DATE
COMMENTS
DATE
COMPLETED
ACTION
DETAILS
August
2014
Initial
Consultatio
n
(Planning)
On August
20th, I had an
interview with
the head of the
sales
department in
RIMSA.
Criterion A
September
2014
Project
Analysis
(Planning)
Analyse all of
the
requirements
to carry out the
project.
After downloading
September
the software, I made 21st, 2014
sure that I had all of
the requirements to
get started with the
project.
Criterion B
September
2014
Brainstormi
ng with
client
(Planning)
After the
requirements
were clear,
After the
September
requirements were
23rd, 2014
clear, I brainstormed
strategies and ideas
that met these
requirements
regarding the
development of the
database.
Criterion B
October
2014
Project
Schedule
(Planning)
Organise and
schedule the
different dates
to meet with
the client in
order to gather
all the
necessary
information for
the product
development.
Criterion C
October 29h,
2014
CRITERION
November
2014
Project
Design the
Design
structure and
(Designing) content of the
product
according to
the clients
requests and
needs.
I designed a
November
questionare and
21st, 2014
sketched its
structure design in a
piece of paper in
order to use it as a
guide for the
development of the
product. I came up
with a clear idea of
the final product.
Criterion D
November
2014
Creating
the
designs,
forms and
reports
(Designing)
A clear design
of the layout
and structure
of the
database to be
presented to
the client
November
30th, 2014
Criterion D
December
2014
Product
Developme
nt
(Developm
ent)
After coming
up with a
design that the
client agreed
with, I will
create the
product using
Microsoft
Access 2013.
I created the
December
product and justified 12th, 2014
the structure and
advanced
techniques used. I
used all of the tools
available to increase
its efficiency.
Criterion E
December
2014
First Draft
given to the
client
(Developm
ent)
A first draft
was provided
to the client for
approval and
comments.
December
16th, 2014
Criterion E
January
2015
Final
Product
Developed
January 5th,
2015
Criterion E
January
2015
Client
Testing
and
Training
A meeting with
the client in
order to
provide insight
in how to use
and control the
database.
Simple instructions
were given to the
client in order for
him to understand
the functioning of
the database.
January 13th,
2015
Criterion F
January
2015
Product
Evaluation
and Future
Developme
nt (Testing)
In general he was
January 26th,
satisfied with the
2014
results and was able
to use the database
adequately
Criterion F
February
2015
Future
Ideas for
improving
the
database
After having
the feedback
from the client,
future ideas for
improvement
were
brainstormed
and organised.
February
13th, 2015
Criterion F
February
2015
Required
Elements
(Implement
ation)
Content and
functionality of
the product,
prescribed
cover page,
questionnaire
structure and
file naming.
I finished meeting
February
the requests of the
23rd, 2014
final project until it is
ready to be sent and
used by the client.
Criterion G