Вы находитесь на странице: 1из 9

Small Scale Irrigation Manageme

Construction of Batu Bulan Dam and

PERHITUNGAN PLAT DINDING - JEPIT JEPIT


Tipe mekanika struktur :
Tipe potongan :
Kondisi pembebanan :
Metode perhitungan :

No.

URAIAN

Jepit-jepit
Plat persegi
Beban tetap
Analitis

RUMUS/NOTASI

1 Tegangan Beton, kg/cm2 :


-Teg. beton karakteristik
Sgm-bk =
-Teg. tekan beton ijin
Sgm'-b =0.33*Sgm-bk =
-Teg. geser beton ijin
Thou'-b=0.43(Sgm-bk)u0.5 =
2 Bilangan equivalensi
n=
3 Tegangan Ijin Baja, kg/cm2 :
-Teg. luluh baja rencana
Sgm-au =
-Teg. tarik baja
Sgm'-au= 0.58*Sgm-au =
4 Kondisi pembebanan :
-Beban merata rencana, t/m
q = q1 + q2 + q3 =
akibat tekaan tanah =
q1 = Ys * hs =
akibat berat plat =
q2 = Yb * d =
akibat berat lalin =
q3 = 2*P*(1+i)/(a*b) =
-Beban terpusat rencana, t
P =
-Panjang bentang, m
L =
5 Momen Maksimum, kgcm
- Moment maks. tumpuan
Mmax1=(1/12)*q*Lu2+(1/8)*P*L =
- Moment maks. lapangan
Mmax2=(1/24)*q*Lu2+(1/8)*P*L =
6 Gaya Lintang Maks., kg
Dmax = 0.5*q*L+0.5*P =
7 Dimensi potongan struktur
-Lebar plat, cm
b=
-Tinggi plat, cm
d=
-Tinggi efektif plat, cm
h =d-d' =
-Jrk tepi beton dg TB tul., cm
d' =
-Tahanan mmn potongan, cm3
W=(1/6)*b*du2 =
8 Tulangan tarik :
-Diameter tulangan (trial), cm
D=
-Jarak tulangan (trial), cm
as =
-Luas tulangan (trial), cm2
Fe =
9 Tulangan tekan :
-Diameter tulangan (trial), cm
D=
-Jarak tulangan (trial), cm
as =
-Luas tulangan (trial), cm2
Fe' =
10 Jarak grs netral, cm
X = -A+(B+C)u0.5 =
A = n*(Fe'+Fe)/b =
CONTOH-3

HARGA
175
60
5.5
24
3,000
1,740
5.100
3.240
0.960
0.900
0.0
3.20
433,432
8,159
100.00
40.00
30.00
10.00

1.6
20
10.05
1.6
25
8.04
9.88
4.34

B = (n*(Fe'+Fe)/b)u2 =
C = 2n*(Fe'*d'+Fe*h)/b =

18.86
183.37

11 Momen inersia, cm4


I=0.33b*Xu3 + nFe'(X-d')u2 + nFe(h-X)u2 =

129,822

CONTOH-3

12
13
14
15
16
17
18

Tahanan mmn baja tarik, cm3


Tahanan mmn baja tekan, cm3
Tahanan momen beton, cm3
Teg. max. tarik baja, kg/cm2
Teg. max. tekan baja, kg/cm2
Teg. max. tekan beton, kg/cm2
Teg. max. geser beton, kg/cm2

CONTOH-3

We = I /(n*(h-X)
We' = I /(n*(X-d')
Wb = I / X
Sgm-e = M/We
Sgm-e' = M/We'
Sgm-b = M/Wb
Thou-b = Dmax/((h-X/3)*b)

=
=
=
=
=
=
=

269
(44,268)
13,143
1,612
(10)
32.98
3.06

Small Scale Irrigation Management Project (III)


nstruction of Batu Bulan Dam and Appurtenances

CATATAN
175
60

D(K-175)

24
SD-30

5.100

Tekanan air
hs=1.80 m
d=40 cm
a=5.85m, b=3.80m

0.0
3.20

217,587

100.00
40.00
30.00 Cek teg. tarik beton
10.00 tanpa tulangan ->
26,667 M/W=
< 6.5 kg/cm2
1.6
25
8.04
1.6
20
10.05
9.18
4.34
CONTOH-3

18.86
164.07
109,618

CONTOH-3

219
(5,585)
11,938
992
(39)
18.23
-

CONTOH-3

<
<
<
<

1,740
1,740
60
5.50

anagement Project (III)


Dam and Appurtenances

Tekanan air
hs=1.80 m
d=40 cm
a=5.85m, b=3.80m

Cek teg. tarik beton


tanpa tulangan ->
8.2
< 6.5 kg/cm2

CONTOH-3

CONTOH-3

OK
OK
OK
OK

CONTOH-3

Вам также может понравиться