REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:1de1
DATE:
Rev. 00
Pg:2de2
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:3de3
DATE:
Rev. 00
Pg:4de4
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:5de5
DATE:
Rev. 00
Pg:6de6
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:7de7
DATE:
Rev. 00
Pg:8de8
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:9de9
DATE:
Rev. 00
Pg:10de10
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:11de11
DATE:
Rev. 00
Pg:12de12
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:13de13
DATE:
Rev. 00
Pg:14de14
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:15de15
DATE:
Rev. 00
Pg:16de16
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:17de17
DATE:
Rev. 00
Pg:18de18
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:19de19
DATE:
Rev. 00
Pg:20de20
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:21de21
DATE:
Rev. 00
Pg:22de22
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:23de23
DATE:
Rev. 00
Pg:24de24
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:25de25
DATE:
Rev. 00
Pg:26de26
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:27de27
DATE:
Rev. 00
Pg:28de28
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:29de29
DATE:
Rev. 00
Pg:30de30
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:31de31
DATE:
Rev. 00
Pg:32de32
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:33de33
DATE:
Rev. 00
Pg:34de34
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:35de35
DATE:
Rev. 00
Pg:36de36
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:37de37
DATE:
Rev. 00
Pg:38de38
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:39de39
DATE:
Rev. 00
Pg:40de40
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:41de41
DATE:
Rev. 00
Pg:42de42
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:43de43
DATE:
Rev. 00
Pg:44de44
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
NO
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:45de45
N/A
DATE:
Rev. 00
Pg:46de46
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:47de47
DATE:
Rev. 00
Pg:48de48
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:49de49
DATE:
Rev. 00
Pg:50de50
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:51de51
DATE:
Rev. 00
Pg:52de52
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:53de53
DATE:
Rev. 00
Pg:54de54
EXHIBIT TT2-CEY-HEC-REG-007
REGISTRO TT2-CEY-HEC-REG-007
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / Linea N
TERMOTASAJERO II
WATER TREATMENT SYSTEM
Water Treatment
LOCATION / Ubicacin:
YES
4. CHECK THAT ALL VENTS AND DRAINS ARE INTALLED (ADD TEMPORARY VENTS AND DRAINS FOR TESTING
AS REQUIRED
NO
N/A
10. CHECK FOR CORRECT FLOW THROUGH FILTERS AND STRAINERS, TRAPS, VALVES, GLOBE VALVES AND
CONTROL VALVES
11. CHECK ALL INSTUMENTS THERMOWELLS INSTALLED
x
x
12. CHECK THAT ALL PIPE SUPPORTS ARE COMPETELY INSTALLED AS PER DRAWINGS
13. CHECK THAT ALL TEMPORARY PIPE SUPPORTS HAVE BEEN REMOVED
x
x
16. CHECK THAT ORIFICE TAPS HAVE BEEN SEAL WELDED AND UNUSED TAPPED, HOLES HAVE BEEN PLUGGED AND SEAL WELDED
17. CHECK THAT ALL NDT / STRESS RELIEVING REQUIREMENTS AS PER SPECIFICATION HAVE BEEN MET AND
RECORDED
REMARKS:
NAME:
SUPERVISOR CEYM
QA/QC CEYM
POST:
JOFFRE BAYAS
ANGELICA OCHOA
TT2
SIGNATURE:
Rev. 00
Pg:55de55
DATE:
Rev. 00
Pg:56de56
EXHIBIT TT2-SUB-P1-001
REGISTRO TT2-SUB-P1-001
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
SYSTEM / Sistema:
LINE N / P&ID N
TERMOTASAJERO II
JACKING OIL SYSTEM
LOCATION / Ubicacin:
YES
NO
REMARKS:
NAME:
POST:
JAVIER JAYA
ANDRES ROJAS
TT2
SIGNATURE:
Rev. 00
Pg:57de57
N/A
DATE:
Rev. 00
Pg:58de58
EXHIBIT TT2-SUB-P1-001
REGISTRO TT2-SUB-P1-001
CHECKLIST PRIOR TO PIPING PRESSURE TEST
DATE / Fecha:
07/02/2015
REPORT/Reporte
HYUNDAI
CLIENT / Cliente:
PROJECT / Proyecto:
No.
LOCATION / Ubicacin:
TT2-921-M103-00002
TERMOTASAJERO II
SYSTEM / Sistema:
YES
NO
Water Treatment
N/A
YES
NO
N/A
ITEM
REMARKS:
NAME:
POST:
ANDRES ROJAS
JAVIER JAYA
TT2
SIGNATURE:
DATE:
Rev. 00