0
66.0
67.0
68.0
69.0
70.0
71.0
72.0
73.0
74.0
75.0
76.0
77.0
78.0
79.0
80.0
81.0
82.0
83.0
84.0
73.6
74.4

Shoulder
Left

Carriageway/Road
Type

Conditi Width
on
(m)
7.0
5.5
5.5
5.5
5.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
3.5
3.5
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0

Type

Roughne
ss
Conditi Width Conditi Width (mm/Km)
on
(m)
on
(m)
2.5

VDF Values

Right

Bus

LGV

2Axle

3Axle

MAV

CBR
Values
(%)

Existing Pavement Composition & Thickness


Wearing Course
Base Course
Sub-Base
SDBC
(mm)

BM (mm)

WMM
(mm)

WBM
(mm)

0.0
0.0

94
99

195
228

217
179

GSB (mm)

Overlay
BC
(mm)

DBM
(mm)

Proposed Pavement Composition & Thickness


SNP
Edge
Widening
Reconstruction/New Construction BBD
No. of
Mean Rut
Cracking Ravelled
Break
Potholes
Depth
SubSubArea (%) Area (%)
Area (Sq
BC
DBM Base
BC
DBM
Base
Deflectio
(No./Km)
(mm)
Base
Base
Existing Proposed
m/Km)
(mm) (mm) (mm)
(mm)
(mm)
(mm)
n (mm)
(mm)
(mm)
3.537
3.531
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Texture
depth
(mm)

Skid
Resistan
ce
(SCRIM
50 Km/hr)

Drainage
Condition

TRIAL PIT ON EVERY 5 KM


Raipur To Baloda Bazar
CH:-11+400
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=230 mm in Two Layer
GSB=200 mm in Two Layer
Photo No:7901-06
Soil Moisture content=12%

Raipur To Baloda Bazar


CH:-15+000

TRIAL PIT ON EVERY 2-2.5 KM


FOR PAVEMENT
COMPOSITION ONLY
Raipur To Baloda Bazar
CH:-12+800
Trial Pit :-LHS
BT=075 mm In one Layer
WBM=200 mm in Two Layer
GSB=200 mm in Two Layer
Photo No:8058-61

Raipur To Baloda Bazar


CH:-17+600

Trial Pit :-LHS


BT=100 mm In Two Layer
WBM=120 mm in one Layer
GSB=350 mm in Two Layer

Trial Pit :-LHS


BT=070 mm In one Layer
WBM=200 mm in Two Layer
GSB=200 mm in Two Layer

Photo No:7918-25
Soil Moisture content=8%

Photo No:8062-66

Raipur To Baloda Bazar


CH:-20+000
Trial Pit :-LHS
BT=80 mm In Two Layer
WBM=200 mm in Two Layer
GSB=300 mm in Two Layer
Photo No:7907-11
Soil Moisture content=7%

Raipur To Baloda Bazar


CH:-25+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB=200 mm in Two Layer
Photo No:7912-16
Soil Moisture content=7.5%

Raipur To Baloda Bazar


CH:-30+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB=300 mm in Two Layer
Photo No:7926-33
Soil Moisture content=6%

Raipur To Baloda Bazar


CH:-34+800

Raipur To Baloda Bazar


CH:-23+000
Trial Pit :-LHS
BT=200 mm In Three Layer
WBM=250 mm in Two Layer
GSB=000 mm in Two Layer
Photo No:8067-71

Raipur To Baloda Bazar


CH:-28+00
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB=200 mm in Two Layer
Photo No:8054-57

Raipur To Baloda Bazar


CH:-29+000
Trial Pit :-LHS
BT=90 mm In Two Layer
WBM=200 mm in Two Layer
GSB=200 mm in Two Layer
Photo No:8049-53

Raipur To Baloda Bazar


CH:-31+000

Chainage

Trial Pit :-LHS


BT=90 mm In Two Layer
WBM=120 mm in One Layer
GSB=300 mm in Two Layer
Photo No:7934-37
Soil Moisture content=6%

Raipur To Baloda Bazar


CH:-40+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=300 mm in Two Layer
GSB=350 mm in Two Layer
Photo No:7938-42
Soil Moisture content=7.50%

Raipur To Baloda Bazar


CH:-45+000
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=250 mm in Two Layer
GSB=250 mm in Two Layer
Photo No:7943-48
Soil Moisture content=10%

Raipur To Baloda Bazar


CH:-50+000
Trial Pit :-LHS
BT=90 mm In Two Layer
WBM=150 mm in one Layer
GSB=100 mm in one Layer
Photo No:7949-53
Soil Moisture content=8%

Raipur To Baloda Bazar


CH:-55+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=150 mm in one Layer
GSB=150 mm in one Layer
Photo No:7954-58
Soil Moisture content=6%

Raipur To Baloda Bazar


CH:-60+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB=150 mm in one Layer
Photo No:7965-70

Trial Pit :-LHS


BT=100 mm In Two Layer
WBM=300 mm in Two Layer
GSB=100 mm in oneLayer
Photo No:8072-75

Raipur To Baloda Bazar


CH:=33+000
Trial Pit :-LHS
BT=40 mm In one Layer
GSB=150 mm in oneLayer
WBM=150 mm in one Layer
Photo No:8045-48

Raipur To Baloda Bazar


CH:=34+000
Trial Pit :-LHS
BT=50 mm In one Layer
GSB=50 mm in oneLayer
WBM=100 mm in one Layer
Photo No:8076-79

Raipur To Baloda Bazar


CH:=36+000
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
Photo No:8040-44

Raipur To Baloda Bazar


CH:=38+00
Trial Pit :-LHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB =100 mm in one Layer
Photo No:8036-39

Raipur To Baloda Bazar


CH:=43+000
Trial Pit :-LHS
BT=60 mm In one Layer
WBM=300 mm in Two Layer
GSB =200 mm in one Layer
Photo No:8031-35

Soil Moisture content=6.5%

Raipur To Baloda Bazar


CH:-65+200
Trial Pit :-LHS
BT=80 mm In Two Layer
GSB=100 mm in one Layer
WBM=100 mm in one Layer
GSB=150 mm in one Layer
Photo No:7971+76
Soil Moisture content=5%

Raipur To Baloda Bazar


CH:-70+000
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=250 mm in Two Layer
Photo No:7977-82
Soil Moisture content=8%

Raipur To Baloda Bazar


CH:-75+000
Trial Pit :-LHS
BT=190 mm In Two Layer
WBM=375 mm in Two Layer
Photo No:7990-94
Soil Moisture content=6%

Raipur To Baloda Bazar


CH:-80+000
Trial Pit :-LHS
BT=120 mm In Two Layer
WBM=350 mm in one Layer
GSB=175 mm in one Layer
Photo No:7982-89
Soil Moisture content=6%

Raipur To Baloda Bazar


CH:-83+000
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=250 mm in one Layer
GSB=150 mm in one Layer
Photo No:8009-8015
Soil Moisture content=7%

Raipur To Baloda Bazar


CH:=47+500
Trial Pit :-RHS
BT=80 mm In Two Layer
WBM=300 mm in Two Layer
GSB =220 mm in one Layer
Photo No:8026-30

Raipur To Baloda Bazar


CH:=57+500
Trial Pit :-LHS
BT=90 mm In Two Layer
WBM=100 mm in one Layer
Photo No:8016-20

Raipur To Baloda Bazar


CH:=62+500
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=150 mm in Two Layer
GSB =300 mm in Two Layer
Photo No:7999-8002

Raipur To Baloda Bazar


CH:=67+500
Trial Pit :-RHS
BT=100 mm In Two Layer
WBM=200 mm in Two Layer
GSB =175 mm in one Layer
Photo No:8003-8008

Raipur To Baloda Bazar


CH:=72+600
Trial Pit :-RHS
BT=80 mm In one Layer
WBM=225 mm in Two Layer
GSB =125 mm in one Layer
Photo No:7995-98

Raipur To Baloda Bazar


CH:=76+500
Trial Pit :-RHS
BT=90 mm In one Layer
WBM=300 mm in Two Layer

Photo No:8080-82

Chainage

BT

WBM

GSB

11+400
12+800
15+000
17+600
20+000
23+000
25+000
28+000
29+000
30+000
31+000
33+000
34+000
34+800
36+000
38+000
40+000
43+000
45+000
47+500
50+000
55+000
57+500
60+000
62+500
65+200
67+500
70+000
72+600
75+000
76+500
80+000
83+000

100
75
100
70
80
200
100
100
90
100
100
40
50
90
100
100
100
60
100
80
90
100
90
100
100
80
100
100
80
190
90
120
100

230
200
120
200
200
250
200
200
200
200
300
150
50
120
200
200
300
300
250
300
150
150
100
200
150
100
200
250
225
375
300
350
250

200
200
350
200
300
200
200
200
300
100
150
100
300
100
350
200
250
220
100
150
150
300
150
175
125

175
150

BT

WBM

GSB

94
99

195
228

217
179

HDM-4 Inputs for Rohtak - Bawal (NH-71)


Chainage

Carriageway/Road

From

To

Type

Conditi Width
on
(m)

363.0
363.5
364.0
364.5
365.0
365.5
366.0
366.5
367.0
367.5
368.0
368.5
369.0
369.5
370.0
370.5
371.0
371.5
372.0
372.5
373.0
373.5
374.0
374.5
375.0
375.5
376.0
376.5
377.0
377.5
378.0
378.5
379.0
379.5
380.0
380.5
381.0
381.5
382.0
382.5
383.0
383.5
384.0
384.5
385.0
385.5
386.0
386.5
387.0
387.5
388.0
388.5
389.0
389.5
390.0
390.5
391.0
391.5
392.0
392.5
393.0
393.5
394.0
394.5
395.0
395.5
396.0
396.5
397.0
397.5
398.0
398.5
399.0
399.5
400.0
400.5
401.0
401.5
402.0
402.5

363.5
364.0
364.5
365.0
365.5
366.0
366.5
367.0
367.5
368.0
368.5
369.0
369.5
370.0
370.5
371.0
371.5
372.0
372.5
373.0
373.5
374.0
374.5
375.0
375.5
376.0
376.5
377.0
377.5
378.0
378.5
379.0
379.5
380.0
380.5
381.0
381.5
382.0
382.5
383.0
383.5
384.0
384.5
385.0
385.5
386.0
386.5
387.0
387.5
388.0
388.5
389.0
389.5
390.0
390.5
391.0
391.5
392.0
392.5
393.0
393.5
394.0
394.5
395.0
395.5
396.0
396.5
397.0
397.5
398.0
398.5
399.0
399.5
400.0
400.5
401.0
401.5
402.0
402.5
403.0

BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT

Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair/ Poor 6.5/7.0
Fair/ Poor 6.5/7.0
Fair/ Poor 6.5/7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0

Type
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved

Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved

Shoulder
Left
Right
Roughne
ss
Conditi Width Conditi Width (mm/Km)
on
(m)
on
(m)
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.5
1.5
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.5
1.5
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

1950
1950
2046
2046
2212
2212
1992
1992
2156
2156
2286
2286
2259
2259
2257
2257
2117
2117
2432
2432
2201
2201
2230
2230
2491
2491
2477
2477
2237
2237
2216
2216
2484
2484
2323
2323
2316
2316
2518
2518
2357
2357
2564
2564
2987
2987
3136
3136
2815
2815
2534
2534
2633
2633
2792
2792
2683
2683
3061
3061
3404
3404
3440
3440
4704
4704
3508
3508
2963
2963
3289
3289
2836
2836
3416
3416
2822
2822
3183
3183

VDF Values
Bus

LGV

2Axle

0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91

0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82

6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.70
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56

3Axle

MAV

CBR
Values
(%)

8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.41
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09

12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
12.89
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96

7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
8.9

Existing Pavement Composition & Thickness


Wearing Course
Base Course
Sub-Base
SDBC
(mm)
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0

BM (mm)
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
70.0

WMM
(mm)

Overlay

Proposed Pavement Composition & Thickness


Widening
Reconstruction/New Construction

WBM
(mm)

GSB
(mm)

BC
(mm)

DBM
(mm)

BC
(mm)

DBM
(mm)

Base
(mm)

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0

350.0

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0
300.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0

150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0

250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0

250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0

SubBC
Base
(mm)
(mm)
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0 Bypass
50.0
50.0
50.0
50.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0 Bypass
50.0
50.0
50.0
50.0
50.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0 Bypass
50.0
50.0
50.0
50.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0
260.0 Bypass
50.0

DBM
(mm)

140.0
140.0
140.0
140.0

140.0
140.0
140.0
140.0
140.0

Base
(mm)

250.0
250.0
250.0
250.0

250.0
250.0
250.0
250.0
250.0

SubBase
(mm)

260.0
260.0
260.0
260.0

260.0
260.0
260.0
260.0
260.0

Edge
BBD
No. of
Mean Rut
Cracking Ravelled
Break
Potholes
Depth
Deflectio Area (%) Area (%) (No./Km) Area (Sq
(mm)
m/Km)
n (mm)
2.247
2.247
2.385
2.385
2.901
2.901
0.941
0.941
2.126
2.126
1.122
1.122
0.843
0.843
0.753
0.753
0.820
0.820
0.835
0.835
1.017
1.017
1.518
1.518
0.775
0.775
0.837
0.837
1.711
1.711
1.027
1.027
1.228
1.228
1.235
1.235
1.453
1.453
1.531
1.531
1.624
1.624
1.403
1.403
1.727
1.727
1.555
1.555
2.594
2.594
1.486
1.764
2.415
2.084
1.95
1.425
1.078

140.0
140.0
140.0
140.0

250.0
250.0
250.0
250.0

260.0
260.0
260.0
260.0

1.438
0.0
0.825
1.257
1.332
1.95
2.15

140.0

250.0

260.0

1.884

5
5
15
15
15
15
15
15
15
15
15
15
15
15
0
25
25
25
15.0
15.0
15.0
15.0
15.0
0
25.0
25.0
15.0
15.0
15.0
15.0
15.0
15.0
25.0
25.0
15.0
15.0
15.0
15.0
15.0
25.0
25.0
25.0
15.0
15.0
15.0
25.0
25.0
25.0
25.0
25.0
25.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0
40.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.0
3.0
0
0
0.7
0.7
0.7
0.7
0
0
0
0
0
0
0

3
4

1
1
1

Texture
depth
(mm)

Skid
Resistan
ce
(SCRIM
50 Km/hr)

Chainage

Shoulder
Left

Carriageway/Road

From

To

Type

Conditi Width
on
(m)

403.0
403.5
404.0
404.5
405.0
405.5
406.0
406.5
407.0
407.5
408.0
408.5
409.0
409.5
410.0
410.5
411.0
411.5
412.0
412.5
413.0
413.5
414.0
414.5
415.0
415.5
416.0
416.5
417.0
417.5
418.0
418.5
419.0
419.5
420.0
420.5
421.0
421.5
422.0
422.5
423.0
423.5
424.0
424.5
425.0
425.5
426.0
426.5
427.0
427.5
428.0
428.5
429.0
429.5
430.0
430.5
431.0
431.5
432.0
432.5
433.0
433.5
434.0
434.5
435.0
435.5
436.0
436.5
437.0
437.5
438.0
438.5
439.0
439.5
440.0
440.5
441.0
441.5
442.0
442.5
443.0

403.5
404.0
404.5
405.0
405.5
406.0
406.5
407.0
407.5
408.0
408.5
409.0
409.5
410.0
410.5
411.0
411.5
412.0
412.5
413.0
413.5
414.0
414.5
415.0
415.5
416.0
416.5
417.0
417.5
418.0
418.5
419.0
419.5
420.0
420.5
421.0
421.5
422.0
422.5
423.0
423.5
424.0
424.5
425.0
425.5
426.0
426.5
427.0
427.5
428.0
428.5
429.0
429.5
430.0
430.5
431.0
431.5
432.0
432.5
433.0
433.5
434.0
434.5
435.0
435.5
436.0
436.5
437.0
437.5
438.0
438.5
439.0
439.5
440.0
440.5
441.0
441.5
442.0
442.5
443.0
443.5

BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT

Fair/Poor 7.0
Fair/Poor 7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Fair
7.0
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Good
5.5
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5/6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5/6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5/6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5/6.0
Poor 5.5 /6.0
Poor 5.5 /6.0
Poor 5.5/6.0
Poor
7.0
Poor
7.0

BT
BT
BT
BT
BT

Good
Good
Good
Good
Good

7.0
7.0
7.0
7.0
7.0

Type

VDF Values

Right

Roughne
ss
Conditi Width Conditi Width (mm/Km)
on
(m)
on
(m)

Paved
Paved
Paved
Paved

Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5

Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5

Paved
Paved
Paved
Paved
Paved
Paved
Paved
Paved

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Paved
Paved
Paved
Paved
Paved
Hard
Hard
Hard

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.3
1.3
1.3

Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.2
1.3
1.3

Hard
Hard
Hard
Hard
Hard
Hard

Fair
Fair
Fair
Fair
Fair
Fair

1.3
1.3
1.3
1.3
1.3
1.3

Fair
Fair
Fair
Fair
Fair
Fair

1.3
1.3
1.3
1.3
1.3
1.3

Hard
Hard

Fair
Fair

1.3
1.3

Fair
Fair

1.3
1.3

Hard
Hard
Hard
Hard
Hard

Fair
Fair
Fair
Fair
Fair

1.3
1.3
1.3
1.3
1.3

Fair
Fair
Fair
Fair
Fair

1.3
1.3
1.3
1.3
1.3

Hard
Hard
Earthen
Earthen
Earthen
Earthen
Earthen
Earthen
Earthen
Earthen
Earthen
Earthen

Fair
Fair
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Poor
Poor

1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3

Fair
Fair
Fair
Fair
Fair
Poor
Poor
Poor
Poor
Poor
Poor
Poor

1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3
1.3

Earthen

Poor

1.3

Poor

1.3

Earthen
Earthen
Earthen
Earthen
Earthen

Poor
Poor
Poor
Poor
Poor

1.3
1.3
1.3
1.3
1.3

Poor
Poor
Poor
Poor
Poor

1.3
1.3
1.3
1.3
1.3

Paved
Paved

Fair
Fair

1.5
1.5

Fair
Fair

1.5
1.5

Paved
Paved

Fair
Fair

1.5
1.5

Fair
Fair

1.5
1.5

Bus

LGV

2Axle

3Axle

MAV

4239
4239
3665
3665
3660
3660
3653
3653
3458
3458
3468
3468
3355
3355
4075
4075
3594
3594
3489
3489
5586
5586
4706
4706
2716
2716
2475
2475
2601
2601
2578
2578
2057
2057
2093
2093
2702
2702
2341
2341
2605
2605
2658
2658
2546
2546
3503
3503
4132
4132
3799
3799
4082
4082
6092
6092
5576
5576
5896
5896
5904
5904
6738
6738
6092
6092
3995
3995

0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91

0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82

6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56

8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09

11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96

3087
3087
3068
3068
2914
2914
3209

0.91
0.91
0.91
0.91
0.91

0.82
0.82
0.82
0.82
0.82

6.56
6.56
6.56
6.56
6.56

8.09
8.09
8.09
8.09
8.09

11.96
11.96
11.96
11.96
11.96

CBR
Values
(%)
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.6
8.6
8.6
8.6
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
6.5
6.5
6.5
6.5
6.5

Existing Pavement Composition & Thickness


Wearing Course
Base Course
Sub-Base
SDBC
(mm)

BM (mm)

25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0

70.0
70.0
70.0
70.0
70.0
70.0
70.0
70.0
70.0
70.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
200.0
100+150
100+150
100+150
100+150
100+150
100+150
100+150
100+150
100+150
100+150
400.0
400.0
400.0
400.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0

25.0
25.0
25.0
25.0
25.0

100.0
100.0
100.0
100.0
100.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

WMM
(mm)

WBM
(mm)

GSB
(mm)

350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
350.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
250.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0

150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
150.0
400.0
400.0
400.0
400.0
400.0

Overlay
BC
(mm)

DBM
(mm)

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0

50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0
50.0

80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0
80.0

Proposed Pavement Composition & Thickness


Edge
Widening
Reconstruction/New Construction
BBD
No. of
Mean Rut
Cracking Ravelled
Break
Potholes
Depth
SubSubBC
DBM Base
BC
DBM
Base
Deflectio Area (%) Area (%) (No./Km) Area (Sq
(mm)
Base
Base
m/Km)
(mm) (mm) (mm)
(mm)
(mm)
(mm)
n (mm)
(mm)
(mm)
50.0
140.0
250.0
260.0
40.0
0
50.0
140.0
250.0
260.0
2.223
40.0
0
50.0
140.0
250.0
260.0
40.0
0
50.0 140.0 250.0 260.0
2.088
25.0
0
50.0 140.0 250.0 260.0
15.0
0
50.0 140.0 250.0 260.0
1.219
15.0
0
50.0 140.0 250.0 260.0
15.0
0
50.0 140.0 250.0 260.0
0.974
15.0
0
50.0 140.0 250.0 260.0
15.0
0
50.0 140.0 250.0 260.0
1.221
15.0
0
50.0 140.0 250.0 260.0
25.0
0
50.0 140.0 250.0 260.0
0.958
15.0
0
50.0 140.0 250.0 260.0
25.0
0
50.0 140.0 250.0 260.0
1.36
15.0
0
50.0 140.0 250.0 260.0
15.0
0
50.0 140.0 250.0 260.0
1.326
15.0
0
50.0 140.0 250.0 260.0
25.0
0
50.0 140.0 250.0 260.0
1.683
25.0
0
50.0
140.0
250.0
260.0
25.0
0
5.0
50.0
140.0
250.0
260.0
0.0
45.0
0
50.0
140.0
250.0
260.0
45.0
0
50.0
140.0
250.0
260.0
0.0
45.0
0
50.0
140.0
250.0
260.0
45.0
0
50.0
140.0
250.0
260.0
1.482
45.0
0
50.0 140.0 250.0 260.0
3.0
0
50.0 140.0 250.0 260.0
0.974
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.367
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.271
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.182
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.096
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.361
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.349
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
0.967
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
0.933
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.236
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.382
0
0
50.0 140.0 250.0 260.0
0
0
50.0 140.0 250.0 260.0
1.317
0
0
50.0 140.0 250.0 260.0
65
1.5
3
50.0
140.0
250.0
260.0
65
1.5
4
50.0
140.0
250.0
260.0
77.0
1.5
4.0
50.0
140.0
250.0
260.0
77.0
1.5
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
77.0
3.0
4.0
50.0
140.0
250.0
260.0
90.0
7.5
4.0
50.0
140.0
250.0
260.0
90.0
7.5
4.0
50.0
140.0
250.0
260.0
90.0
7.5
4.0
Bypass 50.0
140.0
250.0
260.0
77.0
7.5
4.0
50.0
140.0
250.0
260.0
77.0
7.5
4.0
50.0
140.0
250.0
260.0
77.0
12.0
13.0
50.0
140.0
250.0
260.0
77.0
12.0
13.0
50.0
140.0
250.0
260.0
77.0
12.0
13.0
50.0
140.0
250.0
260.0
45.0
12.0
13.0
50.0
140.0
250.0
260.0
45.0
12.0
13.0
0.0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
50.0
140.0
250.0
260.0
12.0
0
50.0
140.0
250.0
260.0
1.582
15.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
1.235
15.0
0
50.0
140.0
250.0
260.0
15.0
0

Texture
depth
(mm)

Skid
Resistan
ce
(SCRIM
50 Km/hr)

Chainage

Shoulder
Left

Carriageway/Road

From

To

Type

443.5
444.0
444.5
445.0
445.5
446.0
446.5
447.0
447.5
448.0
448.5
449.0
449.5
450.0
450.5

444.0
444.5
445.0
445.5
446.0
446.5
447.0
447.5
448.0
448.5
449.0
449.5
450.0
450.5
451.0

BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT

Conditi Width
on
(m)
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good
Good

7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0

Type

VDF Values

Right

Roughne
ss
Conditi Width Conditi Width (mm/Km)
on
(m)
on
(m)

Paved
Paved
Paved
Paved
Paved
Paved

Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5

Fair
Fair
Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5
1.5
1.5

Paved
Paved
Paved
Paved

Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5

Fair
Fair
Fair
Fair

1.5
1.5
1.5
1.5

Paved

Fair

1.5

Fair

1.5

3209
3772
3772
2692
2692
2836
2836
2377
2377
2427
2427
2840
2840
2637
2637

Bus

LGV

2Axle

3Axle

MAV

CBR
Values
(%)

0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91

0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82
0.82

6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56
6.56

8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09
8.09

11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96
11.96

6.5
6.5
6.5
6.5
6.5
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1

Existing Pavement Composition & Thickness


Wearing Course
Base Course
Sub-Base
SDBC
(mm)

BM (mm)

25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0
25.0

100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0

WMM
(mm)

WBM
(mm)
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0
400.0

GSB
(mm)

Overlay
BC
(mm)

DBM
(mm)

Proposed Pavement Composition & Thickness


Edge
Widening
Reconstruction/New Construction
BBD
No. of
Mean Rut
Cracking Ravelled
Break
Potholes
Depth
SubSubBC
DBM Base
BC
DBM
Base
Deflectio Area (%) Area (%) (No./Km) Area (Sq
(mm)
Base
Base
m/Km)
(mm) (mm) (mm)
(mm)
(mm)
(mm)
n (mm)
(mm)
(mm)
50.0
140.0
250.0
260.0
1.403
15.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
1.248
15.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
0.855
15.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
1.083
15.0
0
50.0
140.0
250.0
260.0
20.0
0
50.0
140.0
250.0
260.0
0.974
20.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
1.852
15.0
0
50.0
140.0
250.0
260.0
15.0
0
50.0
140.0
250.0
260.0
1.895
7.0
0
50.0
140.0
250.0
260.0
7.0
0
50.0
140.0
250.0
260.0
1.187
7.0
0

Texture
depth
(mm)

Skid
Resistan
ce
(SCRIM
50 Km/hr)

Drainage
Condition

Drainage
Condition

Drainage
Condition

NAME OF CAPITAL CITIES

Prices as on 16.06.08(Rs per litre)


MS
STATE

MUMBAI

Maharashtra

55.04 38.93 59.20 41.30

DELHI

Delhi

50.56 34.80 54.80 37.10

KOLKATTA

West Bengal

52.20 35.81 56.30 38.20

CHENNAI

Tamil Nadu

55.07 37.13 59.20 39.50

CHANDIGARH

Chandigarh

51.28 34.69 55.40 37.00

AMBALA

Haryana

50.53 33.61 54.80 36.00

JALANDHAR

Punjab

55.46 34.27 59.70 36.60

SIMLA

Himachal Pradesh

53.00 35.49 57.20 37.80

JAMMU

Jammu & Kashmir

51.83 35.05 56.00 37.40

SRINAGAR

Srinagar- Srinagar Depot Pricing Area 53.17 35.99 57.30 38.30

DEHRADUN

Uttaranchal

51.65 36.40 55.90 38.70

LUCKNOW

Uttar Pradesh

52.78 36.24 56.90 38.60

JAIPUR

Rajasthan

53.96 37.37 58.10 39.70

BHOPAL

Madhya Pradesh

54.58 39.05 58.70 41.40

PANAJI

Goa

50.75 37.00 54.90 39.30

AHMEDABAD

Gujarat

54.11 38.99 58.30 41.30

RAIPUR

Chattisgarh

52.14 38.63 56.30 41.00

RANCHI

Jharkand

51.04 35.69 55.20 38.00

BHUBHANESWAR

Orissa

50.84 37.27 55.00 39.60

PATNA

Bihar

HYDERABAD

Andhra Pradesh

56.65 38.25 60.80 40.60

TRIVANDRUM

Kerala

52.49 37.62 56.60 40.00

BANGALORE
Karnataka
Source: bharatpetroleum.com

52.87

HSD

36.79

SPEED

57

HI SPEED

39.1

58.50 39.80 62.60 42.10

46.44

MI Code

NAME OF CAPITAL CITIES

Prices w.e.f 01.07.2011


STATE
MI Code Region

M002
L005
W154
T356
N001
H002
P001
I045
J001
J002
F040
U703
R290
D131
V032
G095
E020
B188
O028
B103
A203
K056
T424
C159

MUMBAI
DELHI
KOLKATTA
CHENNAI
CHANDIGARH
AMBALA
JALANDHAR
SIMLA
JAMMU
SRINAGAR
DEHRADUN
LUCKNOW
JAIPUR
BHOPAL
PANAJI
AHMEDABAD
RAIPUR
RANCHI
BHUBHANESWAR
PATNA
HYDERABAD
TRIVANDRUM
Pondicherry Inter State Sale
BANGALORE

Maha-Mum
M002
Delhi
L005
West Bengal
W154
Tamil Nadu
T356
Chandigarh
N001
Haryana
H002
Punjab
P001
Himachal Pradesh
I045
Jammu & Kashmir
J001
Srinagar- Srinagar Depot J002
Uttaranchal
F040
Uttar Pradesh
U703
Rajasthan
R290
Madhya Pradesh
D131
Goa
V032
Gujarat
G095
Chattisgarh
E020
Jharkand
B188
Orissa
O028
Bihar
B103
Andhra Pradesh
A203
Kerala
K056
Tamil Nadu
T424
Karnataka
C159

Source: bharatpetroleum.com

WR
NR
ER
SR
NR
NR
NR
NR
NR
NR
NR
NR
NR
WR
WR
WR
WR
ER
ER
ER
SR
SR
SR
SR

MS

SPEED
68.59
63.68
67.99
67.48
64.30
63.87
70.78
66.59
66.69
68.36
66.07
67.69
67.72
68.47
63.55
67.85
65.36
63.75
63.57
66.06
70.90
66.18
62.15
71.36

71.30
66.30
71.70
70.20
67.80
66.40
73.60
69.10
69.20
71.40
68.70
70.30
70.40
71.20
66.20
70.50
68.10
67.40
66.80
69.60
73.60
68.70
64.70
74.10

HSD

Hi Speed Speed 97
45.12
41.12
43.57
43.80
40.94
39.77
40.81
42.05
42.34
43.56
43.57
43.08
42.90
45.38
43.95
45.98
45.46
43.21
43.88
43.15
44.93
44.39
43.01
46.06

50.55
46.00
48.55
49.00
45.75
44.50
47.35
47.00
47.15
48.40
48.80
48.10
48.00
50.70
49.10
51.40
50.85
48.30
49.00
48.20
50.20
49.80
47.90
51.40

82.00
77.00
81.00
81.00
76.00

66.73

85.00

86.00

48.16

Vehicle Type
Scooter/Motor Cycle
Auto Rickshaw
Cars
Mini Bus
Bus
LCV + Tractor
2-Axle Truck
3-Axle Truck
MAV
Total

Km 35
1613
23
1103
135
247
510
871
687
925
6114

Location
Km 79
1214
6
686
254
76
360
608
561
602
4367

Composition (%)
Km 35
Km 79
26.38
27.80
0.38
0.14
18.04
15.71
2.21
5.82
4.04
1.74
8.34
8.24
14.25
13.92
11.24
12.85
15.13
13.79
100.00
100.00

Diverting Traffic by
2011
New
Old
2011
Section
Section
4420
1989
2431
790
356
435
2588
1811
776
42
29
12
309
216
93
798
559
239
1538
1077
461
1364
955
409
868
608
261
12717
7600
5118
278
42
236
NS
OS

Traffic at Km 448
Vehicle Type
2007
Scooter/Motor Cycle
Auto Rickshaw
Cars
Mini Bus
Bus
LCV + Tractor
2-Axle Truck
3-Axle Truck
MAV
Total
NMT

Vehicle Type
Scooter/Motor Cycle
Auto Rickshaw
Cars
Mini Bus
Bus
LCV + Tractor
2-Axle Truck
3-Axle Truck
MAV
Total
NMT
Vehicle Type
Scooter/Motor Cycle
Auto Rickshaw
Cars
Mini Bus
Bus

3436
631
2073
34
250
639
1232
1093
696
10084
258

Initial Composition
by 2011 (%)
New
Old
Section Section
26.17
47.50
4.68
8.49
23.84
15.17
0.38
0.24
2.84
1.81
7.35
4.68
14.17
9.02
12.57
8.00
8.00
5.09
100.00
100.00

2007
3436
631
2073
34
250
639
1232
1093
696
10084
258

2011
4420
790
2588
42
309
798
1538
1364
868
12717
278

Traffic at Km 448
2013
2018
5559
6757
987
1190
3206
3823
51
61
378
449
989
1188
1906
2290
1690
2031
1076
1293
15841
19081
288
316

2023
8058
1408
4507
71
525
1401
2700
2394
1524
22588
346

2028
9535
1667
5293
83
617
1645
3170
2812
1790
26612
380

2007
1927
273
2172
30
211

2011
2479
342
2711
37
261

Traffic at Km 386
2013
2018
3118
3789
427
515
3358
4005
45
53
320
380

2023
4519
609
4721
63
444

2028
5348
721
5544
73
522

LCV + Tractor
2-Axle Truck
3-Axle Truck
MAV
Total
NMT
Vehicle Type
Scooter/Motor Cycle
Auto Rickshaw
Cars
Mini Bus
Bus
LCV + Tractor
2-Axle Truck
3-Axle Truck
MAV
Total
NMT

976
1092
902
518
8101

1218
1363
1126
647
10183

1509
1689
1395
801
12661

1813
2029
1676
963
15224

2138
2392
1976
1135
17997

2510
2809
2321
1333
21182

2007
1031
76
1271
24
123
489
884
1054
751
5704

2011
1326
95
1587
30
152
610
1103
1316
937
7157

Traffic at Km 420
2013
2018
1668
2027
118
143
1966
2345
37
44
186
221
756
909
1367
1642
1630
1959
1161
1396
8890
10685

2023
2418
169
2764
51
259
1071
1936
2310
1645
12623

2028
2861
200
3246
60
304
1258
2274
2712
1932
14847

Growth Rate (%)


Upto 2015 2015-2020 2020-2025 2025-2030 2030-35
6.5
5.9
5.0
4.5
4.3
5.8
5.7
4.8
4.3
4.3
5.7
5.5
4.5
4.2
4.1
5.4
5.2
4.4
4.0
4.1
5.4
5.2
4.4
4.0
4.1
5.7
5.5
4.7
4.2
4.1
5.7
5.5
4.7
4.2
4.1
5.7
5.5
4.7
4.2
4.1
5.7
5.5
4.7
4.2
4.1

Traffic at Km 386

Traffic at Km 420

2007

2011

2007

2011

1927
273
2172
30
211
976
1092
902
518
8101

2479
342
2711
37
261
1218
1363
1126
647
10183

1031
76
1271
24
123
489
884
1054
751
5704

1326
95
1587
30
152
610
1103
1316
937
7157

31.636
4.472
14.688
2.013
1.656
7.071
10.804
16.754
10.906

23.910
2.572
14.181
2.406
2.956
11.433
11.274
23.635
7.634

24.685
1.526
18.730
1.826
2.146
6.724
13.969
24.215
6.178

Composition by
2011
Km 386 Km 420
24.3
18.527
3.4
1.324
26.6
22.174
0.4
0.419
2.6
2.126
12.0
8.529
13.4
15.415
11.1
18.388
6.4
13.098
100.00
100.00

Diverting Traffic on New Section at Km 448


2013
2018
2023
2028
2011
1989
2501
3041
3626
4291
356
444
536
634
750
1811
2244
2676
3155
3705
29
36
42
50
58
216
265
314
368
432
559
692
832
981
1152
1077
1334
1603
1890
2219
955
1183
1422
1676
1968
608
753
905
1067
1253
7600
9452
11370
13445
15828
42
43
47
52
57

2007
23.79
3.37
26.81
0.37
2.61

4.3
4.1
4.1
3.8
3.8
4.0
4.0
4.0
4.0

Composition on New Section at Km 386 (%)


2013
2018
2023
2011
24.34
24.62
24.891
25.11
3.36
3.37
3.383
3.39
26.62
26.52
26.305
26.23
0.36
0.36
0.351
0.35
2.56
2.52
2.494
2.47

18.7
1.3
23.50
0.4
2.10
8.27
14.51
18.12
13.1
100.00

24.4
3.2
28.10
0.4
2.5
11.6
12.6
10.9
6.3
100.00

Diverting Traffic on Old Section at Km 448


2013
2018
2023
2011
2431
3057
3716
4432
435
543
655
775
776
962
1147
1352
12
15
18
21
93
113
135
158
239
297
356
420
461
572
687
810
409
507
609
718
261
323
388
457
5118
6389
7711
9143
236
245
269
294

2028
25.25
3.41
26.17
0.35
2.46

2007
23.79
3.37
26.8
0.37
2.61

2011
24.44
3.22
28.1
0.36
2.53

2013
25.08
3.11
29.42
0.34
2.44

12.05
13.48
11.14
6.40
100.00

2007
18.072
1.326
22.292
0.426
2.162
8.574
15.497
18.486
13.167
100.00

11.96
13.39
11.06
6.35
100.00

11.92
13.34
11.02
6.33
100.00

11.910
13.330
11.011
6.324
100.00

11.88
13.29
10.98
6.31
100.00

Composition on New Section at Km 420 (%)


2013
2018
2023
2011
18.527
18.76
19.0
19.2
1.324
1.33
1.3
1.3
22.174
22.12
21.9
21.9
0.419
0.41
0.4
0.4
2.126
2.10
2.1
2.1
8.529
8.51
8.5
8.5
15.415
15.37
15.4
15.3
18.388
18.34
18.3
18.3
13.098
13.06
13.1
13.0
100.00
100.00
100.00
100.00

11.85
13.26
10.96
6.29
100.00

12.05
13.47
11.14
6.4
100.00

11.57
12.57
10.87
6.34
100.00

11.1
11.67
10.58
6.26
100.00

2028
19.3
1.3
21.9
0.4
2.0
8.5
15.3
18.3
13.0
100.00

2007
18.07
1.33
22.29
0.43
2.16
8.57
15.49
18.49
13.17
100.00

2011
18.67
1.27
23.5
0.42
2.1
8.28
14.52
18.13
13.11
100.00

2013
19.26
1.24
24.73
0.41
2.04
7.98
13.56
17.75
13.03
100.00

31.6
4.5
14.7
2
1.7
7.1
10.8
16.8
10.8
100

ection at Km 448
2028
5245
917
1588
25
185
494
951
843
537
10784
323

2018
25.39
3.02
30.4
0.33
2.36

23.9
2.6
14.2
2.4
3
11.4
11.3
23.6
7.6
100

24.7
1.5
18.7
1.8
2.1
6.7
14
24.2
6.3
100

Composition on New Section at Km 448 (%)


2013
2018
2023
2028
2011
26.17
26.47
26.74
26.97
27.11
4.68
4.70
4.71
4.71
4.74
23.84
23.74
23.54
23.46
23.41
0.38
0.38
0.37
0.37
0.37
2.84
2.80
2.76
2.73
2.73
7.35
7.32
7.32
7.29
7.28
14.17
14.11
14.10
14.06
14.02
12.57
12.52
12.50
12.46
12.43
8.00
7.97
7.96
7.94
7.92
100.00
100.00
100.00
100.00
100.00

2023
25.39
3.01
30.4
0.33
2.37

2028
25.39
3.01
30.4
0.33
2.37

2007
34.07
6.26
20.56
0.33
2.48
6.34
12.22
10.84
6.90
100.00

Composition on Old Section at Km 448 (


2013
2011
47.50
47.86
8.49
8.49
15.17
15.05
0.24
0.24
1.81
1.77
4.68
4.64
9.02
8.95
8.00
7.94
5.09
5.05
100.00
100.00

10.78
11.34
10.28
6.1
100.00

10.78
11.34
10.28
6.1
100.00

10.78
11.34
10.28
6.1
100.00

2018
19.6
1.21
25.68
0.39
1.99
7.8
13.24
17.33
12.76
100.00

2023
19.6
1.21
25.68
0.39
1.99
7.8
13.24
17.33
12.76
100.00

2028
19.6
1.21
25.68
0.39
1.99
7.8
13.24
17.33
12.76
100.00

ion on Old Section at Km 448 (%)


2018
2023
2028
48.19
48.47
48.63
8.49
8.47
8.50
14.87
14.79
14.72
0.24
0.23
0.23
1.75
1.72
1.72
4.62
4.60
4.58
8.91
8.86
8.82
7.90
7.86
7.82
5.03
5.00
4.98
100.00
100.00
100.00

2007
34.07
6.26
20.56
0.33
2.48
6.34
12.22
10.84
6.9
100.00

2011
47.79
8.15
16.05
0.24
1.79
4.54
8.48
7.87
5.09
100.00

2013
48.75
7.83
16.7
0.23
1.71
4.32
7.83
7.62
5.01
100.00

2018
49.26
7.59
17.22
0.22
1.66
4.19
7.6
7.39
4.87
100.00

2023
49.26
7.59
17.22
0.22
1.66
4.19
7.6
7.39
4.87
100.00

2028
49.26
7.59
17.22
0.22
1.66
4.19
7.6
7.39
4.87
100.00

Classified
Location35.000 km
Directio Both Direction

Day

Raipur to Kharora

262

256

26

1630

Kharora to Raipur

270

283

18

1564

72

Total PCU Day(1)

532

539

44

1597

108

Total Traffic Day(1)

532

539

44

3194

72

Raipur to Kharora

226

278

13

1695

Kharora to Raipur

218

275

1621

72

Total PCU Day(2)

444

553

20

1658

108

Total Traffic Day(2)

444

553

20

3316

72

Raipur to Kharora

269

382

14

1717

Kharora to Raipur

253

426

18

1691

90

Total PCU Day(3)

522

808

32

1704

135

Total Traffic Day(3)

522

808

32

3408

90

Raipur to Kharora

294

331

1609

Kharora to Raipur

280

304

18

1511

96

Total PCU Day(4)

574

635

23

1560

144

Total Traffic Day(4)

574

635

23

3120

96

Raipur to Kharora

247

231

1630

Kharora to Raipur

236

232

10

1540

82

Total PCU Day(5)

483

463

16

1585

123

Total Traffic Day(5)

483

463

16

3170

82

Raipur to Kharora

237

222

1356

Kharora to Raipur

257

257

10

1635

77

Total PCU Day(6)

494

479

17

1495.5

115.5

Total Traffic Day(6)

494

479

17

2991

77

Raipur to Kharora

255

274

1670

70

Kharora to Raipur

236

254

1716

72

Total PCU Day(7)

491

528

10

1693

213

Total Traffic Day(7)

491

528

10

3386

142

Direction

PCU

Day1

Day2

Day3

Day4

Day5

Day6

Day7

Utility
Vehicle
Three
Two
Minibu
s
Passenger Car
wheele wheeler
s
(Jeep,
rs
s
Van
etc)
1
1
1
0.5
1.5

Total 7-day Traffic

3540

4005

162

22585

631

Total 7-day Traffic PCU

3540

4005

162

11293

946.5

Average Daily Traffic

506

572

23

3226

90

Average Daily Traffic PCU

506

572

23

1613

135

DAY

PCU

Vehicles

no

Day1
Day2
Day3
Day4
Day5
Day6
Day7

6741

6410

4766

6806

6503

787

6564

6657

820

6628.5

6466

6373

6485

6237

6079.5

5864

6600

6476

Average pcu

6558

6373

Classified Traffic Volume Count Survey


Day:
Date:
6

Light Comm.
Vehicle
Bus

Passen
Freight
ger

Surveyor:
Weather:
9

2-axle
Truck

10

3-axle
Truck

11

12

13

14

15

Multi-axle
Truck

Ag.
Ag.
tractor Pedal
Semi
cycle
Articul Tractor with
Articul
trailer
ated
ated

1.5

1.5

4.5

4.5

1.5

4.5

0.5

30

120

80

81

133

63

53

20

23

383

47

105

127

106

68

46

16

30

414

231

337.5

130.5

624

717

589.5

445.5

54

238.5

398.5

77

225

87

208

239

131

99

36

53

797

29

142

84

99

140

56

44

15

30

473

33

154

105

98

72

72

24

32

342

186

444

133.5

612

714

576

522

58.5

279

407.5

62

296

89

204

238

128

116

39

62

815

32

103

80

81

70

43

46

12

31

401

30

104

68

118

46

60

14

41

353

186

310.5

130.5

447

564

400.5

477

39

324

377

62

207

87

149

188

89

106

26

72

754

45

115

81

87

106

39

75

17

34

529

34

98

86

115

35

42

14

40

366

237

319.5

129

519

663

333

526.5

46.5

333

447.5

79

213

86

173

221

74

117

31

74

895

44

128

70

88

110

49

49

17

43

503

30

125

92

107

52

60

11

44

350

222

379.5

112.5

540

651

454.5

490.5

42

391.5

426.5

74

253

75

180

217

101

109

28

87

853

37

109

60

86

110

46

47

33

353

32

132

83

125

54

36

36

362

207

361.5

91.5

507

705

450

373.5

25.5

310.5

357.5

69

241

61

169

235

100

83

17

69

715

33

132

85

135

57

31

36

377

42

118

95

130

46

52

12

46

442

225

375

10.5

540

795

463.5

373.5

25.5

369

409.5

75

250

180

265

103

83

17

82

819

498

1685

492

1263

1603

726

713

194

499

5648

1494

2528

738

3789

4809

3267

3209

291

2246

2824

71

241

70

180

229

104

102

28

71

807

213

361

105

541

687

467

458

42

321

403

pcu
3484
2630
442
6556

2 wheeler

Sheet No:
Checked By:
16

17

18

19

20

21

22

Toll exempted vehicles


Cycle
Hand
ricksha
Cart
w

Animal
Cart

Car

LCV

Truck

Bus

1.5

18

18

28

36

21

51

36

17

12

14

14

16

26

1.5

33

26

11

23

10

28

33

1.5

30

33

10

14

52

15

1.5

45

13

15

15

11

36

18

36

18

12

15

13

32

28

1.5

24

28

11

20

19

18

18

19

Total
Vehicl
es

3202
3208
6741
6410
3353
3150
6806
6503
3318
3339
6564
6657
3396
3070
6629
6466
3241
2996
6485
6237
2734
3130
6080
5864
3182
3294
6600
6476

26

53

175

20

79

52

16

212

175

12

60

237

25

11

30

25

34

44613
45904
6373
6556

Classified T
Location79.000 km
Directio Both Direction
1

Day

Direction

PCU

Day1

Day2

Day3

Day4

Day5

Day6

Day7

Utility
Vehicle
Three
Passenger
Two
s
wheele
Car
wheelers
(Jeep,
rs
Van
etc)
1
1
1
0.5

Minibu
s
1.5

Kharora to Balodabaz

220

152

1078

46

Balodabazar to Kharo

215

163

1167

77

Total PCU Day(1)

435

315

1122.5

184.5

Total Traffic Day(1)

435

315

2245

123

Kharora to Balodabaz

145

128

1289

94

Balodabazar to Kharo

131

149

1339

94

Total PCU Day(2)

276

277

1314

282

Total Traffic Day(2)

276

277

2628

188

Kharora to Balodabaz

183

140

1148

88

Balodabazar to Kharo

128

153

1134

94

Total PCU Day(3)

311

293

1141

273

Total Traffic Day(3)

311

293

2282

182

Kharora to Balodabaz

195

173

1189

92

Balodabazar to Kharo

171

182

1219

88

Total PCU Day(4)

366

355

1204

270

Total Traffic Day(4)

366

355

2408

180

Kharora to Balodabaz

131

143

1217

81

Balodabazar to Kharo

155

145

1219

83

Total PCU Day(5)

286

288

1218

246

Total Traffic Day(5)

286

288

2436

164

Kharora to Balodabaz

176

178

1246

95

Balodabazar to Kharo

190

156

1338

88

Total PCU Day(6)

366

334

1292

274.5

Total Traffic Day(6)

366

334

2584

183

Kharora to Balodabaz

172

213

1230

89

Balodabazar to Kharo

178

248

1181

76

Total PCU Day(7)

350

461

1205.5

247.5

Total Traffic Day(7)

350

461

2411

165

Total 7-day Traffic

2390

2323

41

16994

1185

Total 7-day Traffic PCU

2390

2323

41

8497

1778

Average Daily Traffic

341

332

2428

169

Average Daily Traffic PCU

341

332

1214

254

DAY

PCU

Day1
Day2
Day3
Day4
Day5
Day6
Day7
Average pcu

5049

Vehicles

no

4703

4666.5

3525

5007

4393.5

521

4459

4156

1005

4873

4482

5051

5164

4940.5

5500

5470

5638

6150

4894

Classified Traffic Volume Count Survey


Day:
Date:
6

Surveyor:
Weather:

Light Comm.
Vehicle
Bus

2-axle

Passen
Freight
ger

1.5

10

1.5

Truck
3

11

3-axle
Truck
3

12

13

14

15

Multi-axle
Truck

Ag.
Ag.
tractor Pedal
Semi
cycle
Articul Tractor with
Articul
trailer
ated
ated
4.5

4.5

1.5

4.5

0.5

62

65

43

94

51

19

19

363

28

62

44

110

35

14

20

22

446

270

190.5

1.5

261

612

387

99

58.5

184.5

404.5

90

127

87

204

86

22

39

41

809

111

35

75

32

20

14

17

480

103

37

84

21

27

18

16

492

321

216

477

238.5

211.5

48

148.5

486

214

72

159

53

47

32

33

972

67

31

64

26

26

33

408

69

33

88

29

26

12

30

383

204

192

456

247.5

234

30

283.5

395.5

136

64

152

55

52

20

63

791

90

38

83

45

33

13

30

468

12

80

38

59

16

19

27

461

42

255

228

426

274.5

234

30

256.5

464.5

14

170

76

142

61

52

20

57

929

101

46

90

53

26

45

591

81

56

91

38

29

21

38

631

27

273

1.5

306

543

409.5

247.5

45

373.5

611

182

102

181

91

55

30

83

1222

123

53

96

66

42

34

561

115

67

123

44

27

20

41

572

15

357

1.5

360

657

495

310.5

42

337.5

566.5

238

120

219

110

69

28

75

1133

168

100

135

56

47

23

50

529

205

117

117

48

33

11

49

528

559.5

1.5

651

756

468

360

51

445.5

528.5

373

217

252

104

80

34

99

1057

124

1440

738

1309

560

377

203

451

6913

372

2160

2214

3927

2520

1697

304.5

2030

3457

18

206

105

187

80

54

29

64

988

53

309

316

561

360

242

44

290

494

pcu
2551
1816
529
4896

Sheet No:
Checked By:
16

17

18

19

20

21

22

Toll exempted vehicles


Cycle
Hand
ricksha
Cart
w
2

Animal
Cart

Car

LCV

Truck

Bus

1.5

Total
Vehicl
es

20

11

42

34

14

18

21

21

17

14

12

11

11

20

22

36

10

22

12

17

13

12

30

4.5

36

30

12

10

15

1.5

27

15

4.5

30

10

10

32

1.5

16

17

44

22

2269
2434
4667
4703
2471
2536
4394
5007
2251
2208
4156
4459
2477
2396
4482
4873
2553
2611
4941
5164
2695
2805
5470
5500
2833
2805
6150
5638

40

79

88

26

53 35344

80

158

88

39

12

159

11

13

11

23

13

23

34259
5051
4896

Вам также может понравиться