Integrated Security and Automation, Inc.
354 Bide 8122, Crat Sone, Bray. Mie Zango, Mandaluyong iy Phi
‘
March 10, 2015
SM City San Lazaro
Lacson Extension, Santa Cruz,
Manila
Attention: MR. ANTOLIN V. PAULE
SM PRIME HOLDINGS, INC.
Sriflr Mall of Asia Arena Annex Building (MAAX)
Corel way cor. JW. Diokno Bivd., Mall of Asia Complex,
CBP-1A, Pasay City
Thru: Engr. Bernadette D. Espiritu
Resident Engineer
Re: Proposal for Supply, Installation, Programming, Testing and
Commissioning of Fire Detection and Alarm System-Mall Area
Dear Sir,
We thank you for affording us the opportunity to submit a pre-qualification tender document for the
above-mentioned tender prequaiification
Enclosed for your perusal and approval is a completed document in accordance with your
requirements,
We trust our submission will meet your approval and assure you our best attention at all times.
‘Should there be any query relating to our submission we would welcome an opportunity to discuss
it with you. In this regard please do not hesitate in communicating with the undersigned.
Integrated Security and Automation Inc.
Approved By:
Jar
CEO-Presfdent
oorIntegrated Security and Automation, Inc. Z g
es 350 £»
COMMERCIAL CLARIFICATION
asi aaig #1227. Cnsir8e,
1 Zen ga, Mond
(Section 1)
LALUMP SUI
Total price in Php: Two 1 Hundred Ninety Six Thousand Nine Hundred Thitt
‘Two Pesos and 59/100, 2,496,932.59) oni Sayed Wl
1.2 SCOPE OF WORKS:
Inclusions
1. Supply, installation, programming, testing and commissioning of Fire Detection and Alarm
System for Mall Common Areas, admin offices & rentable spaces, AHU & EE Rooms (see
attached design)
2. Supply of highly qualified Engineer for project supervision and technician to perform the
wire and loop checking Programming, Testing and Commissioning of Fire Alarm System,
3. Roughing: ins & cabling including supply of conduit and other electricaVlabor materials are
included in the proposal
4. Product Seminar and Orientation of the System.
5. Operation and Maintenance Manual.
6. Module provision as tapping point for tenant INCLUDED.
7. BFP Permit (FSIC), Bones (CARI, Surety, and Performance) are included.
8. FACP located at EMB (second floor) ———> chad( be C&L fa) Le
Exclusions:
1. Electrical, Water consumption and other charges.
2. Any repair or replacement of damaged spare parts due to fluctuations of electrical power
supply, force of nature abuse, acts of third parties accidents,
) Provision of panel boardicircuit breaker for our power supply is not inclided in this offer.
"We assume that the owner should provide a vacant slot for our systems.
4. Client must provide vacant/available 220V slot for our panel.
4.3 TERMS OF PAYMENT:
50% upon receipt of PO, 30% upon delivery of all the items and 20% upon Project
Turnover.
LA TERMS AND CONDITIONS:
7. Prices quoted are inclusive of 12% VAT.
2. Prices are subject to change without prior natice.
3. Cash payments will be honored. All Check Payments payable to Integrated Security &
‘Automation Inc.
4. Items and prices offered are only valid for thirty (30) days from date of offer.
5. __ Additional / variation works shall be executed only after approval is received from the
Client.
1.6 DELIVERY PERIOD
Lead time of delivery for the equipment that is, the FDAS System components and its
Peripherals, is 30 Days from receipt Down Payment and approval of all technical submittals,
depending on stock availability at our ISA Warehouse, subject to force majeure and delays
‘over which neither we nor our suppliers have any controlIntegrated Security and Automation, Inc.
landauyong Cy, Phitppines 3380
TEE (ON) 555-3935 + Ge {D917 727-4555 (0025) 727-1585.» F400} 9-9241
ISA Sig. #122. Coss, Bray. New Za
{LZ WORKING COMPLETION
“The project is to be completed approximately 100-118 working days from date of award and
‘approval of all technical submittals, subject to force majeure and delays over which we have
‘nO contol
‘TECHNICAL CLARIFICATION
(Section 2)
ENERAL
Our proposal is based on the tender documents, technical specifications and drawing
layout being supplied
2.2 MATERIAL/EQUIPMENT BRAND
We have identified within our proposal technical details of equipment and devices we
intend to supply in this project. We also confirm that all equipment proposed is generally in
accordance with the nominated brand and or manufacturer as specified.
2.3 WORK TO BE PERFORMED
We wish to advise that our scope of work includes supply, mounting and termination of Fire
Detection System devices and peripherals including programming, project supervision,
testing and commissioning works.
2.4 WARRANTY
11. Warranty on the device and equipment is 24 months upon delivery or turnover of the
project.
2. Warranty void if unit or devices is installedterminated by non-ISA technicians/personnel
3. Warranty void if unit or any part of the item is tampered with by non-ISA or unauthorized
persennel
4. Immediate replacement of defective items for the duration of the warranty period,
2.5 WARRANTY EXCLUSIONS.
ISA shall not be responsible for failure of equipment, or any thereof, and the foregoing
warranty shall not apply, if such failure is attributable to
2:4 Accident, neglect, misuse or abuse
2.2 Exposure of the equipment to conditions beyond the environmental, power or
ordinary operating constraints specified by ISA.
2.3 Service by other than ISA technicians.. Integrated Security and Automation, Inc.
Proect 8M san Lazaro Mal rea
Date ach 82088
‘Contact Perso: Eng. Ma, Brnadte Espa
Sas Eng Mary race Glier
sn igetaeias sevteten io | | | tay coy
aa] — rea
a 3c] sean]
parade [sr |~nesmse]— ree
“ioesse a an [| suas] ao
ert Vw
faslirnen Wc aT GO OT
[zara a]
scant ea
ra Brasco]
far “ra
[eran Toa Taness2.8|
‘CENTAVOS ONLY
a ctsIntegrated Security and Automation, Inc.
184A
2 Pies sb cage tap ice
2 bey etn y(n ct pyran dpndg enn ay Oh pth Mate Me
‘ors Cary Cet deere
4 Mande Resort Mer Ser it cnsagtns e ges tinued Rofirg tg. conn ecg
Soya cont sere strane mona anced BONDS nd BF PERT FEE MELA.
Toomer art 5% Coo Pare haps 2% we comp
& oo pormare ton enact eet pyre pee tee Sey ot Aon he
2 en rn ee Sree un scrs ee pe
Yarn oa etry sue het stare hyena peste
5 tas npucorrs couse ter sano aa ee,
Jo Shalt ear tare ct enuprer.o y che ave!-rtegceg aS psc sabe
181 acon pet nee ce.
{92 Court eemupretn arene ent cr pte ire cy SA,
{23 Serce he tensa Teron
Seg ef Seat, Prepare. Tega Corman oy