Security Level:

EMTS GSM Phase 6 Project


Region:
BTS installation self inspection report
Site ID:
Address:

Reported by:
Period:

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Huawei Confidential

SITE FRONT VIEW

HUAWEI TECHNOLOGIES CO., LTD.

ANTENNA INSTALLATIONS

Huawei Confidential

SITE ID PLATE

HUAWEI TECHNOLOGIES CO., LTD.

PLINTH CONSTRUCTION OVERVIEW

Huawei Confidential

2G TP48200A
2G TMC

2G TMC

2G
IBBS
2G
IBBS
2G
IBBS

RFC

2G
IBBS

RFC

2G EQUIPMENT LOCATION

HUAWEI TECHNOLOGIES CO., LTD.

2G TP48200A

2G EQUIPMENT LOCATION

Huawei Confidential

3G
TP48200A

3G
IBBS

3G
IBBS

3G EQUIPMENT LOCATION

HUAWEI TECHNOLOGIES CO., LTD.

3G
TP48200A

3G EQUIPMENT LOCATION

Huawei Confidential

PLINTH CONSTRUCTION OVERVIEW

HUAWEI TECHNOLOGIES CO., LTD.

PLINTH CONSTRUCTION OVERVIEW

Huawei Confidential

Improper
bolts used for
cabinet base
bolting

Correct
cabinet
base bolting

METAL BASE BOLTING

HUAWEI TECHNOLOGIES CO., LTD.

METAL BASE BOLTING

Huawei Confidential

INDICATE IF
ITS 2G/3G

4 CORE POWER CABLE INSTALLATION

HUAWEI TECHNOLOGIES CO., LTD.

4 CORE POWER CABLE LABELING INSIDE


ACDB

Huawei Confidential

POWER SOURCE

HUAWEI TECHNOLOGIES CO., LTD.

POWER SOURCE

Huawei Confidential

Always
arrange
cables
properly

Wrong
power cable
arrangemen
t

4 CORE POWER CABLE TERMINATION ON


DB

HUAWEI TECHNOLOGIES CO., LTD.

4 CORE POWER CABLE TERMINATION ON


DB

Huawei Confidential

Provide bus bar


for main
grounding
Always apply
denzo paste on
bus bar

MAIN GROUNDING

MAIN EARTHING BUSBAR


TERMINATIONS

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

3G TP48200 OVERVIEW

HUAWEI TECHNOLOGIES CO., LTD.

2G TMC OVERVIEW

Huawei Confidential

Re-work L1 and L3 termination and


ensure the bare copper area is
covered by eye lugs to prevent
electrical shock

4 CORE POWER CABLE


TERMINATION ON THE AC INPUT.

HUAWEI TECHNOLOGIES CO., LTD.

AC power point of
termination
compartment

4 CORE POWER CABLE


TERMINATION ON THE AC INPUT.

Huawei Confidential

CPRI CABLE LABELING (2cm from port)

HUAWEI TECHNOLOGIES CO., LTD.

RRU POWER CABLE LABELING (2cm


from port)

Huawei Confidential

EARTHING FROM TOP TO BOTTOM OF


TP48200

HUAWEI TECHNOLOGIES CO., LTD.

EARTHING FROM TOP TO BOTTOM


CABINET

Huawei Confidential

DDF EARTHED

HUAWEI TECHNOLOGIES CO., LTD.

BBU EARTHED

Huawei Confidential

SLPU & EMUA EARTHED

IDU EARTHED

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Full View

DRFU LAYOUT AND CABLE ROUTINE

HUAWEI TECHNOLOGIES CO., LTD.

Close View

DRFU LAYOUT AND CABLE ROUTINE

Huawei Confidential

ber gland
uld be
ed at
ropriate
ce after
allation

Close View

RUBBER GLANDS INSTALLATION

HUAWEI TECHNOLOGIES CO., LTD.

RUBBER GLANDS INSTALLATION

Huawei Confidential

Rubber gland
should be
placed at
appropriate
space after
installation

bber gland
ould be
ced at
propriate
ace after
tallation

Close View

RUBBER GLANDS INSTALLATION

HUAWEI TECHNOLOGIES CO., LTD.

RUBBER GLANDS INSTALLATION

Huawei Confidential

Full View

Close View

Proper
arrangement
of Jumper
cables should
be done

JUMPER AND FEEDER TERMINATION


LAYOUT

HUAWEI TECHNOLOGIES CO., LTD.

JUMPER AND FEEDER


WATERPROOFING TERMINATION

Huawei Confidential

Full View

RRU
RRU

RRU

Filter

Filter

NO PROPER
CABLE
MANAGEMENT

Filter

Proper way of
installing RRU and
filter resulting to
straight cable
layout

RRU AND FILTER INSTALLATIONS

HUAWEI TECHNOLOGIES CO., LTD.

RRU AND FILTER INSTALLATIONS

Huawei Confidential

Close View

SECTOR 1

Provide color
rings to
identify
sectors 0,1 &
2

RRU WATERPROOFING AND


EARTHING

HUAWEI TECHNOLOGIES CO., LTD.

CPRI CABLE & RRU POWER CABLE


LABELING. (2cm from port)

Huawei Confidential

Fan power
should always
be terminated

PROVIDE
EARTHING
Close
View

FILTER JUMPERS WATERPROOFING


AND EARTHING

HUAWEI TECHNOLOGIES CO., LTD.

FAN POWER SHOULD ALWAYS BE


TERMINATED

Huawei Confidential

Close View

Close
View
BOLT NOT
TIGHTEENED

SECTOR 0

COMPLETE BRACKET
INSTALLATION

HUAWEI TECHNOLOGIES CO., LTD.

COMPLETE BRACKET
INSTALLATION

Huawei Confidential

Close
View

Full View

BATTERY INSTALLATION

HUAWEI TECHNOLOGIES CO., LTD.

BATTERY INSTALLATION

Huawei Confidential

Water proofing
putty applied as
shown

Close
View

Flexible PVC
installed and
water proofing
putty applied as
shown

Water proofing
putty not applied
at cabinet base
opening

WATERPROOF SEALING OF
CABINET

HUAWEI TECHNOLOGIES CO., LTD.

Close
View

WATERPROOF SEALING OF
CABINET

Huawei Confidential

Clamps should
be used for laying
out the fiber and
RRU Power cables

Full View

CABLE TRAY CLAMPS FOR


FIBRE AND RRU POWER
CABLES

HUAWEI TECHNOLOGIES CO., LTD.

Close
View

CABLE TRAY CLAMPS FOR


FIBRE AND RRU POWER
CABLES

Huawei Confidential

able tie
not be
tside the

Always use black


cable tie outside
cabinets

WRONG USE OF CABLE TIE

HUAWEI TECHNOLOGIES CO., LTD.

PROPER USE OF CABLE TIE

Huawei Confidential

d be

Always scratch tower leg


properly before taking
grounding termination
from it and make sure
denso paste is used after.

DCDU LABELING

HUAWEI TECHNOLOGIES CO., LTD.

TOWER LEG EARTHING

Huawei Confidential

Power cables should be


protected with PVC

POWER CABLE PROTECTION

HUAWEI TECHNOLOGIES CO., LTD.

POWER CABLE PROTECTION

Huawei Confidential

No power cable
Labeling to
differentiate bet
2G and 3G powe

Always cover ACDB


openings after power
cable installation

POWER CABLE PROTECTION

HUAWEI TECHNOLOGIES CO., LTD.

POWER CABLE PROTECTION

Huawei Confidential