MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

01

TRABAJOS PRELIMINARES

7,595.70

69,901.35

35,266.56

112,738.83

01.01

OBRAS PROVISIONALES

2,394.32

11,239.47

71.85

13,703.17

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x 2.40 M INCLUIDO


INSTALACION

glb

1.00

1,104.88

249.92

847.46

7.50

1,104.88

01.01.02

ALMACEN PROVICIONAL DE OBRA

m2

150.00

49.24

907.44

6,451.88

27.23

7,386.00

01.01.03

CERCO PROVICIONAL DE OBRA

298.87

17.44

1,236.96

3,940.13

37.12

5,212.29

01.02

SEGURIDAD Y SALUD

43.46

4,799.17

1.32

4,846.71

01.02.01

ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE


SEGURIDAD Y SALUD

01.02.02
01.02.03

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

323.73

323.73

323.73

25.00

121.19

3,029.75

3,029.75

4.00

169.49

677.96

200.00

1.18

glb

1.00

279.27

279.27

glb

1.00

300.00

300.00

glb

1.00

EQUIPOS DE PROTECCION INDIVIDUAL

und

EQUIPOS DE PROTECCION COLECTIVA

glb

01.02.04

SEALIZACION CON CINTA DE SEGURIDAD

01.02.05

CAPACITACION EN SEGURIDAD Y SALUD

01.02.06

RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS

01.03

EXPLANACION

01.03.01

CORTE DE TERRENO CON MAQUINARIA

m3

1,851.40

4.93

1,278.65

7,858.19

9,127.40

01.03.02

RELLENO Y COMPACTACION

m3

220.42

8.23

250.54

1,561.72

1,814.06

01.03.03

MATERIAL AFIRMADO

m3

90.35

50.00

01.03.04

TRANSPORTE DE MATERIAL AFIRMADO C/ MAQUINARIA

m3

90.35

16.63

150.61

1,352.79

1,502.52

01.03.05

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

1,630.98

16.63

2,718.89

24,420.57

27,123.20

01.04

CONTROL DE CALIDAD DE OBRA

3,610.12

3,610.46

01.04.01

DISEO DE MEZCLA DE CONCRETO

und

3.00

338.98

1,016.94

1,016.94

01.04.02

ENSAYO DE RESISTENCIA A LA COMPRESION DEL CONCRETO

und

68.00

38.14

2,593.18

2,593.52

01.05

FLETE TERRESTRE

29,480.62

29,480.62

01.05.01

FLETE TERRESTRE A OBRA

glb

1.00

27,480.62

27,480.62

27,480.62

01.05.02

MOVILIZACION Y DESMOVILIZACION

glb

1.00

2,000.00

2,000.00

01.06

OTROS

43.46

4,398.69

188.46

4,517.50

677.96
236.00

1.32

279.27
300.00
44,084.68

35,193.27

4,517.50

4,517.50

759.23

2,000.00

16,254.47

0.12
0.12

17,013.19
258.39

01.06.01

PLACA RECORTARIA DE ALUMINIO DE 0.60 X 0.40 m

und

1.00

258.39

4.03

254.24

01.06.02

INSTALACION DE COBERTURA FIBRAFORTE ONDA 100, 2,44X1.10X1.8 MM


(INC. ARMADURA E INSTALACION)

m2

113.30

147.88

755.20

16,000.23

02

AULA

50,561.83

76,353.56

4,107.24

130,999.82

02.01

ESTRUCTURAS

26,144.59

52,320.32

2,431.34

80,873.81

02.01.01

TRABAJOS PRELIMINARES

335.23

104.69

82.75

525.16

02.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

67.07

0.98

63.53

02.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

134.14

1.88

135.85

02.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

67.07

3.09

02.01.02

MOVIMIENTO DE TIERRAS

16,754.80

1.91

65.73

69.80

44.97

252.18

135.85

34.89

35.87

207.25

2,791.71

744.60

806.97

4,343.04

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

02.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

42.88

32.52

1,353.88

40.61

02.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

17.93

19.79

226.45

128.32

354.83

02.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

12.41

100.02

400.42

96.13

1,241.25

02.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

62.05

2.54

102.45

55.20

157.61

02.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

31.19

21.68

656.52

19.70

676.20

02.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINARIA

m3

31.19

16.63

51.99

467.01

518.69

02.01.03

CONCRETO SIMPLE

4,667.03

280.23

7,088.59

02.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

20.75

44.20

237.43

611.33

68.66

917.15

02.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 25% PG

m3

7.41

297.06

430.60

1,712.11

58.59

2,201.21

02.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

25.73

40.32

589.56

430.01

17.69

1,037.43

02.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

2.18

333.45

197.83

498.51

30.58

726.92

02.01.03.05

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

62.05

35.55

685.53

1,415.07

104.71

2,205.88

02.01.04

CONCRETO ARMADO

20,876.70

46,804.00

1,261.39

68,917.02

02.01.04.01

ZAPATAS

608.96

4,077.74

110.23

4,794.15

02.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

8.53

424.81

428.35

3,090.41

104.84

3,623.63

02.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

239.37

4.89

180.61

987.33

5.39

1,170.52

02.01.04.02

VIGA DE CIMENTACION

2,653.45

9,148.97

139.06

11,931.31

02.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

5.03

436.48

304.30

1,822.37

68.80

2,195.49

02.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

26.56

51.79

852.05

498.16

25.56

1,375.54

02.01.04.02.03

VIGA DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,655.50

5.05

1,497.10

6,828.44

44.70

8,360.28

02.01.04.03

COLUMNAS

4,803.03

9,134.00

276.28

14,205.92

02.01.04.03.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

0.63

503.99

88.16

214.97

14.38

317.51

02.01.04.03.02

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

6.47

510.57

905.39

2,250.26

147.78

3,303.39

02.01.04.03.03

COLUMNA, ENCOFRADO Y DESENCOFRADO

m2

76.34

53.36

2,643.44

1,350.34

79.31

4,073.50

02.01.04.03.04

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,289.41

5.05

1,166.04

5,318.43

34.81

6,511.52

02.01.04.04

VIGAS

4,728.77

9,148.75

337.48

14,209.38

02.01.04.04.01

VIGAS CONCRETO f'c=175 kg/cm2

m3

0.29

507.79

40.59

99.33

7.36

147.26

02.01.04.04.02

VIGAS CONCRETO f'c=210 kg/cm2

m3

8.95

513.12

1,252.42

3,112.80

227.18

4,592.42

02.01.04.04.03

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

78.37

55.16

2,514.11

1,732.85

75.42

4,322.89

02.01.04.04.04

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,019.17

5.05

921.65

4,203.77

27.52

5,146.81

02.01.04.05

LOSAS ALIGERADAS

5,981.53

11,328.92

335.31

17,646.56

02.01.04.05.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

9.20

481.64

1,044.07

3,199.74

187.24

4,431.09

02.01.04.05.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

105.16

53.18

3,732.53

1,747.94

111.96

5,592.41

02.01.04.05.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

753.19

5.05

681.12

3,106.68

20.34

3,803.61

02.01.04.05.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

und

876.02

4.36

523.81

3,274.56

15.77

3,819.45

02.01.04.06

MUROS Y TABIQUES DE ALBAILERIA

2,100.96

3,965.62

63.03

6,129.70

Cliente

Metrado

Precio S/.

Mano de Obra

2,140.95

Material

Equipo

744.60

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,394.46

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

02.01.04.06.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

38.79

125.29

1,700.54

3,108.15

51.02

4,860.00

02.01.04.06.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

16.55

73.77

396.61

812.50

11.90

1,220.89

02.01.04.06.03

ALAMBRE REFUERZO HORIZONTAL EN ALBAILERIA #8

kg

8.43

5.79

3.81

44.97

0.11

48.81

02.02

ARQUITECTURA

21,869.10

20,547.82

1,593.52

44,010.30

02.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

8,045.41

1,985.22

241.40

10,271.16

02.02.01.01

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

77.62

32.19

1,862.88

580.23

55.89

2,498.59

02.02.01.02

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

44.97

35.72

1,233.47

336.18

37.01

1,606.33

02.02.01.03

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

29.88

28.34

628.68

199.41

18.86

846.80

02.02.01.04

TARRAJEO DE VIGAS, MORTERO 1:5 C:A

m2

65.47

39.75

1,695.42

855.64

50.87

2,602.43

02.02.01.05

VESTIDURA DE DERRAMES 1:5 C:A

12.60

9.81

106.55

13.76

02.02.01.06

BRUAS SEGUN DETALLE 1 X 1 cm

413.62

6.27

2,518.41

02.02.02

CIELO RASOS

02.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

m2

102.01

45.60

02.02.03

PISOS Y PAVIMENTOS

02.02.03.01

CONTRAPISO DE 40 MM

m2

59.32

02.02.03.02

PISO DE MADERA MACHIHEMBRADO PUMAQUIRO DE 4"x1"

m2

02.02.03.03

LOSA CONCRETO 175 KG / CM2 FROTACHADO, BRUADO Y COLOREADO (


0.125CM)

02.02.04

CONTRAZOCALOS

02.02.04.01

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

3.20

123.61

75.57

2,593.40

2,861.71

1,703.32

85.84

4,651.66

2,861.71

1,703.32

85.84

4,651.66

3,496.77

5,340.71

213.56

9,051.09

31.26

768.44

962.34

123.60

1,854.34

59.32

118.50

2,682.21

4,266.67

80.46

7,029.42

m2

2.74

61.07

46.12

111.70

9.50

167.33

306.98

383.20

9.21

699.29

CONTRAZOCALO DE MAD CEDRO 1" X 4" RODON DE 3/4"

45.52

13.94

255.40

371.64

7.66

634.55

02.02.04.02

CONTRAZOCALO S/ COLOREAR H= 30 CM MEZCLA 1:2 E=1.5 CM

5.76

11.24

02.02.05

CUBIERTAS

02.02.05.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

115.62

02.02.05.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

10.25

02.02.06

CARPINTERIA DE MADERA

02.02.06.01

PUERTA C/ TABLEROS DE MADERA 1.05 X 2.10 M

und

1.00

627.62

75.36

550.00

2.26

627.62

02.02.06.02

VENTANA DE MADERA CEDRO C/ SEG

m2

21.83

227.43

1,262.65

2,835.85

866.66

4,964.80

02.02.07

CERRAJERIA

50.58

105.92

1.53

158.03

02.02.07.01

BISAGRAS CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

4.00

14.70

24.19

33.88

0.73

58.80

02.02.07.02

CERRADURA DOS GOLPES EN PUERTA

pza

1.00

92.72

24.19

67.80

0.73

92.72

02.02.07.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

1.00

6.51

2.20

4.24

0.07

6.51

02.02.08

VIDRIOS CRISTALES Y SIMILARES

627.28

740.64

18.77

1,387.13

02.02.08.01

VIDRIO SEMIDOBLES

02.02.09

PINTURAS

02.02.09.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

247.32

02.02.09.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

65.47

p2

247.26

51.58

11.56

1.55

64.74

888.70

5,508.03

26.65

6,423.43

52.95

874.32

5,221.43

26.22

6,122.08

29.40

14.38

286.60

0.43

301.35

1,338.01

3,385.85

868.92

5,592.42

627.28

740.64

18.77

1,387.13

4,245.83

1,319.18

127.40

5,692.26

11.62

2,133.68

676.04

64.03

2,873.86

7.18

353.01

106.86

10.59

470.07

5.61

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

02.02.09.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

152.47

9.04

1,096.30

248.85

32.89

02.02.09.04

PINTURA OLEO 02 MANOS EN DERRAMES

12.60

6.35

67.94

10.22

2.04

80.01

02.02.09.05

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

48.06

15.80

518.28

225.05

15.56

759.35

02.02.09.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

45.52

2.87

76.62

52.16

2.29

130.64

02.02.10

VARIOS Y LIMPIEZA

7.83

75.75

0.24

83.83

02.02.10.01

JUNTA DE CONSTRUCCION CON TEKNOPORT

7.83

75.75

0.24

83.83

02.03

INSTALACIONES ELECTRICAS

2,548.14

3,485.42

82.38

6,115.71

02.03.01

SALIDA PARA ELECTRICIDAD Y FUERZA

1,403.44

1,277.71

48.05

2,729.20

02.03.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

6.00

85.77

299.70

205.88

8.99

514.62

02.03.01.02

SALIDA

pto

4.00

110.73

297.12

130.95

14.86

442.92

02.03.01.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

6.00

76.23

201.98

249.36

6.06

457.38

02.03.01.04

SALIDA DE PARED P/ INTERRUPTOR DOBLE

pto

2.00

70.32

67.32

71.30

2.02

140.64

02.03.01.05

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

3.00

67.40

101.00

98.19

3.03

202.20

02.03.01.06

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

und

1.00

971.44

436.32

522.03

13.09

971.44

02.03.02

CANALIZACION Y/O TUBERIAS

502.98

215.82

15.08

733.63

02.03.02.01

TUBERIAS PVC - P 20 MM

502.98

215.82

15.08

733.63

02.03.03

CONEXION A RED EXTERNA Y MEDIDORES

421.07

02.03.03.01

Cliente

DE CENTRO DE ALUMBRADO EMPOTRADO

m2

Metrado

Precio S/.

2.98

Mano de Obra

28.13

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,378.33

55.62

13.19

56.17

363.22

1.69

ALIM. CAB NYY ( 2- 1 X 4 + 1 - 1X 2.5 ) MM2

3.00

29.37

19.87

67.61

0.60

88.11

02.03.03.02

CABLE COBRE DESNUDO 1X 16 MM2, PVC - P 20MM

3.60

92.49

36.30

295.61

1.09

332.96

02.03.04

TABLEROS Y CUCHILLAS

441.76

1,423.30

13.25

1,878.33

02.03.04.01

TD05

und

1.00

1,348.11

226.08

1,115.25

6.78

1,348.11

02.03.04.02

LAMPARA CON REJILLAS Y FLUORESCENTE CIRCULAR 3 X 40W

und

6.00

88.37

215.68

308.05

6.47

530.22

02.03.05

ARTEFACTOS

143.79

205.37

4.31

353.48

02.03.05.01

LAMPARA CON MARCO DE ALUMINIO Y FLUORESCENTE 2X 20 W

143.79

205.37

4.31

353.48

03

SALA DE USOS MULTIPLES

59,132.97

85,113.00

5,052.35

149,276.13

03.01

ESTRUCTURAS

33,698.62

57,915.38

3,244.57

94,835.89

03.01.01

TRABAJOS PRELIMINARES

395.58

123.54

97.67

619.69

03.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

79.14

0.98

74.96

03.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

158.29

1.88

160.32

03.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

79.14

3.09

03.01.02

MOVIMIENTO DE TIERRAS

03.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

146.21

32.52

03.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

144.96

19.79

03.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

18.67

100.02

602.40

03.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

71.86

2.54

03.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

1.62

21.68

und

4.00

88.37

82.36

2.26

77.56

53.07

297.59

160.30

41.18

42.34

244.54

7,205.04

1,120.20

1,409.81

9,735.46

4,616.39

138.48

4,754.75

1,830.80

1,037.50

2,868.76

144.62

1,867.37

118.65

63.93

182.52

34.10

1.02

35.12

1,120.20

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

03.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINARIA

m3

03.01.03

CONCRETO SIMPLE

03.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

31.32

44.20

03.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

und

6.24

297.06

03.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

32.20

03.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

03.01.03.05

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

03.01.04
03.01.04.01
03.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

11.02

03.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

303.80

03.01.05

VIGA DE CIMENTACION

03.01.05.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

3.20

03.01.05.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

03.01.05.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

03.01.06

COLUMNAS

03.01.06.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

0.92

503.99

128.74

313.92

21.02

463.67

03.01.06.02

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

8.17

510.57

1,143.28

2,841.51

186.63

4,171.36

03.01.06.03

COLUMNA, ENCOFRADO Y DESENCOFRADO

m2

98.47

53.36

3,409.74

1,741.78

102.30

5,254.36

03.01.06.04

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,467.29

5.05

1,326.90

6,052.13

39.62

7,409.81

03.01.07

VIGAS

4,956.21

9,546.26

333.28

14,829.56

03.01.07.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

8.72

513.12

1,220.24

3,032.80

221.35

4,474.41

03.01.07.02

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

84.75

55.16

2,718.78

1,873.91

81.56

4,674.81

03.01.07.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,124.82

5.05

1,017.19

4,639.55

30.37

5,680.34

03.01.08

LOSAS ALIGERADAS

7,387.15

14,248.05

411.69

22,047.19

03.01.08.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

11.22

481.64

1,273.32

3,902.29

228.36

5,404.00

03.01.08.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

128.17

53.18

4,549.24

2,130.41

136.46

6,816.08

03.01.08.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,024.19

5.05

926.19

4,224.47

27.65

5,172.16

03.01.08.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

und

1,067.65

4.36

638.40

3,990.88

19.22

4,654.95

03.01.09

MUROS Y TABIQUES DE ALBAILERIA

2,209.99

4,151.57

66.30

6,428.01

03.01.09.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

42.04

125.29

1,843.01

3,368.56

55.29

5,267.19

03.01.09.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

15.18

73.77

363.78

745.25

10.91

1,119.83

03.01.09.03

ALAMBRE REFUERZO HORIZONTAL EN ALBAILERIA #8

kg

7.08

5.79

3.20

37.76

0.10

40.99

03.02

ARQUITECTURA

22,839.06

24,239.49

1,722.28

48,801.36

03.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

8,287.84

2,454.42

248.66

10,990.46

03.02.01.01

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

1,687.68

525.67

50.63

2,263.60

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato
24.26

26.94

5,026.27

327.13

7,805.90

358.36

922.73

103.64

1,384.34

362.60

1,441.78

49.34

1,853.65

40.32

737.80

538.14

22.14

1,298.30

1.77

333.45

160.62

404.76

24.82

590.21

75.37

35.55

832.69

1,718.86

127.19

2,679.40

CONCRETO ARMADO

782.64

5,245.61

142.29

6,166.99

ZAPATAS

782.64

5,245.61

142.29

6,166.99

424.81

553.40

3,992.52

135.45

4,681.41

4.89

229.24

1,253.09

6.84

1,485.58

2,301.28

7,504.54

106.83

9,903.89

436.48

193.59

1,159.35

43.78

1,396.74

25.62

51.79

821.89

480.52

24.66

1,326.86

1,421.84

5.05

1,285.80

5,864.67

38.39

7,180.29

6,008.66

10,949.34

349.57

17,299.20

1.62

16.63

2.70
2,452.07

m2

70.32

32.19

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

03.02.01.02

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

43.27

35.72

1,186.84

323.47

35.61

1,545.60

03.02.01.03

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

53.61

28.34

1,127.95

357.77

33.84

1,519.31

03.02.01.04

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

m2

93.90

39.75

2,431.64

1,227.19

72.96

3,732.53

03.02.01.05

VESTIDURA DE DERRAMES 1:5 C:A

18.60

9.81

157.29

20.32

4.72

182.47

03.02.01.06

BRUAS SEGUN DETALLE 1 X 1 cm

278.62

6.27

1,696.44

50.90

1,746.95

03.02.02

CIELO RASOS

03.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

m2

125.42

45.60

03.02.03

PISOS Y PAVIMENTOS

03.02.03.01

CONTRAPISO DE 40 MM

m2

71.86

31.26

03.02.03.02

PISO DE MADERA MACHIHEMBRADO PUMAQUIRO DE 4"x1"

m2

71.86

118.50

03.02.04

CONTRAZOCALOS

03.02.04.01

CONTRAZOCALO DE MAD CEDRO 1" X 4" RODON DE 3/4"

33.55

03.02.04.02

CONTRAZOCALO S/ COLOREAR H= 30 CM MEZCLA 1:2 E=1.5 CM

37.32

03.02.05

CUBIERTAS

03.02.05.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

144.16

03.02.05.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

12.78

03.02.06

CARPINTERIA DE MADERA

03.02.06.01

PUERTA C/ TABLEROS DE MADERA 1.05 X 2.10 M

und

2.00

627.62

03.02.06.02

VENTANA DE MADERA CEDRO C/ SEG

m2

24.11

227.43

03.02.07

CERRAJERIA

03.02.07.01

BISAGRAS CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

8.00

03.02.07.02

CERRADURA DOS GOLPES EN PUERTA

pza

03.02.07.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

03.02.08

VIDRIOS CRISTALES Y SIMILARES

03.02.08.01

VIDRIO SEMIDOBLES

03.02.09

PINTURAS

03.02.09.01

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

3,518.43

2,094.22

105.54

5,719.15

3,518.43

2,094.22

105.54

5,719.15

4,180.09

6,334.40

247.18

10,761.75

930.87

1,165.78

149.72

2,246.34

3,249.22

5,168.62

97.46

8,515.41

522.41

348.77

15.68

887.17

13.94

188.24

273.91

5.65

467.69

11.24

334.17

74.86

10.03

419.48

1,108.07

6,867.63

33.24

8,009.00

52.95

1,090.14

6,510.30

32.70

7,633.27

29.40

17.93

357.33

0.54

375.73

1,545.25

4,232.00

961.72

6,738.58

150.72

1,100.00

4.52

1,255.24

1,394.53

3,132.00

957.20

5,483.34

101.16

211.84

3.03

316.06

14.70

48.38

67.76

1.45

117.60

2.00

92.72

48.38

135.60

1.45

185.44

2.00

6.51

4.40

8.48

0.13

13.02

658.01

776.92

19.69

1,455.07

658.01

776.92

19.69

1,455.07

p2

259.37

5.61

2,908.94

833.62

87.27

3,829.32

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

125.42

11.62

1,082.02

342.83

32.47

1,457.38

03.02.09.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

93.90

7.18

506.31

153.26

15.18

674.20

03.02.09.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

167.20

9.04

1,202.20

272.90

36.07

1,511.49

03.02.09.04

PINTURA OLEO 02 MANOS EN DERRAMES

1.49

6.35

8.04

1.21

0.24

9.46

03.02.09.05

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

4.41

15.80

47.56

20.65

1.43

69.68

03.02.09.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

37.32

2.87

62.81

42.77

1.88

107.11

03.02.10

VARIOS Y LIMPIEZA

8.86

85.67

0.27

94.80

03.02.10.01

JUNTA DE CONSTRUCCION CON TEKNOPORT

8.86

85.67

0.27

94.80

03.03

INSTALACIONES SANITARIAS

883.11

1,599.62

28.20

2,511.12

03.03.01

SISTEMA DE AGUA DE LLUVIA

883.11

1,599.62

28.20

2,511.12

m2

3.37

28.13

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

03.03.01.01

CANALETA DE FIERRO GALVANIZADO

25.56

53.58

255.51

1,106.24

03.03.01.02

TUBERIA PVC SAL 4"

19.60

16.00

101.39

212.16

03.03.01.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

4.00

90.17

220.88

133.16

6.63

360.68

03.03.01.04

ENCOFRADO Y DESENCOFRADO DADO DE CONCRETO

m2

3.90

86.90

275.45

55.16

8.26

338.91

03.03.01.05

CONCRETO f'c=140 kg/cm2

m3

0.30

428.10

29.88

92.90

5.64

128.43

03.04

INSTALACIONES ELECTRICAS

1,712.18

1,358.51

57.30

3,127.76

03.04.01

SALIDA PARA ELECTRICIDAD Y FUERZA

832.46

621.84

30.92

1,485.24

03.04.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

6.00

85.77

299.70

205.88

8.99

514.62

03.04.01.02

SALIDA DE CENTRO DE ALUMBRADO EMPOTRADO

pto

4.00

110.73

297.12

130.95

14.86

442.92

03.04.01.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

6.00

76.23

201.98

249.36

6.06

457.38

03.04.01.04

SALIDA DE PARED P/INTERRUPTOR DOBLE

pto

1.00

70.32

33.66

35.65

1.01

70.32

03.04.02

CANALIZACION Y/O TUBERIAS

520.25

223.25

15.60

758.82

03.04.02.01

TUBERIA PVC - P 20MM

520.25

223.25

15.60

758.82

03.04.03

ARTEFACTOS

359.47

513.42

10.78

883.70

03.04.03.01

LAMPARA CON MARCO DE ALUMINIO Y FLUORESCENTE 3X 40 W

und

6.00

88.37

215.68

308.05

6.47

530.22

03.04.03.02

LAMPARA CON MARCO DE ALUMINIO Y FLUORESCENTE 2X 20 W

und

4.00

88.37

143.79

205.37

4.31

353.48

04

SS.HH. ALUMNOS Y DOCENTES

27,743.89

40,003.88

1,842.67

69,584.95

04.01

ESTRUCTURAS

11,614.52

20,776.65

1,026.82

33,413.85

04.01.01

TRABAJOS PRELIMINARES

113.56

35.47

28.05

177.90

04.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

22.72

0.98

21.52

0.65

22.27

04.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

45.44

1.88

46.02

23.65

15.24

85.43

04.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

22.72

3.09

46.02

11.82

12.16

70.20

04.01.02

MOVIMIENTO DE TIERRAS

1,339.75

544.80

371.73

2,256.21

04.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

18.86

32.52

595.48

17.86

613.33

04.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

10.12

19.79

127.81

72.43

200.27

04.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

9.08

100.02

292.98

70.34

908.18

04.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

45.40

2.54

74.96

40.39

115.32

04.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

10.94

21.68

230.28

6.91

237.18

04.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINARIA

m3

10.94

16.63

18.24

163.80

181.93

04.01.03

CONCRETO SIMPLE

3,427.86

168.49

5,159.37

04.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

5.64

44.20

64.54

166.16

18.66

249.29

04.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

m3

7.81

297.06

453.84

1,804.53

61.75

2,320.04

04.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

25.52

40.32

584.74

426.51

17.55

1,028.97

04.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

1.98

333.45

179.68

452.77

27.77

660.23

04.01.03.05

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

25.34

35.55

04.01.04

CONCRETO ARMADO

Cliente

Metrado

Precio S/.

57.53

Mano de Obra

13.19

1,562.76

Material

Equipo

544.80

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,369.50

7.67

313.60

279.96

577.89

42.76

900.84

7,013.50

13,693.64

411.01

21,113.08
Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

04.01.04.01

ZAPATAS

153.38

1,028.06

27.88

1,208.64

04.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

2.16

424.81

108.47

782.56

26.54

917.59

04.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

59.52

4.89

44.91

245.50

1.34

291.05

04.01.04.02

VIGAS DE CIMENTACION

1,066.64

1,857.20

63.54

2,986.58

04.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

2.66

436.48

160.92

963.71

36.38

1,161.04

04.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

25.38

51.79

814.19

476.03

24.43

1,314.43

04.01.04.02.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

101.21

5.05

91.53

417.46

2.73

511.11

04.01.04.03

COLUMNAS

1,296.53

2,355.34

74.09

3,724.13

04.01.04.03.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

0.35

503.99

48.98

119.43

8.00

176.40

04.01.04.03.02

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

1.54

510.57

215.51

535.61

35.17

786.28

04.01.04.03.03

COLUMNA, ENCOFRADO Y DESENCOFRADO

m2

21.44

53.36

742.41

379.24

22.27

1,144.04

04.01.04.03.04

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

320.28

5.05

04.01.04.04

VIGAS

04.01.04.04.01

VIGAS CONCRETO f'c=175 kg/cm2

m3

0.12

04.01.04.04.02

VIGAS CONCRETO f'c=210 kg/cm2

m3

04.01.04.04.03

VIGAS, ENCOFRADO Y DESENCOFRADO

04.01.04.04.04

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

04.01.04.05

LOSAS ALIGERADAS

04.01.04.05.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

4.48

04.01.04.05.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

04.01.04.05.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

04.01.04.05.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

04.01.05

MUROS Y TABIQUES DE ALBAILERIA

04.01.05.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

17.77

04.01.05.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

33.63

04.02

ARQUITECTURA

04.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

04.02.01.01

TARRAJEO PRIMARIO, MORTERO 1:5 C:A

m2

45.93

04.02.01.02

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

61.13

04.02.01.03

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

04.02.01.04

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

04.02.01.05

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

m2

04.02.01.06

VESTIDURA DE DERRAMES 1:5 C:A

04.02.02

CIELO RASOS

04.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

04.02.03

PISOS Y PAVIMENTOS

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

289.63

1,321.06

8.65

1,617.41

1,594.04

2,961.72

82.51

4,635.99

507.79

16.79

41.10

3.05

60.93

1.52

513.12

212.70

528.65

38.58

779.94

m2

30.85

55.16

989.67

682.12

29.69

1,701.69

kg

414.54

5.05

374.88

1,709.85

11.19

2,093.43

2,902.91

5,491.32

162.99

8,557.74

481.64

508.42

1,558.14

91.18

2,157.75

51.14

53.18

1,815.15

850.04

54.45

2,719.63

kg

352.33

5.05

318.62

1,453.26

9.51

1,779.27

und

436.03

4.36

260.72

1,629.88

7.85

1,901.09

1,584.95

3,074.88

47.54

4,707.29

125.29

779.02

1,423.87

23.37

2,226.40

73.77

805.93

1,651.01

24.17

2,480.89

10,577.78

13,034.65

646.49

24,258.74

3,927.54

1,437.64

117.83

5,482.62

18.23

515.39

306.51

15.46

837.30

32.19

1,467.12

456.97

44.01

1,967.77

34.56

35.72

947.94

258.35

28.44

1,234.48

12.73

28.34

267.84

84.95

8.04

360.77

24.34

39.75

630.31

318.08

18.91

967.52

11.70

9.81

98.94

12.78

2.97

114.78

1,152.98

686.28

34.59

1,874.16

1,152.98

686.28

34.59

1,874.16

680.61

1,635.22

59.15

2,375.26

m2

41.10

45.60

Fecha :

20/04/2015 12:43:44p.m.

S10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

04.02.03.01

CONTRAPISO DE 40 MM

m2

22.85

31.26

296.00

370.70

47.61

714.29

04.02.03.02

PISO LOSETA VENECIANA 30 X 30 CM COLOR CLARO

m2

22.85

72.69

384.61

1,264.52

11.54

1,660.97

04.02.04

ZOCALOS

1,594.33

2,582.52

47.82

4,224.16

04.02.04.01

ZOCALO DE MAYOLICA BLANCA 20 X 30 1RA

m2

52.37

80.66

1,594.33

2,582.52

47.82

4,224.16

04.02.05

CUBIERTAS

431.74

2,675.90

12.95

3,120.61

04.02.05.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

56.17

52.95

424.76

2,536.65

12.74

2,974.20

04.02.05.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

und

4.98

29.40

6.98

139.25

0.21

146.41

04.02.06

CARPINTERIA DE MADERA

774.06

3,063.79

313.66

4,151.36

04.02.06.01

PUERTA C/ TABLEROS DE MADERA 0.80X 2.10 M

und

1.00

397.62

75.36

320.00

2.26

397.62

04.02.06.02

PUERTA TABLEROS DE MADERA 1.05X 2.10M

und

1.00

627.62

75.36

550.00

2.26

627.62

04.02.06.03

PUERTA DE MADERA APANELADA DE 0.85 X 1.20M

und

4.00

346.57

180.87

1,200.00

5.43

1,386.28

04.02.06.04

VENTANA DE MADERA CEDRO C/ SEG

m2

7.65

227.43

442.47

993.79

303.71

1,739.84

04.02.07

CERRAJERIA

123.16

207.56

3.70

334.43

04.02.07.01

BISAGRAS CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

16.00

14.70

96.77

135.52

2.90

235.20

04.02.07.02

CERRADURA DOS GOLPES EN PUERTA

pza

1.00

92.72

24.19

67.80

0.73

92.72

04.02.07.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

1.00

6.51

2.20

4.24

0.07

6.51

04.02.08

VIDRIOS CRISTALES Y SIMILARES

211.40

249.61

6.32

467.48

04.02.08.01

VIDRIO SEMIDOBLES

p2

83.33

5.61

211.40

249.61

6.32

467.48

04.02.09

PINTURAS

1,681.96

496.13

50.47

2,228.66

04.02.09.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

41.10

11.62

354.58

112.34

10.64

477.58

04.02.09.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

24.34

7.18

131.24

39.72

3.94

174.76

04.02.09.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

108.42

9.04

779.56

176.96

23.39

980.12

04.02.09.04

PINTURA OLEO 02 MANOS EN DERRAMES

11.70

6.35

63.09

9.49

1.89

74.30

04.02.09.05

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

31.23

15.80

336.79

146.25

10.11

493.43

04.02.09.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

9.92

2.87

16.70

11.37

0.50

28.47

04.03

INSTALACIONES SANITARIAS

4,820.94

5,537.80

147.45

10,505.06

04.03.01

APARATOS SANITARIOS Y ACCESORIOS

947.42

2,157.35

37.77

3,142.64

04.03.01.01

LAVADERO CORRIDO CON REVESTIMIENTO CERAMICO DE 20 X 30 CM

und

1.00

706.73

285.20

404.83

16.63

706.73

04.03.01.02

URINARIO CORRIDO CON REVESTIMIENTO CERAMICO DE 20 X 30 CM

und

1.00

163.90

50.71

110.38

2.78

163.90

04.03.01.03

INODORO TANQUE BAJO DE LOSA 1RA CALIDAD ADULTO

pza

1.00

336.92

71.89

262.87

2.16

336.92

04.03.01.04

INODORO TANQUE BAJO DE LOSA 1RA CALIDAD NIOS

pza

4.00

328.45

287.57

1,017.59

8.63

1,313.80

04.03.01.05

GRIFO CROMADO DE 1/2"

und

3.00

64.53

126.24

63.57

3.79

193.59

04.03.01.06

ACCESORIOS EN DUCHA

und

1.00

94.32

53.92

38.78

1.62

94.32

04.03.01.07

LAVATORIO DE PARED BLANCO INC, ACCESORIOS

pza

1.00

333.38

71.89

259.33

2.16

333.38

04.03.02

INSTALACIONES SANITARIAS

3,873.52

3,380.45

109.68

7,362.42

04.03.02.01

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y4"

m3

5.33

27.87

4.33

148.55

Cliente

Metrado

Precio S/.

Mano de Obra

144.24

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

Fecha :

20/04/2015 12:43:44p.m.

S10

10

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

04.03.02.02

RED DE DISTRIBUCION TUBERIA PVC - SAL 2"

7.50

27.76

157.80

45.64

4.73

208.20

04.03.02.03

RED DE DISTRIBUCION TUBERIA PVC - SAL 4"

14.70

31.10

309.28

138.53

9.28

457.17

04.03.02.04

SALIDA DESAGUE DE PVC SAL 2"

pto

3.00

63.73

161.76

29.45

04.03.02.05

SALIDA DESAGUE DE PVC-SAL 4"

pto

5.00

72.44

269.60

92.63

04.03.02.06

CODO PVC SAL 2" X 45"

pza

2.00

21.71

38.05

4.21

1.14

43.42

04.03.02.07

CODO PVC SAL 4" X 45"

pza

4.00

31.67

101.48

22.16

3.04

126.68

04.03.02.08

SALIDA PARA VENTILACION

pto

3.00

72.76

161.76

56.52

04.03.02.09

REGISTRO DE BRONCE 4"

und

5.00

33.47

100.80

63.55

3.02

167.35

04.03.02.10

SUMIDERO DE BRONCE 2"

und

5.00

53.30

140.27

122.05

4.21

266.50

04.03.02.11

YEE PVC SAL 2"

pza

1.00

25.14

19.03

5.54

0.57

25.14

04.03.02.12

YEE PVC SAL 4"

pza

3.00

30.42

57.08

32.46

1.71

91.26

04.03.02.13

YEE PVC SAL 4" X 2"

pza

3.00

24.69

57.08

15.26

1.71

74.07

04.03.02.14

CAJA DE REGISTRO DESAGUE 12" X 24" C/ TAPA CONCRETO

pza

1.00

551.64

287.47

247.43

18.22

551.64

04.03.02.15

SISTEMA DE AGUA FRIA Y CONTRA INCEDIO

926.52

653.52

27.78

1,607.81

04.03.02.15.01

SALIDA DE AGUA FRIA TUBERIA PVC 1/2"

pto

9.00

90.07

485.28

310.71

14.56

810.63

04.03.02.15.02

TUBERIA PVC CLASE 10 - 1/2"

22.60

12.76

152.16

131.82

4.56

288.38

04.03.02.15.03

VALVULA COMPUERTA DE BRONCE 1/2"

und

4.00

83.80

143.79

187.08

4.31

335.20

04.03.02.15.04

REDUCCION PVC SAP 3/4 A 1/2"

und

1.00

19.97

12.10

7.51

0.36

19.97

04.03.02.15.05

CODO PVC SAL 1/ 2" X 90"

pza

5.00

21.39

95.14

8.94

2.85

106.95

04.03.02.15.06

TEE PVC 1/2"

und

2.00

23.34

04.03.02.16

SISTEMA DE AGUA DE LLUVIA

04.03.02.16.01

CANALETA DE FIERRO GALVANIZADO

31.38

04.03.02.16.02

TUBERIA PVC SAL 4"

19.60

04.03.02.16.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

04.03.02.16.04

ENCOFRADO Y DESENCOFRADO DADO DE CONCRETO

04.03.02.16.05

CONCRETO f'c=140 kg/cm2

04.04

INSTALACIONES ELECTRICAS

04.04.01

SALIDA PARA ELECTRICIDAD Y FUERZA

04.04.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

5.00

85.77

04.04.01.02

SALIDA DE PARED P/ INTERRUPTOR DOBLE

pto

2.00

04.04.01.03

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

3.00

04.04.02

CANALIZACION Y/O TUBERIAS

04.04.02.01

TUBERIAS PVC - P 20 MM

04.04.03

ARTEFACTOS

04.04.03.01

LAMPARA CON REJILLAS Y FLUORESCENTE CIRCULAR 2 X 20W

05

DIRECCION, DEPOSITO, TOPICO, LIMPIEZA

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

191.19
362.20

218.28

38.05

7.46

1.14

46.68

941.30

1,851.50

29.94

2,822.96

53.58

313.70

1,358.12

9.41

1,681.34

16.00

101.39

212.16

4.00

90.17

220.88

133.16

6.63

360.68

m2

3.90

86.90

275.45

55.16

8.26

338.91

m3

0.30

428.10

und

14.69

5.00

313.60

29.88

92.90

5.64

128.43

730.65

654.78

21.91

1,407.30

418.07

341.07

12.54

771.69

249.75

171.58

7.49

428.85

70.32

67.32

71.30

2.02

140.64

67.40

101.00

98.19

3.03

202.20

132.85

57.00

3.98

193.76

132.85

57.00

3.98

193.76

179.73

256.71

5.39

441.85

13.19

88.37

179.73

256.71

5.39

441.85

46,108.88

68,077.17

3,380.38

117,557.74
Fecha :

20/04/2015 12:43:44p.m.

S10

11

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

05.01

ESTRUCTURAS

05.01.01

TRABAJOS PRELIMINARES

05.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

56.05

0.98

53.09

05.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

112.10

1.88

113.54

05.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

56.05

3.09

05.01.02

MOVIMIENTO DE TIERRAS

05.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

36.95

05.01.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

05.01.02.03

RELLENO COMPACTADO CON MATERIAL AFIRMADO

m3

05.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

43.54

2.54

05.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

15.52

21.68

05.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINARIA

m3

15.52

16.63

25.88

232.38

258.10

05.01.03

CONCRETO SIMPLE

5,725.40

313.86

9,116.34

05.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

13.88

44.20

158.81

408.92

45.93

613.50

05.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

m3

8.01

297.06

465.46

1,850.74

63.33

2,379.45

05.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

60.80

40.32

1,393.12

1,016.13

41.81

2,451.46

05.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

6.37

333.45

578.05

1,456.66

89.32

2,124.08

05.01.03.05

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

43.54

35.55

481.03

992.95

73.47

1,547.85

05.01.04

CONCRETO ARMADO

17,189.89

35,369.47

1,005.60

53,551.24

05.01.04.01

ZAPATAS

429.11

2,846.11

74.32

3,347.34

05.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

5.70

424.81

286.24

2,065.10

70.06

2,421.42

05.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

189.35

4.89

142.87

781.01

4.26

925.92

05.01.04.02

VIGA DE CIMENTACION

1,997.48

4,451.91

119.07

6,565.39

05.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

4.99

436.48

301.87

1,807.88

68.26

2,178.04

05.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

39.90

51.79

1,279.99

748.36

38.40

2,066.42

05.01.04.02.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

459.59

5.05

05.01.04.03

COLUMNAS

05.01.04.03.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

0.48

05.01.04.03.02

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

05.01.04.03.03

COLUMNA ENCOFRADO Y DESENCOFRADO

05.01.04.03.04

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

05.01.04.04

VIGAS

05.01.04.04.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

9.44

05.01.04.04.02

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

59.55

05.01.04.04.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

815.17

5.05

05.01.04.05

LOSAS ALIGERADAS

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

22,812.82

41,861.57

1,967.89

66,631.10

280.17

87.50

69.18

438.87

58.34

1.60

54.93

37.59

210.75

113.54

29.16

29.99

173.19

2,266.29

679.20

579.25

3,524.65

35.00

1,201.61

32.52

1,166.65

24.54

19.79

309.93

11.32

100.02

365.25

175.64

485.65

87.69

1,132.23

71.90

38.74

110.59

326.68

9.80

336.47

3,076.47

679.20

415.62

1,895.67

12.41

2,320.93

3,205.15

6,005.64

162.22

9,367.73

503.99

67.17

163.78

10.96

241.92

3.07

510.57

429.60

1,067.74

70.13

1,567.45

m2

54.04

53.36

1,871.25

955.89

56.14

2,883.57

kg

925.70

5.05

837.13

3,818.23

24.99

4,674.79

3,968.54

7,962.25

318.95

12,245.24

513.12

1,321.00

3,283.21

239.63

4,843.85

55.16

1,910.37

1,316.71

57.31

3,284.78

737.17

3,362.33

22.01

4,116.61

3,838.51

6,930.97

218.52

10,989.36
Fecha :

20/04/2015 12:43:44p.m.

S10

12

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

05.01.04.05.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

6.10

481.64

692.27

2,121.57

124.15

2,938.00

05.01.04.05.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

69.72

53.18

2,474.62

1,158.87

74.23

3,707.71

05.01.04.05.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

358.53

5.05

324.23

1,478.83

9.68

1,810.58

05.01.04.05.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

und

580.98

4.36

347.39

2,171.70

10.46

2,533.07

05.01.04.06

MUROS Y TABIQUES DE ALBAILERIA

3,751.10

7,172.59

112.52

11,036.18

05.01.04.06.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

61.08

125.29

2,677.71

4,894.20

80.33

7,652.71

05.01.04.06.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

44.45

73.77

1,065.24

2,182.22

31.95

3,279.08

05.01.04.06.03

ALAMBRE REFUERZO HORIZONTAL EN ALBAILERIA #8

kg

18.03

5.79

05.02

ARQUITECTURA

05.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

05.02.01.01

TARRAJEO PRIMARIO, MORTERO 1:5 C:A

m2

5.04

18.23

05.02.01.02

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

154.10

05.02.01.03

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

05.02.01.04

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

05.02.01.05

TARRAJEO DE VIGAS, MORTERO 1:5 C:A

05.02.01.06

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

8.15

96.17

0.24

104.39

20,423.66

21,959.46

1,326.31

43,711.96

7,580.61

2,299.42

227.44

10,106.90

56.56

33.62

1.70

91.88

32.19

3,698.40

1,151.95

110.95

4,960.48

67.10

35.72

1,840.46

501.59

55.22

2,396.81

13.77

28.34

289.72

91.90

8.69

390.24

m2

33.64

39.75

871.14

439.64

26.14

1,337.19

VESTIDURA DE DERRAMES 1:5 C:A

73.90

9.81

624.92

80.72

18.76

724.96

05.02.01.07

BRUAS SEGUN DETALLE 1 X 1 cm

32.75

6.27

5.98

205.34

05.02.02

CIELO RASOS

2,026.56

1,206.23

60.79

3,294.14

05.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

2,026.56

1,206.23

60.79

3,294.14

05.02.03

PISOS Y PAVIMENTOS

1,296.89

3,115.83

112.72

4,525.98

05.02.03.01

CONTRAPISO DE 40 MM

m2

43.54

31.26

564.02

706.34

90.72

1,361.06

05.02.03.02

PISO LOSETA VENECIANA 30 X 30 CM COLOR CLARO

m2

43.54

72.69

732.87

2,409.49

22.00

3,164.92

05.02.04

CONTRAZOCALOS

675.69

483.75

20.28

1,180.17

05.02.04.01

CONTRAZOCALO DE LOSETA VENECIANA COLOR CLARO DE 10 X 30 CM

52.16

16.98

441.08

431.19

13.24

885.68

05.02.04.02

CONTRAZOCALO S/ COLOREAR H= 30CM MEZCLA 1:2 E= 1.5 CM

26.20

11.24

234.61

52.56

7.04

294.49

05.02.05

ZOCALOS

153.44

248.53

4.60

406.53

05.02.05.01

ZOCALO DE MAYOLICA BLANCA 20 X 30 1RA

m2

5.04

80.66

153.44

248.53

4.60

406.53

05.02.06

CUBIERTAS

734.31

4,568.37

22.02

5,324.73

05.02.06.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

95.37

52.95

721.19

4,306.94

21.63

5,049.84

05.02.06.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

9.35

29.40

13.12

261.43

0.39

274.89

05.02.07

CARPINTERIA DE MADERA

1,333.47

3,898.64

667.95

5,899.79

05.02.07.01

PUERTA C/ TABLEROS DE MADERA 0.90 X 2.10M

und

5.00

427.62

376.80

1,750.00

11.30

2,138.10

05.02.07.02

VENTANA DE MADERA CEDRO C/ SEG

m2

16.54

227.43

956.67

2,148.64

656.65

3,761.69

05.02.08

CERRAJERIA

222.68

487.25

6.68

716.65

05.02.08.01

BISAGRAS CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

15.00

14.70

90.72

127.05

2.72

220.50

05.02.08.02

CERRADURA DOS GOLPES EN PUERTA

pza

5.00

92.72

120.96

339.00

3.63

463.60

m2

72.24

45.60

199.41

Fecha :

20/04/2015 12:43:44p.m.

S10

13

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

05.02.08.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

05.02.09

VIDRIOS CRISTALES Y SIMILARES

05.02.09.01

VIDRIO SEMIDOBLES

05.02.10

PINTURAS

05.02.10.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

72.24

05.02.10.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

05.02.10.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

05.02.10.04
05.02.10.05

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

11.00

21.20

0.33

32.55

2,005.27

2,367.66

59.99

4,434.31

2,005.27

2,367.66

59.99

4,434.31

3,088.08

886.60

92.64

4,067.61

11.62

623.23

197.46

18.70

839.43

33.64

7.18

181.39

54.92

5.44

241.54

m2

234.97

9.04

1,689.49

383.50

50.68

2,124.13

PINTURA OLEO 02 MANOS EN DERRAMES

11.82

6.35

63.73

9.59

1.91

75.06

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

45.08

15.80

486.14

211.10

14.59

712.26

05.02.10.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

26.20

2.87

05.02.11

VARIOS Y LIMPIEZA

05.02.11.01

MESA DE CONCRETO C/CERAMICO INC. INSTALACIONES

m2

1.00

05.02.11.02

JUNTA DE CONSTRUCCION CON TECKNOPOR

m2

3.58

05.02.12

INSTALACIONES SANITARIAS

05.02.12.01

APARATOS SANITARIOS Y ACCESORIOS

05.02.12.01.01

LAVADERO DE ACERO INOXIDABLE UNA POZA

05.02.12.01.02

INSTALACIONES SANITARIAS

05.02.12.01.02.01

p2

5.00

790.43

6.51

5.61

44.10

30.03

1.32

75.19

375.28

925.35

23.59

1,324.22

1,223.51

365.87

834.35

23.31

1,223.51

28.13

9.41

91.00

0.28

100.71

931.38

1,471.83

27.61

2,430.93

931.38

1,471.83

27.61

2,430.93

30.24

173.73

0.91

204.88

87.95

15.90

1.02

104.87

0.39

13.38

0.63

27.76

pza

1.00

204.88

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4"

m3

0.48

27.87

12.99

05.02.12.01.02.02

RED DE DISTRIBUCION TUBERIA PVC - SAL 2"

1.00

27.76

21.04

6.09

05.02.12.01.02.03

SALIDA DESAGUE DE PVC SAL 2"

pto

1.00

63.73

53.92

9.81

05.02.12.01.03

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

138.72

108.93

4.16

251.79

05.02.12.01.03.01

SALIDA DE AGUA FRIA TUBERIA PVC 1/2"

pto

1.00

90.07

53.92

34.53

1.62

90.07

05.02.12.01.03.02

TUBERIA PVC CLASE 10 - 1/2"

4.43

12.76

29.82

25.84

0.89

56.53

05.02.12.01.03.03

VALVULA COMPUERTA DE BRONCE 1/2"

und

1.00

83.80

35.95

46.77

1.08

83.80

05.02.12.01.03.04

CODO PVC SAL 1/ 2" X 90"

pza

1.00

21.39

19.03

1.79

0.57

21.39

05.02.12.01.04

SISTEMA DE AGUA DE LLUVIA

674.47

1,173.27

21.52

1,869.39

05.02.12.01.04.01

CANALETA DE FIERRO GALVANIZADO

18.70

53.58

186.94

809.34

5.61

1,001.95

05.02.12.01.04.02

TUBERIA DE PVC SAL 4"

12.20

16.00

63.11

132.06

05.02.12.01.04.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

4.00

90.17

220.88

133.16

6.63

360.68

05.02.12.01.04.04

ENCOFRADO Y DESENCOFRADO DADO DE CONCRETO

m2

2.60

86.90

183.62

36.77

5.51

225.94

05.02.12.01.04.05

CONCRETO f'c=140 kg/cm2

m3

0.20

428.10

19.92

61.94

3.77

85.62

05.03

INSTALACIONES ELECTRICAS

2,872.40

4,256.14

86.18

7,214.68

05.03.01

SALIDA PARA ELECTRICIDAD Y FUERZA

1,875.12

1,804.71

56.26

3,736.16

05.03.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

16.00

85.77

799.20

549.01

23.98

1,372.32

05.03.01.02

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

12.00

76.23

403.96

498.72

12.12

914.76

05.03.01.03

SALIDA DE PARED P/INTERRUPTOR DOBLE

pto

2.00

70.32

67.32

71.30

2.02

140.64

63.73

195.20

Fecha :

20/04/2015 12:43:44p.m.

S10

14

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

05.03.01.04

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

5.00

67.40

168.32

163.65

5.05

337.00

05.03.01.05

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

und

1.00

971.44

436.32

522.03

13.09

971.44

05.03.02

CANALIZACION Y/O TUBERIAS

309.46

132.79

9.28

451.36

05.03.02.01

TUBERIA PVC - P 20MM

309.46

132.79

9.28

451.36

05.03.03

CONEXION A RED EXTERNA Y MEDIDORES

56.17

363.22

1.69

421.07

05.03.03.01

ALIM. CAB NYY ( 2- 1 X 4 + 1 - 1X 2.5 ) MM2

3.00

29.37

19.87

67.61

0.60

88.11

05.03.03.02

CABLE COBRE DESNUDO 1X 16 MM2, PVC - P 20MM

3.60

92.49

36.30

295.61

1.09

332.96

05.03.04

TABLEROS Y CUCHILLAS

56.52

1,115.25

1.70

1,173.47

05.03.04.01

TD02

und

1.00

1,173.47

56.52

1,115.25

1.70

1,173.47

05.03.05

ARTEFACTOS

575.13

840.17

17.25

1,432.62

05.03.05.01

LAMPARA T/ PLASTICO CUADRADO CON FLUORESCENTE DE 32 W

und

5.00

92.11

179.73

275.41

5.39

460.55

05.03.05.02

LAMPARA CON REJILLAS Y FLUORESCENTE CIRCULAR 2 X 20W

und

11.00

88.37

395.40

564.76

11.86

972.07

06

COCINA Y DEPOSITO

20,770.53

29,274.22

1,488.22

51,526.76

06.01

ESTRUCTURAS

9,296.33

16,841.87

851.63

26,984.83

06.01.01

TRABAJOS PRELIMINARES

97.36

30.40

24.04

152.51

06.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

19.48

0.98

18.45

0.56

19.09

06.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

38.95

1.88

39.45

20.27

13.06

73.23

06.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

19.48

3.09

39.46

10.13

10.42

60.19

06.01.02

MOVIMIENTO DE TIERRAS

1,066.10

246.00

295.36

1,607.50

06.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

17.40

32.52

549.38

16.48

565.85

06.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

8.61

19.79

108.74

61.62

170.39

06.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

4.10

100.02

132.29

31.76

410.08

06.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

15.77

2.57

26.27

14.16

40.53

06.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

10.98

21.68

231.12

6.93

238.05

06.01.02.06

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

10.98

16.63

18.30

164.41

182.60

06.01.03

CONCRETO SIMPLE

1,237.58

2,213.43

123.78

3,575.02

06.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

6.38

44.20

72.99

187.95

21.11

282.00

06.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

m3

2.77

297.06

160.96

640.02

21.90

822.86

06.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

25.94

40.32

594.36

433.53

17.84

1,045.90

06.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

2.59

333.45

235.04

592.27

36.32

863.64

06.01.03.05

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

15.77

35.55

174.23

359.66

26.61

560.62

06.01.04

CONCRETO ARMADO

6,895.29

14,352.04

408.45

21,649.80

06.01.04.01

ZAPATAS

215.21

1,439.80

38.80

1,692.82

06.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

3.00

424.81

150.65

1,086.89

36.87

1,274.43

06.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

85.56

4.89

06.01.04.02

VIGAS DE CIMENTACION

Cliente

Metrado

Precio S/.

34.22

Mano de Obra

13.19

Material

Equipo

246.00

Costo al

07/03/2015

Parcial S/.

Subcontrato

64.56

352.91

1.93

418.39

947.09

2,124.54

56.27

3,126.39
Fecha :

20/04/2015 12:43:44p.m.

S10

15

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

06.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

2.35

436.48

142.17

851.41

32.15

06.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

18.80

51.79

603.10

352.62

18.09

973.65

06.01.04.02.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

223.17

5.05

201.82

920.51

6.03

1,127.01

06.01.04.03

COLUMNAS

1,314.99

2,285.23

72.59

3,671.08

06.01.04.03.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

0.31

503.99

43.38

105.78

7.08

156.24

06.01.04.03.02

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

1.47

510.57

205.71

511.27

33.57

750.54

06.01.04.03.03

COLUMNA ENCOFRADO Y DESENCOFRADO

m2

22.77

53.36

788.46

402.76

23.66

1,215.01

06.01.04.03.04

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

306.79

5.05

06.01.04.04

VIGAS

06.01.04.04.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

3.28

06.01.04.04.02

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

06.01.04.04.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

06.01.04.05

LOSAS ALIGERADAS

06.01.04.05.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

2.29

06.01.04.05.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

06.01.04.05.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

06.01.04.05.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

06.01.04.06

MUROS Y TABIQUES DE ALBAILERIA

06.01.04.06.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

19.53

06.01.04.06.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

19.56

06.01.04.06.03

ALAMBRE REFUERZO HORIZONTAL EN ALBAILERIA #8

kg

4.88

06.02

ARQUITECTURA

06.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

06.02.01.01

TARRAJEO PRIMARIO, MORTERO 1:5 C:A

m2

4.62

18.23

06.02.01.02

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

55.52

06.02.01.03

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

06.02.01.04

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

06.02.01.05

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

06.02.01.06

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,025.73

277.44

1,265.42

8.28

1,549.29

1,640.66

3,309.75

118.66

5,066.92

513.12

458.99

1,140.78

83.26

1,683.03

25.93

55.16

831.84

573.33

24.96

1,430.30

386.85

5.05

349.83

1,595.64

10.44

1,953.59

1,450.20

2,641.53

82.31

4,174.48

481.64

259.88

796.46

46.61

1,102.96

26.19

53.18

929.59

435.32

27.88

1,392.78

kg

144.02

5.05

130.24

594.04

3.89

727.30

und

218.22

4.36

130.49

815.71

3.93

951.44

1,327.14

2,551.19

39.82

3,918.11

125.29

856.18

1,564.89

25.69

2,446.91

73.77

468.75

960.27

14.06

1,442.94

5.79

2.21

26.03

0.07

28.26

10,050.62

9,547.90

593.87

20,191.23

3,382.24

1,030.10

101.48

4,513.32

51.84

30.83

1.56

84.22

32.19

1,332.48

415.02

39.97

1,787.19

46.29

35.72

1,269.67

346.03

38.09

1,653.48

9.89

28.34

208.09

66.01

6.24

280.28

m2

12.17

39.75

315.15

159.05

9.46

483.76

VESTIDURA DE DERRAMES 1:5 C:A

12.04

9.81

101.81

13.16

3.06

118.11

06.02.01.07

BRUAS SEGUN DETALLE 1 X 1 cm

16.95

6.27

103.20

06.02.02

CIELO RASOS

06.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

06.02.03

PISOS Y PAVIMENTOS

06.02.03.01

CONTRAPISO DE 40 MM

m2

15.77

06.02.03.02

PISO LOSETA VENECIANA 30 X 30 CM COLOR CLARO

m2

15.77

06.02.04

CONTRAZOCALOS

3.10

106.28

833.88

42.02

2,277.26

1,400.98

833.88

42.02

2,277.26

469.72

1,128.55

40.83

1,639.29

31.26

204.28

255.84

32.86

492.97

72.69

265.44

872.71

7.97

1,146.32

308.33

178.56

9.25

496.40

1,400.98
m2

49.94

45.60

Fecha :

20/04/2015 12:43:44p.m.

S10

16

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

06.02.04.01

CONTRAZOCALO DE LOSETA VENECIANA COLOR CLARO DE 10 X 30 CM

17.18

16.98

145.28

142.02

4.36

291.72

06.02.04.02

CONTRAZOCALO S/ COLOREAR H= 30CM MEZCLA 1:2 E= 1.5 CM

18.21

11.24

163.05

36.54

4.89

204.68

06.02.05

ZOCALOS

140.65

227.81

4.22

372.65

06.02.05.01

ZOCALO DE MAYOLICA BLANCA 20 X 30 1RA

140.65

227.81

4.22

372.65

06.02.06

CUBIERTAS

280.58

1,775.59

8.41

2,064.61

06.02.06.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

36.16

52.95

273.43

1,632.99

8.20

1,914.67

06.02.06.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

5.10

29.40

7.15

142.60

0.21

149.94

06.02.07

CARPINTERIA DE MADERA

449.58

1,190.51

259.14

1,899.09

06.02.07.01

PUERTA C/ TABLEROS DE MADERA 0.90 X 2.10M

und

1.00

427.62

75.36

350.00

2.26

427.62

06.02.07.02

VENTANA DE MADERA CEDRO C/ SEG

m2

6.47

227.43

374.22

840.51

256.88

1,471.47

06.02.08

CERRAJERIA

98.97

173.68

2.98

275.63

06.02.08.01

BISAGRA CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

12.00

14.70

72.58

101.64

2.18

176.40

06.02.08.02

CERRADURA DOS GOLPES EN PUERTA

pza

1.00

92.72

24.19

67.80

0.73

92.72

06.02.08.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

1.00

6.51

2.20

4.24

0.07

6.51

06.02.09

VIDRIOS CRISTALES Y SIMILARES

211.56

249.79

6.33

467.82

06.02.09.01

VIDRIO SEMIDOBLES

211.56

249.79

6.33

467.82

06.02.10

PINTURAS

06.02.10.01

Cliente

m2

Metrado

Precio S/.

4.62

Mano de Obra

80.66

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

p2

83.39

5.61

1,539.25

431.91

46.18

2,017.25

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

49.94

11.62

430.84

136.51

12.93

580.30

06.02.10.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

12.17

7.18

65.62

19.86

1.97

87.38

06.02.10.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

111.70

9.04

803.15

182.32

24.09

1,009.77

06.02.10.04

PINTURA OLEO 02 MANOS EN DERRAMES

m2

12.04

6.35

64.92

9.78

1.95

76.45

06.02.10.05

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

13.36

15.80

144.07

62.57

4.32

211.09

06.02.10.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

18.21

2.87

06.02.11

VARIOS Y LIMPIEZA

06.02.11.01

MESA DE CONCRETO C/CERAMICO INC. INSTALACIONES

m2

1.00

1,223.51

06.02.11.02

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

2.56

28.13

06.02.12

INSTALACIONES SANITARIAS

06.02.12.01

APARATOS SANITARIOS Y ACCESORIOS

06.02.12.01.01

LAVADERO DE ACERO INOXIDABLE UNA POZA

06.02.12.02

INSTALACIONES SANITARIAS

06.02.12.02.01

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4"

m3

1.37

27.87

37.08

06.02.12.02.02

RED DE DISTRIBUCION TUBERIA PVC - SAL 2"

5.70

27.76

119.92

34.69

06.02.12.02.03

SALIDA DESAGUE DE PVC SAL 2"

pto

2.00

63.73

107.84

19.61

06.02.12.02.04

CODO PVC SAL 2" X 45"

pza

1.00

21.71

19.03

2.11

0.57

21.71

06.02.12.02.05

YEE PVC SAL 2"

pza

1.00

25.14

19.03

5.54

0.57

25.14

06.02.12.02.06

SUMIDERO DE BRONCE 2"

pza

1.00

53.30

28.05

24.41

0.84

53.30

pza

1.00

204.88

30.65

20.87

0.92

52.26

372.60

899.43

23.51

1,295.52

365.87

834.35

23.31

1,223.51

6.73

65.08

0.20

72.01

1,396.16

1,428.09

49.52

2,872.39

30.24

173.73

0.91

204.88

30.24

173.73

0.91

204.88

638.58

343.79

25.51

1,006.42

1.11

38.18

3.60

158.23
127.46

Fecha :

20/04/2015 12:43:44p.m.

S10

17

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

06.02.12.02.07

REGISTROS DE BRONCE 2"

und

1.00

30.76

20.16

10.00

0.60

30.76

06.02.12.02.08

CAJA DE REGISTRO DESAGUE 12" X 24" C/ TAPA CONCRETO

pza

1.00

551.64

287.47

247.43

18.22

551.64

06.02.12.03

SISTEMA DE AGUA FRIA Y CONTRA INCEDIO

137.84

105.18

4.13

247.13

06.02.12.03.01

SALIDA DE AGUA FRIA TUBERIA PVC 1/2"

pto

1.00

90.07

53.92

34.53

1.62

90.07

06.02.12.03.02

TUBERIA PVC CLASE 10 - 1/2"

2.50

12.76

16.84

14.58

0.50

31.90

06.02.12.03.03

VALVULA COMPUERTA DE BRONCE 1/2"

und

1.00

83.80

35.95

46.77

1.08

83.80

06.02.12.03.04

REDUCCION PVC SAP 3/4 A 1/2"

und

1.00

19.97

12.10

7.51

0.36

19.97

06.02.12.03.05

CODO PVC SAL 1/ 2" X 90"

pza

1.00

21.39

06.02.12.04

SISTEMA DE AGUA DE LLUVIA

06.02.12.04.01

CANALETA DE FIERRO GALVANIZADO

10.20

06.02.12.04.02

TUBERIA PVC SAL 4"

12.20

06.02.12.04.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

06.02.12.04.04

ENCOFRADO Y DESENCOFRADO DADO DE CONCRETO

06.02.12.04.05

CONCRETO f'c=140 kg/cm2

06.03

INSTALACIONES ELECTRICAS

06.03.01

SALIDA PARA ELECTRICIDAD Y FUERZA

06.03.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

5.00

06.03.01.02

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

6.00

06.03.01.03

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

06.03.01.04

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

und

06.03.02

CANALIZACION Y/O TUBERIAS

06.03.02.01

TUBERIA PVC - P 20MM

06.03.03

CONEXION A RED EXTERNA Y MEDIDORES

06.03.03.01

ALIM. CAB NYY ( 2- 1 X 4 + 1 - 1X 2.5 ) MM2

3.00

06.03.03.02

CABLE COBRE DESNUDO 1X 16 MM2, PVC - P 20MM

06.03.04

TABLEROS Y CUCHILLAS

06.03.04.01

TD04

und

06.03.05

ARTEFACTOS

06.03.05.01

LAMPARA T/ PLASTICO CUADRADO CON FLUORESCENTE DE 32 W

und

3.00

06.03.05.02

LAMPARA CON REJILLAS Y FLUORESCENTE CIRCULAR 2 X 20W

und

3.00

07

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

19.03

1.79

0.57

21.39

589.50

805.39

18.97

1,413.96

53.58

101.97

441.46

3.06

546.52

16.00

63.11

132.06

4.00

90.17

220.88

133.16

6.63

360.68

m2

2.60

86.90

183.62

36.77

5.51

225.94

m3

0.20

428.10

19.92

61.94

3.77

85.62

1,423.58

2,884.45

42.72

4,350.70

989.05

1,041.16

29.67

2,059.87

85.77

249.75

171.58

7.49

428.85

76.23

201.98

249.36

6.06

457.38

3.00

67.40

101.00

98.19

3.03

202.20

1.00

971.44

436.32

522.03

13.09

971.44

106.16

45.56

3.18

154.85

106.16

45.56

3.18

154.85

56.17

363.22

1.69

421.07

29.37

19.87

67.61

0.60

88.11

3.60

92.49

36.30

295.61

1.09

332.96

56.52

1,115.25

1.70

1,173.47

1.00

1,173.47

56.52

1,115.25

1.70

1,173.47

215.68

319.26

6.48

541.44

92.11

107.84

165.24

3.24

276.33

88.37

107.84

154.02

3.24

265.11

VIVIENDA UNIDOCENTE

30,156.21

43,601.78

2,390.69

76,141.44

07.01

ESTRUCTURAS

14,835.30

24,873.78

1,516.36

41,219.44

07.01.01

TRABAJOS PRELIMINARES

154.39

40.30

34.81

230.51

07.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

38.74

0.98

36.69

1.10

37.97

07.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

38.74

1.88

39.23

20.15

12.98

72.83

07.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

38.74

3.09

78.47

20.15

20.73

119.71

11.74

13.19

195.20

Fecha :

20/04/2015 12:43:44p.m.

S10

18

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

07.01.02

MOVIMIENTO DE TIERRAS

678.64

3,410.84

07.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

36.10

32.52

1,139.81

34.19

1,173.97

07.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

13.17

19.79

166.33

94.26

260.63

07.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

7.59

100.02

244.90

58.80

759.15

07.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

29.21

2.57

48.67

26.22

75.07

07.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

29.81

21.68

627.48

18.83

646.28

07.01.02.06

ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINARIA

m3

29.81

16.63

49.69

446.34

495.74

07.01.03

CONCRETO SIMPLE

2,563.38

4,597.76

238.34

7,399.98

07.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

8.77

44.20

100.34

258.37

29.03

387.63

07.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

m3

6.51

297.06

378.29

1,504.16

51.47

1,933.86

07.01.03.03

SUB ZAPATA MEZCLA 1:10 CEMENTO - HORMIGON 30% PG

m3

1.06

300.90

64.12

244.92

9.91

318.95

07.01.03.04

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

57.39

40.32

1,314.97

959.14

39.46

2,313.96

07.01.03.05

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

4.22

333.45

382.95

965.01

59.18

1,407.16

07.01.03.06

FALSO PISO DE H = 4" CON MEZCLA 1:8

m2

29.21

35.55

322.71

666.16

49.29

1,038.42

07.01.04

CONCRETO ARMADO

9,840.65

19,780.32

564.57

30,178.11

07.01.04.01

ZAPATAS

254.73

1,711.12

46.78

2,011.50

07.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

3.63

424.81

182.29

1,315.15

44.62

1,542.06

07.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

96.00

4.89

72.44

395.97

2.16

469.44

07.01.04.02

VIGA DE CIMENTACION

887.92

2,053.31

52.00

2,991.68

07.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

2.14

436.48

129.47

775.32

29.27

934.07

07.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

m2

17.10

51.79

548.57

320.73

16.46

885.61

07.01.04.02.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

232.08

5.05

209.88

957.26

6.27

1,172.00

07.01.04.03

COLUMNAS

1,275.39

2,423.86

73.64

3,770.93

07.01.04.03.01

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

1.90

510.57

265.88

660.82

43.40

970.08

07.01.04.03.02

COLUMNA ENCOFRADO Y DESENCOFRADO

m2

20.26

53.36

701.55

358.37

21.05

1,081.07

07.01.04.03.03

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

340.55

5.05

07.01.04.04

VIGAS

07.01.04.04.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

4.50

07.01.04.04.02

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

07.01.04.04.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

07.01.04.05

LOSAS ALIGERADAS

07.01.04.05.01

LOSA ALIGERADAS, CONCRETO f'c=210 kg/cm2

m3

4.38

07.01.04.05.02

LOSA ALIGERADAS, ENCOFRADO Y DESENCOFRADO

m2

07.01.04.05.03

LOSA ALIGERADAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

07.01.04.05.04

LOSA ALIGERADAS, LADRILLO HUECO TECHO 0.30 X 0.30 X 0.15 M

07.01.04.06

MUROS Y TABIQUES DE ALBAILERIA

Cliente

Und.

Metrado

Precio S/.

Mano de Obra
2,276.88

Material
455.40

455.40

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

307.96

1,404.67

9.19

1,719.78

2,344.34

4,662.01

165.60

7,168.92

513.12

629.71

1,565.09

114.23

2,309.04

38.03

55.16

1,220.00

840.88

36.60

2,097.73

546.96

5.05

494.63

2,256.04

14.77

2,762.15

3,147.02

4,996.55

168.63

8,312.96

481.64

497.07

1,523.36

89.14

2,109.58

61.92

53.18

2,197.78

1,029.23

65.93

3,292.91

kg

250.41

5.05

226.45

1,032.86

6.76

1,264.57

und

377.50

4.36

225.72

1,411.10

6.80

1,645.90

1,931.25

3,933.47

57.92

5,922.12
Fecha :

20/04/2015 12:43:44p.m.

S10

19

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

07.01.04.06.01

MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

2.36

125.29

103.46

189.11

3.10

295.68

07.01.04.06.02

MURO DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

76.27

73.77

1,827.79

3,744.36

54.82

5,626.44

07.02

ARQUITECTURA

11,753.37

12,823.02

767.45

25,344.10

07.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

4,738.96

1,393.50

142.17

6,273.65

07.02.01.01

TARRAJEO PRIMARIO, MORTERO 1:5 C:A

m2

18.49

18.23

207.48

123.39

6.22

337.07

07.02.01.02

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

93.85

32.19

2,252.40

701.56

67.57

3,021.03

07.02.01.03

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

53.93

35.72

1,479.24

403.16

44.38

1,926.38

07.02.01.04

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

12.22

28.34

257.11

81.55

7.71

346.31

07.02.01.05

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

m2

5.85

39.75

151.50

76.45

4.55

232.54

07.02.01.06

VESTIDURA DE DERRAMES 1:5 C:A

6.75

9.81

57.08

7.39

1.71

66.22

07.02.01.07

BRUAS SEGUN DETALLE 1 X 1 cm

54.88

6.27

334.15

10.03

344.10

07.02.02

CIELO RASOS

07.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

m2

55.60

45.60

07.02.03

PISOS Y PAVIMENTOS

07.02.03.01

CONTRAPISO DE 40 MM

m2

28.27

07.02.03.02

PISO LOSETA VENECIANA 30 X 30 CM COLOR CLARO

m2

07.02.04

CONTRAZOCALOS

07.02.04.01

CONTRAZOCALO DE LOSETA VENECIANA COLOR CLARO DE 10 X 30 CM

07.02.04.02

CONTRAZOCALO S/ COLOREAR H= 30CM MEZCLA 1:2 E= 1.5 CM

07.02.05

ZOCALOS

07.02.05.01

ZOCALO DE MAYOLICA BLANCA 20 X 30 1RA

07.02.06

CUBIERTAS

07.02.06.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

58.43

07.02.06.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

6.40

07.02.07

CARPINTERIA DE MADERA

07.02.07.01

PUERTA DE MADERA CONTRAPLACADA DE 0.90 X 2.40 M

und

1.00

07.02.07.02

PUERTA DE MADERA CONTRAPLACADA DE 0.80 X 2.20 M

und

2.00

07.02.07.03

PUERTA DE MADERA APANELADA DE 1.00 X 2.40M

und

07.02.07.04

VENTANA DE MADERA CEDRO C/ SEG

07.02.08

CERRAJERIA

07.02.08.01

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,559.76

928.39

46.79

2,535.36

1,559.76

928.39

46.79

2,535.36

842.05

2,023.07

73.18

2,938.67

31.26

366.21

458.63

58.90

883.72

28.27

72.69

475.84

1,564.44

14.28

2,054.95

478.92

267.18

14.38

760.87

25.09

16.98

212.17

207.42

6.37

426.03

29.79

11.24

266.75

59.76

8.01

334.84

538.55

872.34

16.15

1,426.88

538.55

872.34

16.15

1,426.88

450.82

2,817.66

13.52

3,282.03

52.95

441.85

2,638.71

13.25

3,093.87

29.40

8.97

178.95

0.27

188.16

721.07

2,813.30

376.24

3,910.48

396.57

45.21

350.00

1.36

396.57

396.57

90.43

700.00

2.71

793.14

1.00

596.57

45.21

550.00

1.36

596.57

m2

9.34

227.43

540.22

1,213.30

370.81

2,124.20

50.58

105.92

1.53

158.03

BISAGRA CAPUCHINA ALUMINIZADA DE 4" PESADA EN PUERTA

pza

4.00

14.70

24.19

33.88

0.73

58.80

07.02.08.02

CERRADURA DOS GOLPES EN PUERTA

pza

1.00

92.72

24.19

67.80

0.73

92.72

07.02.08.03

MANIJA DE BRONCE 4" P/ PUERTAS

pza

1.00

6.51

2.20

4.24

0.07

6.51

07.02.09

VIDRIOS CRISTALES Y SIMILARES

254.96

301.04

7.63

563.81

07.02.09.01

VIDRIO SEMIDOBLES

254.96

301.04

7.63

563.81

07.02.10

PINTURAS

1,751.83

466.27

52.55

2,270.81

m2

p2

17.69

100.50

80.66

5.61

Fecha :

20/04/2015 12:43:44p.m.

S10

20

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

07.02.10.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

55.60

11.62

479.68

151.98

14.39

07.02.10.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

2.68

7.18

14.45

4.37

0.43

19.24

07.02.10.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

154.93

9.04

1,113.99

252.87

33.42

1,400.57

07.02.10.04

PINTURA OLEO 02 MANOS EN DERRAMES

m2

6.75

6.35

36.39

5.48

1.09

42.86

07.02.10.05

PINTURA BARNIZ 02 MANOS EN CARP. MADERA

m2

8.08

15.80

87.14

37.84

2.62

127.66

07.02.10.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

11.99

2.87

07.02.11

VARIOS Y LIMPIEZA

07.02.11.01

MESA DE CONCRETO C/CERAMICO INC. INSTALACIONES

07.03

INSTALACIONES SANITARIAS

07.03.01

APARATOS SANITARIOS Y ACCESORIOS

07.03.01.01

INODORO TANQUE BAJO DE LOSA 1RA CALIDAD ADULTO

pza

1.00

336.92

07.03.01.02

GRIFO CROMADO DE 1/2"

und

1.00

07.03.01.03

ACCESORIOS EN DUCHA

und

07.03.01.04

LAVATORIO DE PARED BLANCO INC, ACCESORIOS

07.03.01.05

LAVADERO DE ACERO INOXIDABLE UNA POZA

07.03.02

INSTALACIONES SANITARIAS

07.03.02.01

SALIDA DESAGUE DE PVC SAL 2"

pto

3.00

07.03.02.02

SALIDA DESAGUE DE PVC-SAL 4"

pto

1.00

07.03.02.03

SALIDA PARA VENTILACION

pto

07.03.02.04

TUBERIA DE PVC SAL 2"

07.03.02.05

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

646.07

20.18

13.73

0.60

34.41

365.87

834.35

23.31

1,223.51

365.87

834.35

23.31

1,223.51

3,567.54

5,904.98

106.88

9,577.90

270.02

755.90

8.11

1,034.03

71.89

262.87

2.16

336.92

64.53

42.08

21.19

1.26

64.53

1.00

94.32

53.92

38.78

1.62

94.32

pza

1.00

333.38

71.89

259.33

2.16

333.38

pza

1.00

204.88

m2

1.00

1,223.51

30.24

173.73

0.91

204.88

940.99

941.77

28.07

1,909.37

63.73

161.76

29.45

191.19

72.44

53.92

18.52

72.44

1.00

72.76

53.92

18.84

72.76

7.30

13.55

37.76

61.12

98.92

TUBERIA DE PVC SAL 4"

3.45

16.00

17.84

37.35

07.03.02.06

REGISTRO DE BRONCE 4"

und

2.00

33.47

40.32

25.42

1.21

66.94

07.03.02.07

SUMIDERO DE BRONCE ROSCADO 3"

pza

3.00

80.90

126.24

112.67

3.79

242.70

07.03.02.08

CAJA DE SUMIDERO CON REJILLA DE FIERRO

und

3.00

185.86

161.76

390.97

4.85

557.58

07.03.02.09

CAJA DE REGISTRO DESAGUE 12" X 24" C/ TAPA CONCRETO

pza

1.00

551.64

287.47

247.43

18.22

551.64

07.03.03

SISTEMA DE AGUA FRIA Y CONTRA INCEDIO

523.34

410.77

15.70

949.79

07.03.03.01

SALIDA DE AGUA FRIA TUBERIA PVC 1/2"

pto

6.00

90.07

323.52

207.14

9.71

540.42

07.03.03.02

TUBERIA PVC CLASE 10 - 1/2"

8.87

12.76

59.72

51.74

1.79

113.18

07.03.03.03

VALVULA COMPUERTA DE BRONCE 1/2"

und

2.00

83.80

71.89

93.54

2.16

167.60

07.03.03.04

REDUCCION PVC SAP 3/4 A 1/2"

und

1.00

19.97

12.10

7.51

0.36

19.97

07.03.03.05

CAJA DE MADERA PARA VALVULA

und

2.00

54.31

56.11

50.84

1.68

108.62

07.03.04

INSTALACIONES ELECTRICAS

1,833.19

3,796.54

55.00

5,684.71

07.03.04.01

SALIDA PARA ELECTRICIDAD Y FUERZA

1,267.27

1,657.97

38.02

2,963.37

07.03.04.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

12.00

85.77

599.40

411.75

17.98

1,029.24

07.03.04.01.02

SALIDA

pto

3.00

231.03

96.89

593.27

2.91

693.09

07.03.04.01.03

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

4.00

67.40

134.66

130.92

4.04

269.60

TOMACORRIENTE SIMPLE CON LINEA DE TIERRA

55.20

Fecha :

20/04/2015 12:43:44p.m.

S10

21

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

07.03.04.01.04

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

und

07.03.04.02

CANALIZACION Y/O TUBERIAS

07.03.04.02.01

TUBERIA DE PVC - P 20MM

07.03.04.03

CONEXION A RED EXTERNA Y MEDIDORES

07.03.04.03.01

ALIM. CAB NYY ( 2- 1 X 4 + 1 - 1X 2.5 ) MM2

3.00

07.03.04.03.02

CABLE COBRE DESNUDO 1X 16 MM2, PVC - P 20MM

3.60

07.03.04.04

TABLEROS Y CUCHILLAS

07.03.04.04.01

TD03

07.03.04.05

ARTEFACTOS

07.03.04.05.01

ART. FLUORESCENTE 2/36W P/ADOSAR (SIM. E JOSFEL)

und

3.00

07.03.04.05.02

ART. FLUORESCENTE 2/36W P/EMPOTRAR MARCO ALUM. (DIF. PLAST)

und

2.00

08

Cliente

Metrado

Precio S/.
1.00

32.41

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

436.32

522.03

13.09

971.44

293.09

125.76

8.79

427.49

293.09

125.76

8.79

427.49

56.17

363.22

1.69

421.07

29.37

19.87

67.61

0.60

88.11

92.49

36.30

295.61

1.09

332.96

56.52

1,115.25

1.70

1,173.47

971.44

13.19

56.52

1,115.25

1.70

1,173.47

160.14

534.34

4.80

699.31

113.95

84.78

254.51

2.54

341.85

178.73

75.36

279.83

2.26

357.46

CERCO PERIMETRICO

65,772.05

97,296.65

4,991.95

168,039.80

08.01

ESTRUCTURAS

41,059.47

70,369.55

4,034.90

115,440.38

08.01.01

TRABAJOS PRELIMINARES

433.15

113.10

97.69

646.65

08.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

108.68

0.98

102.94

3.10

106.51

08.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

108.68

1.88

110.07

56.55

36.44

204.32

08.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

108.68

3.09

220.14

56.55

08.01.02

MOVIMIENTO DE TIERRAS

08.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

86.94

08.01.02.02

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

104.33

08.01.02.03

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

104.33

16.63

08.01.03

CONCRETO SIMPLE

08.01.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

08.01.04

CONCRETO ARMADO

08.01.04.01

SOBRECIMIENTO ARMADO

08.01.04.01.01

SOBRECIMIENTO REFORZADO, CONCRETO FC 175 KG/CM2

m3

14.25

08.01.04.01.02

SOBRECIMIENTO REFORZADO, ENCOFRADO Y DESENCOFRADO

m2

189.94

08.01.04.01.03

SOBRECIMIENTO REFORZADO, ACERO DE REFUERZO FY= 4200 KG/ CM2

kg

1,063.26

5.05

08.01.04.02

COLUMNAS

08.01.04.02.01

COLUMNAS, CONCRETO f'c=175 kg/cm2

m3

6.61

08.01.04.02.02

COLUMNA ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

113.67

08.01.04.02.03

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

1,440.95

08.01.04.03

VIGAS

08.01.04.03.01

VIGAS CONCRETO f'c=175 kg/cm2

08.01.04.03.02

VIGAS , ENCOFRADO Y DESENCOFRADO CARAVISTA

08.01.04.03.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

und

m3

m3

1.00

86.94

1,173.47

58.15

335.82

5,115.00

1,710.35

6,824.17

32.52

2,745.02

82.34

2,827.29

21.68

2,196.06

65.88

2,261.87

173.92

1,562.13

1,735.01

687.37

25,826.40

5,052.02

20,087.83

5,052.02

20,087.83

687.37

25,826.40

30,459.30

50,168.62

1,539.49

82,143.16

12,402.33

12,819.25

710.03

25,923.95

481.79

1,551.77

4,929.00

384.67

6,865.51

72.07

9,889.03

3,504.62

296.65

13,688.98

297.06

961.53

4,385.63

28.71

5,369.46

5,365.36

11,683.41

284.02

17,323.79

503.99

924.98

2,255.44

150.99

3,331.37

59.08

3,137.30

3,484.49

94.12

6,715.62

5.05

1,303.08

5,943.48

38.91

7,276.80

4,297.99

8,475.38

293.64

13,060.62

2,664.39

197.49

3,950.61

7.78

507.79

1,088.70

m2

71.10

61.02

2,354.84

1,913.77

70.64

4,338.52

kg

944.85

5.05

854.45

3,897.22

25.51

4,771.49
Fecha :

20/04/2015 12:43:44p.m.

S10

22

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

08.01.04.04

MUROS Y TABIQUES DE ALBAILERIA

08.01.04.04.01

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM CARA VISTA UNA


CARA

08.02

ARQUITECTURA

08.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

08.02.01.01

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

08.02.02

CONTRAZOCALOS

08.02.02.01

CONTRAZOCALO S/ COLOREAR H= 30 CM MEZCLA 1:2 E=1.5 CM

08.02.03

CARPINTERIA METALICA

08.02.03.01

PUERTA METALICA SEGUN DISEO ( H= 2.35 , A= 1.50)

und

1.00

1,595.71

08.02.03.02

REJA METALICA DE 3 X 2.60 m ( INC. CONFECCION E INSTALACION)

61.83

150.00

08.02.04

PINTURAS

4,517.67

1,417.21

135.48

08.02.04.01

PINTURA OLEO 02 MANOS EN VIGAS

m2

71.10

7.18

383.37

116.04

11.50

510.50

08.02.04.02

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

463.83

9.04

3,335.05

757.05

100.05

4,193.02

08.02.04.03

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

474.84

2.87

08.02.05

VARIOS Y LIMPIEZA

08.02.05.01

CERCO DE TUBERIA RELLENO C/ CONCRETO ARMADO PVC D= 4" INC.


PINTADO

09

MUROS DE CONTENCION

09.01

MURO GRAVEDAD

09.01.01

Cliente

Und.

m2

m2

Metrado

Precio S/.

350.16

350.16

474.84

Mano de Obra

73.78

32.19

11.24

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

8,393.62

17,190.58

251.80

25,834.80

8,393.62

17,190.58

251.80

25,834.80

24,712.58

26,927.10

957.05

52,599.42

8,403.84

2,617.57

252.12

11,271.65

8,403.84

2,617.57

252.12

11,271.65

4,251.82

952.53

127.64

5,337.20

4,251.82

952.53

127.64

5,337.20

310.40

10,550.50

9.31

10,870.21

310.40

1,276.00

9.31

1,595.71
9,274.50

9,274.50

6,066.31

799.25

544.12

23.93

1,362.79

7,228.85

11,389.29

432.50

19,054.05

7,228.85

11,389.29

432.50

19,054.05

104,842.43

221,685.91

9,042.86

335,547.54

4,661.62

4,737.79

1,426.32

10,826.09

ESTRUCTURAS

4,661.62

4,737.79

1,426.32

10,826.09

09.01.01.01

MOVIMIENTO DE TIERRAS

2,550.99

1,177.59

3,728.83

09.01.01.01.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

17.96

32.52

567.06

17.01

584.06

09.01.01.01.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

131.66

19.79

1,662.83

942.31

2,605.55

09.01.01.01.03

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

9.43

2.54

15.57

8.39

23.95

09.01.01.01.04

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

13.45

21.68

283.11

8.49

291.60

09.01.01.01.05

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

13.45

16.63

09.01.01.02

CONCRETO ARMADO

09.01.01.02.01

MUROS DE CONTENCION

09.01.01.02.01.01

MUROS DE CONTENCION, CONCRETO FC = 140 KG/ CM2 + 30% PG

m3

10.94

491.99

09.01.01.02.01.02

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO

m2

17.55

42.98

09.01.01.02.02

MUROS Y TABIQUES DE ALBAILERIA

09.01.01.02.02.01

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

09.01.01.03
09.01.01.03.01
09.01.01.03.01.01

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

6.08

09.01.01.03.01.02

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

6.08

75.25

253.21

201.39

223.67

4,622.53

237.17

6,585.19

1,579.65

4,324.04

232.80

6,136.67

1,093.51

4,070.52

218.22

5,382.37

486.14

253.52

14.58

754.30

145.71

298.49

4.37

448.52

145.71

298.49

4.37

448.52

ARQUITECTURA

385.27

115.26

11.56

512.07

REVOQUES ENLUCIDOS Y MOLDADURAS

312.69

90.92

9.38

412.90

32.19

145.92

45.46

4.38

195.72

35.72

166.77

45.46

5.00

217.18

22.42
1,725.36

m2

6.08

73.77

Fecha :

20/04/2015 12:43:44p.m.

S10

23

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

09.01.01.03.02

VARIOS Y LIMPIEZA

09.01.01.03.02.01

TUBERIA DE PVC SAL 2" - DRENAJE

09.02

MURO VOLADIZO

09.02.01
09.02.01.01
09.02.01.01.01

TRAZO Y REPLANTEO PRELIMINAR

m2

53.54

09.02.01.01.02

EXCAVACION MANUAL EN TERRENO COMPACTADO

m3

09.02.01.01.03

ELIMINACION MANUAL DE MATERIAL EXCEDENTE D= 30M

09.02.01.01.04

ELIMINACION DE MAT. EXCEDENTE C/ EQUIPO

09.02.01.01.05

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

99.17

72.58

24.34

2.18

72.58

24.34

2.18

99.17

100,180.81

216,948.12

7,616.54

324,721.45

ESTRUCTURAS

93,236.67

214,210.83

7,408.22

314,830.46

MOVIMIENTO DE TIERRAS

60,274.63

184,259.06

4,452.26

248,980.71

1.88

54.22

27.86

17.95

100.66

122.40

128.71

15,295.11

458.85

15,754.10

m3

83.64

91.68

7,445.15

223.34

7,668.12

m3

83.64

16.63

139.43

1,252.34

1,390.93

PERFILADO Y NIVELADO

m2

53.55

33.75

415.55

1,392.09

1,807.31

09.02.01.01.06

RELLENO DE ESTRUCTURAS ( e= 300 mm)

m3

1,535.26

144.77

36,925.17

184,231.20

1,107.69

222,259.59

09.02.01.02

CONCRETO ARMADO
32,962.04

29,951.77

2,955.96

65,849.75

m3

61.65

606.49

12,243.69

22,950.35

2,195.85

37,390.11

9.60

10.33

09.02.01.03

MUROS DE CONTENCION

09.02.01.03.01

MURO DE CONTENCION CONCRETO FC= 210 KG/CM2 PARA MUROS


REFORZADOS

09.02.01.03.02

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO

m2

268.98

42.98

7,450.95

3,885.54

223.52

11,560.76

09.02.01.03.03

MURO DE CONTENCION ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

kg

5,991.19

2.43

12,033.28

2,184.81

361.27

14,558.59

09.02.01.03.04

SOLADO DE CONCRETO F'C= 100 KG/CM2 E=10 CM

m2

81.60

28.68

1,234.12

931.07

175.32

2,340.29

09.02.02

ARQUITECTURA

6,944.14

2,737.29

208.32

9,890.99

09.02.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

2,657.84

724.36

79.74

3,461.27

09.02.02.01.01

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

09.02.02.02

VARIOS Y LIMPIEZA

09.02.02.02.01

FILTRO DE GRAVA DE 1/2" A 3"

m3

22.95

09.02.02.02.02

SUMINISTRO E INSTALACION DE TUBERIA FILTRANTE Y ACCESORIOS

09.02.02.02.03

TUBERIA DE PVC SAL 2" - DRENAJE

10
10.01
10.01.01

TRABAJOS PRELIMINARES

10.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

9.36

0.98

10.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

9.36

1.88

9.48

10.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

9.36

3.09

18.96

10.01.02

MOVIMIENTO DE TIERRAS

1,524.52

10.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

21.06

32.52

10.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

6.37

19.79

10.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

9.55

100.02

308.14

10.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

7.35

2.54

12.13

2,657.84

724.36

79.74

3,461.27

4,286.30

2,012.93

128.58

6,429.72

120.30

1,749.71

958.60

52.49

2,760.89

35.00

14.51

223.23

278.34

6.69

507.85

306.00

10.33

2,313.36

775.99

69.40

3,160.98

TANQUE ELEVADO Y CISTERNA

23,168.37

34,919.34

5,306.98

63,380.27

ESTRUCTURAS

12,215.82

21,540.94

1,167.68

34,910.98

37.31

9.76

8.42

55.69

0.27

9.17

4.88

3.14

17.60

4.88

5.01

28.92

573.00

461.25

2,558.66

664.94

19.95

684.87

80.45

45.59

126.06

73.98

955.19

6.53

18.67

m2

96.90

35.72

8.87

573.00

Fecha :

20/04/2015 12:43:44p.m.

S10

24

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

10.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

20.20

21.68

425.19

12.76

437.94

10.01.02.06

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

20.20

16.63

33.67

302.44

335.93

10.01.03

CONCRETO SIMPLE

10.01.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

m3

0.91

10.01.03.02

CIMIENTOS CORRIDOS ENCOFRADO Y DESENCOFRADO

m2

10.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

10.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

10.01.04

CONCRETO ARMADO

10.01.04.01

COLUMNAS

10.01.04.01.01

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

4.10

10.01.04.01.02

COLUMNA ENCOFRADO Y DESENCOFRADO

m2

10.01.04.01.03

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

10.01.04.02

VIGAS

10.01.04.02.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

2.04

10.01.04.02.02

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

10.01.04.02.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

10.01.04.03

LOSAS MACIZAS

10.01.04.03.01

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

189.35

305.78

12.88

508.00

297.06

52.88

210.26

7.20

270.32

2.28

50.70

80.92

32.25

2.43

115.60

m2

1.87

40.32

42.85

31.25

1.29

75.40

m3

0.14

333.45

12.70

32.02

1.96

46.68

10,464.64

20,652.40

685.13

31,788.63

2,829.13

6,114.24

161.19

9,098.94

510.57

573.74

1,425.97

93.65

2,093.34

39.92

53.36

1,382.32

706.12

41.47

2,130.13

965.44

5.05

873.07

3,982.15

26.07

4,875.47

1,505.73

2,816.01

88.34

4,408.09

513.12

285.47

709.51

51.78

1,046.76

27.85

55.16

893.43

615.79

26.80

1,536.21

kg

361.41

5.05

326.83

1,490.71

9.76

1,825.12

220.27

950.92

19.06

1,189.98

LOSA MACIZA, CONCRETO F'C = 210 KG/CM2

m3

0.63

487.68

73.47

219.12

14.66

307.24

10.01.04.03.02

LOSA MACIZA, ENCOFRADO Y DESENCOFRADO

m2

3.14

213.87

108.99

559.30

3.27

671.55

10.01.04.03.03

LOSA MACIZA, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

41.82

5.05

37.81

172.50

1.13

211.19

10.01.04.04

CISTERNA

3,632.97

6,986.68

269.60

10,884.95

10.01.04.04.01

CISTERNA, CONCRETO f'c=210 kg/cm2

m3

8.62

510.57

1,206.26

2,998.02

196.90

4,401.11

10.01.04.04.02

CISTERNA, ENCOFRADO Y DESENCOFRADO

m2

50.48

53.36

1,747.98

892.91

52.44

2,693.61

10.01.04.04.03

CISTERNA ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

750.54

5.05

678.73

3,095.75

20.26

3,790.23

10.01.04.05

TANQUE ELEVADO

1,887.22

3,032.89

135.26

5,054.02

10.01.04.05.01

TANQUE ELEVADO CONCRETO f'c=210 kg/cm2

m3

4.22

510.57

590.53

1,467.71

96.39

2,154.61

10.01.04.05.02

TANQUE ELEVADO, ENCOFRADO Y DESENCOFRADO

m2

31.01

53.36

1,073.79

548.52

32.22

1,654.69

10.01.04.05.03

TANQUE ELEVADO, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

246.48

5.05

222.90

1,016.66

6.65

1,244.72

10.01.04.06

MUROS Y TABIQUES DE ALBAILERIA

389.32

751.66

11.68

1,152.65

10.01.04.06.01

MUROS DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

m2

8.19

125.29

359.05

656.25

10.77

1,026.13

10.01.04.06.02

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM CARA VISTA UNA


CARA

m2

1.12

73.78

26.85

54.98

0.81

82.63

10.01.04.06.03

ALAMBRE REFUERZO HORIZONTAL EN ALBAILERIA #8

kg

7.58

5.79

10.02

ARQUITECTURA

10.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

10.02.01.01

TARRAJEO EN MUROS INTERIOR, MORTERO 1:5 C:A

m2

8.62

32.19

3.42

40.43

0.10

43.89

8,872.08

6,560.03

604.48

16,035.54

5,399.73

1,821.51

162.01

7,382.31

206.88

64.43

6.21

277.48

Fecha :

20/04/2015 12:43:44p.m.

S10

25

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

10.02.01.02

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

9.43

35.72

258.66

70.50

7.76

336.84

10.02.01.03

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

37.20

28.34

782.68

248.26

23.48

1,054.25

10.02.01.04

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

m2

38.25

39.75

990.52

499.90

29.72

1,520.44

10.02.01.05

VESTIDURA DE DERRAMES 1:5 C:A

1.25

9.81

10.57

1.38

0.32

12.26

10.02.01.06

BRUAS SEGUN DETALLE 1 X 1 cm

89.64

6.27

545.79

16.38

562.04

10.02.01.07

TARRAJEO CON IMPERMEABILIZANTE

m2

54.21

53.82

2,081.67

774.16

62.45

2,917.58

10.02.01.08

TARRAJEO EN MUROS DE CONCRETO

m2

21.79

32.19

522.96

162.88

15.69

701.42

10.02.02

CIELO RASOS

238.46

141.93

7.15

387.60

10.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

m2

8.50

45.60

238.46

141.93

7.15

387.60

10.02.03

PISOS Y PAVIMENTOS

153.34

424.39

31.64

609.47

10.02.03.01

VEREDAS CONCRETO f'c=175 kg/cm2 FROTACHADO Y BRUADO ( 10CM)

m2

0.73

54.23

8.19

29.71

1.70

39.59

10.02.03.02

LOSA CONCRETO - 175 KG/CM2 FROTACHADO Y BRUADO (125CM)

m2

9.70

58.75

145.15

394.68

29.94

569.88

10.02.04

CONTRAZOCALOS

182.31

40.84

5.47

228.85

10.02.04.01

CONTRAZOCALO S/ COLOREAR H= 30 CM MEZCLA 1:2 E=1.5 CM

20.36

11.24

182.31

40.84

5.47

228.85

10.02.05

CARPINTERIA METALICA

1,623.30

3,474.88

371.29

5,469.48

10.02.05.01

PUERTA METALICA CUARTO DE MAQUINAS ( 2.05 X .70)

und

1.00

3,285.81

310.40

2,966.10

9.31

3,285.81

10.02.05.02

ESCALERA METALICA DE GATO TUBO F G 1 1/2 Y 1"

6.80

288.28

1,144.58

458.78

356.93

1,960.30

10.02.05.03

ESCALERA DE GATO DE ALUMINIO EN CISTERNA

und

1.00

223.37

168.32

50.00

5.05

223.37

10.02.06

CERRAJERIA

26.39

72.04

0.80

99.23

10.02.06.01

CERRADURA DOS GOLPES EN PUERTA

pza

1.00

92.72

24.19

67.80

0.73

92.72

10.02.06.02

MANIJA DE BRONCE 4" P/ PUERTAS

pza

1.00

6.51

2.20

4.24

0.07

6.51

10.02.07

PINTURAS

732.81

219.13

21.99

973.64

10.02.07.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

8.50

11.62

73.33

23.23

2.20

98.77

10.02.07.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

38.25

7.18

206.25

62.43

6.19

274.64

10.02.07.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

55.25

9.04

397.26

90.18

11.92

499.46

10.02.07.04

PINTURA OLEO 02 MANOS EN DERRAMES

m2

0.20

6.35

1.07

0.16

0.03

1.27

10.02.07.05

PINTURA ANTICORROSIVO - ESMALTE 02 MANOS EN CARP. METALIC

m2

2.87

14.31

20.63

19.80

0.62

41.07

10.02.07.06

PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H= 30 CM

20.36

2.87

10.02.08

VARIOS Y LIMPIEZA

10.02.08.01

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E= 1"

19.26

10.02.08.02

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

2.19

10.02.08.03

CUBIERTA DE LADRILLO PASTELERO

m2

9.73

10.02.08.04

MANGUITO DE PVC - SAP 1 1/2" X 10CM, FIERRO 1/2" X 80 CM

und

6.00

10.03

INSTALACIONES SANITARIAS

10.03.01

SISTEMA DE AGUA PARA TANQUE Y CISTERNA

10.03.01.01

TUBERIA DE F G 4"

Cliente

Metrado

Precio S/.

0.50

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

34.27

23.33

1.03

58.43

515.74

365.31

4.13

884.96

9.21

33.29

143.15

1.00

177.38

28.13

5.76

55.67

0.17

61.60

24.97

98.69

141.41

2.96

242.96

67.17

378.00

25.08

1,299.93

4,737.49

3,511.39

9,548.88

1,299.93

4,737.49

3,511.39

9,548.88

3.60

155.68

0.11

159.39

318.77

403.02

Fecha :

20/04/2015 12:43:44p.m.

S10

26

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

10.03.01.02

TUBERIA DE F G 2"

14.40

26.07

103.54

268.68

3.11

375.41

10.03.01.03

TUBERIA DE F G 1 1/2"

26.80

23.10

192.70

420.49

5.78

619.08

10.03.01.04

TUBERIA PVC CLASE 10 DE 2"

4.00

43.14

155.20

12.71

4.66

172.56

10.03.01.05

TUBERIA DE F G 3/ 4"

0.50

19.50

5.39

4.19

0.16

9.75

10.03.01.06

VALVULA COMPUERTA DE BRONCE 2"

und

1.00

122.21

35.95

85.18

1.08

122.21

10.03.01.07

VALVULA COMPUERTA DE BRONCE 1 1/ 2"

und

4.00

85.65

143.79

194.48

4.31

342.60

10.03.01.08

VALVULA COMPUERTA DE BRONCE 3/4"

und

1.00

69.81

35.95

32.78

1.08

69.81

10.03.01.09

VALVULA CHECK DE BRONCE DE 1 1/2"

und

3.00

141.24

107.84

312.62

3.24

423.72

10.03.01.10

VALVULA FLOTADORA DE BRONCE 1 1/4"

und

1.00

200.91

35.95

163.88

1.08

200.91

10.03.01.11

EQUIPO DE BOMBEO , 02 ELECTROBOMBA 1.4 HP

glb

1.00

6,141.52

120.96

2,587.23

3,433.33

6,141.52

10.03.01.12

TAPA SANITARIA DE FIERRO EN CISTERNA Y TANQUE ALTO

und

2.00

83.44

60.48

104.57

1.81

166.88

10.03.01.13

REBOSE DE CISTERNA DE F G 4"

und

1.00

65.10

12.10

47.90

5.10

65.10

10.03.01.14

REBOSE DE CISTERNA DE F G 2"

und

1.00

45.26

12.10

32.80

0.36

45.26

10.03.01.15

ABRAZADERA DE FIJACION DE TUBO

und

15.00

20.60

148.58

156.09

4.46

309.00

10.03.01.16

ROMPE AGUA

pza

8.00

40.71

125.80

158.21

41.72

325.68

10.04

INSTALACIONES ELECTRICAS

780.54

2,080.88

23.43

2,884.87

10.04.01

SALIDA PARA ELECTRICIDAD Y FUERZA

652.13

855.47

19.57

1,527.18

10.04.01.01

SALIDA DE TECHO ( CENTRO DE LUZ)

pto

3.00

85.77

149.85

102.95

4.50

257.31

10.04.01.02

SALIDA PARA TOMACORRIENTE SIMPLE CON LINEA DE TIERRA

pto

1.00

231.03

32.30

197.76

0.97

231.03

10.04.01.03

SALIDA DE PARED P/ INTERRUPTOR SIMPLE

pto

1.00

67.40

33.66

32.73

1.01

67.40

10.04.01.04

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

und

1.00

971.44

436.32

522.03

13.09

971.44

10.04.02

TABLEROS Y CUCHILLAS

56.52

1,115.25

1.70

1,173.47

10.04.02.01

TD01

und

1.00

1,173.47

56.52

1,115.25

1.70

1,173.47

10.04.03

ARTEFACTOS

71.89

110.16

2.16

184.22

10.04.03.01

LAMPARA T/ PLASTICO CUADRADO CON FLUORESCENTE DE 32 W

71.89

110.16

2.16

184.22

11

TANQUE SEPTICO

9,558.02

12,255.23

2,426.69

24,239.51

11.01

ESTRUCTURAS

9,558.02

7,170.48

2,426.69

19,154.76

11.01.01

TRABAJOS PRELIMINARES

199.28

52.04

44.95

297.50

11.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

50.00

0.98

47.36

1.43

49.00

11.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

50.00

1.88

50.64

26.02

16.77

94.00

11.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

50.00

3.09

101.28

26.02

26.75

154.50

6,455.46

646.25

Cliente

und

Metrado

Precio S/.

2.00

Mano de Obra

92.11

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

11.01.02

MOVIMIENTO DE TIERRAS

2,235.34

9,335.56

11.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

103.32

32.52

3,262.20

97.85

3,359.97

11.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

1.46

19.79

18.44

10.45

28.89

11.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. ZARANDEADO

m3

1.95

46.84

36.94

11.01.02.04

RELLENO Y COMP. MANUAL C/ ARENA

m3

5.17

149.93

125.11

646.25

54.43

91.34

3.75

775.14
Fecha :

20/04/2015 12:43:44p.m.

S10

27

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

11.01.02.05

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

2.84

2.54

4.69

2.53

7.21

11.01.02.06

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

132.42

21.68

2,787.33

83.62

2,870.87

11.01.02.07

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

132.42

16.63

11.01.03

CONCRETO SIMPLE

11.01.03.01

CONCRETO f'c=140 kg/cm2

m3

0.96

11.01.03.02

CONCRETO f'c=175 kg/cm2

m3

11.01.03.03

ENCOFRADO Y DESENCOFRADO.

11.01.03.04
11.01.03.05
11.01.04

CONCRETO ARMADO

11.01.04.01

LOSAS MACIZAS

11.01.04.01.01

LOSA MACIZA, CONCRETO F'C = 210 KG/CM2

m3

0.72

487.68

11.01.04.01.02

LOSA MACIZA, ENCOFRADO Y DESENCOFRADO

m2

13.15

213.87

11.01.04.01.03

LOSA MACIZA, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

49.52

5.05

11.01.05

MUROS Y TABIQUES DE ALBAILERIA

11.01.05.01

MURO DE LADRILLO KK TIPO IV CABEZA M: 1:4, J: 1.5 CM

11.02

INSTALACIONES SANITARIAS

5,084.75

5,084.75

11.02.01

APARATOS SANITARIOS Y ACCESORIOS

5,084.75

5,084.75

11.02.01.01

TANQUE BIODIGESTOR 3000 LT ( INC. ACCESORIOS)

12

PORTADA DE INGRESO

12.01

ESTRUCTURAS

12.01.01

TRABAJOS PRELIMINARES

12.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

56.48

0.98

53.50

12.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

56.48

1.88

57.20

12.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

56.48

3.09

12.01.02

MOVIMIENTO DE TIERRAS

12.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

25.67

32.52

810.50

12.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

3.78

19.79

47.74

27.05

74.81

12.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

8.75

100.02

282.33

67.78

875.18

12.01.02.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

30.45

2.54

50.28

27.09

77.34

12.01.02.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

28.46

21.68

599.06

17.97

617.01

12.01.02.06

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

28.46

16.63

12.01.03

CONCRETO SIMPLE

12.01.03.01

SOLADO DE CONCRETO ( e= 0.10 m ) MEZCLA C:H 1:10

m2

12.67

12.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO - HORMIGON 30% PIEDRA

und

12.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,982.71

2,202.14

1,580.29

2,326.72

92.48

3,999.47

428.10

95.62

297.29

18.06

410.98

1.89

461.81

188.25

649.02

35.54

872.82

m2

20.90

69.95

1,088.14

341.21

32.64

1,461.96

RELLENO C/ PIEDRA SELECCIONADA DE 1/2"

m3

8.35

144.77

200.83

1,002.00

6.02

1,208.83

RELLENO C/ PIEDRA SELECCIONADA DE 6"

m3

0.31

144.77

7.45

37.20

0.22

44.88

585.18

2,796.93

31.79

3,413.60

585.18

2,796.93

31.79

3,413.60

83.96

250.41

16.76

351.13

456.44

2,342.27

13.69

2,812.39

m2

und

16.83

1.00

125.29

220.75

44.78

204.25

1.34

250.08

737.81

1,348.54

22.13

2,108.63

737.81

1,348.54

22.13

2,108.63

5,084.75

5,084.75

5,084.75
10,875.02

21,486.16

1,320.39

33,675.18

7,870.80

14,780.29

1,121.85

23,766.61

225.11

58.76

50.77

336.05

1.61

55.35

29.38

18.94

106.18

114.41

29.38

30.22

174.52

1,837.35

525.00

590.34

2,952.42

24.31

834.79

525.00

426.14

473.29

228.81

631.28

51.59

911.52

44.20

144.97

373.27

41.92

560.01

0.94

297.06

54.62

217.19

7.43

279.24

0.80

40.32

18.33

13.38

0.55

32.26

47.44

Fecha :

20/04/2015 12:43:44p.m.

S10

28

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

12.01.03.04

SOBRECIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO - HORMIGON 25% PG

m3

12.01.04

CONCRETO ARMADO

12.01.04.01

ZAPATAS

12.01.04.01.01

ZAPATAS, CONCRETO FC = 210 KG/ CM2

m3

6.33

424.81

12.01.04.01.02

ZAPATAS, ACERO DE REFUERZO FY= 4200 KG/CM2

kg

117.02

4.89

12.01.04.02

VIGA DE CIMENTACION

12.01.04.02.01

VIGAS DE CIMENTACION, CONCRETO f'c=210 kg/cm2

m3

12.01.04.02.02

VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO

12.01.04.02.03

VIGAS DE CIMENTACION, ACERO DE REFUERZO fy=4200 Kg/cm2.

12.01.04.03

COLUMNAS

12.01.04.03.01

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

1.43

12.01.04.03.02

COLUMNA ENCOFRADO Y DESENCOFRADO

m2

22.12

12.01.04.03.03

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

155.76

12.01.04.04

VIGAS

12.01.04.04.01

VIGAS CONCRETO f'c=210 kg/cm2

m3

0.38

12.01.04.04.02

VIGAS , ENCOFRADO Y DESENCOFRADO

m2

12.01.04.04.03

VIGAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

12.01.04.05

LOSAS MACIZAS

12.01.04.05.01

LOSA MACIZA, CONCRETO F'C = 210 KG/CM2

m3

0.91

487.68

12.01.04.05.02

LOSA MACIZA, ENCOFRADO Y DESENCOFRADO

m2

8.40

213.87

12.01.04.05.03

LOSA MACIZA, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

60.14

5.05

12.01.04.06

MUROS DE CONTENCION

12.01.04.06.01

MUROS DE CONTENCION, CONCRETO FC = 175 KG/ CM2

m3

5.78

12.01.04.06.02

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO

m2

52.10

12.01.04.06.03

MUROS DE CONTENCION, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

12.01.05

MUROS Y TABIQUES DE ALBAILERIA

12.01.05.01

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

m2

12.02

Cliente

Metrado

Precio S/.
0.12

Mano de Obra
333.45

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

10.89

27.44

1.69

40.01

5,200.17

12,788.10

417.77

18,398.84

406.17

2,776.03

80.43

3,261.28

317.88

2,293.36

77.80

2,689.05

88.29

482.67

2.63

572.23

133.11

313.33

7.79

454.00

115.94

4.38

139.67
130.51

0.32

436.48

19.35

m2

2.52

51.79

80.84

47.26

2.43

kg

36.40

5.05

32.92

150.13

0.98

183.82

1,106.90

1,531.10

59.85

2,697.03

510.57

200.10

497.36

32.66

730.12

53.36

765.95

391.27

22.98

1,180.32

5.05

140.85

642.47

4.21

786.59

195.15

388.50

13.90

597.30

513.12

53.17

132.16

9.65

194.99

3.15

55.16

101.05

69.65

3.03

173.75

45.26

5.05

40.93

186.69

1.22

228.56

452.07

2,060.76

31.54

2,544.01

106.12

316.50

21.17

443.79

291.56

1,496.20

8.75

1,796.51

54.39

248.06

1.62

303.71

2,906.77

5,718.38

224.26

8,845.22

510.33

808.83

1,979.45

161.41

2,949.71

42.98

1,443.21

752.60

43.30

2,239.26

724.01

5.05

654.73

2,986.33

19.55

3,656.25

379.36

777.15

11.38

1,167.78

15.83

73.77

379.36

777.15

11.38

1,167.78

ARQUITECTURA

3,004.22

6,705.87

198.54

9,908.57

12.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

1,225.70

366.91

36.78

1,629.10

12.02.01.01

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

27.46

35.72

753.20

205.28

22.60

980.87

12.02.01.02

TARRAJEO EN COLUMNAS, MORTERO 1:5 C:A

m2

17.68

28.34

371.99

118.01

11.16

501.05

12.02.01.03

TARRAJEO EN VIGAS, MORTERO 1:5 C:A

m2

3.15

39.75

81.57

41.17

2.45

125.21

12.02.01.04

VESTIDURA DE DERRAMES 1:5 C:A

2.24

9.81

18.94

2.45

0.57

21.97

12.02.02

CIELO RASOS

235.65

140.26

7.07

383.04

12.02.02.01

CIELO RASO CON MEZCLA C:A 1:5

12.02.03

PISOS Y PAVIMENTOS

m2

8.40

45.60

235.65

140.26

7.07

383.04

373.93

1,238.93

77.11

1,690.18
Fecha :

20/04/2015 12:43:44p.m.

S10

29

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

12.02.03.01

VEREDAS CONCRETO f'c=175 kg/cm2 FROTACHADO Y BRUADO ( 10CM)

m2

21.85

54.23

245.23

889.02

50.57

1,184.93

12.02.03.02

LOSA CONCRETO 175 KG/CM2 FROTACHADO Y BRUADO (0.125 CM.)

m2

8.60

58.75

128.70

349.91

26.54

505.25

12.02.04

CUBIERTAS

67.39

482.70

2.02

552.08

12.02.04.01

COBERTURA C/ PLANCHA TIPO TEJA ANDINA

m2

8.15

52.95

61.63

368.06

1.85

431.54

12.02.04.02

CUMBRERA C/PLANCHA TIPO TEJA ANDINA

4.10

29.40

5.76

114.64

0.17

120.54

12.02.05

CARPINTERIA DE MADERA

64.78

145.50

44.47

254.72

12.02.05.01

VENTANA DE MADERA CEDRO C/ SEG

145.50

44.47

254.72

12.02.06

CARPINTERIA METALICA

12.02.06.01

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

m2

1.12

227.43

64.78
620.80

4,152.54

18.62

4,791.96

PUERTA METALICA SEGUN DISEO ( H= 3.05 , A= 3.15)

und

1.00

3,285.81

310.40

2,966.10

9.31

3,285.81

12.02.06.02

PUERTA METALICA SEGUN DISEO ( H= 2.35 , A= 1.00)

und

1.00

1,506.15

310.40

1,186.44

9.31

1,506.15

12.02.07

VIDRIOS CRISTALES Y SIMILARES

30.57

36.10

0.91

67.60

12.02.07.01

VIDRIO SEMIDOBLES

30.57

36.10

0.91

67.60

12.02.08

PINTURAS

373.47

91.65

11.20

476.34

12.02.08.01

PINTURA LATEX 02 MANOS EN CIELO RASO

m2

8.40

11.62

72.47

22.97

2.17

97.61

12.02.08.02

PINTURA OLEO 02 MANOS EN VIGAS

m2

3.15

7.18

16.99

5.14

0.51

22.62

12.02.08.03

PINTURA OLEO 02 MANOS EN MUROS Y COLUMNAS

m2

37.82

9.04

271.94

61.72

8.16

341.89

12.02.08.04

PINTURA OLEO 02 MANOS EN DERRAMES

2.24

6.35

12.07

1.82

0.36

14.22

12.02.09

VARIOS Y LIMPIEZA

11.93

51.28

0.36

63.55

12.02.09.01

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E= 1"

11.93

51.28

0.36

63.55

13

ATRIO DE ESPERA

1,981.21

2,066.25

410.70

4,458.84

13.01

ESTRUCTURAS

990.73

371.82

311.14

1,674.27

13.01.01

TRABAJOS PRELIMINARES

130.09

33.96

29.35

194.21

13.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

32.64

0.98

30.92

0.93

31.99

13.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

32.64

1.88

33.06

16.98

10.95

61.36

13.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

32.64

3.09

66.11

16.98

17.47

100.86

13.01.02

MOVIMIENTO DE TIERRAS

739.75

19.00

263.92

1,022.46

13.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

11.12

32.52

351.10

10.53

361.62

13.01.02.02

RELLENO C/ TIERRA DE CHACRA

m3

0.38

74.93

9.20

0.28

28.47

13.01.02.03

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

30.87

2.54

50.97

27.46

78.41

13.01.02.04

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

14.46

21.68

304.37

9.13

313.49

13.01.02.05

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

14.46

16.63

13.01.03

CONCRETO SIMPLE

13.01.03.01

CONCRETO f'c=175 kg/cm2

m3

0.90

13.01.03.02

ENCOFRADO Y DESENCOFRADO*

m2

0.60

13.02

ARQUITECTURA

13.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

p2

12.05

6.90

5.61

9.21

19.00

216.52

240.47

120.89

318.86

17.87

457.60

461.81

89.65

309.06

16.93

415.63

69.95

31.24

9.80

0.94

41.97

990.48

1,694.43

99.56

2,784.57

8.22

2.24

0.25

10.72

24.11

Fecha :

20/04/2015 12:43:44p.m.

S10

30

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

13.02.01.01

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

m2

13.02.02

PISOS Y PAVIMENTOS

13.02.02.01

VEREDAS CONCRETO f'c=175 kg/cm2 FROTACHADO Y BRUADO ( 10CM)

m2

30.87

13.02.02.02

CONCRETO f'c=175 kg/cm2, SARDINELES

m3

0.74

13.02.02.03

ENCOFRADO Y DESENCOFRADO*

m2

11.15

69.95

14

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

8.22

2.24

0.25

10.72

982.26

1,692.19

99.31

2,773.85

54.23

346.46

1,256.03

71.46

1,674.08

432.20

55.28

254.12

10.44

319.83

580.52

182.04

17.41

779.94

ASTA DE BANDERA

666.37

1,196.12

58.02

1,920.43

14.01

ESTRUCTURAS

417.91

611.21

44.79

1,073.83

14.01.01

TRABAJOS PRELIMINARES

22.72

5.92

5.12

33.92

14.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

5.70

0.98

5.40

14.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

5.70

1.88

5.77

14.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

5.70

3.09

11.55

14.01.02

MOVIMIENTO DE TIERRAS

14.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

0.24

14.01.02.02

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

14.01.02.03

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

14.01.02.04

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

14.01.03

CONCRETO SIMPLE

14.01.03.01

0.30

35.72

0.16

5.59

2.96

1.91

10.72

2.96

3.05

17.61

19.46

7.68

27.10

32.52

7.58

0.23

7.80

2.92

2.54

4.83

2.59

7.42

m3

0.31

21.68

6.53

0.20

6.72

m3

0.31

16.63

0.52

4.66

5.16

137.77

151.80

10.31

299.87

CONCRETO f'c=140 kg/cm2

m3

0.39

428.10

38.85

120.78

7.34

166.96

14.01.03.02

ENCOFRADO Y DESENCOFRADO*

m2

1.90

69.95

98.92

31.02

2.97

132.91

14.01.04

CONCRETO ARMADO

237.96

453.49

21.68

712.94

14.01.04.01

COLUMNAS

237.96

453.49

21.68

712.94

14.01.04.01.01

COLUMNAS, CONCRETO f'c=210 kg/cm2

m3

0.78

510.57

109.15

271.28

17.82

398.24

14.01.04.01.02

COLUMNA ENCOFRADO Y DESENCOFRADO

m2

2.89

53.36

100.07

51.12

3.00

154.21

14.01.04.01.03

COLUMNAS, ACERO DE REFUERZO fy=4200 Kg/cm2.

kg

31.78

5.05

28.74

131.09

0.86

160.49

14.02

ARQUITECTURA

248.46

584.91

13.23

846.60

14.02.01

PISOS Y PAVIMENTOS

32.78

118.81

6.76

158.35

14.02.01.01

VEREDAS CONCRETO f'c=175 kg/cm2 FROTACHADO Y BRUADO ( 10CM)

32.78

118.81

6.76

158.35

14.02.02

CARPINTERIA METALICA

215.68

466.10

6.47

688.25

14.02.02.01

TUBERIA DE F G 3 X 6M, ASTA DE BANDERA

215.68

466.10

6.47

688.25

15

PATIO, VEREDAS Y AREAS VERDES

79,208.46

58,787.02

11,847.52

149,861.12

15.01

ESTRUCTURAS

26,693.32

8,673.50

8,325.07

43,705.22

15.01.01

TRABAJOS PRELIMINARES

3,012.42

645.22

573.53

4,249.04

15.01.01.01

LIMPIEZA DEL TERRENO NORMAL

m2

1,191.62

0.98

1,128.70

33.96

1,167.79

15.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

619.97

1.88

627.91

207.88

1,165.54

15.01.01.03

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

619.97

3.09

15.01.02

MOVIMIENTO DE TIERRAS

m2

und

2.92

1.00

54.23

688.25

322.61

1,255.81

322.61

331.69

1,915.71

23,177.10

7,212.50

7,715.87

38,101.00
Fecha :

20/04/2015 12:43:44p.m.

S10

31

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

15.01.02.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

280.90

32.52

8,869.06

266.04

15.01.02.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

1.18

19.79

14.90

8.45

23.35

15.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. AFIRMADO

m3

57.00

100.02

1,839.15

3,420.00

441.54

5,701.14

15.01.02.04

RELLENO C/ TIERRA DE CHACRA

m3

75.85

74.93

1,835.57

3,792.50

55.07

5,683.44

15.01.02.05

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

1,428.16

2.54

2,358.14

1,270.53

3,627.53

15.01.02.06

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

363.63

21.68

7,654.10

229.63

7,883.50

15.01.02.07

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

363.63

16.63

606.18

5,444.61

6,047.17

15.01.03

CONCRETO SIMPLE

358.57

518.26

31.31

908.13

15.01.03.01

CONCRETO f'c=175 kg/cm2

m3

1.30

461.81

129.49

446.42

24.44

600.35

15.01.03.02

ENCOFRADO Y DESENCOFRADO*

m2

4.40

69.95

229.08

71.84

6.87

307.78

15.01.04

MUROS Y TABIQUES DE ALBAILERIA

145.23

297.52

4.36

447.05

15.01.04.01

MUROS DE LADRILLO KK TIPO IV SOGA M: 1:4, J: 1.5 CM

145.23

297.52

4.36

447.05

15.02

ARQUITECTURA

29,075.68

30,773.70

1,708.62

61,563.20

15.02.01

REVOQUES ENLUCIDOS Y MOLDADURAS

460.80

125.59

13.82

600.10

15.02.01.01

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

460.80

125.59

13.82

600.10

15.02.02

PISOS Y PAVIMENTOS

24,753.88

24,445.58

1,578.87

50,777.38

15.02.02.01

VEREDAS CONCRETO f'c=175 kg/cm2 FROTACHADO Y BRUADO ( 10CM)

m2

152.82

54.23

1,715.14

6,217.86

353.76

8,287.43

15.02.02.02

LOSA CONCRETO 175 KG / CM2 FROTACHADO, BRUADO Y COLOREADO (


0.125CM)

m2

109.16

61.07

1,837.60

4,450.69

378.88

6,666.40

15.02.02.03

CONCRETO f'c=175 kg/cm2 SARDINELES

m3

17.72

432.20

1,323.75

6,084.95

249.95

7,658.58

15.02.02.04

ENCOFRADO Y DESENCOFRADO*

m2

352.95

69.95

18,375.98

5,762.37

551.24

24,688.85

15.02.02.05

PISO ADOQUINADO

m2

44.60

77.94

1,501.41

1,929.71

45.04

3,476.12

15.02.03

VARIOS Y LIMPIEZA

3,861.00

6,202.53

115.93

10,185.72

15.02.03.01

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E= 1"

155.59

9.21

268.89

1,156.43

8.08

1,432.98

15.02.03.02

AREAS VERDES

m2

758.47

11.54

3,592.11

5,046.10

107.85

8,752.74

15.03

INSTALACIONES SANITARIAS

23,439.46

19,339.82

1,813.83

44,592.70
44,592.70

Cliente

m2

m2

Metrado

Precio S/.

6.06

16.80

Mano de Obra

73.77

35.72

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

9,134.87

15.03.01

SISTEMA DE AGUA DE LLUVIA

23,439.46

19,339.82

1,813.83

15.03.01.01

CANALETA DE EVACUACION PLUVIAL, CONCRETO FC = 210KG/ CM2

29.72

656.44

3,652.54

14,636.24

1,220.27

19,509.40

15.03.01.02

ENCOFRADO Y DESENCOFRADO, CANALETA DE EVACUACION PLUVIAL

m2

380.05

66.00

19,786.92

4,703.58

593.56

25,083.30

16

INSTALACIONES ELECTRICAS EXTERIORES

15,956.49

18,798.64

4,197.00

16.01

ESTRUCTURAS

9,002.89

615.68

3,953.82

13,570.75

16.01.01

MOVIMIENTO DE TIERRAS

8,213.82

3,911.01

12,123.27

16.01.01.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

105.26

32.52

3,323.45

99.69

3,423.06

16.01.01.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

65.28

19.79

824.47

467.21

1,291.89

16.01.01.03

RELLENO Y COMP. MANUAL C/ ZARANDEADO

m3

39.17

46.84

742.04

1,092.79

1,834.72

16.01.01.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

130.57

2.54

215.60

116.16

331.65

42,683.37

3,728.80

Fecha :

20/04/2015 12:43:44p.m.

S10

32

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

16.01.01.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

136.83

21.68

2,880.16

86.41

2,966.47

16.01.01.06

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

136.83

16.63

228.10

2,048.75

2,275.48

16.01.02

CONCRETO SIMPLE

16.01.02.01

CONCRETO f'c=175 kg/cm2

m3

1.21

16.01.02.02

ENCOFRADO Y DESENCOFRADO*

m2

8.41

16.01.03

Cliente

Und.

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

558.39

552.81

35.89

1,147.07

461.81

120.53

415.51

22.76

558.79

69.95

437.86

137.30

13.13

588.28

ARQUITECTURA

230.68

62.87

6.92

300.41

16.01.03.01

REVOQUES ENLUCIDOS Y MOLDADURAS

230.68

62.87

6.92

300.41

16.01.03.01.01

TARRAJEO EN MUROS EXTERIOR, MORTERO 1:5 C:A

16.02

INSTALACIONES ELECTRICAS

16.02.01

SALIDA PARA ELECTRICIDAD Y FUERZA

16.02.01.01

POZO PUESTA A TIERRA INC. CABLE - 2004 P-2 ( R< 5 OHMS)

16.02.02

CANALIZACION Y/O TUBERIAS

16.02.02.01

TUBERIA DE PVC - P 20MM

5.48

13.19

49.55

21.26

1.49

72.28

16.02.02.02

TUBERIA DE PVC - P 35MM

279.65

22.16

2,528.93

3,593.06

75.84

6,197.04

16.02.03

CONEXION A RED EXTERNA Y MEDIDORES

1,906.78

9,139.80

57.29

11,108.78

16.02.03.01

ALIM. CAB NYY ( 2- 1 X 4 + 1 - 1X 2.5 ) MM2

154.54

29.37

1,023.19

3,482.25

30.74

4,538.84

16.02.03.02

ALIM. CAB NYY ( 2- 1 X 16 + 1 - 1X 10 ) MM2

105.07

46.99

695.66

4,218.77

20.90

4,937.24

16.02.03.03

ALIM. CAB NYY ( 3- 1 X 10 + 2 - 1X 6 ) MM2

20.04

56.18

132.68

988.81

3.99

1,125.85

16.02.03.04

CABLE COBRE DESNUDO 1X 16 MM2, PVC - P 20MM

5.48

92.49

55.25

449.97

1.66

506.85

16.02.04

TABLEROS Y CUCHILLAS

113.04

838.97

3.39

955.40

16.02.04.01

TG01

113.04

838.97

3.39

955.40

16.02.05

ARTEFACTOS

193.54

4,067.84

5.81

4,267.20

16.02.05.01

LAMPARA DE VAPOR DE MERCURIO DE 125 W INCL.

193.54

4,067.84

16.02.06

OTROS

16.02.06.01

POSTES METALICOS P/FAROLAS INC. INSTALACION

17

INSTALACIONES SANITARIAS EXTERIORES

9,934.13

2,569.17

16,361.86

17.01

ESTRUCTURAS

5,310.05

2,369.01

7,679.20

17.01.01

MOVIMIENTO DE TIERRAS

5,310.05

2,369.01

7,679.20

17.01.01.01

EXCAVACION DE ZANJA Y ZAPATAS

m3

84.71

32.52

2,674.61

80.23

2,754.77

17.01.01.02

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

46.66

19.79

589.30

333.95

923.40

17.01.01.03

RELLENO Y COMP. MANUAL C/ MAT. ZARANDEADO

m3

38.77

46.84

734.46

1,081.64

1,815.99

17.01.01.04

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

112.78

2.57

187.91

101.26

289.84

17.01.01.05

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

49.47

21.68

1,041.30

31.24

1,072.51

17.01.01.06

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

49.47

16.63

82.47

740.69

822.69

17.02

INSTALACIONES SANITARIAS

4,624.08

3,869.78

200.16

8,682.66

17.02.01

INSTALACIONES SANITARIAS

2,810.11

3,047.25

145.73

5,991.52

m2

und

und

und

und

8.41

1.00

1.00

16.00

8.00

35.72

971.44

955.40

266.70

692.56

300.41

230.68

62.87

6.92

6,953.60

18,182.96

243.18

436.32

522.03

13.09

436.32

522.03

13.09

971.44

2,578.48

3,614.32

77.33

6,269.32

29,112.62

3,728.80

971.44

4,267.20

5.81

1,725.44

86.27

3,728.80

5,540.48

1,725.44

86.27

3,728.80

5,540.48

3,869.78

Fecha :

20/04/2015 12:43:44p.m.

S10

33

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

17.02.01.01

TUBERIA DE PVC SAL 4"

17.02.01.02

CAJA DE REGISTRO DESAGUE 12" X 24" C/ TAPA CONCRETO

pza

17.02.02

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

17.02.02.01

TUBERIA PVC CLASE 10 - 3/4"

17.02.02.02

VALVULA COMPUERTA DE BRONCE 3/4"

17.02.02.03

Cliente

Metrado

Precio S/.

Mano de Obra

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

1,578.40

98.65

16.00

510.34

1,067.84

8.00

551.64

2,299.77

1,979.41

145.73

4,413.12

1,813.97

822.53

54.43

2,691.14

126.90

13.10

1,189.90

436.51

35.71

1,662.39

und

6.00

69.81

215.68

196.65

6.47

418.86

VALVULA CHECK DE BRONCE DE 3/4"

und

1.00

126.03

20.16

105.27

0.60

126.03

17.02.02.04

CODO PVC SAL 3/ 4" X 90"

und

4.00

53.29

172.55

35.49

5.18

213.16

17.02.02.05

TEE PVC 3/4"

und

5.00

54.14

215.68

48.61

6.47

270.70

18

SISTEMA DE SUBDREN

25,729.74

39,141.53

7,722.71

72,606.26

18.01

ESTRUCTURAS

25,729.74

39,141.53

7,722.71

72,606.26

18.01.01

TRABAJOS PRELIMINARES

630.48

215.96

180.59

1,031.28

18.01.01.01

TRAZO Y REPLANTEO PRELIMINAR

m2

207.50

1.88

210.16

107.98

69.58

390.10

18.01.01.02

TRAZO Y REPLANTEO DURANTE EJECUCION

m2

207.50

3.09

420.32

107.98

111.01

641.18

18.01.02

MOVIMIENTO DE TIERRAS

19,863.97

25,398.72

7,384.77

52,645.56

18.01.02.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

311.25

32.52

9,827.32

294.78

10,121.85

18.01.02.02

CAMA DE APOYO PARA TUBERIA E= 10 CM

207.50

13.87

369.22

2,508.47

2,878.03

965.36

2,669.28

83.55

28,266.66

18.01.02.03

RELLENO Y COMP. MANUAL C/ MAT. PROPIO

m3

134.88

19.79

1,703.50

18.01.02.04

RELLENO CON GRAVA UNIFORME TM 1"

m3

176.38

160.26

2,784.38

18.01.02.05

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/ EQUIPO

m2

103.75

2.54

171.31

92.30

263.53

18.01.02.06

ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.

m3

220.47

21.68

4,640.71

139.23

4,779.79

18.01.02.07

ELIMINACION DE MAT. EXCEDENTE C/ MAQUINARIA

m3

220.47

16.63

18.01.03

INSTALACIONES SANITARIAS

18.01.03.01

SISTEMA DE SUBDREN

18.01.03.01.01

TUBERIA PVC SAP PERFORADA DE 6"

18.01.03.01.02

YEE PVC SAL 6"

und

18.01.03.01.03

CODO 45 PVC SAP 6"

18.01.03.01.04

GEOTEXTIL NO TEJIDO CLASE 2

19
19.01
19.01.01

SEGUIMIENTO AMBIENTAL

glb

1.00

508.47

508.47

508.47

19.01.02

CAPACITACION EN CONTROL Y SEGURIDAD DE OBRA

glb

1.00

1,271.19

1,271.19

1,271.19

19.01.03

SEALIZACION DE VIAS

glb

1.00

254.24

254.24

254.24

19.01.04

LETREROS DE UBICACION

und

1.00

152.54

152.54

19.01.05

ACONDICIONAMIENTO DE BOTADEROS

19.01.05.01

LIMPIEZA GENERAL DEL AREA

m2

1,000.00

0.78

19.01.05.02

RECUPERACION MORFOLOGICA DEL AREA

m2

1,000.00

0.78

25,398.72

3,301.08

3,666.42

5,235.29

13,526.85

157.35

18,929.42

367.53

5,235.29

13,526.85

157.35

18,929.42

207.50

46.19

2,091.87

7,429.76

62.75

9,584.43

41.00

13.11

221.07

309.79

6.63

537.51

und

2.00

12.21

10.79

13.31

0.32

24.42

m2

913.00

9.62

2,911.56

5,773.99

87.65

8,783.06

PLAN DE MITIGACION E IMPACTO AMBIENTAL

2,462.72

3,500.01

74.10

6,040.01

LABORES DE MITIGACION AMBIENTAL

2,462.72

3,500.01

74.10

6,040.01

152.54
45.60

2,873.57

757.76

22.80

780.00

757.76

22.80

780.00

1,515.52

1,313.57

Fecha :

20/04/2015 12:43:44p.m.

S10

34

Pgina

Presupuesto
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA

Presupuesto

0202004

Subpresupuesto
Lugar

001
MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL EN LA I.E.I SANTA CRUZ DE CCARAPA, DISTRITO DE HUANCA HUANCA - ANGARES- HUANCAVELICA
OVER VEGA, PRADO
AREQUIPA - CAYLLOMA - HUANCA

Item

Descripcin

Und.

19.01.05.03

MICRO RELLENOS SANITARIOS

und

1.00

677.97

677.97

19.01.05.04

INSTALACIONES DEL CONTENEDOR

und

5.00

127.12

635.60

19.01.06

RECUPERACION DE AREAS VERDES

19.01.06.01

LIMPIEZA Y RECUPERACION DE AREA AFECTADA

20

EQUIPAMIENTO Y MATERIALES DIDACTICOS

20.01

MOBILIARIO

20.01.01

MOBILIARIO PARA AULAS

glb

1.00

6,250.00

20.01.02

MOBILIARIO PARA SALA DE USOS MULTIPLES

glb

1.00

20.01.03

MOBILIARIO PARA DIRECCION

glb

1.00

20.01.04

MOBILIARIO PARA TOPICO

glb

20.01.05

MOBILIARIO PARA COMEDOR

20.01.06

MOBILIARIO PARA VIVIENDA DOCENTE

20.02

EQUIPOS

20.02.01

IMPLEMENTACION DE AULAS

20.03

MATERIAL DIDACTICO

20.03.01

MODULO DE COMUNICACION

glb

1.00

20.03.02

MODULO DE MATEMATICA

glb

20.03.03

MODULO DE CIENCIA Y AMBIENTE

glb

20.03.04

MODULO DE PSICOMOTROCIDAD

20.03.05

MODULO DE BIBLIOTECA DE AULA

20.04

JUEGOS INFANTILES

20.04.01

JUEGOS INFANTILES INC. INSTALACION

21

CAPACITACION Y GESTION EDUCATIVA

21.01

CAPACITACION DOCENTE

glb

1.00

21.02

GESTION EDUCATIVA

glb

1.00

Cliente

Metrado

m2

Precio S/.

1,000.00

Mano de Obra

0.98

Material

Equipo

Costo al

07/03/2015

Parcial S/.

Subcontrato

677.97
635.60

947.20

28.50

947.20

28.50

980.00
980.00

75,665.36

75,665.36

30,205.53

30,205.53

6,250.00

6,250.00

5,225.00

5,225.00

5,225.00

3,250.00

3,250.00

3,250.00

1.00

3,437.53

3,437.53

3,437.53

glb

1.00

9,043.00

9,043.00

9,043.00

glb

1.00

3,000.00

3,000.00

3,000.00

11,789.83

11,789.83

11,789.83

11,789.83

14,170.00

14,170.00

3,800.00

3,800.00

3,800.00

1.00

3,540.00

3,540.00

3,540.00

1.00

2,100.00

2,100.00

2,100.00

glb

1.00

1,500.00

1,500.00

1,500.00

glb

1.00

3,230.00

3,230.00

3,230.00

19,500.00

19,500.00

glb

glb

1.00

1.00

11,789.83

19,500.00

19,500.00

19,000.00

19,000.00

12,000.00

12,000.00

12,000.00

7,000.00

7,000.00

7,000.00

19,500.00

1,721,305.22

COSTO DIRECTO
GASTOS GENERALES 0.0000%
UTILIDAD

172,130.52

10%

-----------1,893,435.74

SUBTOTAL

359,752.79

IMPUESTO (IGV 19%)

========
2,253,188.53

TOTAL PRESUPUESTO
SON :

DOS MILLONES DOSCIENTOS CINCUENTITRES MIL CIENTO OCHENTIOCHO Y 53/100 NUEVOS SOLES