AAAS.
SES 30.15
TP /ps/ik /
/
SARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
STANDARD ENGINEERING SPECIFICATION 30.15SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
The specification contained herein sets out the standard requirements and
procedures to be complied with by CONTRACTORS carrying out work directly or
indirectly for SARAWAK SHELL BERHAD or SABAH SHELL PETROLEUM COMPANY.
For a given project, the Contract Documents related thereto may specify
requirements and procedures which deviate from or qualify those set out in
this standard specification,
The CONTRACTOR shell be responsible for identifying any and all such
deviations and qualifications and ensuring that the work is completed in
strict accordance therewith.
iSARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED eee
age
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
conrenrs
‘PAGE
SECTION
1.0 SCOPE 1
2.0 GENERAL 2
3.0 DESIGN OF WELLHEAD CONTROL PANEL 4
4.0 CONTROL LocrC 5
5.0 ‘HYDRAULIC SYSTEM 7
6.0 PNEUMATIC SYSTEM 9
7.0 PANEL CONSTRUCTION 10
8.0 OTHER REQUIREMENTS 13,
9.0 NAMEPLATES 1s
10.0 ‘TESTING AND INSPECTION 15,
11.0 DRAWINGS AND DOCUMENTATION 16
12.0 SPARE PARTS 7
13.0 SHIPPING, PROTECTION AND PACKAGING 18
14.0 WARRANTY 19
ATTACHMENT 1 WELLHEAD CONTROL PANEL LAYOUT
ATTACHMENT II HYDRAULIC SUPPLY SYSTEM
ATTACHMENT TTT TYPICAL FIELD HOOK-UP
ATTACHNENT IV SCHEMATIC ~ BASIC CABINET
ATTACHMENT V SCHEMATIC ~ WELL CONTROL MODULESARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED.
STANDARD ENGINEERING SPECIFICATIONS
SES 30.15
Page 11
Rev. 1
REVISION REGISTER
REVISION NO. Date, DETAIL OF REVISION
1 1/88 First issue.SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED et
age
STANDARD ENGINEERING SPECIFICATIONS | Fev. 1
1.0
La
1.2
1.3
SCOPE
This specification covers the minimum requirements for all
hydraulic wellhead control panels to be inetalled on of] and gas
offshore platforms.
The wellhead control panel shall comprise @ high pressure hydraulic
system to operate surface and sub-surface safety valves. The panel
shall include pneumatic logic circuite for full local control of
valve operations with external connections to. permit remote
initiation of valve closure in emergency situations.
No deviation fron this specification or referenced drawings will be
permitted unless each deviation ie initiated or approved in writing
by the Company.SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS | Fev. 2
SES 30.15
Page 2
2.0
2a
2d
Deded
21S
2.2
GENERAL
CODES AND STANDARDS
The following SSB
applicable =
Standard Engineering Specifications are
SES 30.1 Design and Specification of Instruments
SES 30.2 Instrument Installation
SES 64.1 Design and Installation of Electrical Equipment
SES 65.1 Hazardous
Rad RSW?
Area Classification
"EES UES “SEBS d S007
SSB/EP-003 Vendor Documents
SSE/EP-004 Instrumentation Drawings and Documents
The following internationally recognised standards are relevant in
specific cases :
API RP 148 Design, Installation & Operation of Subsurface
Sefety Valves System.
APT RP 14C Analysis, Design, Installation & Testing of Basic
Surface ‘Safety Systems on Offshore Production
Platforms.
ty Aveo batt
TEC 529 Degrees uf Protection.
oe
Electrical Apparatus for Expiosivé Atmosphere
Stainless Steel Tube. — ttle Genelec
Only the latest issue or revision of the coder and standards shall
be used.
SES 64.1, SES 65.1
electrical components
ENVIRONMENT
Ambient Temperature ~
Precipitation -
Reletive humidity -
Others -
and IEC 79 shell only be applicable when
are specified.
18°C minimm
34°C maximum
(pte 50°C within enclosure)
Tropicel climate with heavy rainfall
during monsoon period
Up to 1007 maximum with possibility of
condensation due to temperature changes.
Sprays of drilling mud from the wellheadSARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED pee gi
age
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
2.3
2.4
AREA CLASSIFICATION
Zone 1, Ges Croup TIA, Temperature Class 73.
UTILITIES AVATLABLE
Instrument air at 6 barg #2 bar, 90 £ 107 relative humidity
or
Hydrocarbon ges at the same pressure and relative humidity.
24 VDC electrical supply (only applicable when electrical
components are specified).SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30.15
Page 4
Rev. 1
3.0
31
32
3.3
3.4
3.5
366
DESIGN OF WELLHEAD CONTROL PANEL
The following terms shall be used throughout this specification +
‘Module’ refers to a removable draver type unit housing the control
of a single well string.
"Section' or ‘Cabinet’ refers to a unit that will accommodate four
modules.
"Panel! refers to the assembly of all sections together in a row,
‘Total surface shutdown' refers to shutdown of all wellhead surface
valves, ‘Total subsurface shutdom' refers to shutdowm of all
wellhead surface and eubsurface valves.
‘The panel shall control the hydraulic actuators of the following
shutdown valves on each of the well strings :
~ Surface Safety Valve (SSv)
- Surface Controlled Subsurface Safety Valve (SCSSV).
The wellhead control panel shall be designed as per attached
Drawing No, 1-55003, Wellhead Control Panel Layout.
‘The wellhead control panel shall be capable of controlling any
number of strings with the flexibility of expanding the eystem to
its full capacity of 32 strings.
The panel shall be divided into sections. ‘The basic section shall
house the hydraulic supply system for all wells, the common total
surface and total subsurface shutdown controis and four control
modules. Expansion sections, each of which shalt house four
control modules, shall be added as required up to a maximum of 7
expansion sections.
Each well control system chal! be housed in independent module.
Modules shall be stendard drawer type for reuoval and easy
replacement.
The control circuit shall be pneumatic and instrement afr or gas
shall be used as the control medium.40
al
4.21
4.2.2
4.2.3
42h
4.2.5
4.2.6
43
coy
45
SARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30,15
Page 5
Rev. 1
CONTROL Locrc
Control system shall be designed ‘FAIL SAFE’. Shutdown function
shall initiate shutdown upon loss of actuating hydraulic power or
control medium. Pilot valves and solenoid valves shall be
energised during normal operating condition and de-energised during
shutdown condition.
The following shutdown operations shall be possible :
Local initiation of individual surface and subsurface valve
closures from hand buttons on the front of each well control
module.
Local initiation of total surface shutdown from 2 hand button on
the front of the basic section.
Local initiation of total subsurface shutdown from a hand button on
the front of the basic section.
External pneumatic initiation of individual surface valve closure.
This shall be suitable for use with a bleed-type pressure pilot
which will close the surface valve in the event of high or low
wellhead pressure or other abnormal condition. The panel shall be
designed for use with Otis type 'P' or similar pilots. Override
facility shall be provided for this signal for testing and start-up
purposes (see 7.15.5).
External pneumatic initiation of total surface and total subsurface
shutdown, These shall be suitable for use with the platform
emergency shutdown signal (ESD) and blowdown signal (ESD)
respectively. Override facilities shall be provided for these
signals for start-up purposes.
Where specified in the purchase order, remote electrical initiation
of 4.2.4 and 4.2.5 shall also be possible via three-way solenoid
valves.
Subsequent to a shutdown, re-opening of all valves shall only be
possible by manual operation of individual control buttons for each
valve at the panel. It shall not be possible to re-open surface
valve until individual subsurface valve has been manually reset.
It shall not be possible to re-open surface valves until total
surface shutdown has been manually reset.
Tt shall not be possible to re-open surface or subsurface valves
until total subsurface shutdown has been manually reset.SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED peaate’ c
STANDARD ENGINEERING SPECIFICATIONS | Fev. 1
46
47
48
49
The logic circuit for each module shall be designed in such a way
that, on closing, the SSV shell close before the SCSSV. The tine
delay between automatic initiation of SCSSV closure following
initiation of SSV closure chall be adjustable for each string over
a range of 30 to 120 seconds. On re-opening, the SCSSV shall open
first followed by the SS¥.
On opening of the subsurface valve, automatic two-stage
pressurisation shall be provided. Initial pressurization shall be
to the equalising pressure of the valve, This pressure will be
increased to the full operating pressure after an adjustable time
delay of 5 to 7 minutes. Individual adjustment of equalising and
final pressure shall be provided.
Pneumatic time delay circuits consisting of flow control devices,
volume bottles end 3-way valves shall be provided to fulfil the
requirements of 4,6 and 4,7, The pneumatic time delay circuits
shall be individually adjustable.
Except by the use of the manual operators provided on the pumps, it
shall not be possible to re-open individual surface and subsurface
valves until all external shutdown conditions have been cleared and
it shall not be possible to open the SSV before the SCSSV.3.0
5.1
5.3
5.4
5.5
5.6
3.7
5.8
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED SES 30,15
Page 7
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
HYDRAULIC S¥STEN
‘The wellhead control panel shall comprise a hydraulic power system
and up to 32 well control modules. The well control modules shall
be divided into two groups, and the hydraulic system shall be
partitioned such that each group shall be independently supplied.
The hydraulic supply system shall be housed in the basic cabinet.
See attached Drawing No. 1-45006, Hydraulic Supply System.
Hydraulic fluid to operate the SSV's shall be provided by two
primary pneumatically operated pumps equipped with manual
operators. Each pump shall be connected via a discharge header to
all the modules in each group. Each pump shall take its suction
from @ separate reservoir. Each pump shall be capable of supplying
the total number of well strings specified.
Hydraulic fluid to operate the SCSSV's shall be provided by
individuel pneumatically-operated pumps in each well control
module. SCSSV pumps in each group shall take thetr suction from
one of two suction headers, each connected to the associated
reservoir,
An interconnecting valve shall permit either SSV pump to operate
both SSV circuits. It shall not be possible for an SSV pump to
operate an SCSSV and vice versa.
In addition, @ single manual header shell be provided. The menual
header shall be pressurised by a back-up pneumatically-operated
pump equipped with a manual operator, and shall be connected to all
the well control modules. The suction of the back-up pump shall be
connected to both reservoirs via isolating valves in such a vay
that fluid transfer between the two reservoirs is not possible,
This pump shall be capable of providing back-up hydraulic supply
pressure for the SCSSV during start-up.
‘Two hydraulic return headers shall be provided such that hydraulic
fluid ie returned to the reservoir from which it is drawn.
‘Two hydraulic reservoirs shall be provided and mounted on top of
the basic cabinet. The two reservoirs shall be formed by a leak
tight partition in 2 common container which shall be joined
together by an overflow connection or weir. Sizing of the
reservoirs shall meet the requirements of paragraphs 5.9 thru 5.12.
Each of the reservoir shall be provided with drain plug, filler cap
complete with strainer, clean-out plate and sight glass to permit
convenient routing check of hydraulic fluid levels. An automatic
low level shutdown to close all affected SSV's and SCSSV's shall be
provided. A common relief tube complete with flame arrestor shall
be provided at the top of the reservoir to relieve pressure in the
event of gas leakage via the SCSSV actuating line.
A single hydraulic accumilator shall be provided on the discharge
of each of the SSV pumps. This shall be sized to operate any one
SSV of maximum svept volume (see 5.9) through at least two cycles
(a eyele refers to one open and one close operation).5.9
5.12
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED eae pat
age
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
Sizing of the hydraulic system ohall be based on the worst case
figures below but sizing calculations chall be carried out for each
individual application, worst case figures to be revised if
necessary.
ssvsessv
- Maximum actuator swept volume 2 liter 1 liter
- Minimum pressure to actuate valve 200 bar 300 bar
- Maximum actuator pressure rating 415 bar 420 bar
- Maximus opening time, single valve 1 minute* 1] minute
= Maximum closing time, simitaneous 15 seconds 45 seconds
operation of all valves
* $9 opening from accumilator, Accumlator shall be recharged
in not more than 5 minutes.
For the purpose of sizing, it will be assumed that the SSV is
connected vis 30 m of 3/8” 0.D x 0,065" W.T. 316SS seamless tubing
and the SOSSV is connected vie 150 m of 3/8" 0,D x 0.065" W.T.
3168S seamless tubing. See attached drawing no. 1-35001, Typical
Field Hook-up.
Hydraulic circuits are to be rated to 415 bar for SSV, and 420 bar
for SCSSV and manual header. Pump discharge relief valves shall be
set to these figures. Hydraulic supply tubings shall be 3/8" 0.D x
0,065" W.T, 31638 seamless, Hydraulic returns, vents and suctions
where there is no restriction to flow, may be rated to lover
pressures and shall utilise &" 0.D. x 0.049" W.T. 316 SS seamless
tubing.
Vendor stall be responsible for the proper sizing of the pumps,
accumilators and reservoirs required for the service. Vendor shall
supply his sizing calculetions for Company's approval based on the
total number of well strings, including future, specified in the
equipment requisition and/or Purchase Order.
All hydraulic pump inlets shall be provided with dual strainers
complete with the necessary block valve arrangement to permit on
line cleaning and replacement. Strainers will be common to all
pumps taking thetr suction from one reservoir. An isolating valve
shall be provided in each pump suction to allow pump removal.
Each pump discharge line shall be provided with isolating valve for
pump removal, a check valve in addition to pump integral check
valves, and a pressure relief valve discharging to the hydraulic
return header. Relfef valves shall not be set to more than the
pressure rating of any downstream component. See 5.11.
Bydraulic fluid used shall be Shell Tellus 32.‘SARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED Pa ae
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
6.0
6.2
6.3
6.4
6.5
6.6
PNEUMATIC SYSTEM
Incoming air or gas supply shall be vie dual filters and regulators
complete with block valve arrangement for on line replacement and
cleaning, and shall be provided with automatic drain facility.
dn additional pair of filter regulators shall be provided
downstream of the main incoming filter regulators to supply the
pneumatic control circuits at 3.5 barg.
Hydraulic pumps shall be provided with individual pressure
regulators on their air supply lines to allow adjustment of
discharge pressure. These regulators shall be adjustable from the
rear of the control panel.
Air supply tubing shall be 3/8" 0.D, x 0.035" W.T. 316SS seamless
tubing and air signal tubing shall be 1/4" 0.D. x 0.035" W.T. 3165S
seamless tubing.
Pneumatic system shall be sized such that surface and subsurface
valves on a fully equipped module can be operated within the
required minimum time specified in 5.9.
To allow gas to be used as the operating medium, all vente and
exhausts shall be piped to a common vent connection at the top of
each section.7.2
73
7b
2.5
7.6
a7
7.8
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED dba tae
age
STANDARD ENGINEERING SPECIFICATIONS | Rev. 1
PANEL CONSTRUCTION
Panel shall have a degree of protection of at least IP 54 to IEC
529, and shall be suitable for a salt laden marine environment and
be able to be subjected to mud spray during drilling and well
workover operations.
Each section of the panel shall be @ free standing self-supporting
structure. Panel shall be provided with plinth fabricated from 100
mm channel.
Each section or cabinet shall be designed to be bolted together
side by side, without detracting from the degree of protection
stated in 7.1.
For this purpose, the basic cabinet shall be designed to be
enclosed on all sides except for the right hand side (viewed from
the front) which shall be left open for bolting to the first
expansion cabinet. Each expansion cabinet shall be designed to be
opened on both sides for bolting to adjacent cabinets. A
detachable side plate, complete with gasket, shall be provided with
each complete panel and eball be bolted to the right hand side
(viewed from the front) of the last expansion cabinet making the
panel a fully enclosed structure. The side plate shall be fitted
with stiffeners and shall be provided with recessed handles at the
top and bottom to facilitate removal.
Each section shall be designed and constructed to accommodate thi
installation of the instruments and equipments as described in this
specification and as shown in the attached Wellhead Control Panel
Layout 1-55003, Dimensions given are for guidance only and are
dictated by epace availability on offshore platforms. Any
suggested changes to effect a reduction in the overall panel size,
at no sacrifice to operability and accessibility, will be
considered provided all such changes are only made with the
Company's approval.
The panel faces shall be fabricated of 12 gavge or 3 mm 316
stainless steel plates. The plate shall be cut to size on squaring
shear to ensure tight flush joints when bolted together. All 316
stainless steel plate shall be of prime stock and shall be free
from tool or clamp marks, All joints shall be hairline
construction.
Welded construction shall be used throughout. Welding shall be
continuous and spot welding shali not be acceptable.
Each panel section shall be welded with internal bracing as
required to ensure a rigid self-supporting structure.
Lifting luge shall be provided at the top of each section to
facilitate handling. The frame work shall be of sufficient
strength to allow a fully equipped section to be lifted without
causing distortion.7.10
7.12
7.13
Tale
7.15
761561
7.15.2
7.15.3
715.4
7.15.5
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30,15
Page 11
Rev, 1
Internal rails chall be provided to support the modules and to
facilitate their removal.
The base of each section shall be fitted with an enclosed érip tray
to collect any spillage of ofl. The tray shall be fitted with
suitable connection to facilitate draining from one corner.
Hinged lift-off doors with handles and integral locks shall be
provided at the rear of the panel. Doors shall be designed to
facilitate access to panel internals for conponents removal and
maintenance purpose. For the basic cabinet, additional lockable
doors shall be provided at the bottom front.
The well control modules shall be secured to the main frame by
means of slotted head stainless steel bolt of the recessed and
quarter turn type. The modules shall be fitted in such a way that
the IP 54 rating is maintained. The front of each module shall be
provided with handles to facilitate withdrawal from the front of
the panel. The front plate shall be used for sealing and fastening
purposes only, the weight of the module being fully supported by
the internal rails.
Layout of componente within the module shall be designed to
facilitate adjustments of pumps discharge pressures and valves
open/close time delays without removal of the module from the
panel. These adjustments shall be located at the rear of the
nodule.
Connection to each module shall be by means of bulkhead connectors
located at the rear of the module. These bulkhead connectors shall
be arranged in such a way that they can be reached easily by
Lifting off the back covers.
The following controls and indications shall be provided on the
front of each module :
Mushroom headed manual buttons to control surface and subsurface
valves. The action shall be push to close and pull to reset.
Raised guards shall be provided to prevent accidental operation.
Pressure gauge to indicate pressure of hydraulic cupply to surface
and subsurface valves.
Indicators to show the presence of air on the SSV and SCSSV
hydraulic fluid control valve i.e. valve position indicators.
Pressure gauge to indicate holding pressure to the p-pilot (see
4.264)
A pepilot override switch to allow the signal from the p-pilot to
be overriden for tecting and start-up purposes. (See 4.2.4).
The following controle and indications common to all modules shall
be provided on the front of the basic cabinet :SARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30.15
Page 12
Rev. 1
7.16.2
7416.2
7.16.3
7.16.4
7.16.5
7.16.6
7416.7
7.17
Mushroom headed manual buttons for initiation of total surface and
total subsurface shutdown. The action of these buttons shall be
push to shutdown and pull to reset. Raised guards shall be
provided to prevent accidental operation.
Pressure geuge to indicate air supply pressure downstream of the
firet regulator.
Pressure gauges to indicate air presoure in the total surface and
total subsurface shutdown headers,
Pressure gauge to indicate hydraulic pressure on the SSV supply
headers.
Indicators to show the presence of air in the total surface and
total subsurface shutdown headers.
Indicators to show the initiation of external total surface
shutdown (ESD) and total subsurface shutdown (ESDV). (See 4.2.5).
Indicators to show the initiation of hydraulic reservoirs low level
shutdowns (see 5.7).
ALL tubing runs shall be in either horizontal or vertical plane,
carefully grouped for accessibility and ease in tracing lines, and
clamped for rigidity. All bends shall be made with standard
bending tools of the correct size. All bends shall at right
angles. All tubings shall be cut using wheel tube cutters.
Incoming and outgoing pneumatic and hydraulic supply lines, total
surface and total subsurface shutdown headers, manual header and
hydraulic return headers shall be terminated at bulkhead plates
mounted on the bottom right hend side of each cabinet. Field
connections to SSV, SCSSV and hi-lo pressure pilot shall be by
bulkhead connectors at the top of the exbinet.SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SS 30,15
Page 13
Rev. 1
8.2
8d
8.5
8.6
8.7
a8
8.9
OTHER REQUIREMENTS
Pumps shall be positive displacement types, single or double acting
with integral check valves. Piston shall be directly actuated by,a
reciprocating pneumatic piston or diaphragm controlled by an
attached spool valve operated by the actuator at each ond of its
travel.
Metallic parts shall be 316 SS, Seals and other non-metallic parts
shall be suitable for use with hydraulic of1 end hydrocarbon gas.
Accumulators shall be nitrogen-charged piston type and shall be
certified pressure vessels. Accumulators shall be supplied
complete with accumulator charge kit.
Stainless steel tubing shall be seamless, fully annealed, to ASTH
A269 TP 316, hardness (Rockwell) RB 80 or less.
Compression fittings shall be Swagelok 316 stainless steel. All
screwed fitting shall have NPT thread.
All pressure gauges shall be heavy duty, safety pattern, glycerine
filled, precision type. Gauges shall have stainless steel
movenent, micrometer pointer with }" NPT connection, dial markings
black on white and minimum of 50 graduations. Scales shell be
marked in bar. Gauges shall have stainless steel casing with
shatter proof glass and blow-out plug. Minimum gauge size shall be
50 mm for the modules and 100 mm for the basic section. Panel
mounted gauges shall be of flush type. All pressure gauges shall
be provided with a snubber.
Electrical components, where provided, shall be flameproof and
suitable for Zone 1 ané Gas Group IIA of Temperature Class T3, and
have a minimum index of protection of IP 56 to IEC 529. These
solenoid valves, pressure switches or other electrical components
shall be mounted on en open rack outside the panel, and a weather
hood shall be provided. The components shall be wired to a glas
reinforced polyester Ex(e) junction box for terminating the
external signal cables. Tae normal operating voltage of all
electrical components shall be 24 VDC. Electrical components shall
be specified to have integral junction boxes.
All block valves shall be of ball valve construction to ensure
quick actions and a positive leak proof shut off. The complete
valve shall be stainless steel including locking rims etc.
Button valves shall be in 316 stainless steel.
All other metallic materials used in the panel construction shall
be of 316 stainless steel materials.9.3
8.4
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED. at ae
STANDARD ENGINEERING SPECIFICATIONS | Fev. 1
MEPLATES
All sections, modules, sub-assemblies, controls, indicators and
discrete components shall be clearly and adequately identified.
Wherever applicable, Process and Instrumentation Diagram (P & ID)
tag numbers shall be used.
Labels shall be of laminated plastic, white/black/white, minimum
1,5 mm thick. Labels shall be attached by 316 stainless steel
screws. Where location precludes attachment directly to the item,
the label shall be attached to e purpose made adjacent bracket or,
less preferably, shall be wired on using 18 SWC wire. Adhesive or
flexible labels are not acceptable.
Khere controls, indicators or components are identified by coding
symbols (other than P & ID tag mumbers) a permanent coding legend
plate chall be attached to the equipment in a convenient position.
The legend shall also be incorporated in relevant drawings.
Nameplate schedule and construction, giving label size, letter size
and actual engraving, shell be subjected to Company's approval.10.0
10.1
10.2
10.3
10.4
10.5
10.6
10.7
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30,15
Page 15
Rev. 1
INSPECTION AND TESTING
Company or its authorised representative shall prior to
fabrication, review all documentation such as material
certificates, welding procedures, etc. to ensure compliance with
Company's specifications.
Company or its authorised representatives shall have free and
immediate access to the Vendor's facilities to inspect the unit at
any stage during fabrication to assure that the materials end
workmanship meet the requirements of this specification and of the
applicable codes and standards.
A functional test of the entire system shall be conducted in the
Presence of Company Authorised Representative at the Vendor's
facilities with input and output simulation. A factory acceptance
test procedure shall be submitted for Company approval 2 months
before testing is scheduled to enoure full simulation of duty.
The Vendor shall advise the Company three weeks in advance of the
date on which the final acceptance tests are due to commence.
Prior to the final acceptance test, the panel shall be thoroughly
tested by Vendor in the presence of Company Authorised
Representative and these shall include 100% visual inspection
including labelling, function test of mechanical features,
functional test of electrical pneumatic and hyéraulic circuite and
1002 24-hour soak test or such procedure as may be necessary to
assure component and functional stability.
Vendor shall ensure that all necessary equipment, services etc.
that may be required for the test are available at no extra cost.
All defective components shall be replaced immediately and
re-tested.
Vendor shall assemble all sections of the panel and confirm that
the sections match with each other. The complete panel with all
equipment installed and connected shall be pressure tested for any
leak in the systen in the presence of Company Authorised
Representative. The hydraulic lines shall be pressure tested for
24 hours at maximum operating pressure using the specified
hydraulic fluid. The pneumatic lines shall be leak-tested at 15
barg using SNOOP Liquid or equal.
aaa‘SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED re ae
STANDARD ENGINEERING SPECIFICATIONS | Fev. 1
11.3
DRAWING AND DOCUMENTATION
Vendor shall furnish the specified number of copies of all
applicable drawings, data, schedules, manuals and other documents
as specified in Company Procedure SSB/EP-003 "Vendor Documentation”
and SSB/EP-004 "Instrumentation Drawings and Documents". Omission
of certain of these drawings and docunentation shall be agreed with
the Company prior to commencement of design.
Before commencing manufacture of equipment modules and cabinets,
complete manufacturing drawings are to be submitted to the Company
for approval.
Vendor shall be responsible for the updating of all documentation
for his system throughout the site installation period.SARAWAK SHELL BERHAD
‘SABAH SHELL PETROLEUM COMPANY LIMITED aie
STANDARD ENGINEERING SPECIFICATIONS | Fev. !
12.0
12
12.2
SPARE PARTS
Vendor shall provide two separate spare lists, one covering spares
required for start-up and the second covering the spares required
for one year of operation. Each list shall contain itemised prices
based on the delivery of the parts concurrent with the equipment,
ALl spare parts furnished by the Vendor shall be wrapped and
packaged so that they will be preserved in original as new
condition under the normal conditions of storage end shall be
properly tagged and coded so that later identifications as to
intended equipment usage will be facilitated. They shall be
packaged separately clearly marked as "Spare Parts" and shipped at
the same time as the equipment.13.0
13.1
13.2
13.3
13.4
13.5
SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED potarae
STANDARD ENGINEERING SPECIFICATIONS | Rev.
SHIPPING, PROTECTION AND PACKAGING
Upon acceptance by Company, the Vendor shall dismantle the
equipment into separate cabinets which will then be crated for
shipment as individual unite, The basic cabinet shall be crated as
an individual unit. Expansion cabinets shell be bolted together in
manageable groups and crated as separate units.
All instruments that could be damaged in shipment shell be renoved,
tagged and crated in water proof boxes. The boxes shall protect
the instruments in accordance with their sensitivity to dynamic
loads and will heve a static desiccating container placed ineide
the water proof wrapping.
Serewed connections shall be protected with threaded forged steel
plugs. All openings, threaded connections, and cables exposed as a
result of instrument removal shall be protected in @ manner to
prevent damage during shipment by use of conduit plugs or rigid
conduit boxes.
All paneis shall be fully protected against the detrimental effects
of moisture, salt, dust, vibration and shock, and extremes of
temperature which the equipment may be subjected to during shipment
and transportation,
The panel shall be crated to prevent mechanical damage and be
completely water proof for outdoor storage. All erates shall be
sudtable for eling lifting and lifting by a fork-1ift truck.SARAWAK SHELL BERHAD
SABAH SHELL PETROLEUM COMPANY LIMITED
STANDARD ENGINEERING SPECIFICATIONS
SES 30,15
Page 19
Rev. 1
14,0
16.)
14,2
WARRANTY
‘The Vendor shall extend warranty to all items comprising or
contained within the Wellhead Control Panel as specified herein.
The panel shall be guaranteed against malfunction, partial or
complete failure, reoulting from or attributable to
~ Sub-standerd components and materials.
= Incorrectly-rated components and materials.
- Sub-standard workmanship, including but not limited to
sub-standard design, construction, alignment and setting up.
~ Unsatisfactory installation where such installation is
undertaken or recomended by Vendor, including damage to
adjoining equipment.
~ Adjustments carried out strictly in accordance with Vendor's
manuals or written instructions where those manuals or
Anstructions are in error.
The warranty included in this section shall extend for a period of
twelve (12) months following the testing and commissioning of the
panel on the platform, or for a period of eighteen (18) months
after despatch, whichever is the earlier. Vendor shall agree to
replace at his own expense any article, material or vorkmenship
which shall be found defective within’ the abovementioned time
period.(son 2 kvm )si3Niev9
eee a
NOISN¥ax3
Lawevo 21sve
su‘o8 $38, : Cinesa1ndow Auana O1 ~
+g dn0u9 NI
sannoow"saHi0 OL
2 # anos Ni
s300N" w3H10 OL
1 2 amionwassy fs « sonNas3H
ee
j ian
| adanigvo NOISNVaXa =| TSwevd Si8ve
wae a
« Sb SAS MT INIWH LVATTACHMENT OT 7 SES 30.15
See REECE eet REV.1
WELLHEAD CONTROL PANEL
3/800. X 0.038" W.7.
INSTRUMENT
BIR/GAS
SUPPLY.
Va'op. x =TyeK e t
YeoP 7 TYPIGAL FOR ONE WELL STRING
ya"o.n x
0.038" wT.
REMOTE
INITIATION
OF TOTAL :
150M 9 ¥9"0.0.x0.065 Wir a
SHUTDOWNCESO)
scssv
REMOTE,
INITIATION
TOTAL, —pe
OF
‘SUB-SURFACE,
SHUTDOWN, (ESOV) Nolncacaverooce
0085 "wr SSv
FROM HI/LO PRESSURE PILOT
V/a'00. x 0.038"WT
TYPICAL FIELD HOOK-UP | ili awvslans| 01] a [lene
Tong No
il
1-35001 (TF@ 30 1 "lNs AL INSWHOVIIVATTACHMENT IV SHT. 2 OF 2 SES 30.15
REV. 1
PARTS LIST
DESCRIPTION
Do
E
F
6
H
J
K
L
M
N
Pp
a
R
s
T
u
v
3: WAY NORMALLY- CLOSED PILOT-OPERATED VALVE WITH SPRING
RETURN = MANUAL LATCH
3-WAY NORMALLY CLOSED PILOT- OPERATED VALVE WITH SPRING
RETURN = MANUAL “OVERRIDE
3- WAY NORMALLY - CLOSED INDICATING PILOT- OPERATED VALVE
WITH SPRING RETURN
PNEUMATIC INDICATOR
FILTER C/W AUTO DRAIN
PRESSURE REGULATOR
HYDRAULIC PUMP
3-WAY BALL VALVE
STRAINER
LIQUID LEVEL SWITCH
FILLER STRAINER
RELIEF TUBE WITH FLAME ARRESTOR
PRESSURE GAUGE
SNUBBER
GAUGE VALVE
2-WAY BALL VALVE
ACCUMULATOR
CHECK VALVE
RELIEF VALVE
LEVEL GAUGE
TUBING LEGEND
SYMBOL,
DESCRIPTION
ma
ISCHEMATIC -BASIC CABINET | MoO
SARAWAK SHELL BERHAD, "nn |M° re
ENGINEERING DEPT., LUTONG.
PNEUMATIC SUPPLY LINE ( 3/8°0.0. x 0.038" wr.)
PNEUMATIC CONTROL LINE (1/4"0.0. x 0.038" wT)
PNEUMATIC VENT LINE / HEADER(3/0"0.0 x0035"w1/1/2"00. XO038"WT)
HYDRAULIC SUPPLY LINE (3/8°00. x 0.065" W.1.)
HYDRAULIC RETURN LINE / HEADER (3/8"00 xo04s"wr /1/2"00.x0.0a9"wr}
TocaTon
Toaa wo
1-45008
nts P*F 14 887zsovins A IN “TV
Po
Shue $38ATTACHMENT V_ SHT. 2 OF 2 SES 30.15
See ev 1
PARTS LIST
ITEM DESCRIPTION
ry 3-WAY NORMALLY - CLOSED PILOT-OPERATED VALVE
8 3-WAY NORMALLY - CLOSED PILOT - OPERATED VALVE WITH
SPRING RETURN - MANUAL LATCH
c 3-WAY BALL VALVE
D VOLUME BOTTLE
E FLOW CONTROL VALVE
vf PRESSURE REGULATOR
6 SHUTTLE VALVE
4 HYORAULIC PUMP
J 2-WAY NORMALLY - OPEN INDICATING PILOT- OPERATED VALVE |
WITH SPRING RETURN-MANUAL OVERRIDE
« 3-WAY NORMALLY - CLOSED INDICATING PILOT- OPERATED vaLve
WITH SPRING-RETURN- MANUAL OVERRIDE
PRESSURE GAUGE
SNUBEER
GAUGE VALVE
RELIE= VALVE
CHECK VALVE,
2-WAY BALL VALVE
wovzer
TUBING LEGENO
SYMBOL DESCRIPTION
PNEUMATIC SUPPLY LINE ( 3/800. x 0.038" wT)
PNEUMATIC CONTROL LINE (1/4"00 x0.03s"wT)
PNEUMATIC VENT LINE / HEADER(¥8" 0D x0038" WT /1/2"00.x0.069"WT )
HYDRAULIC SUPPLY LINE 13/8090 x cuss" wr)
HYDRAULIC RETURN LINE /HEADER(3/8°00 xcoss'Wt /v2'cc xu 099"W7)
r a Our, a
ISCHEMATIC-WELL CONTROL MODULE} Moo i a :
HELL BERHAD, "MN 8 TR