Академический Документы
Профессиональный Документы
Культура Документы
2
3
4
5
6
7
8
9
10
11
12
13
14
-
40
2
2
4
6
2
20
20
1
6
20
10
1
50
Labor work:
Digging a ditch up to 40 meters and underground installation of cable
Closing windows, removing of old AC window units and patch the holes.
Cable installation and connection, prepare the building inside for rewiring in the PX and the
Floor reinforcement of the building.
Installation of Air condition
m
pcs
pcs
pcs
pcs
pcs
m
m
pcs
pcs
m
m
pcs
m
h the holes.
e for rewiring in the PX and the container.