Академический Документы
Профессиональный Документы
Культура Документы
COTEMAR
PROYECTO:
CONTRATO:
UBICACIN:
PLANTA O INSTALACIN:
PLATAFORMA PP-KU-H
NO.:
MC-KU-H-G-400
TIPO DE DOCUMENTO:
MEMORIA DE CLCULO
DESCRIPCIN:
REV
DESCRIPCION
ELABOR
REVIS
COORDINO
APROB
CLIENTE
APROBADO PARA
CONSTRUCCIN
ING. E.D.S.
ING. R.G.M.
ING. G.L.M.
ING. S.L.M..
ING. G.M.J.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 1 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
FECHA
ABR/2014
MARNA INGENIERIA
S.A. DE C.V.
CONTENIDO
1. INTRODUCCIN................................................................................................................ 3
2. DESCRIPCIN...................................................................................................................3
3. OBJETIVO.......................................................................................................................... 3
4. SISTEMA DE UNIDADES...................................................................................................3
5. LOCALIZACIN DEL SITIO...............................................................................................4
6. DOCUMENTOS DE REFERENCIA....................................................................................4
7. CONSIDERACIONES DE ANLISIS..................................................................................5
7.1.
CARGAS BSICAS............................................................................................................ 5
7.2.
COMBINACIONES DE CARGA.......................................................................................10
8. DESARROLLO.................................................................................................................11
8.1.
10.
9.1.
PARMETROS METEOROLGICOS.............................................................................14
9.2.
CONDICIN DE OPERACIN.........................................................................................15
9.3.
PARMETROS METEOROLGICOS.............................................................................16
9.4.
CONDICIN DE TORMENTA..........................................................................................17
MODELO GEOMTRICO............................................................................................18
10.1. NUMERACIN DE LOS NODOS.....................................................................................19
10.2. GRUPO DE MIEMBROS ESTRUCTURALES..................................................................20
10.3. MATERIALES................................................................................................................... 21
11.
RESULTADOS............................................................................................................. 22
11.1. SUMATORIA DE CARGAS BSICAS..............................................................................22
11.2. SUMATORIA DE CARGAS COMBINADAS......................................................................23
11.3. DESPLAZAMIENTOS MXIMOS.....................................................................................24
11.4. REVISIN POR FLECHA MAXIMA..................................................................................25
11.5. RELACIONES DE INTERACCIN MXIMA EN LOS ELEMENTOS...............................26
11.6. REVISIN DE JUNTAS TUBULARES.............................................................................37
12.
CONCLUSIONES........................................................................................................ 38
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 2 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
1. INTRODUCCIN
Debido a la necesidad del activo Ku-Maloob-Zaap de incrementar la produccin de crudo que se encuentra
ya comprometido por el dicho activo, se hace necesario implementar en la plataforma PP-KU-H, el sistema
artificial de produccin mediante bombeo electrocentrfugo (BEC) para los pozos. Este sistema artificial de
produccin permitir incrementar la produccin de crudo en cada pozo, reduciendo el consumo de gas
residual. Como parte del mismo requerimiento de la infraestructura del sistema BEC es necesario adecuar
la estructuracin de la plataforma PP-KU-H y realizar la instalacin de estructura metlica cantiliver para
contar con el espacio suficiente y que soporte la infraestructura de los sistemas BEC.
2. DESCRIPCIN
Debido a que no se cuenta con los espacios necesarios para la instalacin de la infraestructura del
sistema BEC en la cubierta principal de elev. (+) 15.850 de la plataforma PP-KU-H, se requiere instalar
estructura metlica adicional (Cantiliver), que permitan contar con la infraestructura adecuada para
alcanzar la produccin de crudo comprometido por el activo integral Ku-Maloob-Zaap).
3. OBJETIVO
El objetivo del presente documento es realizar el anlisis en sitio en condicin de operacin y tormenta de
la estructura metlica (Cantiliver) para proporcionar rea requerida que soporte el cuarto de control BEC
(de 7 variadores) del lado Suroeste sobre la cubierta de elev. (+) 15.850 en la plataforma PP-KU-H,
adems de realizar la ingeniera de detalle necesaria para el cantiliver requerido, basado en las normas
NRF-041-PEMEX-2007 y el API RP 2A WSD.
4. SISTEMA DE UNIDADES
El sistema de unidades que con el cual se llev a cabo la elaboracin del modelo estructural de la
estructura es el Sistema Mtrico Decimal, las unidades son las siguientes:
Unidades de longitud = metros (m)
Unidades de superficie = metro cuadrado (m2)
Unidades de volumen = metro cbico (m3)
Unidades de peso = kilogramo (kg)
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 3 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
Tirante de
agua
(metros)
583,917.75
2,166,072.00
76.81
Nombre de la
plataforma
PP-KU-H/Perforacin
6. DOCUMENTOS DE REFERENCIA
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 4 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
7. CONSIDERACIONES DE ANLISIS
7.1. CARGAS BSICAS
CONDICIN DE CARGA 1
CARGA MUERTA GENERADA
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 5 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
CONDICIN DE CARGA 2
CARGA MUERTA NO GENERADA
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 6 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
CONDICIN DE CARGA 3
CARGA VIVA
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 7 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
CONDICIN DE CARGA 4
CARGA DE EQUIPO
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 8 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
CONDICIN DE CARGA 5
CARGA DE TUBERIA
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 9 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 10 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
8. DESARROLLO
Para realizar el anlisis fue necesario elaborar un modelo tridimensional representativo del sistema bajo
condiciones de cargas estticas y ambientales operacin, tomando en cuenta todos los elementos de la
estructura, adems de las restricciones de desplazamientos y apoyo, capturando el modelo al programa
de anlisis, con el objetivo de obtener los resultados correspondientes al comportamiento general de la
estructura, el cual permitir que se puedan identificar los elementos mecnicos actuantes mximos, as
como sus efectos sobre el sistema, asegurando de esta manera un diseo seguro.
Carga muerta
Carga muerta no generada.
Carga viva.
Carga de equipo.
Carga de tubera.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 11 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 12 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
Para las combinaciones de carga en operacin y tormenta en el anlisis del cantiliver y reforzamiento
estructural para cuarto BEC en la plataforma PP-KU-H, se utilizaron 8 direcciones de incidencia como se
muestra a continuacin.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 13 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 14 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
Los datos meteorolgicos y oceanogrficos considerados para el cantiliver-obra falsa que ser utilizado de
manera temporal para la instalacin del cantiliver y reforzamiento estructural para cuarto BEC en la
Plataforma PP-KU-H., se tomarn de la NRF-003-PEMEX-2007, los valores a considerar son los
siguientes:
Sistema mtrico
Sistema ingls
Ft.
8.00
26.247
8.20
8.20
0.760
2.493
0.300
0.984
1.060
3.478
14.40 m/s
27.991 nudos
Velocidad de corriente
De NMM hacia el fondo a:
Sistema mtrico
Sistema ingles
cm/s
0%
30
0.583 nudos
50%
25
0.486 nudos
95%
18
0.350 nudos
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 15 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 16 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
Los datos meteorolgicos y oceanogrficos considerados para el cantiliver-obra falsa que ser utilizado de
manera temporal para la instalacin de cantiliver y reforzamiento estructural para cuarto BEC en la
Plataforma PP-KU-H-A., se tomarn de la NRF-003-PEMEX-2007, los valores a considerar son los
siguientes:
Sistema mtrico
Sistema ingls
Ft.
17.60
57.743
12.18
12.18
0.760
2.493
0.600
1.969
1.360
4.462
33.00 m/s
64.147 nudos
Velocidad de corriente
De NMM hacia el fondo a:
Sistema mtrico
Sistema ingles
cm/s
0%
125
2.430 nudos
50%
100
1.944 nudos
95%
80
1.555 nudos
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 17 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 18 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
10.1.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 19 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
10.2.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 20 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
10.3.
MATERIALES
Para el diseo de la estructura del cantiliver-obra falsa que ser utilizado de manera temporal para la
instalacin del cantiliver y reforzamiento estructural para cuarto BEC en la Plataforma PP-KU-H, se
utilizarn los siguientes materiales estructurales:
ESTRUCTURA
TRABES PRINCIPALES
PLACAS DE CONEXIN Y ATIESADORES
TUBOS
ASTM A-36
ASTM A-36
API 5L GR.B
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 21 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11. RESULTADOS
11.1.
1
2
3
4
5
51
52
53
54
55
56
57
58
61
62
63
64
65
66
67
68
LOAD LOAD
CASE LABEL
FX
(KG)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1
2
3
4
5
51
52
53
54
55
56
57
58
61
62
63
64
65
66
67
68
(KG)
(KG)
(KG-M)
(KG-M)
(KG-M)
(KG)
BUOYANCY
(KG)
0.000
0.000 -364537.562 1368396.125 888325.250
-0.001 364537.594
0.000
0.000
0.000 -159368.469 2644095.000 2015024.500
0.000
0.000
0.000
0.000
0.000 -185162.562 2556885.000 1951564.250
0.000
0.000
0.000
0.000
0.000 -25232.760 241531.094 249971.016
0.000
0.000
0.000
0.000
0.000 -21501.887 196613.250 205998.953
0.000
0.000
0.000
7109.212
-1.754
33.730
148.649 662958.812 35411.551
0.000
0.000
5025.729
7640.805
56.420 -713236.688 468472.438 69118.938
0.000
0.000
-1.754 10807.483
46.060 -1008817.625
-438.383 62337.453
0.000
0.000
-5028.209
7643.286
8.719 -713447.000 -469092.375 19039.477
0.000
0.000
-7109.212
1.753
-33.730
-148.568 -662958.812 -35411.551
0.000
0.000
-5025.729 -7640.807
-56.420 713236.938 -468472.438 -69118.953
0.000
0.000
1.755 -10807.483
-46.060 1008817.625
438.438 -62337.453
0.000
0.000
5028.210 -7643.286
-8.719 713446.938 469092.469 -19039.471
0.000
0.000
74184.758
116.660
340.345 -11254.494 6610403.500 212756.469
0.000
0.000
56299.426 69198.758
1219.000 -6229748.000 4991174.500 420328.125
0.000
0.000
-20.239 102368.906
464.287 -9186559.000 -5820.614 344244.375
0.000
0.000
-55059.590 68549.906
109.808 -6166824.000 -4899555.000 79847.867
0.000
0.000
-74072.172
-305.077
-580.201 29411.365 -6598693.500 -213473.438
0.000
0.000
-56270.090 -69489.859 -1596.139 6257989.500 -4984300.500 -389342.500
0.000
0.000
2.018 -102671.117
-887.190 9215721.000
9619.383 -347962.000
0.000
0.000
55146.930 -68733.508
-346.026 6184390.000 4909259.500 -114919.719
0.000
0.000
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 22 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11.2.
LOAD LOAD
CASE LABEL
(KG)
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
99
100
121
122
123
124
125
126
127
128
131
132
133
134
135
136
137
138
(KG)
(KG)
(KG-M)
(KG-M)
(KG-M)
0.000
0.000 -185162.562 2556885.000 1951564.250
0.000
0.000
0.000 -830495.000 7700688.000 5833871.000
-0.001
7109.212
-1.754 -830461.250 7700836.500 6496830.000 35411.551
5025.729
7640.805 -829176.938 6975374.500 6289845.000 69118.938
-1.754 10807.483 -829187.312 6679793.500 5820934.000 62337.453
-5028.209
7643.286 -829224.688 6975164.000 5352280.000 19039.477
-7109.212
1.753 -829267.125 7688462.500 5158413.500 -35411.551
-5025.729 -7640.807 -829289.812 8401848.000 5352900.000 -69118.953
1.755 -10807.483 -829279.438 8697429.000 5821811.000 -62337.453
5028.210 -7643.286 -829242.062 8402058.000 6290465.000 -19039.471
74184.758
116.660 -706835.500 6335137.500 11410598.000 212756.469
56299.426 69198.758 -705956.875 116644.000 9791369.000 420328.125
-20.239 102368.906 -706711.562 -2840167.000 4794374.000 344244.375
-55059.590 68549.906 -707066.062 179568.000 -99360.500 79847.867
-74072.172
-305.077 -707756.062 6375803.500 -1798499.000 -213473.438
-56270.090 -69489.859 -708772.000 12604382.000 -184106.000 -389342.500
2.018 -102671.117 -708063.062 15562113.000 4809814.000 -347962.000
55146.930 -68733.508 -707521.875 12530782.000 9709454.000 -114919.719
1
2
3
4
5
51
52
53
54
55
56
57
58
61
62
63
64
65
66
67
68
99
100
121
122
123
124
125
126
127
128
131
132
133
134
135
136
137
138
0.00
0.00
0.00
0.00
0.00
7109.21
5025.73
COUPLE
-5028.21
-7109.21
-5025.73
COUPLE
5028.21
74184.76
56299.43
COUPLE
-55059.59
-74072.17
-56270.09
COUPLE
55146.93
0.00
0.00
7109.21
COUPLE
COUPLE
COUPLE
-7109.21
COUPLE
COUPLE
COUPLE
74184.76
56299.43
COUPLE
-55059.59
-74072.17
-56270.09
COUPLE
55146.93
0.00
-364537.56
2.44 -3.75 15.81
0.00
-159368.47 12.64 -16.59 15.49
0.00
-185162.56 10.54 -13.81 15.48
0.00
-25232.76
9.91 -9.57 15.46
0.00
-21501.89
9.58 -9.14 15.45
3.92 -5.03 16.50
COUPLE
1.91 -0.61
2.66
33.73
3.87 -5.03 16.50
7640.80
5.74 -6.85 16.49
COUPLE -4.01
1.34 -2.98
0.68 -0.15
0.67 10807.48
5.77 -6.85 16.49
COUPLE -1.23
0.68
0.13
3.97 -5.03 16.50
7643.29
5.80 -6.85 16.49
COUPLE
0.22 -0.64
1.37
3.92 -5.03 16.50
COUPLE
1.22 -0.46
1.99
-33.73
3.87 -5.03 16.50 -7640.81
5.74 -6.85 16.49
COUPLE -4.01
1.34 -2.98
0.68 -0.15
0.67 -10807.48
5.77 -6.85 16.49
COUPLE -1.23
0.68
0.13
3.97 -5.03 16.50 -7643.29
5.80 -6.85 16.49
COUPLE
0.22 -0.64
1.37
2.80 -2.87 12.36
COUPLE
1.84 -0.58
2.58
340.34
2.71 -2.68 12.12 69198.76
3.90 -4.13 13.08
1219.00 12.43 -8.15
9.57
0.68 -0.15
0.67 102368.91
3.37 -3.80 12.89
COUPLE -3.55
2.57 -1.97
1.70 -2.53 12.19 68549.91
3.20 -4.09 13.12
COUPLE
0.22 -0.17
1.03
1.78 -2.86 12.37
COUPLE
1.17 -0.37
1.90
-580.20
1.93 -2.84 12.12 -69489.86
3.30 -4.29 13.06 -1596.14 12.23 -8.30
9.40
0.68 -0.15
0.66 -102671.12
3.39 -4.10 12.88
COUPLE -11.61
8.03 -7.88
2.50 -2.71 12.18 -68733.51
3.85 -4.24 13.10
COUPLE -0.95
1.64 -0.40
0.00
-185162.56 10.54 -13.81 15.48
0.00
-830495.00
7.02 -9.27 15.64
COUPLE
1.91 -0.61
2.66 -830461.25
7.02 -9.27 15.64
-18.56 35.49 -33.17
COUPLE -531.89 631.54 -1194.35 -829176.94
7.02 -9.27 15.64
0.68 -0.15
0.67 10807.48
5.77 -6.85 16.49 -829187.31
7.02 -9.27 15.64
-24.44 36.79 -35.55
COUPLE -557.36 638.71 -1223.86 -829224.69
7.02 -9.27 15.64
COUPLE
1.22 -0.46
1.99 -829267.12
7.02 -9.27 15.64
-18.56 35.49 -33.17
COUPLE -531.89 631.54 -1194.34 -829289.81
7.02 -9.27 15.64
0.68 -0.15
0.67 -10807.48
5.77 -6.85 16.49 -829279.44
7.02 -9.27 15.64
-24.44 36.79 -35.55
COUPLE -557.36 638.71 -1223.86 -829242.06
7.02 -9.27 15.64
2.80 -2.87 12.36
COUPLE
1.84 -0.58
2.58 -706835.50
6.78 -8.98 15.65
2.71 -2.68 12.12 69198.76
3.90 -4.13 13.08 -705956.88
6.78 -8.98 15.66
0.68 -0.15
0.67 102368.91
3.37 -3.80 12.89 -706711.56
6.79 -8.97 15.65
1.70 -2.53 12.19 68549.91
3.20 -4.09 13.12 -707066.06
6.79 -8.97 15.65
1.78 -2.86 12.37
COUPLE
1.17 -0.37
1.90 -707756.06
6.79 -8.97 15.65
1.93 -2.84 12.12 -69489.86
3.30 -4.29 13.06 -708772.00
6.80 -8.97 15.64
0.68 -0.15
0.66 -102671.12
3.39 -4.10 12.88 -708063.06
6.79 -8.97 15.64
2.50 -2.71 12.18 -68733.51
3.85 -4.24 13.10 -707521.88
6.79 -8.98 15.65
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 23 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11.3.
DESPLAZAMIENTOS MXIMOS
59
99
100
121
122
123
124
125
126
127
128
131
132
133
134
135
136
137
138
-0.2955
-1.0030
-0.8714
-0.8752
-0.9943
-1.1188
-1.1757
-1.1317
-1.0126
-0.8881
-0.6174
-0.6031
-0.8715
-1.5577
-1.9113
-1.6394
-0.9723
-0.6972
0146
0146
0146
0146
0146
0146
0146
0146
0146
0146
0146
0146
0146
0100
0100
0100
0146
0146
-1.1120
-3.5269
-3.5195
-3.4715
-3.4571
-3.4819
-3.5314
-3.5766
-3.5910
-3.5662
-2.8836
-2.6244
-2.5407
-2.7271
-3.1559
-3.3813
-3.3090
-3.1652
0013
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
0034
-3.2626
-7.3464
-7.3414
-7.2668
-7.2405
-7.2739
-7.3476
-7.4183
-7.4446
-7.4112
-6.1167
-5.7165
-5.5646
-5.7572
-6.1743
-6.5742
-6.7264
-6.5343
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 24 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11.4.
Para el clculo de la flecha mxima se tomaran la mximas deflexiones que se obtuvieron en el anlisis
efectuado a la estructura, para la combinacin de carga No. 99 en los nodos No. 0101 y nodo No. 0008
Flecha mxima=deflexin nodo No. 0101 - deflexin nodo No. 0008
Flecha mxima= -0.772 - (-2.182) = -1.410 cms
Calculo de la flecha permisible para L= 881.4 cms
Flecha permisible= L/360 = 881.4/360 = 2.448 cms (por ser cantiliver la flecha permisible es por 2)
De los clculos realizados se observa que:
Flecha permisible= 4.896 cms > flecha mxima= 1.410 cms
0101
0008
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 25 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11.5.
0.08 C<.15
133 1.2 0.000 0.000 0.010 0.012 0.000 0.028 0.050 0.078 0.850 0.850 10.84 61.54
0128-0129 C1
0.10 C<.15
122 1.2 0.000 0.000 0.016 0.027 0.000 0.057 0.038 0.095 0.850 0.850 10.84 61.54
0129-0130 C1
0.10 BEND
124 0.0 0.000 0.000 0.012 0.016 0.000 0.057 0.045 0.102 0.850 0.850 11.69 66.34
0130-0131 C1
0.07 TN+BN
0016-0109 D1
0.69 C>.15A 127 0.0 0.159 0.159 0.027 0.000 0.470 0.212 0.009 0.691 0.850 0.850 44.88 44.88
0017-0110 D1
0.73 C>.15A 127 0.0 0.154 0.154 0.025 0.000 0.454 0.280 0.001 0.735 0.850 0.850 44.91 44.91
0106-0113 D2
0.28 C>.15A 126 0.0 0.011 0.017 0.036 0.000 0.210 0.071 0.003 0.284 0.850 0.850 19.68 24.62
0107-0112 D2
0.24 C>.15A 128 3.8 0.015 0.015 0.024 0.000 0.183 0.058 0.001 0.242 0.850 0.850 24.62 24.62
0108-0104 D2
0.07 TN+BN
135 0.0 0.000 0.000 0.020 0.000 0.003 0.005 0.066 0.074 0.850 0.850 11.11 11.11
0111-0114 D2
0.17 TN+BN
123 0.0 0.000 0.000 0.024 0.000 0.052 0.116 0.000 0.167 0.850 0.850 6.56 6.56
0114-0105 D2
0.16 TN+BN
123 3.6 0.000 0.000 0.032 0.000 0.052 0.106 0.000 0.157 0.850 0.850 22.94 22.94
0106-0008 D3
0.34 C>.15A 125 3.6 0.032 0.030 0.022 0.000 0.260 0.009 0.067 0.336 0.850 0.850 30.76 29.67
0106-0050 D3
0.49 TN+BN
0106-0099 D3
0.35 C>.15B 127 2.6 0.010 0.010 0.063 0.000 0.159 0.194 0.001 0.354 0.850 0.850 21.46 21.61
0107-0009 D3
0.24 C>.15A 121 1.8 0.024 0.024 0.002 0.000 0.212 0.019 0.007 0.238 0.850 0.850 29.67 29.67
0107-0052 D3
0.46 TN+BN
0107-0116 D3
0.34 C>.15B 127 2.6 0.011 0.011 0.048 0.000 0.160 0.178 0.000 0.338 0.850 0.850 21.61 21.61
0109-0050 D3
0.94 C>.15A 125 3.7 0.097 0.097 0.030 0.000 0.837 0.023 0.080 0.940 0.850 0.850 29.85 29.85
0109-0101 D3
0.78 C>.15A 127 0.0 0.035 0.036 0.075 0.000 0.576 0.206 0.002 0.784 0.850 0.850 21.46 21.61
0110-0052 D3
0.83 C>.15A 121 3.7 0.090 0.090 0.006 0.000 0.774 0.020 0.033 0.827 0.850 0.850 29.85 29.85
0110-0115 D3
0.67 C>.15A 121 2.6 0.031 0.031 0.053 0.000 0.502 0.168 0.000 0.670 0.850 0.850 21.61 21.61
0111-0011 D3
0.22 C<.15
137 0.0 0.000 0.000 0.010 0.015 0.000 0.008 0.059 0.067 0.850 0.850 10.00 56.74
127 0.0 0.000 0.000 0.023 0.000 0.456 0.033 0.006 0.495 0.850 0.850 32.89 30.10
127 0.0 0.000 0.000 0.012 0.000 0.414 0.051 0.000 0.465 0.850 0.850 29.85 29.85
125 2.4 0.000 0.000 0.048 0.000 0.008 0.134 0.076 0.218 0.850 0.850 19.84 19.84
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 26 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.18 C<.15
0112-0052 D3
0.52 C>.15B 128 0.0 0.016 0.016 0.070 0.000 0.250 0.266 0.000 0.516 0.850 0.850 21.61 21.61
123 2.9 0.009 0.009 0.016 0.000 0.123 0.054 0.007 0.184 0.850 0.850 23.81 23.81
0112-0115 D3
0.49 TN+BN
0113-0050 D3
0.54 C>.15B 126 0.0 0.017 0.017 0.088 0.000 0.259 0.281 0.001 0.541 0.850 0.850 21.46 21.61
0113-0101 D3
0.52 TN+BN
127 0.0 0.000 0.000 0.033 0.000 0.363 0.153 0.000 0.517 0.850 0.850 29.85 29.85
0109-0108 D4
0.18 TN+BN
127 1.0 0.000 0.000 0.044 0.000 0.048 0.129 0.007 0.184 0.850 0.850 26.94 24.75
0110-0111 D4
0.26 TN+BN
127 0.0 0.000 0.000 0.024 0.000 0.342 0.150 0.000 0.491 0.850 0.850 29.85 29.85
127 0.0 0.000 0.000 0.069 0.000 0.039 0.220 0.000 0.260 0.850 0.850 11.90 11.90
127 0.0 0.001 0.001 0.145 0.000 0.101 0.607 0.007 0.715 0.850 0.850 6.58 6.58
127 0.0 0.000 0.000 0.204 0.000 0.073 0.756 0.017 0.846 0.850 0.850 5.03 5.03
127 0.0 0.000 0.000 0.154 0.000 0.085 0.265 0.001 0.351 0.850 0.850 5.20 5.20
127 2.6 0.000 0.000 0.152 0.000 0.083 0.326 0.010 0.419 0.850 0.850 6.27 6.27
127 2.6 0.000 0.000 0.157 0.000 0.078 0.402 0.011 0.491 0.850 0.850 6.27 6.27
127 0.0 0.001 0.001 0.191 0.000 0.082 0.414 0.003 0.500 0.850 0.850 6.75 6.75
0158-0016 OC1 0.85 C>.15B 127 1.2 0.000 0.000 0.278 0.000 0.199 0.643 0.007 0.849 0.850 0.850 2.90 2.90
0159-0017 OC1 0.99 C>.15B 127 1.2 0.000 0.000 0.205 0.000 0.170 0.803 0.017 0.989 0.850 0.850 2.90 2.90
0006-0144 OC2 0.39 C<.15
127 0.0 0.001 0.001 0.047 0.000 0.026 0.359 0.002 0.387 0.850 0.850 11.98 11.98
127 0.0 0.000 0.000 0.037 0.000 0.023 0.406 0.001 0.430 0.850 0.850 11.98 11.98
0010-0032 T1
0.37 TN+BN
128 0.0 0.000 0.000 0.007 0.004 0.286 0.043 0.039 0.368 0.850 0.850 2.65 10.44
0011-0033 T1
0.31 TN+BN
127 1.0 0.000 0.000 0.003 0.067 0.242 0.051 0.017 0.310 0.850 0.850 2.65 10.44
0023-0006 T1
0.69 TN+BN
121 0.7 0.000 0.000 0.013 0.173 0.285 0.327 0.073 0.686 0.850 0.850 1.94 7.65
0027-0007 T1
0.71 TN+BN
121 0.7 0.000 0.000 0.019 0.205 0.240 0.430 0.042 0.711 0.850 0.850 1.94 7.65
0028-0023 T1
0.55 TN+BN
121 0.8 0.000 0.000 0.009 0.142 0.285 0.235 0.027 0.547 0.850 0.850 2.02 7.99
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 27 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.61 TN+BN
126 0.8 0.000 0.000 0.009 0.176 0.242 0.321 0.045 0.608 0.850 0.850 2.02 7.99
0030-0028 T1
0.47 TN+BN
126 1.0 0.000 0.000 0.002 0.104 0.286 0.159 0.021 0.466 0.850 0.850 2.64 10.43
0031-0029 T1
0.47 TN+BN
126 1.0 0.000 0.000 0.002 0.143 0.242 0.223 0.007 0.471 0.850 0.850 2.64 10.43
0032-0030 T1
0.38 TN+BN
126 1.0 0.000 0.000 0.002 0.064 0.286 0.089 0.009 0.384 0.850 0.850 2.64 10.43
0033-0031 T1
0.37 TN+BN
128 1.0 0.000 0.000 0.006 0.104 0.241 0.121 0.010 0.372 0.850 0.850 2.64 10.43
127 0.0 0.000 0.000 0.000 0.100 0.002 0.076 0.004 0.100 0.850 0.850 4.97 10.25
121 0.0 0.000 0.000 0.010 0.132 0.001 0.189 0.055 0.244 0.850 0.850 4.98 10.26
127 0.0 0.000 0.000 0.001 0.063 0.002 0.001 0.007 0.063 0.850 0.850 4.97 10.25
131 0.8 0.000 0.000 0.009 0.015 0.000 0.017 0.057 0.074 0.850 0.850 3.81 7.85
131 0.7 0.000 0.000 0.020 0.033 0.000 0.001 0.125 0.126 0.850 0.850 3.65 7.51
128 0.0 0.000 0.000 0.045 0.038 0.002 0.048 0.080 0.129 0.850 0.850 3.65 7.51
121 0.0 0.000 0.000 0.005 0.015 0.002 0.074 0.057 0.132 0.850 0.850 3.81 7.85
121 1.0 0.000 0.000 0.010 0.029 0.002 0.074 0.062 0.138 0.850 0.850 4.97 10.25
121 1.0 0.000 0.000 0.004 0.003 0.002 0.085 0.022 0.110 0.850 0.850 4.97 10.25
121 0.0 0.000 0.000 0.018 0.072 0.002 0.007 0.082 0.091 0.850 0.850 4.98 10.26
121 1.0 0.000 0.000 0.019 0.046 0.003 0.138 0.036 0.177 0.850 0.850 4.98 10.26
121 1.0 0.000 0.000 0.002 0.006 0.003 0.167 0.026 0.197 0.850 0.850 4.97 10.25
121 0.0 0.000 0.000 0.008 0.005 0.003 0.167 0.030 0.201 0.850 0.850 4.97 10.25
125 0.0 0.000 0.000 0.014 0.034 0.001 0.129 0.024 0.154 0.850 0.850 3.81 7.85
121 0.7 0.000 0.000 0.034 0.116 0.003 0.009 0.175 0.186 0.850 0.850 3.65 7.51
125 0.0 0.002 0.002 0.119 0.000 0.082 0.299 0.015 0.397 0.850 0.850 12.13 12.13
125 3.8 0.008 0.008 0.023 0.000 0.129 0.030 0.024 0.183 0.850 0.850 21.78 21.78
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 28 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.37 TN+BN
124 6.1 0.000 0.000 0.002 0.075 0.005 0.337 0.030 0.372 0.850 0.850 20.70 65.94
0008-0060 T8
0.18 TN+BN
128 0.0 0.000 0.000 0.017 0.058 0.049 0.062 0.070 0.182 0.850 0.850 2.68 8.54
0009-0064 T8
0.15 TN+BN
121 0.8 0.000 0.000 0.014 0.043 0.038 0.092 0.020 0.150 0.850 0.850 2.68 8.54
0009-0079 T8
0.17 TN+BN
122 0.0 0.000 0.000 0.007 0.028 0.003 0.087 0.082 0.172 0.850 0.850 12.56 40.03
0010-0036 T8
0.51 C<.15
128 0.0 0.000 0.004 0.004 0.123 0.008 0.436 0.068 0.511 0.850 0.850 20.70 65.94
0011-0070 T8
0.37 C<.15
128 0.0 0.000 0.002 0.006 0.075 0.008 0.308 0.055 0.372 0.850 0.850 12.56 40.03
0034-0009 T8
0.40 TN+BN
122 0.0 0.000 0.000 0.003 0.057 0.007 0.337 0.051 0.395 0.850 0.850 20.70 65.94
0034-0062 T8
0.13 SHEAR
127 0.0 0.000 0.000 0.007 0.132 0.000 0.000 0.021 0.132 0.850 0.850 2.68 8.54
0036-0011 T8
0.39 C<.15
126 0.0 0.000 0.002 0.002 0.093 0.004 0.353 0.035 0.393 0.850 0.850 20.70 65.94
0042-0036 T8
0.17 TN+BN
135 1.2 0.000 0.000 0.015 0.071 0.001 0.073 0.097 0.172 0.850 0.850 4.14 13.19
0044-0101 T8
0.57 TN+BN
127 0.7 0.000 0.000 0.007 0.184 0.320 0.220 0.028 0.569 0.850 0.850 2.41 7.69
0045-0044 T8
0.43 TN+BN
127 1.2 0.000 0.000 0.003 0.103 0.320 0.104 0.007 0.431 0.850 0.850 4.14 13.19
0046-0042 T8
0.10 SHEAR
127 1.2 0.000 0.000 0.001 0.100 0.002 0.005 0.009 0.100 0.850 0.850 4.14 13.19
0047-0046 T8
0.08 TN+BN
125 0.6 0.000 0.000 0.001 0.011 0.002 0.068 0.009 0.079 0.850 0.850 4.14 13.19
0048-0115 T8
0.50 TN+BN
126 0.7 0.000 0.000 0.005 0.173 0.286 0.192 0.019 0.497 0.850 0.850 2.41 7.69
0049-0048 T8
0.37 TN+BN
127 1.2 0.000 0.000 0.003 0.094 0.286 0.084 0.004 0.375 0.850 0.850 4.14 13.19
0050-0045 T8
0.50 TN+BN
0050-0051 T8
0.62 C<.15
0051-0047 T8
0.12 TN+BN
131 0.0 0.000 0.000 0.015 0.071 0.001 0.015 0.102 0.118 0.850 0.850 3.82 12.16
0051-0052 T8
0.63 TN+BN
122 0.0 0.000 0.000 0.003 0.135 0.001 0.575 0.052 0.628 0.850 0.850 20.70 65.94
0052-0049 T8
0.42 TN+BN
0052-0074 T8
0.40 C<.15
128 0.0 0.000 0.000 0.022 0.078 0.319 0.073 0.106 0.498 0.850 0.850 3.82 12.16
124 6.1 0.000 0.002 0.002 0.158 0.003 0.575 0.037 0.615 0.850 0.850 20.70 65.94
126 0.0 0.000 0.000 0.014 0.088 0.286 0.075 0.064 0.424 0.850 0.850 3.82 12.16
124 0.0 0.000 0.001 0.006 0.094 0.005 0.338 0.055 0.398 0.850 0.850 12.56 40.03
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 29 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.31 TN+BN
125 1.3 0.000 0.000 0.011 0.196 0.052 0.208 0.047 0.307 0.850 0.850 4.46 14.21
0054-0051 T8
0.18 SHEAR
127 1.3 0.000 0.000 0.004 0.179 0.001 0.034 0.020 0.179 0.850 0.850 4.46 14.21
0055-0052 T8
0.27 TN+BN
121 1.3 0.000 0.000 0.009 0.192 0.042 0.191 0.035 0.268 0.850 0.850 4.46 14.21
0056-0053 T8
0.11 TN+BN
128 0.0 0.000 0.000 0.006 0.007 0.054 0.053 0.003 0.109 0.850 0.850 4.14 13.19
0057-0054 T8
0.22 TN+BN
125 0.0 0.000 0.000 0.000 0.011 0.001 0.209 0.006 0.216 0.850 0.850 4.14 13.19
0058-0055 T8
0.10 TN+BN
126 0.0 0.000 0.000 0.005 0.000 0.043 0.057 0.003 0.103 0.850 0.850 4.14 13.19
0059-0099 T8
0.14 TN+BN
125 0.0 0.000 0.000 0.002 0.081 0.048 0.077 0.017 0.142 0.850 0.850 2.37 7.55
0060-0059 T8
0.16 TN+BN
125 0.6 0.000 0.000 0.002 0.021 0.048 0.101 0.013 0.162 0.850 0.850 4.14 13.19
0061-0057 T8
0.22 TN+BN
125 0.6 0.000 0.000 0.000 0.009 0.001 0.218 0.005 0.224 0.850 0.850 4.14 13.19
0062-0061 T8
0.20 TN+BN
125 1.2 0.000 0.000 0.002 0.033 0.001 0.198 0.006 0.204 0.850 0.850 4.14 13.19
0063-0116 T8
0.12 TN+BN
121 0.0 0.000 0.000 0.001 0.074 0.038 0.076 0.009 0.123 0.850 0.850 2.37 7.55
0064-0063 T8
0.15 TN+BN
121 0.6 0.000 0.000 0.001 0.013 0.038 0.096 0.013 0.147 0.850 0.850 4.14 13.19
0071-0070 T8
0.06 TN+BN
135 1.2 0.000 0.000 0.009 0.002 0.004 0.002 0.057 0.062 0.850 0.850 4.14 13.19
0071-0072 T8
0.04 TN+BN
131 0.0 0.000 0.000 0.006 0.000 0.001 0.005 0.031 0.038 0.850 0.850 4.14 13.19
0073-0072 T8
0.07 TN+BN
125 0.0 0.000 0.000 0.003 0.031 0.004 0.042 0.024 0.070 0.850 0.850 4.14 13.19
0074-0073 T8
0.10 TN+BN
128 0.0 0.000 0.000 0.006 0.039 0.003 0.075 0.022 0.101 0.850 0.850 3.82 12.16
0075-0074 T8
0.13 TN+BN
124 1.3 0.000 0.000 0.010 0.047 0.002 0.075 0.057 0.135 0.850 0.850 4.46 14.21
0076-0075 T8
0.04 TN+BN
121 1.2 0.000 0.000 0.002 0.035 0.002 0.027 0.011 0.041 0.850 0.850 4.14 13.19
0077-0076 T8
0.04 TN+BN
131 0.0 0.000 0.000 0.002 0.001 0.002 0.010 0.024 0.035 0.850 0.850 4.14 13.19
0078-0077 T8
0.04 TN+BN
131 1.2 0.000 0.000 0.003 0.004 0.002 0.010 0.025 0.036 0.850 0.850 4.14 13.19
0079-0078 T8
0.06 TN+BN
122 0.0 0.000 0.000 0.012 0.019 0.002 0.000 0.060 0.062 0.850 0.850 2.68 8.54
0080-0008 T8
0.26 TN+BN
123 4.5 0.000 0.000 0.005 0.047 0.001 0.192 0.065 0.258 0.850 0.850 15.32 48.81
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 30 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.05 TN+BN
133 0.0 0.000 0.000 0.008 0.019 0.001 0.000 0.050 0.051 0.850 0.850 2.68 8.54
0081-0082 T8
0.07 C<.15
99 1.2 0.000 0.000 0.001 0.021 0.000 0.056 0.016 0.072 0.850 0.850 4.14 13.19
0082-0083 T8
0.08 C<.15
99 1.2 0.000 0.000 0.001 0.003 0.000 0.069 0.012 0.081 0.850 0.850 4.14 13.19
0083-0084 T8
0.08 C<.15
99 0.6 0.000 0.000 0.001 0.006 0.000 0.068 0.016 0.084 0.850 0.850 4.14 13.19
0084-0085 T8
0.11 TN+BN
0085-0050 T8
0.53 C<.15
0085-0086 T8
0.09 TN+BN
99 0.0 0.000 0.000 0.015 0.015 0.000 0.032 0.061 0.094 0.850 0.850 3.82 12.16
0086-0087 T8
0.06 TN+BN
99 0.0 0.000 0.000 0.001 0.003 0.000 0.041 0.022 0.064 0.850 0.850 4.14 13.19
0088-0087 T8
0.06 TN+BN
99 1.2 0.000 0.000 0.000 0.000 0.000 0.038 0.019 0.057 0.850 0.850 4.14 13.19
0088-0089 T8
0.11 TN+BN
0089-0010 T8
0.43 C<.15
126 4.5 0.000 0.003 0.002 0.090 0.011 0.386 0.029 0.425 0.850 0.850 15.32 48.81
0099-0056 T8
0.11 TN+BN
127 0.5 0.000 0.000 0.002 0.020 0.054 0.052 0.006 0.112 0.850 0.850 1.77 5.64
0101-0041 T8
0.56 TN+BN
127 0.0 0.000 0.000 0.006 0.135 0.404 0.154 0.006 0.564 0.850 0.850 1.72 5.50
0115-0043 T8
0.53 TN+BN
127 0.0 0.000 0.000 0.006 0.202 0.379 0.135 0.012 0.526 0.850 0.850 1.72 5.50
0116-0058 T8
0.11 TN+BN
127 0.5 0.000 0.000 0.001 0.026 0.044 0.057 0.005 0.105 0.850 0.850 1.77 5.64
122 1.3 0.000 0.000 0.018 0.051 0.001 0.013 0.091 0.105 0.850 0.850 4.46 14.21
122 4.5 0.000 0.003 0.005 0.101 0.011 0.469 0.053 0.533 0.850 0.850 15.32 48.81
121 1.2 0.000 0.000 0.015 0.007 0.003 0.029 0.073 0.105 0.850 0.850 4.14 13.19
128 0.0 0.000 0.000 0.002 0.070 0.403 0.092 0.008 0.503 0.850 0.850 3.72 13.19
121 1.2 0.000 0.000 0.006 0.080 0.335 0.081 0.034 0.450 0.850 0.850 3.94 13.98
0013-0082 T9
0.13 C<.15
127 2.6 0.000 0.000 0.001 0.026 0.000 0.112 0.016 0.128 0.850 0.850 13.92 62.17
0023-0039 T9
0.33 BEND
127 0.0 0.000 0.000 0.003 0.027 0.000 0.257 0.071 0.328 0.850 0.850 32.53 145.31
0027-0066 T9
0.26 TN+BN
0028-0038 T9
0.45 BEND
128 0.0 0.000 0.000 0.002 0.037 0.000 0.381 0.069 0.450 0.850 0.850 32.53 145.31
0029-0067 T9
0.30 BEND
127 0.0 0.000 0.000 0.003 0.038 0.000 0.238 0.061 0.299 0.850 0.850 19.75 88.20
127 0.0 0.000 0.000 0.003 0.023 0.057 0.133 0.068 0.258 0.850 0.850 19.75 88.20
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 31 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.49 BEND
128 0.0 0.000 0.000 0.002 0.043 0.000 0.433 0.061 0.494 0.850 0.850 32.53 145.31
0031-0068 T9
0.33 C<.15
128 0.0 0.000 0.006 0.003 0.037 0.008 0.260 0.059 0.328 0.850 0.850 19.75 88.20
0032-0035 T9
0.57 BEND
128 0.0 0.000 0.000 0.002 0.049 0.000 0.513 0.055 0.569 0.850 0.850 32.53 145.31
0033-0069 T9
0.29 BEND
128 0.0 0.000 0.000 0.003 0.025 0.000 0.236 0.050 0.286 0.850 0.850 19.75 88.20
0035-0033 T9
0.45 BEND
126 6.1 0.000 0.000 0.001 0.045 0.000 0.422 0.024 0.446 0.850 0.850 32.53 145.31
0037-0031 T9
0.43 BEND
126 6.1 0.000 0.000 0.001 0.041 0.000 0.401 0.026 0.427 0.850 0.850 32.53 145.31
0038-0029 T9
0.39 BEND
126 6.1 0.000 0.000 0.001 0.036 0.000 0.362 0.029 0.390 0.850 0.850 32.53 145.31
0039-0027 T9
0.35 BEND
127 6.1 0.000 0.000 0.001 0.030 0.000 0.325 0.026 0.351 0.850 0.850 32.53 145.31
0041-0042 T9
0.70 BEND
128 0.0 0.000 0.000 0.002 0.065 0.000 0.658 0.039 0.696 0.850 0.850 32.53 145.31
0042-0043 T9
0.59 BEND
125 0.0 0.000 0.000 0.001 0.046 0.000 0.571 0.018 0.589 0.850 0.850 32.53 145.31
0043-0071 T9
0.32 BEND
128 0.0 0.000 0.000 0.001 0.044 0.000 0.304 0.019 0.323 0.850 0.850 19.75 88.20
0044-0046 T9
0.72 BEND
128 0.0 0.000 0.000 0.001 0.070 0.000 0.684 0.036 0.720 0.850 0.850 32.53 145.31
0045-0047 T9
0.73 C<.15
128 0.0 0.000 0.005 0.001 0.072 0.005 0.691 0.035 0.731 0.850 0.850 32.53 145.31
0046-0048 T9
0.68 BEND
121 0.0 0.000 0.000 0.001 0.051 0.000 0.652 0.024 0.676 0.850 0.850 32.53 145.31
0047-0049 T9
0.74 C<.15
121 0.0 0.002 0.030 0.001 0.052 0.030 0.684 0.026 0.740 0.850 0.850 32.53 145.31
0048-0072 T9
0.35 C<.15
124 0.0 0.000 0.004 0.001 0.046 0.005 0.325 0.023 0.353 0.850 0.850 19.75 88.20
0049-0073 T9
0.34 BEND
124 0.0 0.000 0.000 0.002 0.044 0.000 0.303 0.036 0.339 0.850 0.850 19.75 88.20
0053-0054 T9
0.72 BEND
125 6.1 0.000 0.000 0.001 0.057 0.000 0.700 0.022 0.722 0.850 0.850 32.53 145.31
0054-0055 T9
0.72 C<.15
121 0.0 0.000 0.001 0.001 0.049 0.001 0.692 0.026 0.719 0.850 0.850 32.53 145.31
0055-0075 T9
0.30 BEND
124 0.0 0.000 0.000 0.002 0.039 0.000 0.260 0.043 0.304 0.850 0.850 19.75 88.20
0056-0057 T9
0.67 BEND
125 6.1 0.000 0.000 0.001 0.050 0.000 0.650 0.018 0.668 0.850 0.850 32.53 145.31
0057-0058 T9
0.68 BEND
121 0.0 0.000 0.000 0.001 0.043 0.000 0.651 0.028 0.679 0.850 0.850 32.53 145.31
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 32 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.28 C<.15
124 0.0 0.000 0.001 0.003 0.033 0.001 0.229 0.050 0.280 0.850 0.850 19.75 88.20
0059-0061 T9
0.60 C<.15
125 6.1 0.001 0.012 0.000 0.042 0.012 0.571 0.016 0.599 0.850 0.850 32.53 145.31
0060-0062 T9
0.53 C<.15
126 6.1 0.002 0.044 0.001 0.034 0.044 0.480 0.010 0.534 0.850 0.850 32.53 145.31
0061-0063 T9
0.61 C<.15
121 0.0 0.001 0.011 0.001 0.035 0.011 0.571 0.029 0.612 0.850 0.850 32.53 145.31
0062-0064 T9
0.56 C<.15
128 0.0 0.003 0.065 0.001 0.026 0.065 0.471 0.026 0.562 0.850 0.850 32.53 145.31
0063-0077 T9
0.23 C<.15
124 0.0 0.000 0.005 0.003 0.026 0.006 0.175 0.053 0.234 0.850 0.850 19.75 88.20
0064-0078 T9
0.18 C<.15
123 0.0 0.000 0.008 0.003 0.017 0.011 0.110 0.055 0.176 0.850 0.850 19.75 88.20
0066-0094 T9
0.08 TN+BN
0067-0095 T9
0.06 C<.15
0068-0096 T9
0.07 TN+BN
0069-0097 T9
0.11 C<.15
128 0.0 0.000 0.000 0.002 0.015 0.000 0.070 0.043 0.113 0.850 0.850 17.45 77.92
0070-0098 T9
0.30 C<.15
128 0.0 0.000 0.001 0.002 0.049 0.001 0.277 0.021 0.299 0.850 0.850 17.45 77.92
0081-0060 T9
0.30 C<.15
123 4.5 0.000 0.002 0.002 0.026 0.002 0.241 0.054 0.297 0.850 0.850 24.08 107.55
0082-0059 T9
0.36 C<.15
122 4.5 0.000 0.005 0.002 0.018 0.005 0.296 0.054 0.356 0.850 0.850 24.08 107.55
0083-0056 T9
0.43 C<.15
122 4.5 0.000 0.005 0.002 0.026 0.006 0.370 0.051 0.426 0.850 0.850 24.08 107.55
0084-0053 T9
0.46 BEND
122 4.5 0.000 0.000 0.002 0.032 0.000 0.414 0.044 0.458 0.850 0.850 24.08 107.55
0086-0045 T9
0.50 BEND
122 4.5 0.000 0.000 0.002 0.041 0.000 0.459 0.043 0.503 0.850 0.850 24.08 107.55
0087-0044 T9
0.53 C<.15
122 4.5 0.001 0.010 0.002 0.049 0.011 0.487 0.036 0.534 0.850 0.850 24.08 107.55
0088-0041 T9
0.47 BEND
122 4.5 0.000 0.000 0.001 0.047 0.000 0.447 0.023 0.470 0.850 0.850 24.08 107.55
0090-0032 T9
0.36 BEND
126 4.5 0.000 0.000 0.001 0.036 0.000 0.337 0.024 0.361 0.850 0.850 24.08 107.55
0091-0030 T9
0.33 BEND
126 4.5 0.000 0.000 0.001 0.033 0.000 0.301 0.025 0.326 0.850 0.850 24.08 107.55
0092-0028 T9
0.33 C<.15
126 4.5 0.000 0.008 0.001 0.054 0.008 0.296 0.025 0.329 0.850 0.850 24.08 107.55
133 0.0 0.000 0.000 0.005 0.003 0.008 0.002 0.070 0.079 0.850 0.850 17.45 77.92
134 0.0 0.000 0.001 0.003 0.000 0.001 0.014 0.045 0.060 0.850 0.850 17.45 77.92
138 0.0 0.000 0.000 0.004 0.003 0.000 0.003 0.065 0.068 0.850 0.850 17.45 77.92
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 33 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
0.22 BEND
0094-0012 T9
0.57 TN+BN
127 4.5 0.000 0.000 0.002 0.036 0.000 0.191 0.033 0.225 0.850 0.850 24.08 107.55
0095-0094 T9
0.26 C<.15
128 0.8 0.000 0.000 0.005 0.108 0.001 0.194 0.069 0.265 0.850 0.850 4.15 18.55
0096-0095 T9
0.10 C<.15
128 1.0 0.000 0.000 0.003 0.071 0.001 0.071 0.030 0.102 0.850 0.850 5.42 24.22
0097-0096 T9
0.06 C<.15
121 0.0 0.000 0.000 0.004 0.010 0.001 0.037 0.020 0.058 0.850 0.850 5.42 24.22
0098-0097 T9
0.05 C<.15
121 1.0 0.000 0.000 0.003 0.002 0.000 0.037 0.016 0.053 0.850 0.850 5.43 24.24
0102-0093 T9
0.44 C<.15
123 7.7 0.004 0.071 0.003 0.005 0.071 0.266 0.102 0.439 0.850 0.850 40.99 183.07
0103-0092 T9
0.61 C<.15
124 7.7 0.004 0.073 0.003 0.012 0.073 0.441 0.094 0.608 0.850 0.850 40.99 183.07
0128-0083 T9
0.11 TN+BN
0129-0084 T9
0.13 TN+BN
0130-0085 T9
0.19 C<.15
0131-0086 T9
0.09 TN+BN
123 0.7 0.000 0.000 0.041 0.139 0.000 0.351 0.216 0.567 0.850 0.850 3.98 17.76
123 2.6 0.000 0.000 0.001 0.023 0.000 0.103 0.011 0.113 0.850 0.850 13.92 62.17
123 2.6 0.000 0.000 0.002 0.024 0.000 0.103 0.025 0.128 0.850 0.850 13.92 62.17
127 2.6 0.000 0.000 0.001 0.039 0.001 0.178 0.015 0.194 0.850 0.850 13.92 62.17
127 2.6 0.000 0.000 0.001 0.017 0.000 0.068 0.020 0.088 0.850 0.850 13.92 62.17
128 0.0 0.000 0.000 0.007 0.072 0.023 0.101 0.111 0.236 0.850 0.850 17.74 67.21
137 0.0 0.000 0.005 0.008 0.034 0.016 0.048 0.100 0.165 0.850 0.850 14.08 53.35
126 0.0 0.000 0.001 0.003 0.150 0.012 0.259 0.058 0.329 0.850 0.850 8.55 32.38
128 0.0 0.000 0.000 0.001 0.060 0.017 0.074 0.023 0.113 0.850 0.850 10.42 39.49
123 0.0 0.000 0.000 0.003 0.078 0.003 0.081 0.035 0.119 0.850 0.850 7.55 28.61
133 6.1 0.000 0.006 0.007 0.029 0.018 0.029 0.089 0.136 0.850 0.850 14.08 53.35
0109-0113 V1
0.39 C>.15A 126 1.0 0.016 0.016 0.051 0.000 0.320 0.070 0.001 0.392 0.850 0.850 19.28 19.31
0110-0112 V1
0.37 C>.15B 128 1.0 0.014 0.014 0.035 0.000 0.275 0.098 0.000 0.374 0.850 0.850 19.31 19.31
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 34 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 35 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 36 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
11.6.
121.920
121.920
45.700
45.700
45.700
45.700
45.700
45.700
45.700
121.920
3.180
3.180
2.540
2.540
1.905
1.905
1.905
1.905
1.905
3.180
25.300
25.300
35.150
35.150
24.600
24.600
24.600
24.600
24.600
25.300
0.061
0.202
0.537
0.500
0.492
0.471
0.415
0.384
0.199
0.212
0.744
0.744
0.445
0.445
0.464
0.464
0.464
0.464
0.464
0.361
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.061
0.202
0.537
0.500
0.492
0.471
0.415
0.384
0.199
0.212
121.920
121.920
45.700
45.700
45.700
45.700
45.700
45.700
45.700
121.920
3.180
3.180
2.540
2.540
1.905
1.905
1.905
1.905
1.905
3.180
25.300
25.300
35.150
35.150
24.600
24.600
24.600
24.600
24.600
25.300
UC
0.744
0.744
0.445
0.445
0.464
0.464
0.464
0.464
0.464
0.361
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 37 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.
12. CONCLUSIONES
Despues de realizar el anlisis en sitio en operacin y tormenta se verificarn los resultados obtenidos, en
las condiciones ms desfavorables, se obtuvieron las siguientes conclusiones:
Los esfuerzos de trabajo actuantes en todos los perfiles estructurales propuestos para el instalacin de
cantiliver y reforzamiento estructural para cuarto BEC en la Plataforma PP-KU-H, son en todos los casos
menores a los esfuerzos permisibles especificados por el Instituto Americano de las Construcciones de
Acero (A.I.S.C.) en su manual de construccin, de acuerdo a lo indicado en el listado de resultados
obtenido en el anlisis, en el cual se muestran los valores de los esfuerzos de trabajo de cada uno de los
miembros que conforman la estructura. De igual forma despus de haber revisado los desplazamientos se
consideran aceptables.
SUBDIRECCIN DE MANTENIMIENTO Y
LOGISTICA
GERENCIA DE MANTENIMIENTO INTEGRAL
MARINO
COORDINACIN DE PROYECTOS ESPECIALES
DE MANTENIMIENTO
RESIDENCIA DE OBRAS MARINAS A
MC-KU-H-G-400
Pgina 38 de 38
ELABOR: ING. E.D.S.
REV. 0
FECHA: ABR-2014
MARNA INGENIERIA
S.A. DE C.V.