VWTA-20 PENDING POINTS

SI.NO

CONSTRAINTS

DESCRIPTION
VESPL

BUNKER

BUNKER CHUTE&CASING CORNER PLATE FIT UP & WELDING

II

BALANCE WELDING IN CHUTE & CASINGS

II

TEMPORARY SUPPORTS REMOVE WORK

IV

MAN HOLE DOOR FIT UP

MORRIE'S WHEEL CHAIN TO BE PROVIDED

FUEL FEEDING SYSTEM

III

DIVIIDING CHUTE BALANCE SUPPORT WORK

IV

PA LINE TO MIXING NOZZLE GASKET FIXING

VI

DRAG CHAIN FEEDER SUPPORT WELDING

VII

PA LINE SUPPORT WELDING

VIII

CROSS COVER FLANGE WITH GASKET FIXING

IX

FUEL LINE DRAIN TO SLIDE GATE WELDING

FURNACE

SPORGER HEADER FLANGE JOINT WELDING

II

SPORGER HEADER SUPPORT WELDING

III

BOTTOM SUPPORT TIE BEAM BALANCE WELDING

COVER FLANGE REQUIRED

BAPL

IV

SPORGER HEADER DRAIN

BALANCE FURNACE HOPPER WELDING

VI

HOPPER MANHOLE DOOR & ATTENDING PLATFORM FIT UP

VII

FUEL LINE TO FURNACE HOPPER PAD FIT UP & WELDING

VIII

FURNACE HOPPER DRAIN PIPING AND KNIFE & SLIDE GATE FIT UP

WATER WALL

II

WATER WALL BOTTOM SUPPORT SEATING WORK

III

FURNACE BED COIL SEAL BOX

WATER WALL ROOF SEAL BOX BALANCE WORK & WELDING

BED MATERIAL BUNKER

DRG. REQUIRED

STUD BOLT
REQUIRED.

BED MATEIAL BUNKER STIFFNER BEAM WELDING

AIRHEATER

AIR HEATER TUBE SHEET BALANCE WELDING

PLATFORM ASSEMBLY

TOE PLATE FIXING WORK TO BE COMPLETED.

ROOF TRUSS & SIDE CLADDING

SIDE CLADDING BALNCE WORK

MATERIAL REQ

II

ROOF TRUSS ERECTION WORK

MATERIAL REQ

III

BALNCE WELDING WORK

ZERO EXPANSION MOVEMENT DIAGRAM

WATER WALL, STEAM DRUM ZERO EXPANSION ARRESTER ERECTION WORK

II

EXPANSION INDICATOR FIT UP

10
I
11

RISER SUPPORT
RISER SUPPORT MODIFICATION WORK

ECONOMISER

ECONOMISER CASING SCALLOPED PLATE TUBE WELDING

II

ECONOMISER INLET & OUTLET HEADER U CLAMP CHANGING

12

MAIN STEAM OUTLET LINK

SAFTY VALVE FIT UP & WELDING

II

THERMOWELL CHANGING

II

SPRING HANGER SUPPORT PLATE FIXING

13
I
14
I
15

AIR DUCTING
ALL DUCTING FLANGES OUTER SIDE STRETCH WELDING

PRIMARY AIR SYSTEM ASSEMBLY


ALL DUCTING FLANGES OUTER SIDE STRETCH WELDING

FLUE GAS DUCTING ASSEMBLY

AIR HEATER TO ESP DUCTING SUPPORT ERECTION

II

ID FAN TO CHIMNEY DUCTING ERECTION WORK

16
I

FOUNDATION REQ
CHIMNEY REQUIRED

FEED PIPING
BALNCE PIPING FIT UP, ERECTION &WELDING

PIPE RACK REQ

II

FEED PIPING SUPPORT

17

HP DOSING PIPING

HP DOSING PIPING FIT UP & WELDING BALANCE WORK

18

REMOTE PRESSURE GAUGE EXTENSION PIPING

I
19

VALVE & CONDENSING LOOP ASSEMBLY FIT UP & WELDING WORK

REDUSER REQ

START UP OIL FIRING SYSTEM

BALANCE PIPING FIT UP, ERECTION &WELDING

II

PIPING SUPPORT

20

PIPE RACK REQ

COOLING WATER PIPING

FEED PUMP COOLING WATER INLET & OUTLET PIPING FIT UP & WELDING

INSERT PLATE REQ

II

FEED PUMP COOLING WATER INLET & OUTLET PIPING SUPPORT

INSERT PLATE REQ

III

SAMPLE COOLER COOLING WATER INLET PIPING & SUPPORT

21

BOILER SAFTY VALVE EXHAUST PIPING

MAIN STEAM LINE DRIP PAN FIT UP & WELDING

II

BALNCE SUPPORT ERECTION & WELDING

22

NON IBR DRAIN PIPING

ALL DRAIN PIPING FIT UP & WELDING

II

ALL DRAIN PIPING SUPPORTWORK & WELDING

23
I

DEAERATOR
DEAERATOR TO FEED PUMP SUCTION PIPING &SUPPORT

INSERT PLATE & PIPE RACK REQ

II

INITIAL HEATING & STEAM INLET PIPING SUPPORT

INSERT PLATE REQ

III

MAKE UP WATER INLET PIPING & SUPPORT

INSERT PLATE REQ

IV

DEAERATOR STROAGE TANK OVERFLOW & DRAIN PIPING

INSERTPLATE REQ

DEAERATOR IMPULSE PIPING

VII

BALANCE PLATFORM WORK

VIII

LP DOSING ERECTION

INSERT PLATE REQ

IX

LP DOSING PIPING

INSERT PLATE REQ

AUTO MINIMUM REIRCULATION BALNCE LEAK PIPING SUPPORT WORK.

INSERT PLATE REQ

24

IMPULSE PIPING

STEAM DRUM LEVEL TRANSMITTER IMPULSE PIPING WORK

II

IMPULSE PIPING BALANCE SUPPORT

1"TO 1/2" CONNECTOR


REQ {QTY-2 NOS)

25

ROTARY EQUIPEMENT.

FD FAN FINAL ALIGNMANT

FULL GROUTING,PACKING
PLATE REQ

II

PA FAN FINAL ALIGNMENT

FULL GROUTING,PACKING
PLATE REQ

III

FEED PUMP FINAL ALIGNMENT

FULL GROUTING,PACKING
PLATE REQ

IV

ID FAN ALIGNMNET & FINAL ALIGNMENTT

FULL GROUTING,PACKING
PLATE REQ

26

ESP

II

HOPPER BALANCE WELDING

III

HOPPER PARTITION PLATE BALANCE FIT UP

IV

HOPPER PARTITION HAMMER PLATE FIXING

HOPPER PARTITION MAN HOLE DOOR FIT UP WORK

VI

HOPPER SLIDE GATE & RAV FIXING

VII

LONGITIDUNAL WALL SIDE COVERING PLAT FIT UP & WELDING WORK

VIII

OUTLET INTERNAL WALKWAY WORK

IX

COLLECTING ELECTRODE ALIGNMENT

COLLECTING ELECTRODE RAPPING SYSTEM

XI

DISCHARGE ELECTRODE ALIGNMENT

XII

DISCHARGE RAPPING SYSTEM

XIII

GD PLATE LOCKING REMOVING WORK

XIV

GD RAPPING SYSTEM

XV

BALANCE PLATFORM WORK

XVI

INSULATOR ERECTION WORK

XVII

GAS DIVERTION PLATE FIT UP & WELDING

XVIII

BLOWER WITH HEATER ERECTION & PIPING WORK

XIX

HT DUCT ERECTION & HT CONNECTION

XX

SEALING ROOF ERECTION & WELDING

XXI

RAIN ROOF ERECTION & WELDING

XXII

ROOF BEAM MAN HOLE DOOR FIT UP & WELDING

27
I

TEMPORARY SUPPORTS REMOVING


BOILER TEMPORARY SUPPORTS

RAV REQ

II
28

ESP TEMPORARY SUPPORTS

REFRACTORY

HOPPER REFRACTORY WORK

CONTRACTOR

MISSED MATERIAL REQ

II

FURNACE REFRACTORY WORK

CONTRACTOR

MISSED MATERIAL REQ

III

SEAL BOX REFRACTORY WORK

CONTRACTOR

MISSED MATERIAL REQ

IV

ROOF SEAL BOX REFRACTORY WORK

CONTRACTOR

MISSED MATERIAL REQ

29

INSULATION

ESP INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

II

ESP TO CHIMNEY FLUE GAS DUCTING INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

III

PIPING INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

IV

DEAERATOR INSULATION & DEAERATOR PIPING

CONTRACTOR & BALANCE


MATERIAL REQ

BOILER BALANCE INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

VI

FAN INSULATION WORK

CONTRACTOR & BALANCE


MATERIAL REQ

30

ROOF SHEETING

31

FINAL PAINTING

REMARKS
UTTKAL ENGINEERS

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE


MAN POWER SHORTAGE

MAN POWER SHORTAGE


MAN POWER SHORTAGE MATERIAL AVAILABLE
MAN POWER SHORTAGE
MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER SHORTAGE


MAN POWER SHORTAGE
MAN POWER SHORTAGE

MAN POWER SHORTAGE MATERIAL AVAILABLE


MAN POWER SHORTAGE MATERIAL AVAILABLE
MAN POWER SHORTAGE MATERIAL AVAILABLE
MAN POWER SHORTAGE MATERIAL AVAILABLE

MAN POWER SHORTAGE REWORK


MAN POWER SHORTAGE MATERIAL AVAILABLE.REFRACTORY IS AN U/P.
MAN POWER SHORTAGE REFRACTORY COMPLETION

MAN POWER SHORTAGE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE MATRIAL SHORTAGE


MAN POWER SHORTAGE MATERIAL SHORTAGE

MAN POWER SHORTAGE

INSULATION WORK COMPLETED IN THIS PLACES

MAN POWER SHORTAGE

REWORK

MAN POWER SHORTAGE

REWORK

MAN POWER SHORTAGE

MATERIAL AVAILABLE
REWORK
REWORK

MAN POWER SHORTAGE

MAN POWER SHORTAGE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MAN POWER

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MATERIAL AVAILABLE
MATERIAL AVAILABLE
MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

MATERIAL AVAILABLE

MAN POWER SHORTAGE

material available

material available
MAN POWER SHORTAGE

material available

material available
material available

MATERIAL AVAILABLE

MILWRIGHT FITTER

UTKAL EXTRA WORK ASKING FOR PACKING PLATE CUTTING

MILWRIGHT FITTER
MILWRIGHT FITTER
MILWRIGHT FITTER

MAN POWER REQ

MATERIAL AVAILABLE

MATERIAL AVAILABLE
MATERIAL AVAILABLE
MAN POWER REQ

MATERIAL AVAILABLE
MATERIAL AVAILABLE

MAN POWER REQ

ALIGNMENT IS VERY POOR.REALIGNMENT MUST


REQUIRED

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

ALIGNMENT IS VERY POOR.REALIGNMENT MUST


REQUIRED

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ


MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MATERIAL AVAILABLE

MAN POWER REQ

MAN POWER REQ

MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN


WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAXIMUM INSULATION MATERIALS ARE DAMAGED BY RAIN
WATER.
MAN POWER REQ

MAN POWER REQ

SHOULD BE COMPLETE THE ROOF &SIDE CLADDING


STRUCTURE

MATERIAL AVAILABLE

S.NO

S.NO

MAN POWER REQUIREMENT FOR BOILER


DESCRIPTION
NOS
1 FITTER(PIPING)
1NOS
2 FITTER (STRUCTURE)
2 NOS
3 GRINDER
2 NOS
4 RIGER
03 NOS
5 WELDER
02 NOS
6 HELPER
02 NOS
7 IBR WELDER
01 NOS
TOTAL
13 NOS
MAN POWER REQUIREMENT FOR ESP
DESCRIPTION
NOS
1 FITTER
2 NOS
2 WELDER
04NOS
3 RIGER
02 NOS
4 HELPER
04 NOS
TOTAL
12NOS

AVAILABLE MAN POWER DETAIL IN BOILER


DESCRIPTION
NOS
1 SUPERVISIOR
1NOS
1 FITTER
2 NOS
2 WELDER
04NOS
3 RIGER
02 NOS
4 HELPER
05 NOS
TOTAL
14 NOS
*MAN POWER NOT AVAILABLE IN ESP
S.NO

NOTE: UTKAL ENGG SOME TIME PUT HIS MAN PO

MAN POWER & TOOLS REQUIREMENT FOR REFRAC


1 TOTAL
10 NOS WITH NECESSORY T
MAN POWER & TOOLS REQUIREMNET FOR INSULA
1 TOTAL
15 NOS WITH NECESSORY T

1 TOTAL

MAN POWER REQUIREMENT FOR SHEETING


15 NOS WITH NECESSORY T

OR BOILER
S.NO

FOR ESP

TOOLS REQUIREMENT FROM UTKAL ENGG


DESCRIPTION
NOS
1 WELDING M/C
3+1 RECTIFIER
2 GRINDING M/C AG4
02 NOS
3 SPRIT LEVEL
04 NOS
4 RIGHT ANGLE
05 NOS
5 WATER LEVEL
03 NOS
6 LIGHT
04NOS

IBR FORMALTIES ISSUE(UTKAL ENGG SCOPE)


1.VWHO BALANCE RADIOGRAPHY FILM & REPORT
2.VWHO 052,VWHO 053 BALANCE RADIOGRAHY ARRANGEMENT & SR ARR

IN BOILER

OME TIME PUT HIS MAN POWER TO CUSTOMER WORK FROM THIS MAN POEWER.SO THIS MAN POWER IS NOT ST

UIREMENT FOR REFRACTORY


0 NOS WITH NECESSORY TOOLS
UIREMNET FOR INSULATION
5 NOS WITH NECESSORY TOOLS

UIREMENT FOR SHEETING


5 NOS WITH NECESSORY TOOLS

AVAILABLE
4NOS
1NOIS
I NOS
NIL
01 NOS

L ENGG SCOPE)

RRANGEMENT & SR ARRANGEMENT

S MAN POWER IS NOT STATIC