Академический Документы
Профессиональный Документы
Культура Документы
No.
1
2.
Particulars
Laying 8 I/D SW pipe line including
excavation laying CC 1:6:12 under line laying
cutting jointing pipe line complete.
Construction of road Gulley Chambers Big size
Quantit
Rate
y
171.5
Rs 120 /rft
Rft
Amount
(Rs.)
20580/-
5 no.
Rs
4200 /each
Rs
1400/each
Rs 250/cum
21000/-
Rs 17/sft
Rs 62/per
piece
49.15
Paise
409394/
14880/-
949 Sqr.
Ft
292 Sqr.
Ft.
I Job
Rs 105/sft
Rs 40/sft
Rs
137000/-
99645/-
3 no.
1800/-
5400/-
3.
3 no.
4.
5.
113
+418
Cum
24082
Sqr. Ft
240 pc.
6.
7.
8.
9.
10.
11.
12.
13
26152
Sqr. Ft
4200/-
132750
128537
0/-
11680/137000/
-
14
3 no.
1500/-
4500/-
15
1 Job
9500/-
9500/-
1 Job
6000/-
6000/-
EXTRA WORK
16
17
18
1 Job
2400/-
2400/-
240 pc.
20 each
4800/-