Вы находитесь на странице: 1из 2

Assignment

Name and Student ID

Transmissivity
2

Location

Q (m3 /day)

(m/day)

Question 1: No-flow boundary conditions are implemented by:

Question 2: Flow Calculation with no abstraction or recharge


Condition 1 flow is

m3 /day

Condition 2 flow is

m3 /day

Question 3: Recharge or abstraction at a node is calculated by:

Question 4: Water Level and Flows for Condition 1 are:


Water level at pumping/recharge node

(. . . , . . .)
3

is

m above datum

Flow accross boundary AB

m /day

Flow accross boundary BC

m3 /day

Flow accross boundary CD

m3 /day

Flow accross boundary DA

m3 /day

Question 5: Water Level and Flows for Condition 2 are:


Water level at pumping/recharge node

(. . . , . . .)

Flow accross boundary AB

m3 /day

Flow accross boundary BC

m3 /day

Flow accross boundary CD

m3 /day

Flow accross boundary DA

m3 /day

Declaration:
The work presented above is all my own work signed:

3501 - Water Resources Engineering

is

m above datum

Assignment

Figure 3.34: Layout of nodes for the assignment

3501 - Water Resources Engineering

Вам также может понравиться