INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Campsite

Date of Testing

: 09.02.13

: 16 mm - 7 mm

Source of material : : Hot Mix Plant


Total Weight (gm) : 16280

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

26.5

Cumulative
Wt.Retained
(gm)
0

19.00

0.00

13.20

Cumulative %
Retained

Cumulative %
Passing

100.0

0.00

0.00

100.00

5120

5120

31.45

68.55

9.50

7201

12321

75.68

24.32

4.75

3856

16177

99.37

0.63

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Sample No

26.5

100

19.00

0.00

100.00

13.20

5498

5498

37.05

62.95

9.50

5720

11218

75.59

24.41

4.75

3530

14748

99.38

0.62

Remarks

Weight of Sample Taken (gms) : 14840

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Campsite

Date of Testing

: 09.02.13

: 16 mm - 7 mm

Source of material : : Hot Mix Plant

Sample No

26.5

100

19.00

0.00

100.00

13.20

6085

6085

36.99

63.01

9.50

6405

12490

75.93

24.07

4.75

3875

16365

99.48

0.52

Weight of Sample Taken (gms) : 16450

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

: 7 mm - 3 mm

Source of material

: Hot Mix Plant

Total Weight (gm) : 17020

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative %
Retained

Cumulative %
Passing

26.5

100.0

19.00

100.00

13.20

100.00

9.50

0.00

100.00

4.75

4560

4560

26.79

73.21

2.36

10901

15461

90.84

9.16

1.18

720

16181

95.07

4.93

0.600

210

16391

96.30

3.70

0.300

160

16551

97.24

2.76

0.150

0.00

0.075

0.00

Sample No

26.5

100.00

19.00

100.00

13.20

100.00

9.50

0.00

100.00

4.75

4188

4188

27.25

72.75

2.36

9786

13974

90.94

9.06

1.18

698

14672

95.48

4.52

0.600

148

14820

96.45

3.55

0.300

134

14954

97.32

2.68

Total Weight (gm) :

15366

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Remarks

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

: 7 mm - 3 mm

Source of material

: Hot Mix Plant

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative %
Retained

Cumulative %
Passing

26.5

100.00

19.00

100.00

13.20

100.00

9.50

0.00

100.00

4.75

4120

4120

27.03

72.97

2.36

9698

13818

90.65

9.35

1.18

705

14523

95.28

4.72

0.600

178

14701

96.44

3.56

0.300

132

14833

97.31

2.69

Total Weight (gm) : 15243

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Remarks

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

: 3 mm down

Source of material : : Hot Mix Plant


Total Weight (gm)

1410

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative %
Retained

Cumulative %
Passing

26.5

100.00

19.00

100.00

13.20

100.00

9.50

100.00

4.75

0.00

100.00

2.36

16

16

1.13

98.87

1.18

389

405

28.72

71.28

0.600

255

660

46.81

53.19

0.300

240

900

63.83

36.17

0.150

265

1165

82.62

17.38

0.075

150

1315

93.26

6.74

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative %
Retained

Cumulative %
Passing

26.5

0.00

100.00

19.00

0.00

100.00

13.20

0.00

100.00

9.50

0.00

100.00

4.75

0.00

100.00

2.36

26

26

1.79

98.21

1.18

374

400

27.47

72.53

0.600

292

692

47.53

52.47

0.300

230

922

63.32

36.68

0.150

289

1211

83.17

16.83

0.075

145

1356

93.13

6.87

Construction Team

Total Weight (gm)

Independent Engineer

Remarks

1456

Supervision Team

Remarks

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)
Chainage

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

: 3 mm down

Source of material : : Hot Mix Plant

Sample No

Total Weight (gm)

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative %
Retained

Cumulative %
Passing

26.5

100.00

19.00

100.00

13.20

100.00

9.50

100.00

4.75

0.00

100.00

2.36

22

22

1.75

98.25

1.18

320

342

27.23

72.77

0.600

244

586

46.66

53.34

0.300

210

796

63.38

36.62

0.150

235

1031

82.09

17.91

0.075

140

1171

93.23

6.77

Location

Type of material

1256

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Remarks

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)

Chainage

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

Type of material

: filler

Source of material

: Hot Mix Plant

Sample No

:1

Total Weight (gm)

200

Location

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative % Retained

Cumulative %
Passing

19.00

100.00

13.20

100.00

9.50

100.00

4.75

100.00

2.36

100.00

1.18

100.00

0.600

100.00

0.300

100.00

0.150

2.5

2.5

1.25

98.75

0.075

19.5

22.0

11.00

89.00

I.S.Sieve (mm)

Remarks

26.5

Pan

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative % Retained

Cumulative %
Passing

19.00

100.00

13.20

100.00

9.50

100.00

4.75

100.00

2.36

100.00

1.18

100.00

0.600

100.00

0.300

100.00

0.150

2.8

2.8

1.40

98.60

0.075

20.2

23.0

11.50

88.50

Total Weight (gm) :

200

26.5

Pan
Construction Team

Independent Engineer

Supervision Team

Remarks

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE- I


(AS PER MORT&H TABLE 500 - 18)

Chainage

: 58+360 L/S

Date of Sampling

: 09.02.13

: Camp site

Date of Testing

: 09.02.13

Type of material

: filler

Source of material

: Hot Mix Plant

Sample No

:3

Total Weight (gm) :

Location

200

Weight Retained
(gm)

Cumulative
Wt.Retained
(gm)

Cumulative % Retained

Cumulative %
Passing

19.00

100.00

13.20

100.00

9.50

100.00

4.75

100.00

2.36

100.00

1.18

100.00

0.600

100.00

0.300

100.00

0.150

2.10

2.10

1.05

98.95

0.075

20.1

22.2

11.10

88.90

I.S.Sieve (mm)
26.5

Pan
Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Remarks

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate
and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502


AVERAGE INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE-I

Chainage

: 58+360 L/S

: 10/02/2013

Location

: Camp Site

: 10/02/2013
: Hot Mix Plant
40mm - 16mm

IS Sieve in mm

Sample1

Sample2

Sample3

Average

26.5

100.00

100.00

100.00

100.00

19.00

91.41

91.99

91.77

91.72

13.20

7.77

7.28

7.63

7.56

9.50

0.69

0.56

0.64

0.63

4.75

0.26

0.21

0.27

0.25

2.36

0.00

0.00

0.00

0.00

1.18

0.00

0.00

0.00

0.00

0.600

0.00

0.00

0.00

0.00

0.300

0.00

0.00

0.00

0.00

0.150

0.00

0.00

0.00

0.00

0.075

0.00

0.00

0.00

0.00

IS Sieve in mm

Sample1

Sample2

Sample3

Average

26.5

100.00

100.00

100.00

100.00

19.00

100.00

100.00

100.00

100.00

13.20

68.55

62.95

63.01

64.84

9.50

24.32

24.41

24.07

24.27

4.75

0.63

0.62

0.52

0.59

2.36

0.00

0.00

0.00

0.00

1.18

0.00

0.00

0.00

0.00

0.600

0.00

0.00

0.00

0.00

0.300

0.00

0.00

0.00

0.00

0.150

0.00

0.00

0.00

0.00

0.075

0.00

0.00

0.00

0.00

PAN
16mm - 7mm

PAN
7mm - 3mm
IS Sieve in mm

Sample1

Sample2

Sample3

Average

26.5

100.00

100.00

100.00

100.00

19.00

100.00

100.00

100.00

100.00

13.20

100.00

100.00

100.00

100.00

9.50

100.00

100.00

100.00

100.00

4.75

73.21

72.75

72.97

72.98

2.36

9.16

9.06

9.35

9.19

1.18

4.93

4.52

4.72

4.72

0.600

3.70

3.55

3.56

3.60

0.300

2.76

2.68

2.69

2.71

0.150

0.00

0.00

0.00

0.00

0.075

0.00

0.00

0.00

0.00

PAN

Construction Team

Independent Engineer

Date:

Date:

Supervision Team
Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate
and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

AVERAGE INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE-I


Chainage

: 58+360 L/S

: 10/02/2013

Location

: Camp Site

: 10/02/2013
: Hot Mix Plant
3mm Down

IS Sieve in mm

Sample1

Sample2

Sample3

Average

19.00

100.00

100.00

100.00

100.00

13.20

100.00

100.00

100.00

100.00

9.50

100.00

100.00

100.00

100.00

4.75

100.00

100.00

100.00

100.00

2.36

98.87

98.21

98.25

98.44

1.18

71.28

72.53

72.77

72.19

0.600

53.19

52.47

53.34

53.00

0.300

36.17

36.68

36.62

36.49

0.150

17.38

16.83

17.91

17.37

0.075

6.74

6.87

6.77

6.79

26.5

PAN
Filler
IS Sieve in mm

Sample1

Sample2

Sample3

Average

19.00

100.00

100.00

100.00

100.00

13.20

100.00

100.00

100.00

100.00

9.50

100.00

100.00

100.00

100.00

4.75

100.00

100.00

100.00

100.00

2.36

100.00

100.00

100.00

100.00

1.18

100.00

100.00

100.00

100.00

0.600

100.00

100.00

100.00

100.00

0.300

100.00

100.00

100.00

100.00

0.150

98.75

98.60

98.95

98.77

0.075

89.00

88.50

88.90

88.80

26.5

PAN

Construction Team

Independent Engineer

Supervision Team

Date:

Date:

Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

AGGREGATE IMPACT VALUE TEST


(TEST METHOD : IS - 2386 PART - 4 )
Location/Source

: Gandyal

Date of Sampling

: 11.02.13

Type of Material

: Hot Bin Aggregat

Date of Testing

: 11.02.13

Proposed Use

: B.C.

Tested by

: Jointly

Description

Trial No

Weight of sample passing 12.5 mm and


retained on 10 mm IS sieves, W1

(g)

353.00

354.00

353.00

Weight of fraction passing 2.36 mm IS sieve,


after the test, W2

(g)

48.50

50.00

50.50

Weight of fraction retained on 2.36 mm IS sieve


after the test, W3

(g)

304.50

304.00

302.50

A.I.V. = (W2 / W1)X100

(%)

13.74

14.12

14.31

Average value of A.I.V. (%)

(%)

Construction Team

Independent Engineer

14.06

Supervision Team

Date:

Date:

Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

AGGREGATE IMPACT VALUE TEST


(TEST METHOD : IS - 2386 PART - 4 )

Location/Source

: Gandyal

Date of Sampling

: 11.02.13

Type of Material

: Hot Bin Aggregat

Date of Testing

: 11.02.13

Proposed Use

: B.C.

Tested by

: Jointly

Description

Trial No

Weight of sample passing 12.5 mm and


retained on 10 mm IS sieves, W1

(g)

354.00

353.00

354.00

Weight of fraction passing 2.36 mm IS sieve,


after the test, W2

(g)

49.00

50.50

50.00

Weight of fraction retained on 2.36 mm IS sieve


after the test, W3

(g)

305.00

302.50

304.00

A.I.V. = (W2 / W1)X100

(%)

13.84

14.31

14.12

Average value of A.I.V. (%)

(%)

14.09

Construction Team

Independent Engineer

Date:

Date:

Supervision Team
Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

AGGREGATE IMPACT VALUE TEST


(TEST METHOD : IS - 2386 PART - 4 )

Location/Source

: Gandyal

Date of Sampling

: 11.02.13

Type of Material

: Hot Bin Aggregat

Date of Testing

: 11.02.13

Proposed Use

: B.C.

Tested by

: Jointly

Description

Trial No

Weight of sample passing 12.5 mm and


retained on 10 mm IS sieves, W1

(g)

354.00

354.00

354.00

Weight of fraction passing 2.36 mm IS sieve,


after the test, W2

(g)

48.00

49.00

49.50

Weight of fraction retained on 2.36 mm IS sieve


after the test, W3

(g)

306.00

305.00

304.50

A.I.V. = (W2 / W1)X100

(%)

13.56

13.84

13.98

Average value of A.I.V. (%)

(%)

13.79

Construction Team

Independent Engineer

Supervision Team

Date:

Date:

Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance,
Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India/MORT&H

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

FLAKINESS AND ELONGATION INDEX TEST


(TEST METHOD : IS - 2386 PART - 1)

Location/Source : Gandyal

Date of Sampling

: 11.03.13

Type of Material : Hot Bin Aggregat

Date of Testing

: 11.03.13

Sample No.

Tested by

: Jointly

:1

IS SIEVE (mm)

Total wt . of Agg taken


in (A) gms

Wt of Agg Passing
Through Thickness
Gauge (B) gms

Wt of Agg Retained on
Thickness Gauge (C)
gms

Wt of Agg Ret on Length


Gauge After Ret. on
Thickness Gauge (D) gms

Passing

Retaining

40.0

31.5

31.5

25.0

25.0

20.0

20.0

16.0

16.0

12.5

1105

135

970

128

12.5

10.0

254

40

214

38

10

6.3

101

15

86

20

1460

190

1270

186

Total

Results

Sample No.

Flackiness Index =B/A x100

13.01

Elongation Index = D/C x 100

14.65

Conbined FI and EI

27.66 %

:2

IS SIEVE (mm)

Total wt . of Agg taken


in (A) gms

Wt of Agg Passing
Through Thickness
Gauge (B) gms

Wt of Agg Retained on
Thickness Gauge (C)
gms

Wt of Agg Ret on Length


Gauge After Ret. on
Thickness Gauge (D) gms

Passing

Retaining

40.0

31.5

31.5

25.0

25.0

20.0

20.0

16.0

16.0

12.5

1095

132

963

130

12.5

10.0

250

38

212

35

10

6.3
Total

98

16

82

22

1443

186

1257

187

Results
Flackiness Index =B/A x100

12.89

Elongation Index = D/C x 100

14.88

Conbined FI and EI

27.77 %

Construction Team

Independent Engineer

Supervision Team

Date:

Date:

Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance,
Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India/MORT&H

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

FLAKINESS AND ELONGATION INDEX TEST


(TEST METHOD : IS - 2386 PART - 1)

Location/Source : Gandyal

Date of Sampling

: 11.03.13

Type of Material : Hot Bin Aggregat

Date of Testing

: 11.03.13

Sample No.

Tested by

: Jointly

:3

IS SIEVE (mm)

Total wt . of Agg taken


in (A) gms

Wt of Agg Passing
Through Thickness
Gauge (B) gms

Wt of Agg Retained on
Thickness Gauge (C)
gms

Wt of Agg Ret on Length


Gauge After Ret. on
Thickness Gauge (D) gms

Passing

Retaining

40.0

31.5

31.5

25.0

25.0

20.0

20.0

16.0

16.0

12.5

1120

140

980

135

12.5

10.0

258

42

216

36

10

6.3

104

17

87

18

1482

199

1283

189

Total
Results
Flackiness Index =B/A x100

13.43

Elongation Index = D/C x 100

14.73

Conbined FI and EI

28.16 %

Construction Team

Independent Engineer

Supervision Team

Date:

Date:

Date:

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

LOS ANGELES ABRASION TEST


(TEST METHOD : IS - 2386 PART - 4)

Location/Source : Gandyal

Date of Sampling : 13.02.13

Type of Material

: Hot Bin Aggregat

Date of Testing

: 13.02.13

Sample No.

:1

Tested by

: Jointly

Trail Number

Grade B

Grade C

Grade D

Initial weight, W 1 gms

5000

5000

5000

Weight of Materials retained on 1.70 mm


sieve after the test(W 2 gms)

3986

3914

3990

Weight of materials passing on 1.70 mm


IS sieve, W3 (W2- W1) gms

1014

1086

1010

Los Angeles Abrasion =(W 3 / W 1) X 100

20.28

21.72

20.20

Average

20.73

IS SIEVE (mm)

Weight of Indicated Sizes gms


Grading

Passing

Retaining
B

40

25

25

20

20

12.5

2500

12.5

10

2500

10

6.3

2500

6.3

4.75

2500

4.75

2.36

5000

5000

5000

5000

4584+/- 25

3330 +/- 20

2500 +/- 15

11

Total
Tolerance Limit (Sphere
Weight) gms
No of Spheres

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY OF BITUMEN


(TEST METHOD : IS - 1202)

Lab. Sample No

:1

Date of Sampling

: 13.02.13

Type of material

: PMB 40

Date of Testing

: 14.02.13

Location

: Camp Site 58+360 L/S

Source of material

: Hincol

S.No

Description

Sample No 1 Sample No 2

Sample No
3

Weight of Pycnometer (W 1)

37.66

37.66

37.66

Weight of Pycnometer + Sample (W 2)

69.09

70.10

69.55

Weight of Pycnometer + Sample + Kerosin (W 3)

84.77

84.95

84.89

Weight of Pycnometer + Full of Kerosin (W 4)

77.84

77.84

77.84

Weight of Sample (W 2-W 1)

31.43

32.44

31.89

Specific Gravity of Kerosin (K)

0.80

0.80

0.80

Specific Gravity of Sample K(W 2-W 1) / (W 4-W 1) - (W 3-W 2)

1.026

1.025

1.027

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Average

1.026

25.144

25.952

25.512

24.50

25.33

24.84

1.026286 1.024556 1.027053

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design,
Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY OF FILLER


TEST METHOD :AASTHO - 100)
Lab. Sample No

:1

Location

: Camp Site 58+360 L/S Date of Testing

Source of Material

: Hot Bin Aggregate

Type of Material

: Filler

SL.No

DESCRIPTION OF TEST

Date of Sampling

Proposed use

TRIAL - 01

TRIAL - 02

Weight of Pycnometer (A)

37.66

37.66

Weight of Pycnometer + Sample (B)

54.36

55.20

Weight of Pycnometer + Sample + Kerosine(C)

89.38

90.05

Weight of Pycnometer +Kerosine (D)

77.84

77.84

Specific Gravity of Kerosine (K)

0.80

0.80

Bulk Specific Gravity

K ( B-A ) / [ ( D-A ) - ( C-B ) ]

2.589

2.633

K ( B-A ) / [ ( D-A ) - ( C-B ) ]

2.589

2.633

Apprent Specific Gravity

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

of Pathankot to Amritsar
NHDP III B on Design,

uthority of India

sar toll road pvt. Ltd


108+502

on Team

: 13.02.13
: 14.02.13
: B.C.

Average

2.611
13.36

14.032

5.16

5.33

2.611

2.589147 2.632645

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

PENETRATION VALUE OF BITUMEN


(TEST METHOD : IS 1203)

Sample No

:1

Date of Sampling

: 14.02.13

Location

: Camp Site 58+360 L/S

Date of Testing

: 14.02.13

Bitumen Grade

: PMB 40

Source of material

: Hincol

Observation No:

Test Load (gms)

100

100

100

Test Temp (0C)

25

25

25

Time For Penetration (Sec)

Penetration

46

46

47

Average Penetration

46

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance,
Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

DETERMINATION OF SOFTENING POINT


(TEST METHOD : IS 1205)

Lab. Sample No

:1

Date of Sampling

: 14.02.13

Type of material

: PMB 40

Date of Testing

: 14.02.13

Location

: Camp Site 58+360 L/S

Source of material : Hincol

Bitumen Grade

PMB 40

Apparatus Used

Ring and Ball Apparatus

Period of Cooling at Room Temperature (minute)

35

Period of Cooling in Water bath (minute)

15

Description
Temperature at which sample
touches the bottom Plate

Ball No 1

Ball No 2

Softening Point Mean Value

66.00

68.00

67.00

Remarks

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

DETERMINATION OF DUCTILITY
(TEST METHOD : IS - 1208)

Sample No

Date of Sampling

: 14.02.2013

Location

: Campsite 87+500 L/S

Date of Testing

: 14.02.2013

Bitumen Grade

: PMB 40

Source of material

: Hincol

Pouring Temperature, 0C

156

Test Temperature,0C

27

Period of Cooling (min)

30

Test Property

Briquette Number
Average
1

96

95

Ductility Value(cm)

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

95.5

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance,
Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

STRIPPING VALUE OF AGGREGATES


(TEST METHOD : I.S - 6241)

Lab. Sample No

:1

Date of Sampling:

: 14.02.2013

Type of material

: Hot Bin Aggregate

Date of Testing :

: 15.02.2013

location

: Camp Site 58+360 L/S

Tested By

: Jointly

Total Wt of Aggregate

100 gms

Size of Aggregate

20mm passing - 12.5 mm retained

Grade of Bitumen used

PMB 40

% of Bitumen used

5.0%

Duration of Sample Immersion in Water (Hrs)

24 Hrs

Trial I

Trial II

Average

97

98

97.5

Stripping Value

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design,
Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY & WATER ABSORPTION TEST


(TEST METHOD : IS 2386 PART - 3)
Sample No.

:1

Date of Sampling

: 13.02.2013

Location

: Camp Site 58+360 L/S

Date of Testing

: 14.02.2013

Source of Material

: Gandyal

Proposed use

: B.C. ( Grading- I )

Type of Material

: Hot Bin Aggregates

Size of Agg

: 16 mm - 7 mm

Trial No
Determination

Average
1

Weight of Saturated Surface Dry Aggregates in Air (W1 gm)

4060

4062

4067

Weight of Aggregates in Water (W2 gm)

2550

2548

2554

Weight of Oven Dried Aggregates in Air (W3 gm)

4042

4045

4050

Bulk Specific Gravity

W3/( W1-W2 )

2.677

2.672

2.677

2.675

Apprent Specific Gravity =

W3/( W3-W2 )

2.709

2.702

2.707

2.706

Water Absorption (%) =

( W1-W3 ) X 100/W3

0.45

0.42

0.42

0.43

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build,
Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY & WATER ABSORPTION TEST


(TEST METHOD : IS 2386 PART - 3)
Sample No.

:2

Date of Sampling

: 13.02.2013

Location

: Camp Site 58+360 L/S

Date of Testing

: 14.02.2013

Source of Material

: Gandyal

Proposed use

: B.C. ( Grading- I)

Type of Material

: Hot Bin Aggregates

Size of Agg

: 7 mm - 3 mm

Trial No
Determination

Average
1

Weight of Saturated Surface Dry Aggregates in Air (A gm)

500

500

500

Weight of Pykno meter + Sample+Water (B gm)

1834

1835

1834

Weight of Pykno meter + Water

1520

1520

1520

496

496

497

(C gm)

Weight of Oven Dried Dry Aggregates in Air (D gm)


Bulk Specific Gravity

D/A -(B-C)

2.667

2.681

2.672

2.673

Apprent Specific Gravity =

D/D -(B-C)

2.725

2.740

2.716

2.727

Water Absorption (%) =

100 (A - D)/D

0.81

0.81

0.60

0.74

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar


sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance,
Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY & WATER ABSORPTION TEST


(TEST METHOD : IS 2386 PART - 3)
Sample No.

:3

Date of Sampling

Location

: Camp Site 58+360 L/S

Date of Testing

Source of Material

: Gandyal

Proposed use

Type of Material

: Hot Bin Aggregates

Size of Agg

Trial No
Determination
1

Weight of Saturated Surface Dry Aggregates in Air (A gm)

500

500

500

Weight of Pykno meter + Sample+Water (B gm)

1835

1834

1835

Weight of Pykno meter + Water

1520

1520

1520

492

493

492

(C gm)

Weight of Oven Dried Dry Aggregates in Air (D gm)


Bulk Specific Gravity

D/A -(B-C)

2.659

2.651

2.659

Apprent Specific Gravity =

D/D -(B-C)

2.780

2.754

2.780

Water Absorption (%) =

100 (A - D)/D

1.63

1.42

1.63

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

nkot to Amritsar
Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amrits
on Design, Build, Finance, sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Bu
Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

t. Ltd

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

SPECIFIC GRAVITY & WATER ABSORPTION TEST


(TEST METHOD : IS 2386 PART - 3)
: 13.02.2013

Sample No.

:1

Date of Sampling

: 14.02.2013

Location

: Camp Site 58+360 L/S

Date of Testing

: B.C. ( Grading- I )

Source of Material

: Gandyal

Proposed use

: 3 mm down

Type of Material

: Hot Bin Aggregates

Size of Agg

rvision Team

Trial No
Average

Determination
1

Weight of Saturated Surface Dry Aggregates in Air (W1 gm)

4056

4060

4064

Weight of Aggregates in Water (W2 gm)

2549

2550

2559

Weight of Oven Dried Aggregates in Air (W3 gm)

4042

4045

4050

Bulk Specific Gravity

W3/( W1-W2 )

2.682

2.679

2.691

2.656

Apprent Specific Gravity =

W3/( W3-W2 )

2.707

2.706

2.716

2.771

Water Absorption (%) =

( W1-W3 ) X 100/W3

0.35

0.37

0.35

1.56

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

e of Pathankot to Amritsar
NHDP III B on Design, Build,

uthority of India

sar toll road pvt. Ltd

o 108+502

EST

:13.02.13
:14.02.13
: B.C. ( Grading- I )

: 40 mm - 16 mm

Average

2.684
2.710
0.35

Team

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of
Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

MARSHALL STABILITY TEST ( MS - 2)


Sp. Gra of Bit (Gb)

1,025

Proving Ring Constant :

Bulk Sp. Gra(Gsb)

: 2.693

App Sp. Gra(Gsa)

Sl No

Mould
Height
(mm)

Bitumen
% (Pb)

1
2

4.50

Wt in Air

Wt in
Water

SSD Wt
in Air

Volume
(cc)

Bulk
Density
(g/cc)
Gmb

1244.5

724.5

1246.0

521.5

1245.0

724.0

1245.5

1249.0

723.0

1250.0

2
3

2
3

2.386

190

1.00

1596

3.2

521.5

2.387

180

1.00

1512

3.0

527.0

2.370

200

1.00

1680

3.3

1.00

1596.00

3.2

2
3

2
3

62.16

2.391

205

1.00

1722

3.2

1246.5

727.0

1248.0

521.0

2.393

215

1.00

1806

3.5

1247.0

728.5

1248.0

519.5

2.400

200

1.00

1680

3.4

1.00

1736.00

3.4

2.511

4.62

15.29

69.79

1260.5

736.0

1261.0

525.0

2.401

210

1.00

1764

3.6

1245.0

729.0

1246.0

517.0

2.408

215

1.00

1806

4.0

1264.0

738.0

1265.0

527.0

2.398

210

1.00

1764

3.3

1.00

1778.00

3.6

2.504

4.03

15.23

73.52

1258.5

734.5

1260.0

525.5

2.395

215

1.00

1806

4.0

1257.0

735.5

1257.5

522.0

2.408

210

1.00

1764

3.9

1259.0

734.0

1259.5

525.5

2.396

195

1.00

1638

3.8

1.00

1736.00

3.9

2.494

3.97

15.73

74.77

1256.5

730.5

1257.0

526.5

2.387

200

1.00

1680

4.1

1255.5

730.0

1256.0

526.0

2.387

205

1.00

1722

4.3

1253.5

731.5

1254.5

523.0

2.397

185

1.00

1554

4.0

1652.00

4.1

Average

Construction Team

15.56

522.5

2.400

5.50

5.89

VFB (%)

1250.5

Average
1

2.530

Air Voids
VMA (%)
(%)

728.0

2.403

5.25

Gmm

1249.5

Average
1

: 2.733

Flow (mm)

2.395

5.00

Effect Sp.Gr(Gse)

Correct
Stability
(KN)

Average
1

: 09.05.2012

Correction
factor

2.381

4.75

: 2.772

Date

Proving
Ring
Reading

Average
1

8.4 Kg/Div

2.390

Independent Engineer

2.478

3.91

16.45

76.20

Supervision Team

Date

Date

Date

1025

2,511

2,478

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to
Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

Type of Mix

: BC-II MIX

Date of Sampling

: 07.05.12

Location

: 58+360 L/S

Date of Testing

: 07.05.12

4.50%

Bitumen Content

4.75%

5.00%

5.25%

5.50%

839

761

762.5

752.5

760

752.5

760

752.5

760

752.5

2. Weight of Flask + Mix(gm)

2016

2009

2017

2012

2018

2014

2026

2019

2029

2022

3. Weight of Flask + Mix + Water (gm)

3935

3885

3930

3890

3930.5

3890

3932

3892

3932

3889

4.Weight of Flask + water

3424

3132

3175

3132

3175

3132

3175

3132

3175

3132

5. GMM = {(2)-(1)}/ [{(4)-(1)}-{(3)-(2)}]

1.767

2.521

2.512

2.511

2.503

2.505

2.487

2.500

2.479

2.477

1. Weight of Empty Flask (gm)

Average

2.144

2.511

2.504

2.494

REMARKS :

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

2.478

RFI No.

Type of Mi : BC-II MIX


Location

: LAB ( 83 CAMP )

Source of : Railla Mines Quarry,Kotputli

4.5% - 5.5 %

BC-II

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

MARSHALL TESTING REPORT


Bitumen Sp.Gravity

1,025

1,025

1,025

1,025

Binder Content

4.50

4.75

5.00

5.25

Agg % By Total Wt.

95.50

95.25

95.00

94.75

MARSHALL DENSITY

2,381

2,395

2,403

2,400

LAB GMM

2,530

2,511

2,504

2,494

Calculated Gmm Based on Avg


SP.Gr

2,530

2,511

2,504

2,494

Gsb

2,693

2,693

2,693

2,693

Gse

2,718

2,707

2,710

2,709

Pba

0.35

0.19

0.23

0.21

Pbe

4.17

4.56

4.78

5.05

VMA

15.56

15.29

15.23

15.56

Air Voids

5.89

4.62

4.03

3.77

VFB

62.16

69.79

73.52

75.78

Stability

1512.00

1680.00

1792.00

1596.00

Flow

2.30

2.60

3.60

3.20

Marshall Qotient

657.39

646.15

497.78

498.75

NOTE:Gsb = 2.693

Gmm : Maximum Specific Gravity Of Bitumenious mix

Gsa = 2.772

Gsb : Bulk Specific Gravity Of Aggregate

Gse = 2.733

Gse : Effective Specific Gravity Of Aggregate


Pba : Bitumen Absorbed By Aggregate in %
Pbe : Effective Bitumen Content in %
VMA : Voids In Mineral Aggregate
Air Voids : Air Voids In Aggregate
VFB: Voids Filled With Bitumen

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

kot to Amritsar sectioofNH15fromKm 6.082


e, Operate and Transfer(DBFOT)Basis

thority of India

ar toll road pvt. Ltd


108+502

1,025

1,025

5.25

5.50

94.75

94.50

2,400

2,390

2,494

2,478

2,530

00

2,494

2,478

2,511

00.0

2,693

2,693

2,504

00.0

2,709

2,701

2,494

00.0

0.21

0.10

2,478

00.0

gsb

5.05

5.40

15.56

16.13

3.77

3.55

75.78

77.99

1596.00

1512.00

3.20

4.80

498.75

315.00

Bitumenious mix

2,693

2,693

2,693

2,693
2,693

gate

ggregate

e in %

Supervision Team
Date

23.32
b

gse

2,718

7,319

0.025

0.003415

0.34

2,707

7,289

0.014

0.001920

0.19

2,710

7,298

0.017

0.002329

0.23

2,709

7,295

0.016

0.002193

0.22

2,701

7,273

0.008

0.001099

0.11

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofNH15fromKm 6.082 to
Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

FRACTURED TEST OF AGGREGATES


Lab. Sample No : 1

Date of Sampling:

: 13.02.2013

Type of material : Aggregate

Date of Testing :

: 13.02.2013

location

Tested By

: Jointly

: Camp Site 58+360 L/S

Size of the Agg.


(mm)

Total wt.(gms)

Minimum two side


fractured material
wt.(gms)

unfractured
material wt.(gms)

% of fractured
material

Specified limit

Remarks

10

500

482

18

3.6

<10 %

Satisfactory

20

500

483

17

3.4

<10 %

Satisfactory

40

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE-I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Campsite

Date of Testing

: 09.02.13

: 40 mm - 16 mm

Source of material : : Hot Mix Plant


Total Weight (gm) : 23100

Sample No

I.S.Sieve (mm)

Weight Retained
(gm)

26.5

Cumulative
Wt.Retained
(gm)
0

19.00

1985

13.20

Cumulative %
Retained

Cumulative %
Passing

100.0

1985

8.59

91.41

19320

21305

92.23

7.77

9.50

1635

22940

99.31

0.69

4.75

101

23041

99.74

0.26

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Sample No

26.5

100

19.00

1850

1850

8.01

91.99

13.20

16369

18219

92.72

7.28

9.50

1320

19539

99.44

0.56

4.75

70

19609

99.79

0.21

Remarks

Weight of Sample Taken (gms) : 19650

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to


Amritsar sectioofNH15fromKm 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on
Design, Build, Finance, Operate and Transfer(DBFOT)Basis
Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

INDIVIDUAL GRADATION FOR BITUMINOUS CONCRETE-I


(AS PER MORT&H TABLE 500 - 18)
Chainage
Location

Type of material

: 58+360 L/S

Date of Sampling

: 09.02.13

: Campsite

Date of Testing

: 09.02.13

: 40 mm - 16 mm

Source of material : : Hot Mix Plant

Sample No

26.5

100

19.00

1901

1901

8.23

91.77

13.20

18770

18770

92.37

7.63

9.50

1420

20190

99.36

0.64

4.75

75

20265

99.73

0.27

Weight of Sample Taken (gms) : 20320

2.36

0.00

1.18

0.00

0.600

0.00

0.300

0.00

0.150

0.00

0.075

0.00

Construction Team

Independent Engineer

Supervision Team

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar section of
NH15 from Km 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate
and Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: From Km 6+082 to 108+502

VISCOSITY OF EMULSION
(TEST METHOD : IS-3117)

Source

Date of Sampling

Type of material

Date of Testing

location

Tested By

Water Temp.

Emulsion Temp.

Trial I
3

Trial II

Viscosity Value

Remarks:

Construction Team

Independent Engineer

Supervision Team

Average

Date

Date

Date

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar section of NH15
from Km 6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and
Transfer(DBFOT)Basis

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: From Km 6+082 to 108+502

ABSOLUTE VISCOSITY BY CANNON-MANNING VACUUMS VISCOMETER


(TEST METHOD : IS-1206,Part-2)

Source

Date of Sampling

Type of material

Date of Testing

location

Tested By

Trail No

Discription

Flow time (Sec)

Calibration Factor Viscosity (Poises)


kt
k

AbsoluteViscosity at 60 C,30 cmHG Vacuum =

Specified Value for (VG-30) =

Construction Team

Min 2400 poises

Independent Engineer

Supervision Team

Remarks

Date

Date

Date