Project Management Assignment Wi-Fi Hotspot
Implementation
SUBMITTED BY
ASEEM MUKHI 09020541013
ANISH BHAT 09020541014
BODELE PARAG 09020541015
Contents
2
Project Management Assignment Wi-Fi Hotspot
Implementation
1. INTRODUCTION
UCO Bank has their 2nd Head Office Building in Salt Lake, Kolkata(Head
Office-2) which is well designed architecture.
• Mobility
• Total Security
• Integrated Management
• Flexible Architecture
The scope of this design basis is to identify the Wireless access points in
every floor, so that all the important areas where the Wireless connectivity is
3
Project Management Assignment Wi-Fi Hotspot
Implementation
required are covered and to design and implement a WLAN system at Head
Office-2.
1.3. Architecture
There are 5 floors in Head Office-2 namely 1st Floor, 2nd Floor (4TH FLOOR),
3rd Floor 4th Floor and 5th Floor. Every floor has two wings namely VIP Wing
(A-Wing) and Service Wing (B-Wing). All the 5 floors come under the scope
of Wireless LAN project. The plan is to provide authorized users with wireless
connection in every part of Head Office-2.
4
Project Management Assignment Wi-Fi Hotspot
Implementation
5
Project Management Assignment Wi-Fi Hotspot
Implementation
6
Project Management Assignment Wi-Fi Hotspot
Implementation
7
Project Management Assignment Wi-Fi Hotspot
Implementation
2. FEASIBILITY STUDY
As the Head Office-2 have very high end and expensive interior
architecture, the civil work required for fixing of access points and
cable laying was a challenge. Cable laying was done above the false
ceiling and in parallel to the air conditioner duct. Access points were
also fixed above the false ceiling and antennas were fixed on the false
ceiling.
Total budget requirement was Rs. 70,000,00 approx. This budget was
the project was financed by UCO Bank. The budget was allocated to
8
Project Management Assignment Wi-Fi Hotspot
Implementation
3. PROJECT PLANNING
Detailed Site Survey with IMSG Team and R.C. electrical team to
identify the feasibility of A.P. installation and the cable laying from I.T.
Room to the A.P location.
1st Floor
9
Project Management Assignment Wi-Fi Hotspot
Implementation
10
Project Management Assignment Wi-Fi Hotspot
Implementation
3rd Floor
11
Project Management Assignment Wi-Fi Hotspot
Implementation
12
Project Management Assignment Wi-Fi Hotspot
Implementation
4th Floor
Serial A.P.
Floor Coverage area
No. No.
1 4th 1 Entire Service Wing
FLOOR
2 4th 2 Entire Service Wing
FLOOR
3 4th 3 Entire Service Wing
FLOOR
4 4th 4 Entire Service Wing
FLOOR
5 4th 5 Entire VIP Wing
FLOOR
6 4th 6 Entire VIP Wing
FLOOR
7 4th 7 Entire VIP Wing
FLOOR
8 4th 8 Entire VIP Wing
FLOOR
9 4th 9 Entire VIP Wing
FLOOR
13
Project Management Assignment Wi-Fi Hotspot
Implementation
5th Floor
AP-16
14
Project Management Assignment Wi-Fi Hotspot
Implementation
Based on the site survey, the final cable laying routes should be
identified for each floor. This was done after taking feedback from
Head Office-2 administration head, Mr. Sudhir Sanjaliwala.
15
Project Management Assignment Wi-Fi Hotspot
Implementation
16
Project Management Assignment Wi-Fi Hotspot
Implementation
After ensuring that the whole setup is working properly, the following
things should be handed over to the R.C. technical team :
17
Project Management Assignment Wi-Fi Hotspot
Implementation
4 PROJECT SCHEDULING
4.1 Scheduling
18
Project Management Assignment Wi-Fi Hotspot
Implementation
access points and AAA security. Quotation given by Forte was Rs.
6, 40,000.
19
Project Management Assignment Wi-Fi Hotspot
Implementation
6 ORGANIZATION OF TEAM
20
Project Management Assignment Wi-Fi Hotspot
Implementation
21
Project Management Assignment Wi-Fi Hotspot
Implementation
6.2 Hierarchy
GM,DIT
DGM,DIT
AGM,Procurement
Chief Officer
Networking
IT Officer
22
Project Management Assignment Wi-Fi Hotspot
Implementation
IT Helpdesk
Territory Manager
National Manager
Support
Tech. Director
Chief Technical
Officer
Chief Executive
Officer
Managing Director
The project was financed by Head Office. The budget was allocated to
DIT(Department of Information Technology). DIT used this budget in
purchasing material and payment to the system integrator (Ontrack
Systems Limited)
23
Project Management Assignment Wi-Fi Hotspot
Implementation
24
Project Management Assignment Wi-Fi Hotspot
Implementation
Model : AIR-LAP1231G-A-K9
Manufacturer : CISCO
10.1.2 Antenna
Model : AIR-ANT5959
Manufacturer : CISCO
Model : WS-C3750
Manufacturer : CISCO
10.1.4 WLSE
Manufacturer : CISCO
25
Project Management Assignment Wi-Fi Hotspot
Implementation
Model : CSACSE-1113-K9
Manufacturer : CISCO
26
Project Management Assignment Wi-Fi Hotspot
Implementation
After ensuring that the whole setup is working properly, the following
things should be handed over to the R.C. technical team :
27