what tests are to be carried out after changing the tap position of Off circuit tape

changer of large AC Generator step up power transformer


http://www.bhelisg.com/Tenders/13-14/cswvallur/TECHNICAL
%20SPECIFICATIONS.pdf

http://www.globalspec.com/productfinder/electrical_electronic_components

INSTALLATION, COMMISSIONING,
OPERATION AND MAINTENANCE
INSTRUCTIONS
VOL-II of II
BHART HEAVY ELECTRICALS LIMITED,
BHOPAL

References:
1. Partial Discharge Experiment web site maintained by National Grid,
http://www.partialdischarge.co.uk
2. H. Kan, T. Miyamoto, Proposal for an Improvement in Transformer
Diagnostics Using Dissolved Gas Analysis (DGA), IEEE Electrical
Insulation Magazine, Vol.11, No.6, November/December 1995.
3. IEEE C57.104-1991 Guide to Interpretation of Gases Generated in OilImmersed Transformers (ANSI)
http://www.bhelbpl.co.in/bplweb_new/products/em/O&MManual/HCompact/O&MHCOMPCT.pdf

INSTALLATION COMMISSIONING OPERATION AND


MAINTENANCE OF TRANSFORMERS by C.P.DESHMUKH A.G.M
BHEL BHOPAL
102 SLIDES

http://www.slideserve.com/ami/installation-commissioning-operation-andmaintenance-of-transformers-by-c-p-deshmukh-a-g-m-bhel-bhopal#ex1^305987
http://ipmabhopal.com/index.php/faculty-of-ipma-bhopal
CP Deshmukh
Electrical Engineering graduate has over 4 decades of experience in manufacturing, design,
erection, commissioning including servicing of transformers in India & abroad. He retired as
Additional General Manager from BHEL in 2009 and is still retained as consultant. He is invited
by organisations like NTPC, Power Grid and major utilities for conducting training programmes.
He has presented many technical papers in national & international seminars.
Methods of measurement of HV neutral current in large generator stepup power
transformer