Вы находитесь на странице: 1из 2
FIGURE C This document rasan for purposes ot es ony under the eatery of Sepien Hazon PEE7036, on Merch 27, 2008," i ge belted fer cnc pup, "ok NoTES: PRELIMINARY DRAWING, FOR BIDDING ONLY, NOT FOR CONSTRUCTION. FINAL DESIGN MAY” VARY. WORK THS DRAWING TH PROJECT PLANS AND. SPECIFICATIONS. FOUNDATION WATERIAL AND CONSTRUCTION TO GE PER ACI-318, PROJECT SPECIFICATIONS, AND SOILS REPORT. COMPACTION TO BE PER CONTRACT OOCUMENTS BUT MUST BE ADEQUATE TO SUPPORT 4,000 PSF. CONCRETE TO BE PER SPECIFICATIONS GUT INNO CASE LESS THAN 3,000 PSI AT 28 DAYS. ALL REBAR 60 KSI YIELD. TOP OF FOUNDATION UNDER TANK SHELL MUST BE FLAT AND LEVEL WITHIN + IN ANY 30° OF CIRCUMFERENCE, +" OVER ALL tank PROPOSED FOUNDATION 500,000 GALLON TANK thi builders, inc. CTY OF YELLVILLE, ARKANSAS

Вам также может понравиться