W D =550 kg /m
W U =1.4 W D +1.7 W L
W U =1195 kg /m
0.12 kg /cm2
Considerando:
h=
dnde:
Ln
4
WU
( )
b=
h
2
h=peralte de viga.
b=ancho de viga .
h=
h=
6.5
=0.57 m
11.5
Ln
4
WU
( )(
6.5
4
0.12
h 0.60
b= =
=0.30 m
2
2
b=0.30 m(medida constructiva)
V 107=V 108=V 109=V 110=V 111=b h=0.30 m 0.60 m
h=
Ln 4.5
=
=0.321m
14 14
W D =400 kg/m2
W U =1.4 W D +1.7 W L
W U =815 kg/m2
0.085 kg /cm
Considerando:
h=
dnde:
Ln
4
W U
( )
b=
h
2
h=peralte de viga.
b=ancho de viga.
h=
Ln
4
WU
( ) (
6.5
4
0.085
Para este caso saldra la divisin entre 14, pero como es viga principal lo consideramos slo
entre 12
h=
6.5
=0.55m
12
h 0. 55
b= =
=0. 275 m
2
2
b=0.30 m(medida constructiva)
Para el techo:
h=
Ln 4.5
=
=0.321m
14 14
Peso Loza=300 kg /m
Peso Vigas= [ ( 4.5 ) ( 0.25 ) ( 0.35 )+ ( 6.35 )( 0.30 )( 0.55 ) ] ( 2.4 /28.575 )=121 kg/m
2
Peso Columna=[ ( 3 ) ( 0.50 )( 0.50 ) ] ( 2.4 /28.575 )=63 kg /m
2
2
N=6
=1.1
n=0.30
f c=0.28Tn/cm 2
b D=
PG
nf c
1.1 168.7068
=2209.36 cm2
0.30 0.28
b D=47 cm 47 cm
b D=50 cm 50 cm (medida constructiva)
Para I al III piso:
N=3
=1.1
n=0.30
f c=0.28Tn/cm 2
b D=
PG
nf c
1.1 84.35
2
=1104. 63 cm
0.30 0.28
b D=33.23 cm33.23 cm
b D=35 cm 35 cm(medida constructiva)
Columna C-8:
N=6
=1.1
n=0.30
f c=0.28Tn/cm
b D=
PG
nf c
1.1 159.66
2
=2086.73 cm
0.30 0.28
b D=45.68 cm 45.68 cm
b D=45 cm 45 cm(medida constructiva)
Para I al III piso:
N=3
=1.1 .
n=0.30
f c=0.28Tn/cm 2
b D=
PG
nf c
1.1 79.67
=1043.30 cm2
0.30 0.28
b D=32.3 cm32.3 cm
Columna C5:
W=984 kg/m2=0.984T/m2
AT=26.56m2
=1.1
n=.20
Fc=.28T/m2
Considerando Del I al III piso
N=6
Pg= (.984)*(26.56)*(6) =156.81Tm
= 1.1
B*D=
1.1(156.81)
( .30 )(.28) =2053.46
1.1(78.41)
( .30 )(.28) =1026.8
1.1(166.05)
( .30 )(.28) =2174.46
1.1(83.025)
( .30 )(.28) =1087.23
B*D=
1.25(74.98)
( .25 )(.28) =1338.93
1.25(37.49)
( .25 )(.28) =669.46
1.25(73.8)
( .25 )(.28) =1317.86
= 1.25
B*D=
1.25(36.9)
( .25 )(.28) =658.93
1.25(79.70)
( .25 )(.28) =1423.21
1.25(39.85)
( .25 )(.28) =711.60
AT=12.7m2
=1.25
n=.25
Fc=.28T/m2
1.25(74.98)
( .25 )(.28) =1338.93
1.25(37.49)
( .25 )(.28) =669.46
N=6
Pg= (.984)*(6)*(6) =35.424Tm
= 1.25
B*D=
1.50(35.424)
=948.86
( .20 )(.28)
1.5(17.71)
( .20 )(.28) =475.18
C-1
30*30 cm 2
25*25 cm2
C-2
40*40 cm 2
25*25 cm2
C-3
40*40 cm2
30*30 cm2
C-4
40*40 cm2
25*25 cm2
C-5
45*45 cm2
35*35 cm2
C-6
50*50 cm2
35*35 cm2
C-7
40*40 cm2
25*25 cm2
C-8
45*45 cm2
35*35 cm2
C-9
50*50 cm2
35*35 cm2
rea de Columnas:
2
4 C 4 =4 0.40 0.40=0.64 m2
rea de Vigas:
Vigas Principales (V-107 ; V-108 ; V-109 ; V-110 ; V-111):
4 C 4 =4 0.25 0.25=0.25 m2
Z .U .C.S
. P
R
V= 134.347 Tn