The document discusses pre-job cementing calculations that are required prior to a cementing job, including calculating slurry and additive volumes, total cement quantity, displacement volume, hydrostatic pressures at different positions, differential pressure after displacement, and collapse pressure at the casing shoe. It also mentions calculating expected returns volume and pit volume increase. The document notes that thickening time and other equations are useful for carrying out cement calculations.
Исходное описание:
Paper on Cementing Calculations in oil and gas wells.
The document discusses pre-job cementing calculations that are required prior to a cementing job, including calculating slurry and additive volumes, total cement quantity, displacement volume, hydrostatic pressures at different positions, differential pressure after displacement, and collapse pressure at the casing shoe. It also mentions calculating expected returns volume and pit volume increase. The document notes that thickening time and other equations are useful for carrying out cement calculations.
The document discusses pre-job cementing calculations that are required prior to a cementing job, including calculating slurry and additive volumes, total cement quantity, displacement volume, hydrostatic pressures at different positions, differential pressure after displacement, and collapse pressure at the casing shoe. It also mentions calculating expected returns volume and pit volume increase. The document notes that thickening time and other equations are useful for carrying out cement calculations.
CEMENTING CALCULATIONS PRE-JOB CALCULATIONS The following calculations are required prior to a cement job: (a)Lead and Tail slurry volumes mix water and additive volumes.. (b)Total quantity of cement (c)Displacement volume (d)Hydrostatic pressure for various cement positions (e)Differential pressure at the end of cement displacement (f) Collapse pressure at the casing shoe at the end of displacement. (g) The expected total volume of returns during the cement job, and the expected overall increase in pit volume. The following sections discuss and illustrate the required calculations. The following equations are useful for carrying out cement calculations. 1. Thickening time Thickening time = mixing time + surface time + displacement time + plug release time + safety time(6.1)