INPUT DATA
BUILDING DATA
Ground Floor Area
M2
Typical Floor Area
M2
No.of Floors (Ground+Typical)
MATRIAL PRICE DATA
Sand
M3
Gravel
M3
Cement
Ton
Steel Reinforcement
Ton
Masonry (25*12*6) cm
1000Block
NOTE Material Price
Shown are just for guide you can change them
All result without earthworks cost

0
0
0

30
100
850
4800
400

OUTPUT DATA
Ground Floor Concrete Works
Ground Floor Finishing Works
Total Ground Floor Cost

EGP
EGP
EGP

Typical Floor Concrete Works


Typical Floor Finishing Works
Total Typical Floor Cost

EGP
EGP
EGP

Total Cost Concrete Works


Total Cost Finishing Works
Total Cost Concrete+Finishing

EGP
EGP
EGP

NOTE Finshing include


(Masonry-Internal Plaster-Wood frames-Plumbing
conduits-Electricity main cables, main distribution board
,conduit without wires)
NOTE Concrete
Up to 6 floors , Isolated Footings system is used
More than 6 floors, Raft Foundation system is used