Вы находитесь на странице: 1из 10

INVERSION TOTAL POR COMPONENTES

ALTERNATIVA 01 - PRECIOS PRIVADO


ITEM

RUBROS

01.00

ESTUDIOS

01.01

EXPEDIENTE TECNICO

02.00

COSTO DIRECTO

02.01

UND

PARCIAL

TOTAL
30,000.00

GLB

30,000.00

OBRAS PROVISIONALES

GLB

61,651.16

02.02

OBRAS PRELIMINARES

GLB

123,319.96

02.03

DEMOLICIONES

GLB

94,934.29

02.04

MOVIMIENTOS DE TIERRAS

GLB

509,729.35

02.05

PAVIMENTOS

GLB

2,076,270.47

02.06

OBRAS DE ARTE Y DRENAJE

GLB

3,733,797.42

02.07

SEALIZACION Y SEGURIDAD VIAL

GLB

132,148.14

02.08

JARDINERIA Y VARIOS

GLB

103,361.83

GLB

41,500.00

GLB

37,810.03

GLB

10,000.00

GLB

86,422.92

GLB

0.00

GLB

0.00

02.09

MITIGACION AMBIENTAL

03.00

SUPERVISION

03.01

SUPERVISION DE OBRA (6.81%)

04.00

PLAN DE CONTINGENCIA

04.01

PLAN DE CONTINGENCIA

05.00

GASTOS GENERALES

05.01

GASTOS GENERALES (10.97%)

06.00

UTILIDAD

06.01

UTILIDAD (5%)

07.00

IGV

07.01

IGV (18%)

1,080,286.55

37,810.03
10,000.00
86,422.92
0.00
0.00

TOTAL INVERSION

1,244,519.50

6,876,712.62 ok
5,796,426.07

74,416.40
2,627,499.82
-2,553,083.42

INVERSION TOTAL A PRECIOS PRIVADOS


ALTERNATIVA 01
INVERSION

PRECIOS
PRIVADOS

ALTERNATIVA 01
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS
CUADRAS 05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
INFRAESTRUCTURA

1,166,709.47

MANO DE OBRA

425,084.66

CALIFICADA

84,374.18

NO CALIFICADA*

340,710.48

MATERIALES, INSUMOS

552,789.36

EQUIPOS

90,418.58

HERRAMIENTAS

11,993.95

SUBCONTRATOS

0.00

TOTAL COSTO DIRECTO

1,080,286.55

GASTOS GENERALES (8% CD)


UTILIDAD (0% CD)

86,422.92
0.00

SUBTOTAL

1,166,709.47

IGV (0%)

0.00

TOTAL INFRAESTRUCTURA

1,166,709.47

ESTUDIOS

30,000.00

PLAN DE CONTINGENCIA

10,000.00

SUPERVISION (3.5%)

37,810.03

TOTAL INVERSION

1,244,519.50

INVERSION TOTAL A PRECIOS SOCIALES


ALTERNATIVA 01
INVERSION

PRECIOS DE
MERCADO

FC

PRECIOS
SOCIALES

ALTERNATIVA 01
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS
05 AL 09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
INFRAESTRUCTURA
MANO DE OBRA
CALIFICADA
NO CALIFICADA*
MATERIALES O INSUMOS

1,166,709.47

941,413.67

425,084.66

291,428.10

84,374.18

0.91

76,780.50

340,710.48

0.63

214,647.60

552,789.36

0.85

469,870.96

EQUIPO

90,418.58

0.85

76,855.79

HERRAMIENTAS

11,993.95

0.85

10,194.86

0.00

0.85

SUBCONTRATOS
TOTAL COSTO DIRECTO
GASTOS GENERALES (8% CD)
UTILIDAD (5% CD)
SUBTOTAL
IGV (0%)
TOTAL INFRAESTRUCTURA

0.00

1,080,286.55

848,349.71

86,422.92

93,063.96

0.00

0.00

1,166,709.47

941,413.67

0.00

0.00

1,166,709.47

941,413.67

ESTUDIOS (Infraestructura+Plan de Contingencia)

30,000.00

1.00

PLAN DE CONTINGENCIA

10,000.00

0.85

8,500.00

SUPERVISION

37,810.03

1.00

37,810.03

TOTAL INVERSION

1,244,519.50

30,000.00

1,017,723.70

INVERSION TOTAL POR COMPONENTES


ALTERNATIVA 02 - PRECIOS PRIVADO
ITEM

RUBROS

01.00

ESTUDIOS

01.01

EXPEDIENTES TECNICOS

02.00

COSTO DIRECTO

02.01

UND

PARCIAL

TOTAL
30,000.00

GLB

30,000.00

OBRAS PROVISIONALES

GLB

61,651.16

02.02

OBRAS PRELIMINARES

GLB

123,319.96

02.03

DEMOLICIONES

GLB

94,934.29

02.04

MOVIMIENTOS DE TIERRAS

GLB

530,207.35

02.05

PAVIMENTOS

GLB

2,292,325.01

02.06

OBRAS DE ARTE Y DRENAJE

GLB

3,799,864.42

02.07

SEALIZACION Y SEGURIDAD VIAL

GLB

132,148.14

02.08

JARDINERIA Y VARIOS

GLB

112,458.71

02.09

MITIGACION AMBIENTAL

GLB

48,000.00

03.00

SUPERVISION

03.01

SUPERVISION DE OBRA (6.57%)

GLB

39,004.08

04.00

PLAN DE CONTINGENCIA

04.01

PLAN DE CONTINGENCIA

05.00

GASTOS GENERALES

05.01

GASTOS GENERALES (10.57%)

06.00

UTILIDAD

06.01

UTILIDAD (5%)

07.00

IGV

07.01

IGV (18%)

1,114,402.27

39,004.08
10,000.00
GLB

10,000.00

GLB

89,152.18

GLB

0.00

89,152.18
0.00
0.00
GLB

TOTAL INVERSION

0.00

1,282,558.53

7,194,909.04 ok
-6,080,506.77

91,422.00
748,461.60
-657,039.60

INVERSION TOTAL A PRECIOS PRIVADOS


ALTERNATIVA 02
ALTERNATIVA 02:
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL 09,
DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN

INVERSION
INFRAESTRUCTURA

PRECIOS
PRIVADOS
1,203,554.45

MANO DE OBRA

429,047.45

CALIFICADA

88,534.39

NO CALIFICADA*

340,513.06

MATERIALES O INSUMOS

582,640.04

EQUIPO

90,176.00

HERRAMIENTAS

12,538.79

SUBCONTRATOS

0.00

TOTAL COSTO DIRECTO

1,114,402.27

GASTOS GENERALES (8%)

89,152.18

UTILIDAD (5% CD)

0.00

SUBTOTAL

1,203,554.45

IGV (18%)

0.00

TOTAL INFRAESTRUCTURA

1,203,554.45

ESTUDIOS (Infraestructura+Plan de Contingencia)

30,000.00

PLAN DE CONTINGENCIA

10,000.00

SUPERVISION (3.5%)

39,004.08

TOTAL INVERSION

1,282,558.53

16,486.41
414,041.95
344,867.32
1,205,676.16

INVERSION TOTAL A PRECIOS SOCIALES


ALTERNATIVA 02
INVERSION

PRECIOS DE
MERCADO

FC

PRECIOS
SOCIALES

ALTERNATIVA 02
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JR. MONTERO ROJAS CUADRAS 05 AL
09, DISTRITO Y PROVINCIA DE LAMAS-DPTO. SAN MARTIN
INFRAESTRUCTURA
MANO DE OBRA
CALIFICADA

1,191,015.67

1,196,862.01

429,047.45

295,089.52

88,534.39

0.91

80,566.29

340,513.06

0.63

214,523.23

582,640.04

0.85

495,244.03

EQUIPO

90,176.00

0.85

76,649.60

HERRAMIENTAS

12,538.79

0.85

10,657.97

0.00

0.85

0.00

NO CALIFICADA*
MATERIALES O INSUMOS

SUBCONTRATOS
TOTAL COSTO DIRECTO
GASTOS GENERALES (8% CD)
UTILIDAD (0% CD)
SUBTOTAL
IGV (0%)
TOTAL INFRAESTRUCTURA

1,101,863.49

877,641.12

89,152.18

92,766.67

0.00

43,882.06

1,191,015.67

1,014,289.84

0.00

182,572.17

1,191,015.67

1,196,862.01

ESTUDIOS (Infraestructura+Implementacion)

30,000.00

1.00

PLAN DE CONTINGENCIA

10,000.00

0.85

8,500.00

SUPERVISION

39,004.08

1.00

39,004.08

TOTAL INVERSION

1,260,019.75

30,000.00

1,274,366.09

INVERSION TOTAL A PRECIOS DE MERCADO- ALTERNATIVA 01


ESTUDIOS
INFRAESTRUCTURA

30,000
1,166,709

PLAN DE CONTINGENCIA

10,000

SUPERVISION

37,810

TOTAL PRESUPUESTO

1,244,519

INVERSION TOTAL A PRECIOS DE MERCADO - ALTERNATIVA 02


ESTUDIOS
INFRAESTRUCTURA

30,000
1,203,554

PLAN DE CONTINGENCIA

10,000

SUPERVISION

39,004

TOTAL PRESUPUESTO

1,282,559

INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 01


ESTUDIOS
INFRAESTRUCTURA

30,000
941,414

PLAN DE CONTINGENCIA

8,500

SUPERVISION
TOTAL PRESUPUESTO

37,810
1,017,724

INVERSION TOTAL A PRECIOS SOCIAL - ALTERNATIVA 02


ESTUDIOS
INFRAESTRUCTURA
PLAN DE CONTINGENCIA
SUPERVISION
TOTAL PRESUPUESTO

30,000
1,196,862
8,500
39,004
1,274,366