Insulator Change in case of Flash over / Damage

SL. NO.

DESCRIPTION OF ITEM

QTY.

Remarks

Requirement of T&P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

FOUR SHEAVE PULLY


SWIVEL JOINT
CEILING (5M - 18/20 MM)
D-SACKLE (6.5 T)
D-SACKLE (4.75 T)
SINGLE SHEAVE PULLY (OPEN)
DOUBLE SHEAVE PULLY
PP ROPE (18 MM)
PP ROPE (20 MM)
DISCHARGE ROD
FALL ARRESTER
SCREW DIVER (BAG TYPE)
COME ALONG CLAMP (BOLT TYPE)
CEILING (1M - 16 MM)
Cutting Plier
RING SPANNER (24/26)

2 NOS
1 NOS
AS REQUIRED
8 NOS
1 NOS
5 NOS
2 NOS
2 BUNDLE
1 BUNDLE
6 NOS
2 NOS
2 NOS
3 NOS
6 NOS
2 NOS
3 NOS
Requirement of Material
As per Requirement
Minimum Requirement of Manpower
1
1
1
Depends upon Site condition
2
Depends upon Site condition
8

Insulator

1
2
3
4
5

Engineer
Safety Officer
Supervisor
Skilled Labour (Fitter)
Unskilled labour (Helper)