Вы находитесь на странице: 1из 9

0+113

RC Pipe O 0.5 m

+ 1.27

TRANSVERSAL SECTION B-B' (1/100)

TRANSVERSAL SECTION C-C' (1/100)


KEY PLAN
NTS

PLAN VIEW (1/200)

B
1
1

1
1

1
1

C
+ 1.46
+ 1.27

C'

B'

TRANSVERSAL SECTION A-A'(1/200)


INF
as shown

Rev. A is not extracted from a BFS Document

* ALL ELEVATION ARE GIVEN IN WBN#2 REFERENTIAL

STA.0+120
CL OF RCP PIPE
STA.0+125

0+120
RC Pipe 5 x O 1.2m
Tjejoe Diversion

TRANSVERSAL SECTION C-C' (1/100)

TRANSVERSAL SECTION B-B' (1/100)

KEY PLAN

A'

REFERENCE DRAWINGS

PLAN VIEW (1/200)

B
WEDA BAY NICKEL PROJECT
INDONESIA
ENGINEERING, PROCUREMENT, CONSTRUCTION Management
2250 KDTPY ORE - 35 KDTPY NI

+0.56
+0.60

B'

DETAILED DRAWINGS
ROAD FROM MAIN SITE TO CONSTRUCTION CAMP-CULVERTS-SECTION 1B
(Sheet 2 of 9 - Ch. 0+120 DIVERSION TJEJOE)
Rev. A is not extracted from a BFS Document
As Shown

TRANSVERSAL SECTION A-A'(1/100)

A1

7065E-1930-DW-1441-001_0.dwg

KEYPLAN
Note :
1. All dimension in millimeters except otherwise shown.
2. Minimum cover for reinforcement shall be 30 mm.
or 50 mm against buried surfaces.
3. Concrete: minimum value for fc' = 25 Mpa
Reinforced steel: minimum value for fy = 400Mpa
4. Rebars diameter and spacing represention :
16@200 = diameter 16 mm every 200 mm

SECTION A-A
Scale: 1/50

PLAN
Scale: 1/50

SECTION B-B
Scale: 1/50

INF
as shown

Rev. A is not extracted from a BFS Document

0+347
PIPES O 0.5m
Tjejoe Diversion

+ 1.69

TRANSVERSAL SECTION B-B' (1/100)

KEY PLAN
NTS

TRANSVERSAL SECTION C-C' (1/100)

PLAN VIEW (1/200)

+ 1.69

+ 1.51

B'

TRANSVERSAL SECTION A-A'(1/200)


INF
as shown

Rev. A is not extracted from a BFS Document

0+607
3 PIPES O 1.8m

KEY PLAN
NTS
CL OF RCP PIPE

PLAN VIEW (1/200)

TRANSVERSAL SECTION C-C' (1/100)

B
CL OF RCP PIPE

Capping Layer CBR 15%

C'

B'

TRANSVERSAL SECTION A-A'(1/200)

TRANSVERSAL SECTION B-B' (1/100)


INF
as shown

Rev. A is not extracted from a BFS Document

KEYPLAN

SECTION A-A
Scale: 1/50

PLAN
Scale: 1/50

Note :
1. All dimension in millimeters except otherwise shown.
2. Minimum cover for reinforcement shall be 30 mm.
or 50 mm against buried surfaces.
3. Concrete: minimum value for fc' = 25 Mpa
Reinforced steel: minimum value for fy = 400 Mpa
4. Rebars diameter and spacing represention :
16@200 = diameter 16 mm every 200 mm

SECTION C-C
Scale: 1/50

SECTION B-B
Scale: 1/50
INF
as shown

Rev. A is not extracted from a BFS Document

KEYPLAN

Note :
1. All dimension in millimeters except otherwise shown.
2. Minimum cover for reinforcement shall be 30 mm.
or 50 mm against buried surfaces.
3. Concrete: minimum value for fc' = 25 Mpa
Reinforced steel: minimum value for fy = 240Mpa
4. Rebars diameter and spacing represention :
16@200 = diameter 16 mm every 200 mm

SECTION D-D
Scale: 1/25
INF
as shown

Rev. 0 is not extracted from a BFS Document

* ALL ELEVATION ARE GIVEN IN WBN#2 REFERENTIAL

0+140
RC Pipe 10 x O 1.2m
Gojemdi Diversion

TRANSVERSAL SECTION C-C' (1/100)

STA.0+140
CL OF RCP PIPE

STA.0+150

KEY PLAN
Surface CBR 50%

TRANSVERSAL SECTION B-B' (1/100)

A'

REFERENCE DRAWINGS

PLAN VIEW (1/200)

WEDA BAY NICKEL PROJECT


INDONESIA
+0.12

ENGINEERING, PROCUREMENT, CONSTRUCTION Management


2250 KDTPY ORE - 35 KDTPY NI

+0.16

B'

DETAILED DRAWINGS
ROAD FROM MAIN SITE TO CONSTRUCTION CAMP-CULVERTS-SECTION 1B
(Sheet 8 of 9 - Ch. 0+140 DIVERSION GOJEMDI)
Rev. A is not extracted from a BFS Document
As Shown

TRANSVERSAL SECTION A-A'(1/200)

A1

7065E-1930-DW-1441-001_0.dwg

Note :
1. All dimension in millimeters except otherwise shown.
2. Minimum cover for reinforcement shall be 30 mm.
or 50 mm against buried surfaces.
3. Concrete: minimum value for fc' = 25 Mpa
Reinforced steel: minimum value for fy = 240Mpa
4. Rebars diameter and spacing represention :
16@200 = diameter 16 mm every 200 mm

KEYPLAN

SECTION A-A
Scale: 1/50

PLAN
Scale: 1/50

SECTION B-B
Scale: 1/50

INF
as shown

Rev. A is not extracted from a BFS Document

Вам также может понравиться