Вы находитесь на странице: 1из 1

MAPUA INSTITUTE OF TECHNOLOGY

MAPUA MATHEMATICS DEPARTMENT


70

LINEAR REGRESSION MODEL


AND SCATTER PLOT
60
50
40

PROJECT COST IN MILLION

30

SCATTER PLOT AND


LINEAR REGRESSION LINE
20

LINEAR REGRESSION EQUATION


Duration (days) X
150
200
300
400
450

MAXIM PLANT
CONTINENTAL TEMIC
RED RIBBON
ANALOG DEVICES
INTEGRATED M-E

10
0
100 150 200 250 300 350 400 450 500

y = 0.1328x -

PROJECT DURATION IN WORKING DAYS

KNOWN VALUES:

x 1=1500
i=1

2
n
yx=173.0574361
1 =515, 000
x 1 y 1 =60,548. 4668
i=1 1
i=1

i=1

SLOPE:

x1

(173.0574361)

5
^ 1
=0.1328
i=1
Y-INTERCEPT
(1500)2

515,
000
173.0574361
5
y = n
=34.61148722
5

x1
1500
^ 0= y ^ 1 x
x =n
=300
5
n

60, 548. 46684

i=1

^ 0=34.610.13
( 300 )
2

^ 0=5.225

ANALOG DEVICES
( y 1)
i=1

GENERAL
y 1 x 1 TRIAS
n

i=1

^1 = Operations
OWNER: Analog Devices Philippines
KALAYAAN ENGINEERING CO., INC. is an engineering firm
with close to 50 years of experience in the field of construction,
air conditioning and ventilation for commercial and industrial
applications.

Project Duration: 400 WORKING DAYS


Location: General Trias, Cavite
Total Project Cost: P45,700,000.00
DATE STARTED: January 7, 2011
DATE ENDED: April 4, 2012

INTEGRATED MICROELECTRONICS,
INC. BLDG.

RED RIBBON COMISSARY

OWNER: RED RIBBON BAKESHOP, INC.


Project Duration: 300 WORKING DAYS
Location: Luisita Industrial Parc, Tarlac
Total Project Cost: P29,088,918.14
DATE STARTED: September 16, 2010
DATE ENDED: August 22, 2011

OWNER: RESINS, INC


Project Duration: 450 WORKING DAYS
Location: Bian, Laguna
Total Project Cost: P59,038,379.00
DATE STARTED: July 8, 2006
DATE ENDED: November 30, 2007

CONTINENTAL TEMIC

MAXIM PLANT PRODUCTION

BULDING EXPANSION

LINE FIT-OUT

OWNER: CONTINENTAL TEMIC ELECTRONICS, INC


Project Duration: 200 WORKING DAYS
Location: Calamba, Laguna
Total Project Cost: P21,800,000.00
DATE STARTED: November 7, 2009
DATE ENDED: June 22, 2010
*Nature of Work: Mechanical Works

DAMIAN

LOYOLA

OWNER: MAXIM DALLAS


Project Duration: 150 WORKING DAYS
Location: Batangas City
Total Project Cost: P17,430,138.98
DATE STARTED: December 6, 2011
DATE ENDED: May 24, 2012
*Nature of Work: Mechanical Works

SUBMITTED BY:

MEDINA

C. RAMIREZ

UY