The Use/Evalution Phase takes place:
Y once the system has been implemented
once the system has been designed
once the system configuration has been proposed.
In the Use/Evaluation Phase:
JS the system should be in full use and should meet the
objectives that were Identified in the Planning Phase
the system should be in full use and should meet the
objectives that were identified in the Analysis Phase
the system should be designed to meet the objectives
that were identified in the Planning Phase
Once the system has been implemented:
SY 4 process of maintenance and monitoring should be
éstablishedito\ensiire that it continues to run to its
Tnaximum capacity,
itis self-maintaining and its future performance is
guaranteed
further productivity enhancements will only need to be
considered if the Project Management team has not
planned for all eventualities
Order the following into the correct sequence of steps.
determine how well the system
works for those who use it
audit the system (including
completing a post
implementation review)
maintain the system
re-engineer proposals