DATA UNTUK ROUTING WADUK

DATA LENGKUNG KAPASITAS

DATA HIDROGRAF BANJIR

DATA SPESIFIKASI SPILLWAY

(dihitung dari puncak mercu pelimpah)


Tampungan, S

Waktu (t)

Debit, Q

(m)
272.7
272.9
273.1
273.3
273.5
273.7
273.9
274.1
274.3
274.5
274.7
274.9
275.1
275.3

(m3)
0
526200
1066300
1620300
2174300
2728300
3282300
3843700
4412500
4981300
5550100
6118900
6708300
7318300

Jam
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0

(m3/d)
6.0
7.0
11.0
25.0
77.0
182.0
299.0
420.0
441.0
432.0
402.0
362.0
313.0
261.0
215.0
181.0
155.0
132.0
114.0
99.0
87.0
76.0
68.0
59.0
51.0
44.0
38.0
33.0
28.0
24.0
20.0
16.0
13.0
10.0
7.0

05/28/2015 / 12:53:58

Lebar spillway

Koef. Debit, CD

32.0 m
2.0

500

400

Debit (m 3/dt)

Elevasi

300

200

100

0
0.0

271776343.xls / Routing Waduk

2.0

0
0.0

05/28/2015 / 12:53:58

271776343.xls / Routing Waduk

2.0

ROUTING WADUK
Elevasi mercu
Lebar mercu, B

Elevasi

(m)

(m)

272.7
272.9
273.1
273.3
273.5
273.7
273.9
274.1
274.3
274.5
274.7
274.9
275.1
275.3

0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6

272.7
32.0

KoefCD
t

S/t

2.0
=

0.5

S Q
+
t 2

(106 m3) (m3/dt) (m3/dt) (m3/dt)


0
0.53
1.07
1.62
2.17
2.73
3.28
3.84
4.41
4.98
5.55
6.12
6.71
7.32

0
292
592
900
1208
1516
1824
2135
2451
2767
3083
3399
3727
4066

jam

0
6
16
30
46
64
84
106
130
155
181
209
238
268

S
Q

t
2

0
295
600
915
1231
1548
1866
2188
2516
2845
3174
3504
3846
4200

0
289
584
885
1185
1484
1781
2082
2387
2690
2993
3295
3608
3932

Inflow , I (m3/d)
Outflow ,Q (m3/d)

Debit (m 3/dt)

400

300

200

100

0
2.0

4.0

05/28/2015 / 12:53:58

6.0 Waktu
8.0 (jam)
10.0

12.0

14.0

Jam

(m3/d)

0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0

6.0
7
11
25
77
182
299
420
441
432
402
362
313
261
215
181
155
132
114
99
87
76
68
59
51
44
38
33
28
24
20
16
13
10
7

S1

(m3/d) (106 m3) (m3/d)

S2

(m3/d) (106 m3)

Outflow,Q

(m)

(m3/d)

0.21
0.21
0.21
0.22
0.25
0.33
0.48
0.70
0.95
1.20
1.41
1.59
1.72
1.81
1.86
1.88
1.88
1.87
1.85
1.81
1.77
1.73
1.68
1.63
1.58
1.53
1.48
1.43
1.38
1.33
1.28
1.23
1.19
1.14
1.10

6
6
6
6
8
12
21
37
60
84
107
128
144
156
162
165
166
164
160
156
151
145
139
134
127
121
115
110
104
98
93
88
83
78
73

(m3/dt)

500

0.0

Waktu (t) Inflow, I (I1+I2)/2

16.0

18.0

7
9
18
51
130
241
360
431
437
417
382
338
287
238
198
168
144
123
107
93
82
72
64
55
48
41
36
31
26
22
18
15
12
9

0.54
0.54
0.55
0.57
0.65
0.87
1.28
1.89
2.60
3.28
3.88
4.37
4.75
5.01
5.15
5.22
5.22
5.18
5.11
5.01
4.90
4.77
4.64
4.51
4.36
4.22
4.08
3.93
3.79
3.65
3.51
3.38
3.25
3.12

299
299
302
314
358
477
701
1032
1414
1779
2100
2364
2566
2703
2782
2816
2819
2797
2758
2707
2646
2580
2509
2436
2361
2284
2206
2129
2053
1978
1905
1832
1762
1693

305
308
320
365
487
718
1061
1462
1850
2196
2482
2702
2853
2941
2980
2984
2962
2920
2865
2800
2728
2652
2573
2491
2408
2325
2242
2160
2079
2000
1923
1847
1773
1701

0.54
0.55
0.57
0.65
0.87
1.28
1.89
2.60
3.28
3.88
4.37
4.75
5.01
5.15
5.22
5.22
5.18
5.11
5.01
4.90
4.77
4.64
4.51
4.36
4.22
4.08
3.93
3.79
3.65
3.51
3.38
3.25
3.12
2.99

271776343.xls / Routing Waduk

0
0.0

2.0

4.0

05/28/2015 / 12:53:58

6.0 Waktu
8.0 (jam)
10.0

12.0

14.0

16.0

18.0

271776343.xls / Routing Waduk

ROUTING WADUK
Tabel 1. Tabel pendukung penelusuran banjir di waduk
Elevasi mercu
Lebar mercu, B

272.7
32.0

Koef.CD =
t
=

2.0
0.5

Tabel 2. Penghitungan penelusuran banjir melalui waduk/embung


jam

S Q
+
t 2

S
Q

t
2

Elevasi

S/t

(m)

(m)

(106 m3)

(m3/dt)

(m3/dt)

(m3/dt)

(m3/dt)

272.7
272.9
273.1
273.3
273.5
273.7
273.9
274.1
274.3
274.5
274.7
274.9
275.1
275.3

0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6

0
0.5262
1.0663
1.6203
2.1743
2.7283
3.2823
3.8437
4.4125
4.9813
5.5501
6.1189
6.7083
7.3183

0
292
592
900
1208
1516
1824
2135
2451
2767
3083
3399
3727
4066

0
6
16
30
46
64
84
106
130
155
181
209
238
268

0
295
600
915
1231
1548
1866
2188
2516
2845
3174
3504
3846
4200

0
289
584
885
1185
1484
1781
2082
2387
2690
2993
3295
3608
3932

500
400

Inflow, I (m3/d)
Outflow,Q (m 3/d)

De bit (m 3/dt)

300
200
100
0
1.0
0.0

3.0
2.0

05/28/2015 / 12:53:58

5.0
4.0

7.0
6.0

9.0

11.0 13.0 15.0 17.0


12.0 14.0 16.0

Waktu
8.0 (jam)10.0

Waktu (t)

Inflow, I

(I1+I2)/2

S1

S2

Outflow,Q

Jam

(m3/d)

(m3/d)

(106 m3)

(m3/d)

(m3/d)

(106 m3)

(m)

(m3/d)

0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.0
10.5
11.0
11.5
12.0
12.5
13.0
13.5
14.0
14.5
15.0
15.5
16.0
16.5
17.0

6
7
11
25
77
182
299
420
441
432
402
362
313
261
215
181
155
132
114
99
87
76
68
59
51
44
38
33
28
24
20
16
13
10
7

7
9
18
51
130
241
360
431
437
417
382
338
287
238
198
168
144
123
107
93
82
72
64
55
48
41
36
31
26
22
18
15
12
9

0.5434
0.5443
0.5497
0.5711
0.6513
0.8703
1.2816
1.8907
2.5985
3.2770
3.8765
4.3709
4.7484
5.0056
5.1538
5.2178
5.2225
5.1827
5.1093
5.0123
4.8990
4.7742
4.6423
4.5056
4.3642
4.2203
4.0755
3.9317
3.7894
3.6493
3.5121
3.3773
3.2455
3.1173

299
299
302
314
358
477
701
1032
1414
1779
2100
2364
2566
2703
2782
2816
2819
2797
2758
2707
2646
2580
2509
2436
2361
2284
2206
2129
2053
1978
1905
1832
1762
1693

305
308
320
365
487
718
1061
1462
1850
2196
2482
2702
2853
2941
2980
2984
2962
2920
2865
2800
2728
2652
2573
2491
2408
2325
2242
2160
2079
2000
1923
1847
1773
1701

0.5443
0.5497
0.5711
0.6513
0.8703
1.2816
1.8907
2.5985
3.2770
3.8765
4.3709
4.7484
5.0056
5.1538
5.2178
5.2225
5.1827
5.1093
5.0123
4.8990
4.7742
4.6423
4.5056
4.3642
4.2203
4.0755
3.9317
3.7894
3.6493
3.5121
3.3773
3.2455
3.1173
2.9923

0.21
0.21
0.21
0.22
0.25
0.33
0.48
0.70
0.95
1.20
1.41
1.59
1.72
1.81
1.86
1.88
1.88
1.87
1.85
1.81
1.77
1.73
1.68
1.63
1.58
1.53
1.48
1.43
1.38
1.33
1.28
1.23
1.19
1.14
1.10

6
6
6
6
8
12
21
37
60
84
107
128
144
156
162
165
166
164
160
156
151
145
139
134
127
121
115
110
104
98
93
88
83
78
73

271776343.xls / Routing Waduk prn

PROSEDUR PENGHITUNGAN PENELUSURAN BANJIR MELALUI WADUK


Pada penelusuran banjir melalui waduk/embung, dimensi dari pelimpah (spillway) sudah ditetapkan.
1.
Dibuat lengkung kapasitas waduk yang dimulai dari elevasi puncak mercu ambang pelimpah (spillway), bukan dari dasar bendungan/embung.
Ditetapkan besarnya pias waktu (t) untuk perhitungan penelusuran banjir.
2.
3.
Dihitung besaran-besaran berikut, kemudian ditabelkan.
a.
b.

dengan S adalah volume tampungan waduk (m 3) dan t adalah besarnya pias waktu (detik).

Q=C.B.H

dengan notasi :
Q
C
B
H
c.

=
=
=
=

debit yang melewati spillway (m3/dt),


koefisien debit di spillway,
lebar spillway (m),
kedalaman aliran diatas mercu spillway (m).

S
Q

t 2

dan

S
Q
+
t 2

Hasil dari langkah (3) ini ditabelkan sebagaimana ditampilkan pada Tabel 1.
4.

Dibuat Tabel 2 dengan penjelasan sebagai berikut ini :


a. Inflow (I) adalah hidrograf banjir rencana yang diperoleh dari metode klasik atau metode sintetis (Nakayasu, Gama 1 dll)
Untuk langkah waktu (t) pertama.
b. Untuk langkah pertama, Outflow (Q) = 0,00 atau nilai yang ditetapkan besarnya. Hal ini sesuai dengan asumsi bahwa elevasi muka air
sama dengan elevasi mercu spillway.
c. Dihitung nilai H dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai debit (Q) yang sudah didapat pada langkah (4b).
d. Kolom (I1 + I2)/2, kolom S1, kolom 1, kolom 2 dan kolom S2 dikosongkan
Untuk langkah waktu (t) kedua dan seterusnya.
e. Dihitung nilai (I1 + I2)/2 dari debit inflow (I).
f.

Berdasarkan nilai H pada Tabel 2 (langkah sebelumnya), dihitung S 1 dengan menginterpolasi nilai S pada Tabel 1 untuk nilai H yang sesuai.

S
Q
g. Berdasarkan nilai H yang sama, dihitung besarnya 1 dengan cara interpolasi nilai

t
2
h. Dihitung besarnya 2 dengan rumusan sebagai berikut :

2 = 1 +

05/28/2015 / 12:53:58

pada Tabel 1 untuk nilai H yang sesuai.

I1 + I2
2

271776343.xls / Routing Waduk prn

i.

Dihitung besarnya S2 dengan rumusan sebagai berikut :

S2 = S1 +

I1 + I 2
Q t
2

Q adalah debit outflow pada langkah waktu sebelumnya


j.

Berdasarkan nilai S2 pada Tabel 2, dihitung besarnya H dengan cara interpolasi nilai H pada Tabel 1 untuk nilai S (Tabel 1) yang sama
dengan S2

k. Dihitung besarnya Q dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai H yang sudah didapat pada langkah (j).
l.

Diulangi langkah (e) hingga (k) untuk langkah waktu selanjutnya, dengan menggunakan nilai H dan Q yang baru.

m. Dibuat grafik hidrograf Inflow (I) dan Outflownya (O).

05/28/2015 / 12:53:59

271776343.xls / Routing Waduk prn

05/28/2015 / 12:53:59

271776343.xls / Routing Waduk prn

bendungan/embung.

hwa elevasi muka air

at pada langkah (4b).

ntuk nilai H yang sesuai.

05/28/2015 / 12:53:59

271776343.xls / Routing Waduk prn

abel 1) yang sama

pada langkah (j).

05/28/2015 / 12:53:59

271776343.xls / Routing Waduk prn

Вам также может понравиться