SYNOSIS OF PROJECT ON

MECHANICAL LOAD OPERATED


RAIWAY BARRIER
FOR THE PARTIAL FULFILLMENT OF THE REQUIREMENT
FOR THE AWARD OF
BACHELOR OF TECHNOLOGY

Submitted To
UPTU

Submitted by
Sheetal
MBA IIIRd Sem

SHANTI INSTITUTE OF TECHNOLOGY


KURALI

1 | Page

[1]
INTRODUCTION

1.1 INTRODUCTION
Aim of this project is to control the unmanned rail gate automatically using load operated
platform. Today often we see news papers very often about the railway accidents happening at
un- attended railway gates. Present project is designed to avoid such accidents if implemented in
spirit. This project is developed in order to help the INDIAN RAILWAYS in making its present
working system a better one, by eliminating some of the loopholes existing in it. Based on the
responses and reports obtained as a result of the significant development in the working system
of INDIAN RAILWAYS,
This project can be further extended to meet the demands according to situation. This can be
further implemented to have control room to regulate the working of the system. Thus becomes
the user friendliness.
In this project no electronic sensor based but will be used rather purely mechanical
analog system will be used to drive railway gates this system will also produce electricity while
load of train will put on the track through rack and pinion mechanism.

2 | Page

1.2 BLOCK DIAGRAM

Load of train
on track

Rack and
pinion
mechanism

Load
handle

Load
activate
d gate

3 | Page

incom ming load

outgoing load

railway bar rier

4 | Page

Existing system
Manual and manpower required
Electronic : sensors can activate with other objects also

In proposed system: not need of manpower , it will activate only when train will come

5 | Page