Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Time Units:

Hours

Key Performance Indicators


System

Average

Number Out
9,251

May 21, 2015

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Entity
Time
VA Time

of

29

May 21, 2015

Kondisi Eksisting
Replications:

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

8.4769

(Insufficient)

6.3980

9.9719

BULK M

7.4750

(Insufficient)

3.2231

12.2099

BULK XL

8.6083

(Insufficient)

0.00

13.0380

CONT L

1.8483

(Insufficient)

1.5316

2.2495

CONT M

1.9146

0.016699509

1.2761

2.9194

CONT S

1.9049

0.006975274

1.1050

3.0243

CONT XL

1.8736

(Insufficient)

1.5506

2.3294

GCAR L

8.9782

(Insufficient)

1.8359

19.0223

GCAR M

7.5875

(Insufficient)

4.0196

11.8897

GCAR S

11.9185

(Correlated)

0.00

71.7656

GCAR XL

8.5206

(Insufficient)

4.1994

13.0205

OTHR

4.6823

0.183971762

0.05970053

15.2548

PASS

6.1770

0.083990033

2.2344

13.7054

TANK L

1.8830

(Insufficient)

1.1111

3.0106

TANK M

7.1255

(Insufficient)

2.5861

10.5399

TANK S

7.6107

0.176855503

1.8434

13.2005

TANK XL

8.9393

(Insufficient)

7.6175

10.7798

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

0.00

(Insufficient)

0.00

0.00

BULK M

0.00

(Insufficient)

0.00

0.00

BULK XL

0.00

(Insufficient)

0.00

0.00

CONT L

0.00

(Insufficient)

0.00

0.00

CONT M

0.00

0.000000000

0.00

0.00

CONT S

0.00

0.000000000

0.00

0.00

CONT XL

0.00

(Insufficient)

0.00

0.00

GCAR L

0.00

(Insufficient)

0.00

0.00

GCAR M

0.00

(Insufficient)

0.00

0.00

GCAR S

0.00

0.000000000

0.00

0.00

GCAR XL

0.00

(Insufficient)

0.00

0.00

OTHR

0.00

0.000000000

0.00

0.00

PASS

0.00

0.000000000

0.00

0.00

TANK L

0.00

(Insufficient)

0.00

0.00

TANK M

0.00

(Insufficient)

0.00

0.00

TANK S

0.00

0.000000000

0.00

0.00

TANK XL

0.00

(Insufficient)

0.00

0.00

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

6.0545

(Insufficient)

0.00

22.5932

BULK M

0.2195

(Insufficient)

0.00

8.9226

BULK XL

4.5426

(Insufficient)

0.00

13.9184

CONT L

5.2362

(Insufficient)

0.00

13.9184

CONT M

21.6778

5.14050

0.00

59.0635

CONT S

22.9299

(Correlated)

0.00

60.4532

CONT XL

4.0793

(Insufficient)

0.00

14.0651

GCAR L

8.1657

(Insufficient)

0.00

42.1368

GCAR M

2.1098

(Insufficient)

0.00

21.5485

GCAR S

2577.39

(Correlated)

0.00

5480.28

GCAR XL

3.9311

(Insufficient)

0.00

19.3709

OTHR

4.2799

0.855407416

0.00

34.5061

PASS

337.60

(Correlated)

0.00

803.53

TANK L

4.5743

(Insufficient)

0.00

14.9944

TANK M

1.1116

(Insufficient)

0.00

15.7355

TANK S

1.9697

0.707824681

0.00

27.6672

TANK XL

7.2654

(Insufficient)

0.5346

13.9184

NVA Time

Wait Time

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Entity
Time
Transfer Time
Average

Half Width

Minimum
Value

Maximum
Value

BULK L

3.9667

(Insufficient)

3.9667

3.9667

BULK M

3.9667

(Insufficient)

3.9667

3.9667

BULK XL

3.9617

(Insufficient)

3.6167

3.9667

CONT L

3.7167

(Insufficient)

3.7167

3.7167

CONT M

3.7167

(Correlated)

3.7167

3.7167

CONT S

3.7167

(Correlated)

3.7167

3.7167

CONT XL

3.7167

(Insufficient)

3.7167

3.7167

GCAR L

4.0167

(Insufficient)

4.0167

4.0167

GCAR M

4.0167

(Insufficient)

4.0167

4.0167

GCAR S

4.0167

(Correlated)

4.0167

4.0167

GCAR XL

4.0167

(Insufficient)

4.0167

4.0167

OTHR

3.2333

(Correlated)

3.2333

3.2333

PASS

2.7327

0.000524682

2.5500

2.7333

TANK L

3.8167

(Insufficient)

3.8167

3.8167

TANK M

3.8167

(Insufficient)

3.8167

3.8167

TANK S

3.8159

(Correlated)

3.5333

3.8167

TANK XL

3.8167

(Insufficient)

3.8167

3.8167

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

0.00

(Insufficient)

0.00

0.00

BULK M

0.00

(Insufficient)

0.00

0.00

BULK XL

0.00

(Insufficient)

0.00

0.00

CONT L

0.00

(Insufficient)

0.00

0.00

CONT M

0.00

0.000000000

0.00

0.00

CONT S

0.00

0.000000000

0.00

0.00

CONT XL

0.00

(Insufficient)

0.00

0.00

GCAR L

0.00

(Insufficient)

0.00

0.00

Other Time

of

29

May 21, 2015

Kondisi Eksisting
Replications:

GCAR M

0.00

(Insufficient)

0.00

0.00

GCAR S

0.00

0.000000000

0.00

0.00

GCAR XL

0.00

(Insufficient)

0.00

0.00

OTHR

0.00

0.000000000

0.00

0.00

PASS

0.00

0.000000000

0.00

0.00

TANK L

0.00

(Insufficient)

0.00

0.00

TANK M

0.00

(Insufficient)

0.00

0.00

TANK S

0.00

0.000000000

0.00

0.00

TANK XL

0.00

(Insufficient)

0.00

0.00

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

18.4980

(Insufficient)

11.0930

35.4484

BULK M

11.6612

(Insufficient)

7.6312

23.1000

BULK XL

17.1126

(Insufficient)

3.6167

29.5024

CONT L

10.8011

(Insufficient)

5.2483

19.7026

CONT M

27.3091

5.14078

5.0325

64.6619

CONT S

28.5516

(Correlated)

5.1585

66.3902

CONT XL

9.6696

(Insufficient)

5.2672

19.5531

GCAR L

21.1606

(Insufficient)

7.3200

55.0859

GCAR M

13.7139

(Insufficient)

8.0363

32.5605

GCAR S

2593.33

(Correlated)

22.6581

5499.11

GCAR XL

16.4684

(Insufficient)

8.2160

33.1360

OTHR

12.1955

0.969375603

3.2930

42.5430

PASS

346.51

(Correlated)

5.8549

811.39

TANK L

10.2739

(Insufficient)

5.0591

20.4497

TANK M

12.0537

(Insufficient)

6.4027

25.7093

TANK S

13.3963

0.778184416

6.0226

40.6624

TANK XL

20.0213

(Insufficient)

12.0976

27.3204

Total Time

Other

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Entity
Other
Number In

Time Units:

Hours

Page

of

29

May 21, 2015

Value

BULK L

18.0000

BULK M

138.00

BULK XL

115.00

CONT L

128.00

CONT M

816.00

CONT S

3631.00

CONT XL

192.00

GCAR L

294.00

GCAR M

125.00

GCAR S

1860.00

GCAR XL

86.0000

OTHR

1071.00

PASS

1561.00

TANK L

267.00

TANK M

29.0000

TANK S

509.00

TANK XL

9.0000

4000.000
BULK L
BULK M
BULK XL
CONT L
CONT M
CONT S
CONT XL
GCAR L
GCAR M
GCAR S
GCAR XL
OTHR
PASS
TANK L
TANK M
TANK S
TANK XL

3500.000
3000.000
2500.000
2000.000
1500.000
1000.000
500.000
0.000

Number Out

Value

BULK L

15.0000

BULK M

136.00

BULK XL

70.0000

CONT L

128.00

CONT M

813.00

CONT S

3615.00

CONT XL

192.00

GCAR L

247.00

GCAR M

125.00

GCAR S

734.00

GCAR XL

86.0000

OTHR

1071.00

PASS

1402.00

TANK L

196.00

TANK M

19.0000

TANK S

393.00

TANK XL

9.0000

Model Filename:

Page

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Category Overview

3:43:55 PM

Time Units:

Hours

Entity
Other
WIP
Average

Half Width

Minimum
Value

Maximum
Value

BULK L

0.7910

(Insufficient)

0.00

3.0000

BULK M

1.1337

(Insufficient)

0.00

4.0000

BULK XL

20.6679

(Insufficient)

0.00

45.0000

CONT L

0.1578

(Insufficient)

0.00

2.0000

CONT M

2.5393

(Correlated)

0.00

11.0000

CONT S

11.8156

(Correlated)

0.00

34.0000

CONT XL

0.2119

0.022080843

0.00

2.0000

GCAR L

18.8100

(Correlated)

0.00

49.0000

GCAR M

0.1957

(Insufficient)

0.00

5.0000

GCAR S

569.87

(Correlated)

0.00

1126.00

GCAR XL

0.1617

(Insufficient)

0.00

2.0000

OTHR

1.4910

0.173737406

0.00

9.0000

PASS

62.2216

(Correlated)

0.00

162.00

TANK L

31.5676

(Correlated)

0.00

71.0000

TANK M

4.7716

(Insufficient)

0.00

11.0000

TANK S

57.3316

(Correlated)

0.00

119.00

0.02056987

(Insufficient)

0.00

1.0000

TANK XL

of

29

May 21, 2015

Kondisi Eksisting
Replications:

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Process

Time Units:

Hours

Page

of

29

May 21, 2015

Time per Entity


VA Time Per Entity
Average

Half Width

Minimum
Value

Maximum
Value

Bongkar Muat di Terminal Curah


Cair 1 Surabaya

8.9393

(Insufficient)

7.6175

10.7798

Bongkar Muat di Terminal Curah


Cair 2 Surabaya

1.8830

(Insufficient)

1.1111

3.0106

Bongkar Muat di Terminal Curah


Cair 3 Surabaya

7.5936

0.169263121

1.8434

13.2005

Bongkar Muat di Terminal Curah


Kering 1 Surabaya

8.7331

(Insufficient)

2.8567

13.0380

Bongkar Muat di Terminal Curah


Kering 2 Surabaya

8.4769

(Insufficient)

6.3980

9.9719

Bongkar Muat di Terminal Curah


Kering 3 Surabaya

7.4750

(Insufficient)

3.2231

12.2099

Bongkar Muat di Terminal


General Cargo 1 Surabaya

8.5206

(Insufficient)

4.1994

13.0205

Bongkar Muat di Terminal


General Cargo 2 Surabaya

8.9782

(Insufficient)

1.8359

19.0223

Bongkar Muat di Terminal


General Cargo 3 Surabaya

7.5875

(Insufficient)

4.0196

11.8897

Bongkar Muat di Terminal


General Cargo 4 Surabaya

11.9185

(Correlated)

0.00

71.7656

Bongkar Muat di Terminal


Lainnya Surabaya

4.6823

0.183971762

0.05970053

15.2548

Bongkar Muat di Terminal


Multipurpose 1 Gresik

5.4244

(Insufficient)

5.4244

5.4244

Bongkar Muat di Terminal


Multipurpose Gresik

0.00

(Insufficient)

0.00

0.00

Bongkar Muat di Terminal


Petikemas 1 Surabaya

1.8736

(Insufficient)

1.5506

2.3294

Bongkar Muat di Terminal


Petikemas 2 Surabaya

1.8483

(Insufficient)

1.5316

2.2495

Bongkar Muat di Terminal


Petikemas 3 Surabaya

1.9067

0.006854031

1.1050

3.0243

Naik Turun Penumpang di


Terminal Penumpang Gresik

5.9440

(Insufficient)

3.3049

9.9968

Naik Turun Penumpang di


Terminal Penumpang Surabaya

6.1779

0.089516601

2.2344

13.7054

Average

Half Width

Minimum
Value

Maximum
Value

Bongkar Muat di Terminal Curah


Cair 1 Surabaya

8.9393

(Insufficient)

7.6175

10.7798

Bongkar Muat di Terminal Curah


Cair 2 Surabaya

1.8830

(Insufficient)

1.1111

3.0106

Bongkar Muat di Terminal Curah


Cair 3 Surabaya

7.5936

0.169263121

1.8434

13.2005

Bongkar Muat di Terminal Curah


Kering 1 Surabaya

8.7331

(Insufficient)

2.8567

13.0380

Bongkar Muat di Terminal Curah


Kering 2 Surabaya

8.4769

(Insufficient)

6.3980

9.9719

Bongkar Muat di Terminal Curah


Kering 3 Surabaya

7.4750

(Insufficient)

3.2231

12.2099

Total Time Per Entity

Bongkar Muat di Terminal


General Cargo 1 Surabaya

8.5206

(Insufficient)

4.1994

13.0205

Bongkar Muat di Terminal


General Cargo 2 Surabaya

8.9782

(Insufficient)

1.8359

19.0223

Bongkar Muat di Terminal


General Cargo 3 Surabaya

7.5875

(Insufficient)

4.0196

11.8897

Bongkar Muat di Terminal


General Cargo 4 Surabaya

11.9185

(Correlated)

0.00

71.7656

Bongkar Muat di Terminal


Lainnya Surabaya

4.6823

0.183971762

0.05970053

15.2548

Bongkar Muat di Terminal


Multipurpose 1 Gresik

5.4244

(Insufficient)

5.4244

5.4244

Bongkar Muat di Terminal


Multipurpose Gresik

0.00

(Insufficient)

0.00

0.00

Bongkar Muat di Terminal


Petikemas 1 Surabaya

1.8736

(Insufficient)

1.5506

2.3294

Bongkar Muat di Terminal


Petikemas 2 Surabaya

1.8483

(Insufficient)

1.5316

2.2495

Bongkar Muat di Terminal


Petikemas 3 Surabaya

1.9067

0.006854031

1.1050

3.0243

Naik Turun Penumpang di


Terminal Penumpang Gresik

5.9440

(Insufficient)

3.3049

9.9968

Naik Turun Penumpang di


Terminal Penumpang Surabaya

6.1779

0.089516601

2.2344

13.7054

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Time Units:

Hours

Process
Accumulated Time
Accum VA Time

Value

Bongkar Muat di Terminal Curah


Cair 1 Surabaya

80.4537

Bongkar Muat di Terminal Curah


Cair 2 Surabaya

369.07

Bongkar Muat di Terminal Curah


Cair 3 Surabaya

3120.97

Bongkar Muat di Terminal Curah


Kering 1 Surabaya

602.58

Bongkar Muat di Terminal Curah


Kering 2 Surabaya

127.15

Bongkar Muat di Terminal Curah


Kering 3 Surabaya

1016.60

Bongkar Muat di Terminal


General Cargo 1 Surabaya
Bongkar Muat di Terminal

732.78
2217.61

Page

of

29

May 21, 2015

General Cargo 2 Surabaya


B
o
n
Bongkar Muat di Terminal
g
General Cargo 4 Surabaya
k
Bongkar
Muat di Terminal
a
Lainnya
Surabaya
r
M
Bongkar Muat di Terminal
u
Multipurpose 1 Gresik
a
Bongkar
Muat di Terminal
t
Multipurpose
Gresik
d
i
Bongkar
Muat di Terminal
T
Petikemas 1 Surabaya
e
Bongkar
Muat di Terminal
r
Petikemas
2 Surabaya
m
i
Bongkar
Muat di Terminal
n
Petikemas
3 Surabaya
a
Naik Turun Penumpang di
l
Terminal Penumpang Gresik
G
Naik
Turun Penumpang di
e
Terminal
Penumpang Surabaya
n
e
10000.000
r
a
8000.000
l
C
6000.000
a
r
4000.000
g
o
2000.000
3
S
0.000
u
r
a
b
a Other
y
a

948.43
8748.19
5014.75
5.4244
0.00
359.73
236.58
8442.97
29.7202
8630.50

Bongkar Muat di
Terminal Curah Cair 1
Surabaya

Bongkar Muat di
Terminal Curah Cair 2
Surabaya

Bongkar Muat di
Terminal Curah Cair 3
Surabaya

Bongkar Muat di
Terminal Curah Kering
1 Surabaya

Bongkar Muat di
Terminal Curah Kering
2 Surabaya

Bongkar Muat di
Terminal Curah Kering
3 Surabaya

Bongkar Muat di
Terminal General Cargo
1 Surabaya

Bongkar Muat di
Terminal General Cargo
2 Surabaya

Bongkar Muat di
Terminal General Cargo
3 Surabaya

Bongkar Muat di
Terminal General Cargo
4 Surabaya

Bongkar Muat di
Terminal Lainnya
Surabaya

Bongkar Muat di
Terminal Multipurpose 1
Gresik

Bongkar Muat di
Terminal Multipurpose
Gresik

Bongkar Muat di
Terminal Petikemas 1
Surabaya

Bongkar Muat di
Terminal Petikemas 2
Surabaya

Bongkar Muat di
Terminal Petikemas 3
Surabaya

Naik Turun Penumpang


di Terminal Penumpang
Gresik

Naik Turun Penumpang


di Terminal Penumpang
Surabaya

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

of

May 21, 2015

Kondisi Eksisting
Replications:

Time Units:

Hours

Process
Other
Number In

Value

Bongkar Muat di Terminal Curah


Cair 1 Surabaya

9.0000

Bongkar Muat di Terminal Curah


Cair 2 Surabaya

196.00

Bongkar Muat di Terminal Curah


Cair 3 Surabaya

411.00

Bongkar Muat di Terminal Curah


Kering 1 Surabaya

70.0000

Bongkar Muat di Terminal Curah


Kering 2 Surabaya

15.0000

Bongkar Muat di Terminal Curah


Kering 3 Surabaya

136.00

Bongkar Muat di Terminal


General Cargo 1 Surabaya

86.0000

Bongkar Muat di Terminal


General Cargo 2 Surabaya

248.00

Bongkar Muat di Terminal


General Cargo 3 Surabaya

125.00

Bongkar Muat di Terminal


General Cargo 4 Surabaya

735.00

Bongkar Muat di Terminal


Lainnya Surabaya

1071.00

Bongkar Muat di Terminal


Multipurpose 1 Gresik

1.0000

Bongkar Muat di Terminal


Multipurpose Gresik

1.0000

Bongkar Muat di Terminal


Petikemas 1 Surabaya

192.00

Bongkar Muat di Terminal


Petikemas 2 Surabaya

128.00

Bongkar Muat di Terminal


Petikemas 3 Surabaya

4429.00

Naik Turun Penumpang di


Terminal Penumpang Gresik
Naik Turun Penumpang di
Terminal Penumpang Surabaya
4500.000
4000.000
3500.000
3000.000
2500.000

29

5.0000
1398.00

Bongkar Muat di
Terminal Curah Cair 1
Surabaya

Bongkar Muat di
Terminal Curah Cair 2
Surabaya

Bongkar Muat di
Terminal Curah Cair 3
Surabaya

Bongkar Muat di
Terminal Curah Kering
1 Surabaya

Bongkar Muat di
Terminal Curah Kering
2 Surabaya

Bongkar Muat di
Terminal Curah Kering
3 Surabaya

Bongkar Muat di
Terminal General Cargo
1 Surabaya

Bongkar Muat di
Terminal General Cargo
2 Surabaya

Bongkar Muat di
Terminal General Cargo
3 Surabaya

4500.000
4000.000
3500.000
3000.000
2500.000
2000.000
1500.000
1000.000
500.000
0.000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Time Units:

Hours

Process
Other
Number Out

Value

Bongkar Muat di Terminal Curah


Cair 1 Surabaya

9.0000

Bongkar Muat di Terminal Curah


Cair 2 Surabaya

196.00

Bongkar Muat di Terminal Curah

411.00

Bongkar Muat di
Terminal Curah Cair 1
Surabaya

Bongkar Muat di
Terminal Curah Cair 2
Surabaya

Bongkar Muat di
Terminal Curah Cair 3
Surabaya

Bongkar Muat di
Terminal Curah Kering
1 Surabaya

Bongkar Muat di
Terminal Curah Kering
2 Surabaya

Bongkar Muat di
Terminal Curah Kering
3 Surabaya

Bongkar Muat di
Terminal General Cargo
1 Surabaya

Bongkar Muat di
Terminal General Cargo
2 Surabaya

Bongkar Muat di
Terminal General Cargo
3 Surabaya

Bongkar Muat di
Terminal General Cargo
4 Surabaya

Bongkar Muat di
Terminal Lainnya
Surabaya

Bongkar Muat di
Terminal Multipurpose 1
Gresik

Bongkar Muat di
Terminal Multipurpose
Gresik

Bongkar Muat di
Terminal Petikemas 1
Surabaya

Bongkar Muat di
Terminal Petikemas 2
Surabaya

Bongkar Muat di
Terminal Petikemas 3
Surabaya

Naik Turun Penumpang


di Terminal Penumpang
Gresik

Naik Turun Penumpang


di Terminal Penumpang
Surabaya

Page

of

29

May 21, 2015

Cair 3 Surabaya
Bongkar Muat di Terminal Curah
Kering 1 Surabaya

69.0000

Bongkar Muat di Terminal Curah


Kering 2 Surabaya

15.0000

Bongkar Muat di Terminal Curah


Kering 3 Surabaya

136.00

Bongkar Muat di Terminal


General Cargo 1 Surabaya

86.0000

Bongkar Muat di Terminal


General Cargo 2 Surabaya

247.00

Bongkar Muat di Terminal


General Cargo 3 Surabaya

125.00

Bongkar Muat di Terminal


General Cargo 4 Surabaya

734.00

Bongkar Muat di Terminal


Lainnya Surabaya

1071.00

Bongkar Muat di Terminal


Multipurpose 1 Gresik

1.0000

Bongkar Muat di Terminal


Multipurpose Gresik

1.0000

Bongkar Muat di Terminal


Petikemas 1 Surabaya

192.00

Bongkar Muat di Terminal


Petikemas 2 Surabaya

128.00

Bongkar Muat di Terminal


Petikemas 3 Surabaya

4428.00

Naik Turun Penumpang di


Terminal Penumpang Gresik
Naik Turun Penumpang di
Terminal Penumpang Surabaya

5.0000
1397.00

Model Filename:

Page

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Category Overview

3:43:55 PM

Time Units:

Hours

Queue
Time
Waiting Time
Average

Half Width

Minimum
Value

Maximum
Value

4.1301

0.296596490

0.00

14.2342

Seize alur section 1.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 10.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 2.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 3.Queue

0.00

0.000000000

0.00

0.00

Pasang Surut.Queue

of

29

May 21, 2015

Kondisi Eksisting
Replications:

Seize alur section 4.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 5.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 6.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 7.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 8.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 9.Queue

0.00

0.000000000

0.00

0.00

Term.Curah Cair 1
Surabaya.Queue

0.00

(Insufficient)

0.00

0.00

Term.Curah Cair 2
Surabaya.Queue

0.3048

(Insufficient)

0.00

4.4096

Term.Curah Cair 3
Surabaya.Queue

1.9348

0.649132051

0.00

27.6672

Term.Curah Kering 1
Surabaya.Queue

0.2839

(Insufficient)

0.00

9.2828

Term.Curah Kering 2
Surabaya.Queue

1.2431

(Insufficient)

0.00

9.9719

Term.Curah Kering 3
Surabaya.Queue

0.2195

(Insufficient)

0.00

8.9226

Term.General Cargo 1
Surabaya.Queue

0.5662

(Insufficient)

0.00

11.0581

Term.General Cargo 2
Surabaya.Queue

4.2517

(Insufficient)

0.00

40.4649

Term.General Cargo 3
Surabaya.Queue

2.1098

(Insufficient)

0.00

21.5485

2581.36

(Correlated)

0.00

5494.16

4.2799

0.855407416

0.00

34.5061

Term.Multipurpose 1
Gresik.Queue

0.00

(Insufficient)

0.00

0.00

Term.Multipurpose 2
Gresik.Queue

0.00

(Insufficient)

0.00

0.00

Term.Penumpang Gresik.Queue

0.00

(Insufficient)

0.00

0.00

Term.Penumpang
Surabaya.Queue

339.13

(Correlated)

0.00

803.53

Term.Petikemas 1
Surabaya.Queue

0.04634219

(Insufficient)

0.00

2.0898

Term.Petikemas 2
Surabaya.Queue

0.08521728

(Insufficient)

0.00

1.9834

Term.Petikemas 3
Surabaya.Queue

22.7014

(Correlated)

0.00

60.4532

Term.General Cargo 4.Queue


Term.Lainnya Surabaya.Queue

Other

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Queue
Other
Number Waiting
Average

Half Width

Minimum
Value

Maximum
Value

0.5229

0.049108073

0.00

11.0000

Seize alur section 1.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 10.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 2.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 3.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 4.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 5.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 6.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 7.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 8.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 9.Queue

0.00

(Insufficient)

0.00

0.00

Term.Curah Cair 1
Surabaya.Queue

0.00

(Insufficient)

0.00

0.00

Term.Curah Cair 2
Surabaya.Queue

0.00682059

(Insufficient)

0.00

2.0000

Pasang Surut.Queue

of

29

May 21, 2015

Kondisi Eksisting
Replications:

10

Surabaya.Queue
Term.Curah Cair 3
Surabaya.Queue

0.0908

(Insufficient)

0.00

3.0000

Term.Curah Kering 1
Surabaya.Queue

0.00226829

(Insufficient)

0.00

1.0000

Term.Curah Kering 2
Surabaya.Queue

0.00212862

(Insufficient)

0.00

1.0000

Term.Curah Kering 3
Surabaya.Queue

0.00340779

(Insufficient)

0.00

1.0000

Term.General Cargo 1
Surabaya.Queue

0.00555812

(Insufficient)

0.00

1.0000

Term.General Cargo 2
Surabaya.Queue

0.1211

(Insufficient)

0.00

4.0000

Term.General Cargo 3
Surabaya.Queue

0.03010512

(Insufficient)

0.00

3.0000

Term.General Cargo 4.Queue

564.10

(Correlated)

0.00

1114.00

Term.Lainnya Surabaya.Queue

0.5233

0.129448218

0.00

7.0000

Term.Multipurpose 1
Gresik.Queue

92.7041

(Insufficient)

0.00

197.00

Term.Multipurpose 2
Gresik.Queue

44.3022

(Insufficient)

0.00

103.00

0.00

(Insufficient)

0.00

0.00

Term.Penumpang
Surabaya.Queue

60.7470

(Correlated)

0.00

160.00

Term.Petikemas 1
Surabaya.Queue

0.00101572

(Insufficient)

0.00

1.0000

Term.Petikemas 2
Surabaya.Queue

0.00124518

(Insufficient)

0.00

1.0000

Term.Petikemas 3
Surabaya.Queue

11.5049

(Correlated)

0.00

33.0000

Term.Penumpang Gresik.Queue

Model Filename:

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Page

11

of

29

Category Overview

3:43:55 PM

May 21, 2015

Kondisi Eksisting
Replications:

Time Units:

Hours

Resource
Usage
Instantaneous Utilization
Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

0.00

(Insufficient)

0.00

1.0000

section_10_Pelabuhan_Surabay
a

0.00

(Insufficient)

0.00

1.0000

section_2_to_3

0.00

(Insufficient)

0.00

1.0000

section_3_to_4

0.00

(Insufficient)

0.00

1.0000

section_4_to_5

0.00

(Insufficient)

0.00

1.0000

section_5_to_6

0.00

(Insufficient)

0.00

1.0000

section_6_to_7

0.00

(Insufficient)

0.00

1.0000

section_7_to_8

0.00

(Insufficient)

0.00

1.0000

section_8_to_9

0.00

(Insufficient)

0.00

1.0000

section_9_to_10

0.00

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
1_Surabaya

0.00918421

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
2_Surabaya

0.04213130

0.005558278

0.00

1.0000

Terminal_Curah_Cair
3_Surabaya

0.3563

0.030206027

0.00

1.0000

Terminal_Curah_Kering
1_Surabaya

0.06951180

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
2_Surabaya

0.01451517

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
3_Surabaya

0.1161

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
1_Surabaya

0.08365018

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
2_Surabaya

0.2539

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
3_Surabaya

0.1083

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
4_Surabaya

0.9995

(Insufficient)

0.00

1.0000

Terminal_Lainnya_Surabaya

0.5826

0.037072517

0.00

1.0000

Terminal_Multipurpose_1_Gresik

0.9996

(Insufficient)

0.00

1.0000

Terminal_Multipurpose_2_Gresik

0.9920

(Insufficient)

0.00

1.0000

0.00344029

(Insufficient)

0.00

1.0000

0.9990

(Insufficient)

0.00

1.0000

Terminal_Penumpang_Gresik
Terminal_Penumpang_Surabaya

Terminal_Petikemas 1_Surabaya

0.04106542

0.004456166

0.00

1.0000

Terminal_Petikemas 2_Surabaya

0.02700648

(Insufficient)

0.00

1.0000

Terminal_Petikemas 3_Surabaya

0.9639

(Insufficient)

0.00

1.0000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Resource
Usage
Number Busy

of

29

May 21, 2015

Kondisi Eksisting
Replications:

12

Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

0.00

(Insufficient)

0.00

1.0000

section_10_Pelabuhan_Surabay
a

0.00

(Insufficient)

0.00

1.0000

section_2_to_3

0.00

(Insufficient)

0.00

1.0000

section_3_to_4

0.00

(Insufficient)

0.00

1.0000

section_4_to_5

0.00

(Insufficient)

0.00

1.0000

section_5_to_6

0.00

(Insufficient)

0.00

1.0000

section_6_to_7

0.00

(Insufficient)

0.00

1.0000

section_7_to_8

0.00

(Insufficient)

0.00

1.0000

section_8_to_9

0.00

(Insufficient)

0.00

1.0000

section_9_to_10

0.00

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
1_Surabaya

0.00918421

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
2_Surabaya

0.04213130

0.005558278

0.00

1.0000

Terminal_Curah_Cair
3_Surabaya

0.3563

0.030206027

0.00

1.0000

Terminal_Curah_Kering
1_Surabaya

0.06951180

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
2_Surabaya

0.01451517

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
3_Surabaya

0.1161

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
1_Surabaya

0.08365018

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
2_Surabaya

0.2539

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
3_Surabaya

0.1083

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
4_Surabaya

0.9995

(Insufficient)

0.00

1.0000

Terminal_Lainnya_Surabaya

0.5826

0.037072517

0.00

1.0000

Terminal_Multipurpose_1_Gresik

0.9996

(Insufficient)

0.00

1.0000

Terminal_Multipurpose_2_Gresik

0.9920

(Insufficient)

0.00

1.0000

0.00344029

(Insufficient)

0.00

1.0000

Terminal_Penumpang_Surabaya

0.9990

(Insufficient)

0.00

1.0000

Terminal_Petikemas 1_Surabaya

0.04106542

0.004456166

0.00

1.0000

Terminal_Petikemas 2_Surabaya

0.02700648

(Insufficient)

0.00

1.0000

Terminal_Petikemas 3_Surabaya

0.9639

(Insufficient)

0.00

1.0000

Terminal_Penumpang_Gresik

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Resource
Usage
Number Scheduled

of

29

May 21, 2015

Kondisi Eksisting
Replications:

13

Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

1.0000

(Insufficient)

1.0000

1.0000

section_10_Pelabuhan_Surabay
a

1.0000

(Insufficient)

1.0000

1.0000

section_2_to_3

1.0000

(Insufficient)

1.0000

1.0000

section_3_to_4

1.0000

(Insufficient)

1.0000

1.0000

section_4_to_5

1.0000

(Insufficient)

1.0000

1.0000

section_5_to_6

1.0000

(Insufficient)

1.0000

1.0000

section_6_to_7

1.0000

(Insufficient)

1.0000

1.0000

section_7_to_8

1.0000

(Insufficient)

1.0000

1.0000

section_8_to_9

1.0000

(Insufficient)

1.0000

1.0000

section_9_to_10

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Cair
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Cair

1.0000

(Insufficient)

1.0000

1.0000

2_Surabaya
Terminal_Curah_Cair
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
4_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Lainnya_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_1_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Model Filename:

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Page

14

of

29

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Time Units:

Hours

Resource
Usage
Scheduled Utilization

Value

section_1_to_2

0.00

section_10_Pelabuhan_Surabay
a

0.00

section_2_to_3

0.00

section_3_to_4

0.00

section_4_to_5

0.00

section_5_to_6

0.00

section_6_to_7

0.00

section_7_to_8

0.00

section_8_to_9

0.00

section_9_to_10

0.00

Terminal_Curah_Cair
1_Surabaya

0.00918421

Terminal_Curah_Cair
2_Surabaya

0.04213130

Terminal_Curah_Cair
3_Surabaya

0.3563

Terminal_Curah_Kering
1_Surabaya

0.06951180

Terminal_Curah_Kering
2_Surabaya

0.01451517

Terminal_Curah_Kering
3_Surabaya

0.1161

Terminal_General_Cargo
1_Surabaya

0.08365018

Terminal_General_Cargo
2_Surabaya

0.2539

Terminal_General_Cargo
3_Surabaya

0.1083

Terminal_General_Cargo
4_Surabaya

0.9995

Terminal_Lainnya_Surabaya

0.5826

Terminal_Multipurpose_1_Gresik

0.9996

Terminal_Multipurpose_2_Gresik

0.9920

Terminal_Penumpang_Gresik
Terminal_Penumpang_Surabaya

0.00344029
0.9990

May 21, 2015

Terminal_Petikemas 1_Surabaya

0.04106542

Terminal_Petikemas 2_Surabaya

0.02700648

Terminal_Petikemas 3_Surabaya

0.9639

1.000
0.800
0.600
0.400
0.200
0.000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Kondisi Eksisting
Replications:

Time Units:

Hours

Resource
Usage
Total Number Seized

Value

section_1_to_2

10849.00

section_10_Pelabuhan_Surabay
a

10535.00

section_2_to_3

10846.00

section_3_to_4

10845.00

section_4_to_5

10844.00

section_5_to_6

10844.00

section_1_to_2

section_10_Pelabuhan_Surabaya

section_2_to_3

section_3_to_4

section_4_to_5

section_5_to_6

section_6_to_7

section_7_to_8

section_8_to_9

section_9_to_10

Terminal_Curah_Cair 1_Surabaya

Terminal_Curah_Cair 2_Surabaya

Terminal_Curah_Cair 3_Surabaya

Terminal_Curah_Kering
1_Surabaya

Terminal_Curah_Kering
2_Surabaya

Terminal_Curah_Kering
3_Surabaya

Terminal_General_Cargo
1_Surabaya

Terminal_General_Cargo
2_Surabaya

Terminal_General_Cargo
3_Surabaya

Terminal_General_Cargo
4_Surabaya

Terminal_Lainnya_Surabaya

Terminal_Multipurpose_1_Gresik

Terminal_Multipurpose_2_Gresik

Terminal_Penumpang_Gresik

Terminal_Penumpang_Surabaya

Terminal_Petikemas 1_Surabaya

Terminal_Petikemas 2_Surabaya

Terminal_Petikemas 3_Surabaya

P
a
g
e

15

of

29

May 21, 2015

section_6_to_7

10844.00

section_7_to_8

10537.00

section_8_to_9

10535.00

section_9_to_10

10535.00

Terminal_Curah_Cair
1_Surabaya

9.0000

Terminal_Curah_Cair
2_Surabaya

196.00

Terminal_Curah_Cair
3_Surabaya

411.00

Terminal_Curah_Kering
1_Surabaya

70.0000

Terminal_Curah_Kering
2_Surabaya

15.0000

Terminal_Curah_Kering
3_Surabaya

136.00

Terminal_General_Cargo
1_Surabaya

86.0000

Terminal_General_Cargo
2_Surabaya

248.00

Terminal_General_Cargo
3_Surabaya

125.00

Terminal_General_Cargo
4_Surabaya

735.00

Terminal_Lainnya_Surabaya

1071.00

Terminal_Multipurpose_1_Gresik

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

Terminal_Penumpang_Gresik

5.0000

Terminal_Penumpang_Surabaya

1398.00

Terminal_Petikemas 1_Surabaya

192.00

Terminal_Petikemas 2_Surabaya

128.00

Terminal_Petikemas 3_Surabaya

4429.00

12000.000
10000.000
8000.000
6000.000
4000.000
2000.000
0.000

User Specified
Time Persistent

section_1_to_2

section_10_Pelabuhan_Surabaya

section_2_to_3

section_3_to_4

section_4_to_5

section_5_to_6

section_6_to_7

section_7_to_8

section_8_to_9

section_9_to_10

Terminal_Curah_Cair 1_Surabaya

Terminal_Curah_Cair 2_Surabaya

Terminal_Curah_Cair 3_Surabaya

Terminal_Curah_Kering
1_Surabaya

Terminal_Curah_Kering
2_Surabaya

Terminal_Curah_Kering
3_Surabaya

Terminal_General_Cargo
1_Surabaya

Terminal_General_Cargo
2_Surabaya

Terminal_General_Cargo
3_Surabaya

Terminal_General_Cargo
4_Surabaya

Terminal_Lainnya_Surabaya

Terminal_Multipurpose_1_Gresik

Terminal_Multipurpose_2_Gresik

Terminal_Penumpang_Gresik

Terminal_Penumpang_Surabaya

Terminal_Petikemas 1_Surabaya

Terminal_Petikemas 2_Surabaya

Terminal_Petikemas 3_Surabaya

Variable
waktu_tempuh

Average

Half Width

Minimum
Value

Maximum
Value

20.1598

0.147165329

0.00

65.0000

Unnamed Project
Replications:

Time Units:

Hours

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Unnamed Project
Replications:

Time Units:

Hours

Key Performance Indicators


System

Average

Number Out
6,289

Page

16

of

29

May 20, 2015

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Entity
Time
VA Time

of

29

May 20, 2015

Unnamed Project
Replications:

17

Average

Half Width

Minimum
Value

Maximum
Value

BULK M

7.7117

(Insufficient)

1.6237

13.6285

CONT L

7.2495

(Insufficient)

1.7613

14.8302

CONT M

7.1125

0.233491890

0.3881

17.4275

CONT S

6.9298

(Insufficient)

1.5582

17.8275

CONT XL

6.9213

(Insufficient)

1.7165

13.8138

GCAR L

7.0604

(Correlated)

0.5237

18.3809

GCAR M

7.2173

(Insufficient)

0.1670

15.9346

GCAR S

7.1473

0.134582103

0.8870

18.5658

GCAR XL

6.9505

(Insufficient)

1.6869

15.9179

OTHR

7.0249

0.206073798

0.6308

17.7969

TANK L

6.8185

(Insufficient)

1.5336

15.0658

TANK M

7.2586

0.249231460

0.00

17.2750

TANK S

6.8866

(Insufficient)

0.8267

17.1248

TANK XL

7.2430

0.224080873

1.2434

16.8524

Average

Half Width

Minimum
Value

Maximum
Value

BULK M

0.00

(Insufficient)

0.00

0.00

CONT L

0.00

(Insufficient)

0.00

0.00

CONT M

0.00

0.000000000

0.00

0.00

CONT S

0.00

(Insufficient)

0.00

0.00

CONT XL

0.00

(Insufficient)

0.00

0.00

GCAR L

0.00

0.000000000

0.00

0.00

GCAR M

0.00

(Insufficient)

0.00

0.00

GCAR S

0.00

0.000000000

0.00

0.00

GCAR XL

0.00

(Insufficient)

0.00

0.00

OTHR

0.00

0.000000000

0.00

0.00

TANK L

0.00

(Insufficient)

0.00

0.00

TANK M

0.00

0.000000000

0.00

0.00

TANK S

0.00

(Insufficient)

0.00

0.00

TANK XL

0.00

0.000000000

0.00

0.00

Average

Half Width

Minimum
Value

Maximum
Value

BULK M

538.09

(Insufficient)

0.00

5502.75

CONT L

558.66

(Insufficient)

0.00

5489.98

CONT M

547.25

(Correlated)

0.00

5700.36

CONT S

373.15

(Insufficient)

0.00

5693.27

CONT XL

597.89

(Insufficient)

0.00

5745.41

GCAR L

540.44

(Correlated)

0.00

5738.76

GCAR M

422.45

(Insufficient)

0.00

5209.26

GCAR S

460.41

(Correlated)

0.00

5702.34

GCAR XL

673.44

(Insufficient)

0.00

5637.59

OTHR

376.54

(Correlated)

0.00

5693.32

TANK L

558.49

(Insufficient)

0.00

5728.34

TANK M

600.99

(Correlated)

0.00

5692.41

TANK S

420.27

(Insufficient)

0.00

5398.93

TANK XL

618.63

(Correlated)

0.00

5754.12

NVA Time

Wait Time

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Entity
Time
Transfer Time
Average

Half Width

Minimum
Value

Maximum
Value

BULK M

3.8074

(Insufficient)

2.8167

4.1333

CONT L

3.7213

(Insufficient)

2.8167

4.1333

CONT M

3.7025

0.024497877

2.7500

4.0333

CONT S

3.7023

(Insufficient)

2.7667

4.0333

CONT XL

3.7412

(Insufficient)

2.8833

4.0833

GCAR L

3.7376

0.027330229

2.7667

4.1333

GCAR M

3.7163

(Insufficient)

2.8000

4.0167

GCAR S

3.8259

0.013834421

2.8333

4.1333

GCAR XL

3.7635

(Insufficient)

3.1000

4.0833

OTHR

3.6293

0.021168333

2.8000

4.0500

TANK L

3.7131

(Insufficient)

2.8667

4.0833

TANK M

3.7641

0.022376160

2.7833

4.0833

TANK S

3.7989

(Insufficient)

2.8333

4.0833

TANK XL

3.7418

0.036770230

2.7667

4.1333

Average

Half Width

Minimum
Value

Maximum
Value

BULK M

0.00

(Insufficient)

0.00

0.00

CONT L

0.00

(Insufficient)

0.00

0.00

CONT M

0.00

0.000000000

0.00

0.00

CONT S

0.00

(Insufficient)

0.00

0.00

Other Time

of

29

May 20, 2015

Unnamed Project
Replications:

18

CONT XL

0.00

(Insufficient)

0.00

0.00

GCAR L

0.00

0.000000000

0.00

0.00

GCAR M

0.00

(Insufficient)

0.00

0.00

GCAR S

0.00

0.000000000

0.00

0.00

GCAR XL

0.00

(Insufficient)

0.00

0.00

OTHR

0.00

0.000000000

0.00

0.00

TANK L

0.00

(Insufficient)

0.00

0.00

TANK M

0.00

0.000000000

0.00

0.00

TANK S

0.00

(Insufficient)

0.00

0.00

TANK XL

0.00

0.000000000

0.00

0.00

Average

Half Width

Minimum
Value

Maximum
Value

BULK M

549.61

(Insufficient)

5.3951

5517.77

CONT L

569.63

(Insufficient)

7.2930

5500.41

CONT M

558.06

(Correlated)

5.0828

5716.08

CONT S

383.79

(Insufficient)

4.8930

5708.08

CONT XL

608.56

(Insufficient)

4.8846

5758.38

GCAR L

551.24

(Correlated)

4.9955

5749.85

GCAR M

433.39

(Insufficient)

5.0276

5219.64

GCAR S

471.39

(Correlated)

4.9092

5712.93

GCAR XL

684.15

(Insufficient)

5.5451

5651.19

OTHR

387.19

(Correlated)

4.7973

5702.56

TANK L

569.02

(Insufficient)

7.1560

5743.59

TANK M

612.02

(Correlated)

4.8064

5705.33

TANK S

430.95

(Insufficient)

5.2616

5416.68

TANK XL

629.62

(Correlated)

5.2838

5768.22

Total Time

Other

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Unnamed Project
Replications:

Time Units:

Hours

Page

19

of

29

May 20, 2015

Entity
Other
Number In

Value

BULK L

17.0000

BULK M

130.00

BULK XL

131.00

CONT L

111.00

CONT M

791.00

CONT S

490.00

CONT XL

199.00

GCAR L

3535.00

GCAR M

131.00

GCAR S

1801.00

GCAR XL

82.0000

OTHR

1068.00

PASS

1536.00

TANK L

228.00

TANK M

1569.00

TANK S

515.00

TANK XL

1388.00

4000.000
BULK L
BULK M
BULK XL
CONT L
CONT M
CONT S
CONT XL
GCAR L
GCAR M
GCAR S
GCAR XL
OTHR
PASS
TANK L
TANK M
TANK S
TANK XL

3500.000
3000.000
2500.000
2000.000
1500.000
1000.000
500.000
0.000

Number Out

Value

BULK L

0.00

BULK M

72.0000

BULK XL

0.00

CONT L

72.0000

CONT M

476.00

CONT S

277.00

CONT XL

118.00

GCAR L

1809.00

GCAR M

88.0000

GCAR S

1085.00

GCAR XL

42.0000

OTHR

638.00

PASS

0.00

TANK L

85.0000

TANK M

527.00

TANK S

224.00

TANK XL

776.00

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

20

of

May 20, 2015

Unnamed Project
14000.000
1.000
9000.000
12000.000

8000.000
Replications:
0.800

Time Units:

Hours

10000.000
7000.000
0.600
8000.000
6000.000

Entity

6000.000
5000.000
0.400
4000.000
4000.000
0.200
2000.000
3000.000

Other
WIP

0.000
2000.000

29

Average

Half Width

Minimum
Value

Maximum
Value

BULK L

9.3872

(Insufficient)

2.0000

19.0000

BULK M

32.1769

(Insufficient)

0.00

60.0000

BULK XL

68.1863

(Insufficient)

1.0000

132.00

CONT L

21.1407

(Insufficient)

0.00

40.0000

CONT M

159.62

(Correlated)

2.0000

318.00

CONT S

102.76

(Correlated)

0.00

214.00

CONT XL

43.3858

(Insufficient)

1.0000

83.0000

GCAR L

869.55

(Correlated)

6.0000

1732.00

GCAR M

16.7676

(Insufficient)

0.00

46.0000

GCAR S

358.64

(Correlated)

3.0000

722.00

GCAR XL

22.1399

(Insufficient)

0.00

43.0000

OTHR

215.44

(Correlated)

2.0000

433.00

PASS

760.22

(Correlated)

1.0000

1537.00

section_1_to_2

section_10_Pelabuhan_Surabaya

section_2_to_3

section_3_to_4

section_4_to_5

section_5_to_6

section_6_to_7

section_7_to_8

section_8_to_9

section_9_to_10

Terminal_Curah_Cair 1_Surabaya

Terminal_Curah_Cair 2_Surabaya

Terminal_Curah_Cair 3_Surabaya

Terminal_Curah_Kering
1_Surabaya

Terminal_Curah_Kering
2_Surabaya

Terminal_Curah_Kering
3_Surabaya

Terminal_General_Cargo
1_Surabaya

Terminal_General_Cargo
2_Surabaya

Terminal_General_Cargo
3_Surabaya

Terminal_General_Cargo
4_Surabaya

Terminal_Lainnya_Surabaya

Terminal_Multipurpose_1_Gresik

Terminal_Multipurpose_2_Gresik

Terminal_Penumpang_Gresik

Terminal_Penumpang_Surabaya

Terminal_Petikemas 1_Surabaya

Terminal_Petikemas 2_Surabaya

Terminal_Petikemas 3_Surabaya

Record 1

TANK L

64.7841

(Insufficient)

1.0000

146.00

TANK M

525.77

(Correlated)

4.0000

1046.00

TANK S

140.65

(Correlated)

1.0000

293.00

TANK XL

315.22

(Correlated)

4.0000

616.00

Model Filename:

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

3:43:55 PM

Unnamed Project

Category Overview

Page

21

of

29

May 20, 2015

Replications:

Time Units:

Hours

Queue
Time
Average

Half Width

Minimum
Value

Maximum
Value

4.1191

0.084804468

0.00

14.6967

Seize alur section 1.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 10.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 2.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 3.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 4.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 5.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 6.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 7.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 8.Queue

0.00

0.000000000

0.00

0.00

Seize alur section 9.Queue

0.00

0.000000000

0.00

0.00

Term.Curah Cair 1
Surabaya.Queue

12.4840

(Insufficient)

0.00

104.37

Term.Curah Cair 2
Surabaya.Queue

0.2568

(Insufficient)

0.00

3.4119

Term.Curah Cair 3
Surabaya.Queue

162.24

(Correlated)

0.00

438.91

Term.Curah Kering 2
Surabaya.Queue

17.9843

(Insufficient)

0.00

108.64

Term.Curah Kering 1
Surabaya.Queue

19.9992

7.00739

0.00

150.16

Term.Curah Kering 3
Surabaya.Queue

20.3686

5.87510

0.00

124.26

Term.General Cargo 1
Surabaya.Queue

18.1795

(Insufficient)

0.00

96.2502

Term.General Cargo 2
Surabaya.Queue

2852.96

(Correlated)

3.3583

5756.19

Term.General Cargo 3
Surabaya.Queue

10.1839

(Insufficient)

0.00

103.29

Term.General Cargo 4.Queue

0.00

(Insufficient)

0.00

0.00

Term.Lainnya Surabaya.Queue

0.00

(Insufficient)

0.00

0.00

Term.Penumpang Gresik.Queue

0.00

(Insufficient)

0.00

0.00

Term.Penumpang
Surabaya.Queue

0.00

(Insufficient)

0.00

0.00

Term.Petikemas 1
Surabaya.Queue

42.3203

(Correlated)

0.00

190.17

Term.Petikemas 2
Surabaya.Queue

3.3356

(Insufficient)

0.00

20.2595

Term.Petikemas 3
Surabaya.Queue

127.90

(Correlated)

0.00

328.93

Waiting Time
Pasang Surut.Queue

Other

Model Filename:

Page

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Category Overview

3:43:55 PM

Time Units:

Hours

Queue
Other
Number Waiting
Average

Half Width

Minimum
Value

Maximum
Value

2.6833

0.062512602

0.00

15.0000

Seize alur section 1.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 10.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 2.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 3.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 4.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 5.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 6.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 7.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 8.Queue

0.00

(Insufficient)

0.00

0.00

Seize alur section 9.Queue

0.00

(Insufficient)

0.00

0.00

Pasang Surut.Queue

of

29

May 20, 2015

Unnamed Project
Replications:

22

Term.Curah Cair 1
Surabaya.Queue

0.1158

(Insufficient) #

12.0000

Term.Curah Cair 2
Surabaya.Queue

0.00117584

(Insufficient)

0.00

2.0000

Term.Curah Cair 3
Surabaya.Queue

22.3214

(Correlated)

0.00

62.0000

Term.Curah Kering 2
Surabaya.Queue

0.3376

(Insufficient)

0.00

13.0000

Term.Curah Kering 1
Surabaya.Queue

1.0716

0.548066157

0.00

20.0000

Term.Curah Kering 3
Surabaya.Queue

1.2964

0.471882616

0.00

16.0000

Term.General Cargo 1
Surabaya.Queue

0.2768

(Insufficient)

0.00

11.0000

Term.General Cargo 2
Surabaya.Queue

924.25

(Correlated)

1.0000

1833.00

Term.General Cargo 3
Surabaya.Queue

0.1865

(Insufficient)

0.00

15.0000

Term.General Cargo 4.Queue

208.41

(Correlated)

0.00

436.00

Term.Lainnya Surabaya.Queue

438.44

(Correlated)

0.00

914.00

Term.Multipurpose 1
Gresik.Queue

306.90

(Correlated)

5.0000

614.00

Term.Multipurpose 2
Gresik.Queue

945.35

(Correlated)

3.0000

1873.00

Term.Penumpang Gresik.Queue

165.44

(Correlated)

0.00

354.00

Term.Penumpang
Surabaya.Queue

673.81

(Correlated)

0.00

1395.00

Term.Petikemas 1
Surabaya.Queue

4.7216

(Correlated)

0.00

28.0000

Term.Petikemas 2
Surabaya.Queue

0.1119

(Insufficient)

0.00

11.0000

Term.Petikemas 3
Surabaya.Queue

18.3497

(Correlated)

0.00

50.0000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Resource
Usage
Instantaneous Utilization
Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

0.00

(Insufficient)

0.00

1.0000

section_10_Pelabuhan_Surabay
a

0.00

(Insufficient)

0.00

1.0000

section_2_to_3

0.00

(Insufficient)

0.00

1.0000

section_3_to_4

0.00

(Insufficient)

0.00

1.0000

section_4_to_5

0.00

(Insufficient)

0.00

1.0000

section_5_to_6

0.00

(Insufficient)

0.00

1.0000

section_6_to_7

0.00

(Insufficient)

0.00

1.0000

section_7_to_8

0.00

(Insufficient)

0.00

1.0000

section_8_to_9

0.00

(Insufficient)

0.00

1.0000

section_9_to_10

0.00

(Insufficient)

0.00

1.0000

0.08199722

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
1_Surabaya

of

29

May 20, 2015

Unnamed Project
Replications:

23

Terminal_Curah_Cair
2_Surabaya

0.00854082

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
3_Surabaya

0.9561

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
1_Surabaya

0.4436

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
2_Surabaya

0.1573

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
3_Surabaya

0.4758

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
1_Surabaya

0.1279

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
2_Surabaya

1.0000

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
3_Surabaya

0.1403

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
4_Surabaya

0.9976

(Insufficient)

0.00

1.0000

Terminal_Lainnya_Surabaya

1.0000

(Insufficient)

0.00

1.0000

Terminal_Multipurpose_1_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Gresik

0.9964

(Insufficient)

0.00

1.0000

Terminal_Penumpang_Surabaya

0.9963

(Insufficient)

0.00

1.0000

Terminal_Petikemas 1_Surabaya

0.7322

(Insufficient)

0.00

1.0000

Terminal_Petikemas 2_Surabaya

0.06158789

(Insufficient)

0.00

1.0000

Terminal_Petikemas 3_Surabaya

0.9332

(Insufficient)

0.00

1.0000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Resource
Usage
Number Busy

of

29

May 20, 2015

Unnamed Project
Replications:

24

Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

0.00

(Insufficient)

0.00

1.0000

section_10_Pelabuhan_Surabay
a

0.00

(Insufficient)

0.00

1.0000

section_2_to_3

0.00

(Insufficient)

0.00

1.0000

section_3_to_4

0.00

(Insufficient)

0.00

1.0000

section_4_to_5

0.00

(Insufficient)

0.00

1.0000

section_5_to_6

0.00

(Insufficient)

0.00

1.0000

section_6_to_7

0.00

(Insufficient)

0.00

1.0000

section_7_to_8

0.00

(Insufficient)

0.00

1.0000

section_8_to_9

0.00

(Insufficient)

0.00

1.0000

section_9_to_10

0.00

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
1_Surabaya

0.08199722

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
2_Surabaya

0.00854082

(Insufficient)

0.00

1.0000

Terminal_Curah_Cair
3_Surabaya

0.9561

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
1_Surabaya

0.4436

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
2_Surabaya

0.1573

(Insufficient)

0.00

1.0000

Terminal_Curah_Kering
3_Surabaya

0.4758

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
1_Surabaya

0.1279

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
2_Surabaya

1.0000

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
3_Surabaya

0.1403

(Insufficient)

0.00

1.0000

Terminal_General_Cargo
4_Surabaya

0.9976

(Insufficient)

0.00

1.0000

Terminal_Lainnya_Surabaya

1.0000

(Insufficient)

0.00

1.0000

Terminal_Multipurpose_1_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Gresik

0.9964

(Insufficient)

0.00

1.0000

Terminal_Penumpang_Surabaya

0.9963

(Insufficient)

0.00

1.0000

Terminal_Petikemas 1_Surabaya

0.7322

(Insufficient)

0.00

1.0000

Terminal_Petikemas 2_Surabaya

0.06158789

(Insufficient)

0.00

1.0000

Terminal_Petikemas 3_Surabaya

0.9332

(Insufficient)

0.00

1.0000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Page

Category Overview

3:43:55 PM

Time Units:

Hours

Resource
Usage
Number Scheduled

of

29

May 20, 2015

Unnamed Project
Replications:

25

Average

Half Width

Minimum
Value

Maximum
Value

section_1_to_2

1.0000

(Insufficient)

1.0000

1.0000

section_10_Pelabuhan_Surabay
a

1.0000

(Insufficient)

1.0000

1.0000

section_2_to_3

1.0000

(Insufficient)

1.0000

1.0000

section_3_to_4

1.0000

(Insufficient)

1.0000

1.0000

section_4_to_5

1.0000

(Insufficient)

1.0000

1.0000

section_5_to_6

1.0000

(Insufficient)

1.0000

1.0000

section_6_to_7

1.0000

(Insufficient)

1.0000

1.0000

section_7_to_8

1.0000

(Insufficient)

1.0000

1.0000

section_8_to_9

1.0000

(Insufficient)

1.0000

1.0000

section_9_to_10

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Cair
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Cair
2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Cair
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Curah_Kering
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_General_Cargo
4_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Lainnya_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_1_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Gresik

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Penumpang_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 1_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 2_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

Terminal_Petikemas 3_Surabaya

1.0000

(Insufficient)

1.0000

1.0000

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Unnamed Project
Replications:

Time Units:

Hours

Resource
Usage
Scheduled Utilization

Value

section_1_to_2

0.00

section_10_Pelabuhan_Surabay
a

0.00

section_2_to_3

0.00

section_3_to_4

0.00

section_4_to_5

0.00

section_5_to_6

0.00

section_6_to_7

0.00

section_7_to_8

0.00

section_8_to_9

0.00

section_9_to_10

0.00

Terminal_Curah_Cair
1_Surabaya

0.08199722

Page

26

of

29

May 20, 2015

Terminal_Curah_Cair
2_Surabaya

0.00854082

Terminal_Curah_Cair
3_Surabaya

0.9561

Terminal_Curah_Kering
1_Surabaya

0.4436

Terminal_Curah_Kering
2_Surabaya

0.1573

Terminal_Curah_Kering
3_Surabaya

0.4758

Terminal_General_Cargo
1_Surabaya

0.1279

Terminal_General_Cargo
2_Surabaya

1.0000

Terminal_General_Cargo
3_Surabaya

0.1403

Terminal_General_Cargo
4_Surabaya

0.9976

Terminal_Lainnya_Surabaya

1.0000

Terminal_Multipurpose_1_Gresik

1.0000

Terminal_Multipurpose_2_Gresik

1.0000

Terminal_Penumpang_Gresik

0.9964

Terminal_Penumpang_Surabaya

0.9963

Terminal_Petikemas 1_Surabaya

0.7322

Terminal_Petikemas 2_Surabaya

0.06158789

Terminal_Petikemas 3_Surabaya

0.9332

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Unnamed Project
Replications:

Time Units:

Hours

Resource
Usage
Total Number Seized

Value

section_1_to_2

13720.00

section_10_Pelabuhan_Surabay
a

10886.00

section_2_to_3

13719.00

section_3_to_4

13720.00

section_4_to_5

13721.00

section_5_to_6

13720.00

section_6_to_7

13720.00

section_7_to_8

10886.00

section_8_to_9

10886.00

section_9_to_10

10886.00

Terminal_Curah_Cair
1_Surabaya

81.0000

Terminal_Curah_Cair
2_Surabaya

40.0000

Terminal_Curah_Cair
3_Surabaya

1196.00

Terminal_Curah_Kering
1_Surabaya

466.00

Terminal_Curah_Kering
2_Surabaya

164.00

Terminal_Curah_Kering
3_Surabaya

556.00

Terminal_General_Cargo
1_Surabaya

133.00

Page

27

of

29

May 20, 2015

1_Surabaya
Terminal_General_Cargo
2_Surabaya

983.00

Terminal_General_Cargo
3_Surabaya

160.00

Terminal_General_Cargo
4_Surabaya

1.0000

Terminal_Lainnya_Surabaya

1.0000

Terminal_Multipurpose_1_Gresik

0.00

Terminal_Multipurpose_2_Gresik

0.00

Terminal_Penumpang_Gresik

1.0000

Terminal_Penumpang_Surabaya

1.0000

Terminal_Petikemas 1_Surabaya

970.00

Terminal_Petikemas 2_Surabaya

293.00

Terminal_Petikemas 3_Surabaya

1247.00

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Model Filename:

Category Overview

3:43:55 PM

Unnamed Project
Replications:

Time Units:

Hours

Page

28

of

29

May 20, 2015

User Specified
Counter
Count
Record 1

Value

5691.00

Time Persistent
Variable
Tipe_kapal
waktu_tempuh

Average

Half Width

Minimum
Value

Maximum
Value

3.3963

0.027368485

1.0000

6.0000

21.9386

0.120314143

4.0000

65.0000

Model Filename:

E:\Thesis\Simulasi\New Irwan\Skenario APBS\1. Kondisi Awal

Page

29

of

29