Академический Документы
Профессиональный Документы
Культура Документы
Governor
CERTS MICROGRID
LABORATORY TEST BED
APPENDIX A
Prepared For:
Prepared By:
Lawrence Berkeley National Laboratory
Prepared By:
Lawrence Berkeley National Laboratory
Joseph H. Eto, Principal Investigator
Berkeley, CA 94720
Ed Linton, Northern Power Systems
Commission Contract No. 500-03-024
LBNL-802E
Prepared For:
DISCLAIMER
This report was prepared as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the
Energy Commission, its employees or the State of California. The Energy Commission, the State of California, its employees, contractors and
subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent
that the uses of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the California
Energy Commission nor has the California Energy Commission passed upon the accuracy or adequacy of the information in this report.
10
L11A,B,C
Additional impedance
for weak grid conditions
T11
500kVA
Cabinet 2a - 480V
CB12
500A
A12
A13
A14
B12
B13
B14
C12
C13
C14
CT11A
CT12A
(500/5A )
CT11B
(2000/5A )
A61
CT12B
B61
CT11C
CT12C
CT11N
N1
To
Sheet 2
TB12
TB11
G1
Ground
Network
C61
CB13
250A
2
To Meter 1
(Sheet 6)
2
To DSP
Control
(Sheet 6)
Feeder C
75 yds cable
N1
S11
Vacuum CB
(including Relay 1)
8
K62
Optional
Utility
Transformer
(Sheet 17)
G1
Ground
Network
Fault bus
bar set
FD10
Load Bank
Zone 6
(Sheet 16, 17)
Utility Connection
Drawn by: Ed Linton
Figure 1: CERTS Test Bed Schematic - Preliminary - Zones 1 and 6
APA-1
Date:
10/3/2005
Zones 1 and 6
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 1 of 22
10
Cabinet 2d - 480V
CB17
Fault bus
bar set
K22
(Sheet 18)
A61
From
Sheet 1
B61
C61
N1
CT13A
CT14A
(400/5A)
(1500/5A)
CT14R
CT14B
CT13B
CT13C
CB16
CB14
A62
CT14C
C62
CT13N
To
Sheet 3
A22
Static Switch
SS15
Thyristor
Assembly
B62
A22
B22
B22
C22
C22
N1
N1
TB14
TB13
F17H-A,B,C
2
To Meter 2
(Sheet 6)
(2A)
PT17A, B, C
To Relay 2 and DSP
Control (Sheet 6)
F13H-A,B,C
(2A)
277/120V
F17X-A,B,C
(1.6A)
To Meter 1
and Meter 2
(Sheet 6)
To DSP Control
(Sheet 6)
2
F14H-A,B,C
(2A)
PT14A, B, C
CB51
Cabinet 2e
277/120V
F14X-A,B,C
250A
F51H-A,B,C
(1.6A)
(2A)
Va
Vb
Voltage
Relay
5a
To Relay 2 and
DSP Control
(Sheet 6)
Vc
com
A51 B51
C51
To
Sheet 5
APA-2
Date:
10/3/2005
Zone 6 and 2
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 2 of 22
Cabinet 2d - 480V
75 yds
cable
CB31
250A
From
A22
A31
B22
B31
C22
C31
CT32A
(250/5A )
CT34A
CT32R
(300A )
CT34B
CT32B
CT35A
10
25 yds
cable
(250/5A)
A31
CT35B
CT34C
CT32C
To Sheet 4
CT35C
C31
CT35N
N1
N1
F35H-A,B,C
TB35
TB32
(2A)
B31
Sheet 2
K32
(Sheet 8)
To Microsource
A1 Controller
To Meter 3 and
Meter A1
(Sheet 8)
and Microsource
A1 Controller
To Meter 3
(Sheet 8)
2
Load Bank
Zone 3
(Sheet 7, 8)
G1
Fault bus
bar set
2
TB33
F32H-A,B,C
CT33N
(2A)
(150/5A)
PT32A, B, C
CT33C
277/120V
F32X-A,B,C
CT33B
(1.6A)
To Meter A1
(Sheet 8)
CT33A
2
Va
DAS_24dcPOS
DAS_24dcCOM
Vb
Vc
com
Vs
Relay 3
(also Sheet 10)
+
F
PWR
A31
Vsn
B31 C31
N1
Ia
(5A)
Ib
Ic
In
to CB32, and
Microsource A1
Cabinet 2e
Drawn by: Ed Linton
APA-3
APA-3
Date:
10/3/2005
Zone 3
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 3 of 22
10
75 yard
cable
CB41
250A
From
Zone 3
A31
A41
B31
B41
C31
C41
CT42A
(150/5A)
CT44A
CT42R
CT42B
(200A)
CT45A
(150/5A)
CT45B
CT44B
Sheet 3
N1
CT44C
CT45C
CT45N
To Meter 4
and
Meter A2
(Sheet 13)
and
Microsource
A2 Controller
CT42C
F45H-A,B,C
(2A)
K42
TB45
TB42
To Microsource
A2 Controller
To Meter 4
(Sheet 13)
(Sheet 13)
G1
5
4
CT43N
(2A)
(150/5A)
PT42A, B, C
CT43C
277/120V
F42X-A,B,C
To Meter A2
(Sheet 13)
CT43B
(1.6A)
Fault bus
bar set
TB43
F42H-A,B,C
Load Bank
Zone 4
(Sheet 12, 13)
CT43A
4
Va
DAS_24dcPOS
DAS_24dcCOM
Vb
Vc
com
Vs
Relay 4
(also Sheet 10)
+
F
PWR
A41
Vsn
B41 C41
N1
Ia
(5A)
Ib
Ic
In
to CB42 and
Microsource A2
4
PROPRIETARY AND CONFIDENTIAL INFORMATION
G
APA-4
Date:
10/3/2005
Zone 4
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 4 of 22
10
75 yds
cable
T51
112kVA
Cabinet 6a - 480V
480 / 480V
CT52A
A51
A52
B51
B52
C51
C52
(Full-load
current = 90A)
G2
CT54A
CT52R
CT52B
CT55A
CT54C
CT52C
To Meter 5 and
Meter B1
(Sheet 15)
and Microsource
B1 Controller
(150/5A)
CT55B
CT55C
To Microsource
B1 Controller
TB52
(2A)
(200A)
CT54B
F55H-A,B,C
Ground
Network
(150/5A)
K52
(Sheet 15)
TB55
To Meter 5
(Sheet 15)
Load Bank
Zone 5
(Sheet 14, 15)
Fault bus
bar set
6
F52H-A,B,C
TB53
(2A)
G2
PT52A, B, C
CT53C
277/120V
(150/5A)
F52X-A,B,C
To Meter B1
(Sheet 15)
CT53B
(1.6A)
CT53A
6
Va
DAS_24dcPOS
DAS_24dcCOM
Vb
Vc
com
Vs
Relay
5
+
B52 C52
Ia
(5A)
(also
Sheet 10)
PWR
A52
Vsn
to CB52 and
Microsource B1
Ib
Ic
In
APA-5
Date:
10/3/2005
Zone 5
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 5 of 22
Cabinet 2a 480V
10
Cabinet 2e LV SS Control
Va
Vb
To
PT17
Vc
com
V1
(Va)
V2
(Vb)
V3
(Vc)
(Vn)
Vref
(Vg)
V4
Ia
DSP
Control
(1A)
To CT12
Ib
DAS_120acBLK
L/+
DAS_120acW HT
N/-
I1
(5A)
I2
Ic
To
F13H
Meter 1
(See also
Sheet 19)
To CT11
I3
I4
(1A)
DAS_24dcPOS
DAS_24dcCOM
Ia
To CT14
Ib
Ic
Va
+
PWR
V2
To
PT14
Vc
V1
To CT14R
Vb
V3
com
Vref
V4
L/+
N/-
I1
(5A)
Va
I2
Meter 2
(See also
Sheet 19)
Vb
To CT13
I3
I4
DAS_24dcPOS
DAS_24dcCOM
Vc
com
Vs
Relay 2
(also Sheet 10)
Vsn
Ia
(1A)
+
PWR
Ib
Ic
In
2
G
APA-6
Date:
10/3/2005
Zone 2 Controls
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 6 of 22
10
To
Sheet 8
CB33
250A
A31
A32
B31
B32
C31
C32
CT36A
(200/5A)
From
Sheet 3
CT36B
CT36C
CB38
CB34
15A
C32
(See also
Sheet 20)
Vref
Cabinet 3b
- 480V DAS
Load Control
V3
V4
Load3_120acW HT
MS34
CB36-1
CB36-1 through
CB36-6
I1
(5A)
L/+
I2
N/-
I3
I4
T38
K36-1a
DO-1
TB37
K36-1c
SR31
R36-1
5kW
Motor Load
10 to 20 HP
see
specification
R36-6
20kW
Torque
sensor
K38
DO-19
K37-1
DO-20
(Sheet 8)
K37-3
DO-24
Load3_24dcPOS
M34
K36-6c
DO-18
R38
K36-6b
DO-17
DO-25
Load control
SSR's K36-1a
through K36-6c
K36-6a
DO-16
Zone 3
Load
Control
PLC
DC Power
Supply
PS38
K36-1b
DO-2
DO-3
load bit 6
(msb)
K36-6a,b,c
F38X
Cabinet 3b
3
load bit 1
(lsb)
K36-1a,b,c
K36-1a,b,c through
K36-6a,b,c
CB36-6
480 / 120V
TB37
Load3_120acBLK
Load3_120acWHT
V2
150A
Load3_120acBLK
V1
Load
Meter 3
CB35
30A
Cabinet 3b - LV
DAS Load Control
B32
(2A)
N1
TB36
F36H-A,B,C
A32
CT36N
N1
J31
Load3_24dcCOM
AI-1
AI-2
APA-7
Date:
10/3/2005
Load Bank 3
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 7 of 22
B32
(See also
Sheet 19)
V1
(Va)
V2
(Vb)
V3
(Vc)
Vref
10
DAQ
Fault 3
Apply
DAQ
Fault 3
Arm
Fault 3 Local
Arming Key
Switch
I1
L/+
I2
N/-
I3
S31
To TB35
(Sheet 3)
K33-1
LT31
I4
K33-3
LT32
"Fault 3
Remotely
Armed"
"Fault 3
Locally
Armed"
Load3_24dcCOM
LT33
Fault 3
Warning
Strobe Light
c11
K32
YO
open
c12
V1
Meter
A1
(See also
Sheet 19)
V2
V3
Vref
K32
YC
close
c2
K34
L/+
I2
N/-
I3
K33-2
DO-27
K33-3
DO-28
(5A)
To TB33
(Sheet 3)
Load3_24dcCOM
K33-1
DO-26
V4
Load3_24dcPOS
Zone 3
Load
Control
PLC
I1
L39-1A,B,C
10 kVAR
61.1 mH, 24A
c1
Trigger
circuit
(Sheet 19)
K39-1
Fault Switch
(Cabinet 3a,
Sheet 3)
Load3_24dcPOS
K33-2
(5A)
100A
(Vg)
C32
CB39
To F35H
(Sheet 3)
(Vn)
V4
N1
Meter 3
Cabinet 2e LV
A32
From
Sheet 7
J32
1
2
DO-29
3
4
DO-30
I4
K39-3
2
Pwr
+
5
3
Load3_120acBLK
Load3_120acBLK
u1
L39-3A,B,C
30 kVAR
20.4 mH, 72A
Load3_120acW HT
Fault Switch
Spring Motor
K39-2a,b,c
u2
Load3_120acBLK
K32
M
Load3_120acW HT
K37-1
L39-2A,B,C
20 kVAR
30.5 mH, 48A
K39-1
K37-2a
K392a
K37-2b
K392b
K37-2c
K392c
K37-3
K39-3
Load3_120acW HT
(K37-x in Cabinet 3c)
APA-8
Date:
10/3/2005
Rev. L
Sheet 8 of 22
120V
CB1
15A
DAS_120acW HT
FD1
CB10
100A
DAS_24dcPOS
PS1
CB2
15A
Distributed to
Cabinets 2a, 2e,
4a & 6a
CB Power Supply
Cabinet 2a
CB_120acW HT
FD2
Duplex
Outlet
U2e
G3
10
DAS_24dcCOM
CB_120acBLK
T91
15kVA
DAS_120acBLK
Duplex
Outlet
U2a
CB_24dcPOS
PS2
Distributed to
Cabinets 2a, 2d,
4a & 6a
CB_24dcCOM
CB3
15A
2
Load3_120acBLK
Load3_120acW HT
FD3
Duplex
Outlet
U3b
Load3_24dcPOS
PS3
Distributed to
Cabinets 3a, 3b
Load3_24dcCOM
CB4
15A
3
Load4_120acBLK
Load4_120acW HT
FD4
Duplex
Outlet
U5b
Load4_24dcCOM
CB5
15A
Load4_24dcPOS
PS4
5
Load5_120acBLK
CB9
15A
Load5_120acW HT
FD5
PC_120acBLK
Duplex
Outlet
U7b
PC_120acW HT
Load5_24dcPOS
PS5
Load5_24dcCOM
CB6
15A
Duplex
Outlet
U9b
Distributed to
Cabinets 7a, 7b
7
Load6_120acBLK
Load6_120acW HT
FD6
Distributed to
Cabinets 5a, 5b
Duplex
Outlet
U8b
Load6_24dcPOS
PS6
Distributed to
Cabinets 8a, 8b
Load6_24dcCOM
8
PROPRIETARY AND CONFIDENTIAL INFORMATION
APA-9
Date:
10/3/2005
Control Power
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 9 of 22
Cabinet 2e
Load Cabinets
Cabinet 4a
Cabinet 6a
Microsources
10
Cabinet 2a
Relay 3
RS-232
FO401
FO207
FO202
FO203
RS232
Relay 2
RS232
RS232
RS232
RS232
FO601
Relay 4
RS232
Relay 5
RS232
FO206
FO205
FO204
SEL-2030
RS232
FO101
SS DSP Control
RS485
RS-485
Meter 1
Microsource A2
Ethernet
FO901
Microsource B1
Meter 2
RS485
Microsource A1
FO201
RS485
Ethernet Hub
Meter 3
Load Meter 3
FO902
RS232
EIR
308
-2ST
Meter 4
Meter 5
Load Meter 4
EMS
Computer
FO903
RS485
EIR
305
-1ST
Meter A1
EIR
308
-2ST
Load Meter 5
Meter A2
E
Load Meter 6
Meter B1
FO904
RS232
Ethernet Hub
Load PLC 3
ECOM
-F
Load PLC 4
ECOM
-F
Load PLC 5
ECOM
-F
Load PLC 6
DAS
Computer
ECOM
EIR
308
-2ST
EIR
308
-2ST
Load PLC 2
ECOM
-F
EIR
305
-1ST
Ledgend:
RS232
RS485
EIR
308
-2ST
APA-10
Date:
10/3/2005
Rev. L
Sheet 10 of 22
10
Feeder A
Cabinet 2
2e Low
Voltage
2d
CB31
CT32R
Cabinet 4a
Cabinet 3
3a
75 yards
25 yards
CB41
Cabinet 5
5a
75 yards
CT42R
N
G1
N
G1
CB43
CB33
Fault
Load
Fault
Load
CB34,
CB35,
CB39
CB32
3
CB45,
CB48,
CB49
CB42
5b
3b
G1
CB51
Load Elements
Zone 3
Load Elements
Zone 4
Battery
Battery
Microsource A1
Fault
Load
Feeder B
Microsource A2
T51
Cabinet 6a
CT52R
CB16
S&C
G2
Static
Switch
SS15
CB17
Cabinet 7
7a
75 yards
CB53
G2
Fault
Load
CB55,
CB57,
CB59
CB52
CB14
7b
DAS and EMS
Control Power
CT14R
CB13
Cabinet 8
8a
Feeder C
(75 yards)
Load Elements
Zone 5
N
G1
Battery
120V
Reliable
control power
source
Microsource B1
CB63
CB12
2a
Cabinet 9a
Zone power
supplies
Fault
Load
G3
CB65,
CB69
G1
8b
T11
Load Elements
Zone 6
Optional
Transformer
S11
FD10
Utility
Drawn by: Ed Linton
Figure 11: CERTS Test Bed Schematic - Preliminary - Ground & Neutral Treatment
APA-11
Date:
10/3/2005
Rev. L
Sheet 11 of 22
10
CB43
250A
A41
A42
B41
B42
C41
C42
CT46A
(200/5A)
From
Sheet 4
CT46B
CT46C
J41
A42
B42
C42
CT46N
N1
N1
4
TB46
F46H-A,B,C
CB48
15A
(2A)
CB45
150A
5
5
Load4_120acWHT
Load4_120acWHT
V1
Load
Meter 4
(See also
Sheet 20)
V2
V3
Vref
V4
CB46-1
CB46-1 through
CB46-6
I1
I2
N/-
I3
I4
T48
K46-1a
DO-1
K46-1c
TB47
K46-6b
DO-17
R46-1
5kW
R48
K46-6a,b,c
R46-6
20kW
K46-6c
DO-18
F
Load control
SSR's K46-1a
through K46-6c
K46-6a
DO-16
Zone 4
Load
Control
PLC
DC Power
Supply
PS48
K46-1b
DO-2
DO-3
load bit 6
(msb)
K46-1a,b,c
F48X
Cabinet 5b
load bit 1
(lsb)
K46-1a,b,c through
K46-6a,b,c
480 / 120V
TB47
(5A)
L/+
CB46-6
K47-1
DO-19
(Sheet 13)
K47-3
DO-23
Load4_24dcPOS
Load4_24dcCOM
DO-24
AI-1
APA-12
Date:
10/3/2005
Load Bank 4
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 12 of 22
A42
V1
(Va)
V2
(Vb)
(Vn)
Vref
I2
N/-
I3
Fault 4 Local
Arming Key
Switch
To TB45
(Sheet 4)
S41
LT41
CB49
LT42
"Fault 4
Locally
Armed"
Load4_24dcCOM
K42
YO
open
c12
LT43
"Fault 4
Remotely
Armed"
(See also
Sheet 19)
K49-1
Fault 4
Warning
Strobe Light
V3
Vref
Load4_24dcPOS
V4
I1
L/+
I2
N/-
I3
To TB43
(Sheet 4)
K43-3
DO-28
J42
1
2
DO-29
3
(See also sheet 12)
Load4_120acBLK
E
DO-30
Load4_120acW HT
Pwr
+
L49-3A,B,C
30 kVAR
20.4 mH, 72A
K43-2
DO-27
Zone 4
Load
Control
PLC
Load4_24dcCOM
K43-1
DO-26
I4
K49-3
Load4_120acBLK
u1
Fault Switch
Spring Motor
K49-2a,b,c
F
K42
YC
close
c2
K44
Trigger
circuit
(Sheet 19)
V2
(5A)
L49-1A,B,C
10 kVAR
61.1 mH, 24A
c1
c11
V1
Meter
A2
Fault 4 Switch
(Cabinet 5a,
Sheet 4)
K43-3
K43-1
K43-2
2
100A
10
DAQ
Fault 4
Apply
DAQ
Fault 4
Arm
I4
N1
Load4_24dcPOS
I1
(5A)
L/+
Cabinet 5b - LV
DAS Load Control
(Vg)
B42
C42
To F45H
(Sheet 4)
(Vc)
V3
V4
From
Sheet 12
K42
M
Load4_120acBLK
u2
K47-1
K49-1
K492a
K47-2b
K492b
K47-2c
K492c
K47-3
K49-3
L49-2A,B,C
20 kVAR
30.5 mH, 48A
K47-2a
Load4_120acW HT
Load4_120acW HT
(K47-x in Cabinet 5a)
Figure 13: CERTS Test Bed Schematic - Preliminary - Load Bank 4 Continued
Date:
10/3/2005
Rev. L
Sheet 13 of 22
10
To
Sheet 15
CB53
250A
A52
A53
B52
B53
C52
C53
CT56A
(200/5A)
From
Sheet 5
CT56B
CT56C
CB58
15A
(2A)
C
A53
B53
C53
TB56
F56H-A,B,C
J51
CB55
150A
Load5_120acBLK
Load5_120acWHT
Cabinet 7b - LV
DAS Load Control
Cabinet 7b 480V DAS
Load Control
V1
V2
Load
Meter 5
(See also
Sheet 20)
V3
Vref
CB56-1
V4
L/+
CB56-1 through
CB56-6
CB56-6
I1
N/-
I2
I3
T58
480 / 120V
K56-1a
DO-1
DO-2
DO-3
K56-6a
K56-6b
DO-17
7
Load resistor array
R56-1 through
R56-6
R56-1
5kW
R58
R56-6
20kW
K57-1
DO-19
K56-6a,b,c
K56-6c
DO-18
Zone 5
Load
Control
PLC
Load control
SSR's K56-1a
through K56-6c
K56-1c
DO-16
load bit 6
(msb)
DC Power
Supply
PS58
K56-1b
TB57
load bit 1
(lsb)
K56-1a,b,c through
K56-6a,b,c
K56-1a,b,c
F58X
Cabinet 7b
TB57
(5A)
(Cabinet 7b)
K57-3
DO-24
Load5_24dcPOS
Load5_24dcCOM
DO-25
AI-1
Date:
10/3/2005
Load Bank 5
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 14 of 22
A53
V1
(Va)
V2
(Vb)
To F55H
(Sheet 5)
(Vc)
V3
(Vg)
Vref
B53
Fault 5 Local
Arming Key
Switch
I1
(5A)
L/+
I2
N/-
I3
C53
S51
CB59
C
K53-3
LT52
c11
K52
YO
open
c12
LT53
"Fault 5
Remotely
Armed"
"Fault 5
Locally
Armed"
Load5_24dcCOM
V1
Fault 5
Warning
Strobe Light
c1
K52
YC
close
c2
K54
Trigger
circuit
(Sheet 19)
V2
V3
Vref
(See also
Sheet 19)
Load5_24dcPOS
Load5_24dcCOM
V4
K59-1
(5A)
L/+
I2
N/-
I3
To TB53
(Sheet 5)
K53-2
DO-27
Zone 5
Load
Control
PLC
I4
K53-1
DO-26
I1
K53-1
K53-2
Meter
B1
Fault 5 Switch
(Cabinet 7a,
Sheet 5)
Load5_24dcPOS
To TB55
(Sheet 5)
LT51
100A
10
DAQ
Fault 5
Apply
DAQ
Fault 5
Arm
I4
L59-1A,B,C
10 kVAR
61.1 mH, 24A
Cabinet 7b - LV
DAS Load Control
V4
From
Sheet 14
K53-3
DO-28
J52
1
2
DO-29
K59-3
DO-30
Load5_120acW HT
Pwr
+
G
Load5_120acBLK
Load5_120acBLK
L59-3A,B,C
30 kVAR
20.4 mH, 72A
7
u1
Fault Switch
Spring Motor
K52
M
K59-2a,b,c
Load5_120acBLK
u2
Load5_120acW HT
K57-1
K59-1
K592a
K57-2b
K592b
K57-2c
K592c
K57-3
K59-3
182 Mad River Park
Waitsfield, VT 05673
802-496-2955
www.northernpower.com
L59-2A,B,C
20 kVAR
30.5 mH, 48A
K57-2a
Load5_120acW HT
(K59-x in Cabinet 7c)
Figure 15: CERTS Test Bed Schematic - Preliminary - Load Bank 5 Continued
Date:
10/3/2005
Rev. L
Sheet 15 of 22
10
To
Sheet 17
CB63
250A
A63
A64
B63
B64
C63
C64
CT66A
(200/5A)
From
Sheet 1
CT66B
CT66C
J61
A63
B63
C63
CT66N
N1
N1
4
TB66
F66H-A,B,C
CB68
15A
(2A)
150A
Cabinet 8b - LV
DAS Load Control
CB65
Load6_120acBLK
Load6_120acWHT
V1
Load
Meter 6
(See also
Sheet 20)
V2
V3
Vref
V4
CB66-1
(5A)
L/+
CB66-6
I2
N/-
I3
T68
K66-1a
DO-1
TB67
K66-6b
DO-17
R68
R66-6
20kW
K67-1
DO-19
(Cabinet 8b)
K67-3
DO-24
Load6_24dcPOS
Load6_24dcCOM
AI-1
R66-1
5kW
K66-6c
DO-18
DO-24
Load control
SSR's K66-1a
through K66-6c
K66-6a
DO-16
Zone 6
Load
Control
PLC
TB67
K66-1c
DO-3
load bit 6
(msb)
DC Power
Supply
PS68
K66-1b
DO-2
K66-6a,b,c
F68X
Cabinet 8b
load bit 1
(lsb)
K66-1a,b,c through
K66-6a,b,c
K66-1a,b,c
480 / 120V
I4
CB66-1 through
CB66-6
I1
Date:
10/3/2005
Load Bank 6
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 16 of 22
10
Cabinet 8b - LV
DAS Load Control
DAQ
Fault 6
Apply
DAQ
Fault 6
Arm
Fault 6 Local
Arming Key
Switch
A64
Fault 6 Switch
(Cabinet 8a,
Sheet 1)
Load5_24dcPOS
From
Sheet 16
B64
S61
K63-1
K63-3
K63-2
C64
LT61
N1
K62
YO
open
LT63
"Fault 6
Remotely
Armed"
"Fault 6
Locally
Armed"
Load5_24dcCOM
CB69
LT62
c11
Fault 6
Warning
Strobe Light
c1
K62
YC
close
K64
c12
c2
Trigger
circuit
(Sheet 19)
100A
Load5_24dcPOS
K63-1
DO-22
K69-1
K63-2
DO-23
Zone 6
Load
Control
PLC
L69-1A,B,C
10 kVAR
61.1 mH, 24A
Load5_24dcCOM
K63-3
DO-24
J62
DO-29
1
2
DO-30
3
4
K69-2
G
Pwr
+
5
Load6_120acBLK
u1
L69-2A,B,C
30 kVAR
20.4 mH, 72A
K69-2a,b,c
Fault Switch
Spring Motor
u2
Load6_120acBLK
K62
M
Load6_120acW HT
K67-1
L69-2A,B,C
20 kVAR
30.5 mH, 48A
K69-1
K67-2a
K692a
K67-2b
K692b
K67-2c
K692c
K67-3
K69-3
Load6_120acW HT
(K69-x in Cabinet 8c)
APA-17
Date:
10/3/2005
Rev. L
Sheet 17 of 22
10
Cabinet 10 - 480V
A
B
C
P11
1
Resistive
Overload:
83 kW,
60 kW
Gnd
Shorting
Bars
Locked Rotor
Overload:
70 kVAR
8.7 mH
93A
10
CB57
To Load Bank
50A
P12
Cabinet 2e - LV DAS
1
K50-3
2
3
PNL57
3-Phase
Diode
Bridge
K50-4
4
5
K50-3
K50-4
S21
K23-1
K23-3
K23-2
R54-1 R54-2
R58
K50-2
C54-1 C54-2
K58
LT22
"Fault 2
Locally
Armed"
CB_24dcCOM
"Fault 2
Remotely
Armed"
LT23
Fault 2
Warning
Strobe Light
c11
c1
K22
YO
open
K50-1
K22
YC
close
K24
c12
c2
Trigger
circuit
(Sheet 19)
Fault 2 Switch
(Cabinet 2d,
Sheet 2)
CB_24dcPOS
LT21
K50-1
DAQ
Fault 2
Apply
DAQ
Fault 2
Arm
Fault 2 Local
Arming Key
Switch
K50-2
CB_24dcPOS
CB_24dcCOM
CB_120acBLK
DO-1
R50-2
10kW
Zone 2
Load
Control
PLC
R50-1
5kW
Harmonic Load
DO-2
DO-3
APA-18
K23-2
Fault Switch
Spring Motor
K23-3
K22
M
u2
CB_120acW HT
Figure 18: CERTS Test Bed Schematic - Preliminary - Harmonic Load and Zone 2 Fault Control
u1
Pwr
+
K23-1
Date:
10/3/2005
Rev. L
Sheet 18 of 22
DAS Trigger
Pos
10
Load Cabinets
SCOM
SCOM
Meter 1
Digital Input
S1
SCOM
SCOM
Meter 2
Digital Input
S1
Meter 3
Digital Input
S1
S8
S8
Meter 4
Digital Input
CB51
Aux b
SCOM
Meter 5
Digital Input
S1
S8
Load Meter 3
Digital Input
DAS Trigger
Neg
Load
PLC 3
DO-24
K34
S8
S1
(Cabinet 3b,
sheet 7, 8)
S8
S8
SCOM
CB41
Aux b
CB31
Aux b
SS15
Status b
Cabinet 2e
SCOM
Load Meter 4
Digital Input
Load
PLC 4
DO-24
K44
S8
C
SCOM
Meter A1
Digital Input
S8
SCOM
Meter B1
Digital Input
S8
SCOM
Meter A2
Digital Input
S8
K24
(Cabinet 5b,
sheet 12, 13)
Relay 2
OUT102
(sheet 10)
SCOM
Load Meter 5
Digital Input
Load
PLC 5
DO-24
K54
S8
(Cabinet 7b,
sheet 14, 15)
SCOM
Load Meter 6
Digital Input
DAS PC
opto-coupled
input
F
S1
Load
PLC 6
DO-24
K64
S8
DAS
digital
output
(Cabinet 8c,
sheet 16, 17)
opto-coupled
input
S8
SCOM
30 Vdc
+
-
APA-19
Date:
10/3/2005
Rev. L
Sheet 19 of 22
CB_24dcCOM
CB_24dcPOS
10
CB_120acW HT
CB_120acBLK
CB12 Aux
23
CB12
M
U2
CB12 Status
Q/3
CB12 Spring
Motor
S1
30 Vdc
+
-
SCOM
U1
Meter 1
24
SS Control
Relay 2
A17
xxx
A18
SS Open
xxx
OUT101
SS Open
DSP Control
xxx
xxx
xxx
xxx
xxx
xxx
SS Alarm
SS Status
xxx
SS Close
DSP Control
xxx
xxx
xxx
xxx
xxx
xxx
SS Alarm
xxx
SS Close
SS Status
Relay 2
A01
A02
IN101
SS Status
Meter 2
xxx
xxx
U1
CB13
M
U2
CB13 Spring
Motor
S1
CB13 Aux
F
23
Meter 1
24
Q/3
SS Status
30 Vdc
+
-
SCOM
S2
CB13 Status
30 Vdc
+
-
SCOM
APA-20
Date:
10/3/2005
CB Control
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 20 of 22
CB_120acBLK
CB_120acW HT
CB_24dcPOS
10
CB_24dcCOM
CB31
Relay 3
A17
A18
C11
YO
C12
CB31 Open
OUT101
Meter 3
S2
13
E
U1
CB31
M
U2
CB31 Spring
Motor
Q/1
14
30 Vdc
+
-
SCOM
Aux
23
CB31 Status
Relay 3
Q/3
24
A01
A02
IN101
---
---
A03
A04
Microsource A1
Status
---
Microsource A1
Trip
IN102
A19
---
A20
OUT102
APA-21
Date:
10/3/2005
CB Control
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 21 of 22
CB_24dcPOS
CB_120acBLK
10
CB_24dcCOM
CB_120acW HT
CB41
Relay 4
A17
A18
C11
YO
C12
CB41 Open
OUT101
Meter 4
S2
Q/1
14
30 Vdc
+
-
SCOM
13
Aux
U1
CB41
M
U2
23
CB41 Spring
Motor
CB41 Status
Relay 4
24
A01
Q/3
A02
IN101
---
---
A03
A04
Microsource A2
Status
---
Microsource A2
Trip
IN102
A19
---
A20
OUT102
CB51
Relay 5
A17
A18
C11
YO
C12
CB51 Open
OUT101
Meter 5
S2
Q/1
13
U1
CB51
M
U2
14
30 Vdc
+
-
SCOM
Aux
CB51 Spring
Motor
23
24
A01
Q/3
---
CB51 Status
Relay 5
A02
IN101
---
A03
A04
Microsource B1
Status
A06
Relay 5A
Under-voltage Trip
IN102
---
A05
---
IN103
A19
---
A20
---
OUT102
Microsource B1
Trip
APA-22
Date:
10/3/2005
CB Control
PROJ#:
file: CERTS_Schematic_RevL.vsd
Rev. L
Sheet 22 of 22
10
Cabinet 2d
Cabinet 2e
Cabinet 2a
Relay 2
SEL-351A
Meter 1
CB31
CT11
CT12
CT13
Meter 3
CB51
DSP Controller
Meter 2
Meter 4
Meter 5
Meter A1
Meter A2
Static Switch
CT14
CT32
Meter B1
CT34
CT35
Relay 3
CB12
CB13
K22
CT33
Fault
Sw
SEL-351A
LT21
LT22
LT23
SEL-2030
S21
Load PLC 2
T11
600A bus
Static switch:
CB14
CB16
CB17
T51
TB32
TB35
F35H
TB33
F51H
PT32
F32H
F32X
PT17
F17H
F17X
10 cm
Cab
3a A1
400A bus
Cabinets also
include:
TB11
TB12
TB13
TB14
PT14
F14H
F14X
F13H
U2a outlet
PS2
FD2
Cab
8a
S&C
S&C
APA-3
APA-23
Date: 10/3/2005
K23-1,2,3
K24
K25
PS1
FD1
Relay 5a
U2e outlet
Rev. E
Sheet 1 of 2
10
Cabinet 6a
5b
7b
8b
Cabinet 3a
Cabinet 3b
Cabinet 4a
Similar Cabinets:
5a
7a
8a
CB34
Relay 4
LT31
CB38
LT32
CB39
Relay 5
ION 7600
Load Meter 3
S31
SEL-351A
SEL-351A
LT33
CB35
To Cab 3b
Load PLC 3
Fan
Fan
Fan
CB33
CB41
K32
CB36
ABB S4
CT52
CT54
CT55
CT42
CT44
CT45
Cab A2
5a
225A bus
T51
TB52
TB55
F55H
TB53
PT52
F52H
F52X
Cab B1
7a
Cab
2d
Cab
4a
TB36
F36H
J31
K39-2a,b,c
225A bus
Date: 10/3/2005
FD3
PS3
K38
K37
K33
K34
K39
MS34
J32
225A bus
10 cm
CT36
TB37
Cabinets also
include:
TB42
TB45
F45H
TB43
PT42
F42H
F42X
K36
S503
CT53
CT43
Cab
3a
Fault
Sw
Rev. E
Sheet 2 of 2
Feeder A
480 V
CB41
10
75
yard
loop
Meter A2 (DAS)
Feeder A
CT45 480 V
4
CT43
F45
Fault
Load
Meter 4 (DAS)
EMS
F36
CT36
T31
Microsource A2
CB43
CB42
Load Meter 4
(DAS)
Controller
F46
CT46
T41
Load Bank 3
Fault
Load
Load Bank 4
Protective
Relay 4
Filter
Storage
Zone 3
CT44
F45H
PT24
CT42
CB33
Load Meter 3
(DAS)
Protective
Relay 3
Filter
Storage
Zone 4
CB51
PT17
PT51
CB16
Relay
5a
Feeder B
EMS
CT14R
PT14
CT14
CT13
F13
CT53
Microsource B1
CB53
CB52
Load Meter 5
(DAS)
F56
CT56
T52
Controller
SS15
CB14
480 V
EMS
Static
Switch
75
yard
loop
Meter B1 (DAS)
CT55
F55
CT52R
S&C
Meter 5 (DAS)
CT54
F55H
PT52
CT52
T51
Zone 2
CB17
CT42R
CB32
Controller
25
yard
loop
CT33
Microsource A1
EMS
Fault
Load
75
yard
loop
Meter A1 (DAS)
CT35
F35
CT32R
Meter 3 (DAS)
CT34
F35H
CT32
PT32
CB31
Fault
Load
Load Bank 5
Protective
Relay 5
Filter
Protective
Relay 2
Zone 5
DSP Control
Meter 2
CB13
Feeder C
480 V
Storage
75 yard loop
CT12
CT11
Zone 6
Meter 1
CB63
L11
F66
CT66
Load Meter 6
(DAS)
CB12
Additional inductor
can be added for
higher impedance
Fault
Load
Load Bank 6
T11
S11
FD10
Zone 1
Utility Interface
PCC - Zone 1
Date:
10/3/2005
Rev. P
Sheet 1 of 5
CT32R
CT32
PT32
CB31
trip
51
Feeder A
480 V
CB41
CB32
50
G
CB33
trip
T32
27
p-p
10
CT42R
CT42
PT42
51
CB42
50
G
Fault Current
Zone 3
Load Bank
Zone 3
trip
CB43
T42
27
p-p
Load Bank
Zone 4
trip
Microsource A1
Fault Current
Zone 4
Microsource A2
Relay 4
Relay 3
Zone 2
Devices:
CB51
trip
Fault Current
Zone 2
Relay 2, DSP, and
Static Switch Control
PT17
CT52R
PT52
CT52
T51
27
51
Relay
5A
close
25
EMS
trip
Static
Switch
CB52
SS15
Relay 5
Fault Current
Zone 5
Microsource B1
CB14
27
p-p
59
50
G
81
O/U
50
51
PT14
CT14
CT14R
Feeder C
32
480 V
CB13
CB63
CT12
F
Fault Current
Zone 6
Relay Functions:
Load Bank
Zone 5
trip
CB17
Static
Switch
CB53
T52
27
p-p
52
50
G
CB16
Feeder B
480 V
Load Bank
Zone 6
25
Synchronization
27
p-p
Undervoltage phase-to-phase
27
Undervoltage
32
Directional power
46
47
50
Instantaneous overcurrent
50
G
51
Time overcurrent
59
Overvoltage
81
O/U
CB12
(ground fault
detection on
delta system)
T11
51
27
FD10
S11
Utility Interface
PCC - Zone 1
Drawn by: Ed Linton
APA-26
Date:
10/3/2005
Rev. P
Sheet 2 of 5
10
CB
CT
Load
Meter
(DAS)
Ser
DAS Trigger
DAS Ethernet
DC Power
Supply
Motor Starter
/ Protector
Zero-crossing
SSR array
Diode Bridge
Electronic Load
with DC voltage
monitor
E
Torque sensor
Mechanical
Load
Harmonic load
0 - 15 kW
(moveable to any load bank)
Asynchronous Motor
Load 15 HP
(Load Bank 3 only)
F
Load
Control
PLC
DAS RS-485
PROPRIETARY AND CONFIDENTIAL INFORMATION
G
APA-27
Date:
10/3/2005
Rev. P
Sheet 3 of 5
10
Feeder A
Cabinet 2
2e Low
Voltage
2d
CB31
CT32R
Cabinet 4a
Cabinet 3
3a
75 yards
25 yards
CB41
Cabinet 5
5a
75 yards
CT42R
N
G1
N
G1
CB43
CB33
Fault
Load
CB34,
CB35,
CB39
CB32
3
Fault
Load
CB45,
CB48,
CB49
CB42
CB51
Load Elements
Zone 3
Load Elements
Zone 4
Battery
Battery
Microsource A1
Fault
Load
Feeder B
Microsource A2
T51
Cabinet 6a
3
G2
CB16
Static
Switch
SS15
Cabinet 7
7a
75 yards
CT52R
S&C
CB17
CB53
G2
Fault
Load
CB55,
CB57,
CB59
CB52
CB14
7b
DAS and EMS
Control Power
CT14R
CB13
Cabinet 8
8a
Feeder C
(75 yards)
Load Elements
Zone 5
N
G1
Cabinet 9a
Battery
120V
Reliable
control power
source
Microsource B1
CB63
CB12
Zone power
supplies
Fault
Load
2a
5b
3b
G1
G3
CB65,
CB69
G1
8b
T11
Load Elements
Zone 6
Optional
Transformer
G1
S11
FD10
Utility
Drawn by: Ed Linton
Figure 28: CERTS Test Bed - One-line Diagram - Cabinet Layout and Ground & Neutral Treatment
APA-28
Date:
10/3/2005
Rev. P
Sheet 4 of 5
10
DAS PC
EMS PC
RS-232
Relay Comm.
Processor
Ethernet Hub
RS-485
Hardware
Interface
Trigger Circuit
Microsource
A1 Control
RS-485
Meter 1
RS-232
Microsource
A2 Control
Meter 2
Zone 2 Load
Control PLC
Relay 2
DSP Control
Relay Comm.
Processor
Microsource
B1 Control
Meter A1
Meter 3
Load
Meter 3
Meter A2
Meter 4
Load
Meter 4
Zone 4 Load
Control PLC
Meter B1
Meter 5
Load
Meter 5
Zone 5 Load
Control PLC
Load
Meter 6
Zone 6 Load
Control PLC
Zone 3 Load
Control PLC
S&C
Static Switch
Control
Optional
connection for
relay event data
APA-29
Date:
10/3/2005
One-Line Diagr am
Rev. P
Sheet 5 of 5