Вы находитесь на странице: 1из 1

S.

No
1

Description
Capacity of the system
STG
Water Cooled condenser

Cooling tower
MCW pump
Continuous Intermittent
1815 Cum/hr

ACW pump

1815 Cum/hr

Remarks

SIEMENS utility requirement list

Lube oil cooler

100 Cum/hr

100 Cum/hr

Surendra project - 86.5 cum/hr.


ITC STG contract document in PG
annexure - 100 cum/hr.

Generator cooler

100 Cum/hr

100 Cum/hr

Surendra project - 75 cum/hr.


ITC STG contract document in PG
annexure - 100 cum/hr.

5 Cum/hr
8 Cum/hr
2 Cum/hr

5 Cum/hr
8 Cum/hr
2 Cum/hr

Preliminary data received from


Boiler team through Email dt
23/8/2011

0 Cum/hr

0 Cum/hr

Referred from Surendra project - 5


cum/hr for ash hoppers.
As per K.Kumar telecon by
Mr.Aravind, It is not required

Compressor

10 Cum/hr

10 Cum/hr

Referred from Surendra project Instrument air compressor (90DegF


to 104 DegF for 80 lpm = 4.8
cum/hr)

Air compressor for instrument and service air

10 Cum/hr

10 Cum/hr

Referred from Surendra project Instrument air compressor (90DegF


to 104 DegF for 80 lpm = 4.8
cum/hr)

5
6

Condensate polishing unit - Heat Exchanger


Side stream filteration
(5% of Circulated water)

75 Cum/hr

75 Cum/hr
106 Cum/hr

1
2
3
4
5
6
7
8
9

Boiler
Boiler feed water pump
SWAS
Coal spreader
Ash Handling System
Eco & APH ash hoppers

Total
No. of working
Total capacity per unit
Margin available
Selected capacity

2125 Cum/hr
2 Nos.
1063 Cum/hr
4%
1100 Cum/hr

Cooling tower make-up water requirement


Cooling water inlet to cooling tower
Cooling water outlet from cooling tower
Cooling temperature range
Cycles of concentration
Evaporation loss
Drift loss
Blow down loss
Total loss
Make up water required for cooling tower

43 Deg C
35 Deg C
8 Deg C
5
1.45 %
0.05 %
0.31 %
1.8 %
38.52 Cum/hr

1815 Cum/hr
1 No.
1815 Cum/hr
5%
1900 Cum/hr

Heat balance calculation

416 Cum/hr
1 No.
416 Cum/hr
3%
430 Cum/hr As per contract,
CT - 1100 cum/hr per cell
MCWP - 1800 Cum/hr
ACWP - 250 Cum/hr