August
2014

Initial
Consultatio
n
(Planning)

On August
20th, I had an
interview with
the head of the
sales
department in
RIMSA.

After he filled me in August 22nd,


with the details of
2014
his role in the
company, and on
the issue that he
was going through, I
got to the
conclusion that the
adequate solution
would be to create a
database using
Microsoft Access
2013.

Criterion A

September
2014

Project
Analysis
(Planning)

Analyse all of
the
requirements
to carry out the
project.

After downloading
September
the software, I made 21st, 2014
sure that I had all of
the requirements to
get started with the
project.

Criterion B

September
2014

Brainstormi
ng with
client
(Planning)

After the
requirements
were clear,

After the
September
requirements were
23rd, 2014
clear, I brainstormed
strategies and ideas
that met these
requirements
regarding the
development of the
database.

Criterion B

October
2014

Project
Schedule
(Planning)

Organise and
schedule the
different dates
to meet with
the client in
order to gather
all the
necessary
information for
the product
development.

I wrote down all the


data that the client
provided me during
the interview
regarding the
pharmaceutical
laboratory. Also, I
set multiple goal
dates to finish the
product and satisfy
the clients needs.

Criterion C

October 29h,
2014

CRITERION

November
2014

Project
Design the
Design
structure and
(Designing) content of the
product
according to
the clients
requests and
needs.

I designed a
November
questionare and
21st, 2014
sketched its
structure design in a
piece of paper in
order to use it as a
guide for the
development of the
product. I came up
with a clear idea of
the final product.

Criterion D

November
2014

Creating
the
designs,
forms and
reports
(Designing)

A clear design
of the layout
and structure
of the
database to be
presented to
the client

A clear idea of the


product was
provided to the cline
in order to have
opinion and
approval of client.
After the meeting
the client was
pleased with the
structure and
content.

November
30th, 2014

Criterion D

December
2014

Product
Developme
nt
(Developm
ent)

After coming
up with a
design that the
client agreed
with, I will
create the
product using
Microsoft
Access 2013.

I created the
December
product and justified 12th, 2014
the structure and
advanced
techniques used. I
used all of the tools
available to increase
its efficiency.

Criterion E

December
2014

First Draft
given to the
client
(Developm
ent)

A first draft
was provided
to the client for
approval and
comments.

The client was able


to take a frist look at
the development of
the database. He
was pleased with
the first draft but
gave me some
things to work on
such as security
(password) and the
queries of the
territories.

December
16th, 2014

Criterion E

January
2015

Final
Product
Developed

The final copy


of the product
was finished
and delivered
to client and
teacher.

The client was


pleased wight he
final product and
was able to test it
for the first time.

January 5th,
2015

Criterion E

January
2015

Client
Testing
and
Training

A meeting with
the client in
order to
provide insight
in how to use
and control the
database.

Simple instructions
were given to the
client in order for
him to understand
the functioning of
the database.

January 13th,
2015

Criterion F

January
2015

Product
Evaluation
and Future
Developme
nt (Testing)

After the client


tested and
understood the
final product, a
questionnaire
was provided
in order to get
feedback

In general he was
January 26th,
satisfied with the
2014
results and was able
to use the database
adequately

Criterion F

February
2015

Future
Ideas for
improving
the
database

After having
the feedback
from the client,
future ideas for
improvement
were
brainstormed
and organised.

Some of the ideas


for improvement
included providing
more visual
information and
being able to
analyze multiple
visits at the same
time.

February
13th, 2015

Criterion F

February
2015

Required
Elements
(Implement
ation)

Content and
functionality of
the product,
prescribed
cover page,
questionnaire
structure and
file naming.

I finished meeting
February
the requests of the
23rd, 2014
final project until it is
ready to be sent and
used by the client.