CEAMTechnicalServicesCorp.

CeamBuilding,No.6JasminSt.
ElvindaVillage,SanPedro,Laguna,Philippines
Tels.8688741*8684262*FaxNo.8694571
Email:ceam@pldtdsl.net
_____________________________________________________________________________________________

March10,2015

PETRONBATAANREFINERY
Limay,Bataan

Attention
:

Thru

Project

Subject

:
:

ContractNo.
ProjectName

CEAMRef.No.

:PPCS140069
:PowerDistribution
SystemforPETCOKE
HandlingFacility
:LPHFPDSC/P017

MR.RAULM.RONQUILLO

RSFFBProjectManager

MR.ANTONIOJ.CALVO
LLCDCConstructionManager

PBRPetcokePowerDistributionSystem
PBRPetcokePowerDistributionSystem
ChangeOrderNo.1rev5

Gentlemen:

InconnectionwithoursubmissionofChangeOrderNo.1forPETCOKEPDSProject,wewould
liketosubmitourlatestChangeOrderNo.1rev5thathasbeenevaluatedanddiscussedat
the projects coordination meeting last March 5, 2015. Items and prices are consolidated
basedonthelastmeetingdiscussion.

TermsandConditions:

1. 30%downpayment;balancethruprogressbilling.
2. ProjectDuration:asperapprovedPBRschedule
3. Crushermotorcommissioningisexcludedinthisquotation.

Thankyouverymuch;welookforwardtoreceiveyourvaluedordersoon.

Verytrulyyours,

AlvinT.Dachola
ProjectEngineer

CLIENT
NAME OF PROJECT
LOCATION

PETRON BATAAN REFINERY


POWER DISTRIBUTION SYSTEM
PETCOKE HANDLING PROJECT, LIMAY, BATAAN

Item
A.

B.

DESCRIPTION
GENERAL REQUIREMENTS
1.0 Safety Provision
2.0 Delivery of Materials
Sub - Total A
ELECTRICAL WORKS
1.0 MEDIUM VOLTAGE SWITCHGEAR SPACE TO SPACE CONVERSION
CONVERSION OF 1 SPACE VERTICAL TO SPARE VERTICAL
2.0 SUPPLY AND INSTALLATION OF TWO -2- TEMPORARY LV MCC
TO BE USED FOR THE TEMPORARY OPERATION OF CONVEYOR SYSTEM
3.0 HIGH RESISTANCE GROUNDING PANEL
4.0 SUPPLY AND INSTALLATION DIGITAL POWER METER ON GPII's 750kVA TRANSFORMER
5.0 TERMINATION KIT INSTALLATION FOR GPII's 750kVA TRANSFORMER PRIMARY CABLE
6.0 10C 2.5mm2 DIRECT BURIAL CONTROL CABLE (SS2D TO POWER CENTER)
7.0 BC 105A POWER CABLE
3C 25mm2, 1kV, XLPE/SWA
8.0 BC 106A POWER CABLE
3C 16mm2, 1kV, XLPE/SWA
9.0 HAMMER MILL B LRS POWER CABLE
Termination kits and lugs

Note: Testing and Commissioning for the LRS and Crusher Motor is excluded

10.0 TERMINATION BOX INSTALLATION FOR MAINTENANCE HOIST A AND B


11.0 LRS STARTERS A AND B CONTROL CABLES

Unit Price

Qty

Unit

1.00
1.00

lot
lot

28,000.00
42,000.00

1.00

lot

2,022,643.06

2,022,643.06

1.00

lot

1,090,588.13

1,090,588.13

assy
set
set
mtrs

1,868,175.00
78,594.45
59,432.00
1,241.94

1,868,175.00
78,594.45
118,864.00
961,264.70

256.00

mtrs

790.48

202,361.86

304.00

mtrs

702.00

213,408.76

2.00

set

34,200.00

68,400.00

2.00

set

25,650.00

51,300.00

275.00
275.00
275.00
275.00

mtrs
mtrs
mtrs
mtrs

541.33
270.66
1,082.66
550.91

148,865.48
74,432.74
297,730.95
151,500.44

1.00

lot

117,135.00

117,135.00

1.00

lot

1.00
1.00
2.00
774.00

TOTAL

28,000.00
42,000.00
70,000.00

DRAWING REFERENCE: BR 100-2-E729 REV A SHEET 1 OF 2


LOCATION OF LIQUID STARTER OPTION A
8C 2.00mm2, XLPE/SWA DIRECT BURIAL
4C 2.00mm2, XLPE/SWA DIRECT BURIAL
16C 2.00mm2, XLPE/SWA DIRECT BURIAL
3C 6.00mm2, XLPE/SWA DIRECT BURIAL

Note: Testing and Commissioning for the LRS and Crusher Motor is excluded

C.

13.0 CONSUMABLES AND OTHER SUNDRIES (i.e. TAPES, LUGS, CABLE GLANDS, MARKERS ETC)
DEDUCTIVE WORKS
1.0 CONSTRUTION OF TRANSFORMER FENCE/YARD
Sub - Total B

(50,118.15)
7,415,146.40

TOTAL [ I + II ] Php (Vat Ex)

7,485,146.40

VAT

898,217.57

GRAND TOTAL [ I + II ] Php (Vat IN)

8,383,363.97

PROPOSAL FORM: ceam 14-098 PBR.PETCOKE HANDLING FACILITIES POWER DISTRIBUTION - CHANGE ORDER NO. 1rev5
CEAM TECHNICAL SERVICES CORP.
(Business Name of Bidder)
/ / Individual
Business Address:
CEAM Bldg. No. 6, Jasmin St., Elvinda Village
San Pedro, Laguna
Telephone Nos.:
(632) 868-4262/(632) 868-8741

/ / Partnership

/ / Corporation
Contractor License No.:
Classification/ Category:

PCAB Lic. No. 29357


SP Electrical/ Category "A"

Signed by:
Signature:
Name in Print:
Position Title/Date:

Alvin T. Dachola
Project Engineer/ 10Mar15