IV V / Project: Construction of Western
High Speed Diameter, stage IV and V
ICA-WHSD-PPPCQCP-000 . 0
/ 1/12
,
- / QUALITY
CONTROL PROCEDURE OF CONCRETE,
SUPPLIED BY THE MANUFACTURER
WESTERN HIGH-SPEED DIAMETER PROJECT
STAGE IV & STAGE V /
, IV V
ST. PETERSBURG /RUSSIAN FEDERATION
- /
REVISION DESCRIPTION:
00
21.02.2013
Ufuk
Dogandemir
Victor Ignatiev
Mete Demir
Quality
Chief Engineer
PMO Director
____________________________________________________________________________________
ICA-WHSD-PPP-CQCP-000 .0 21/02/2013
, / Quality control procedure of
concrete, supplied by the manufacturer
: Northern
Capital Highway
Rev.
DATE
ICA-WHSD-PPPCQCP-000 . 0
:
IV V / Project: Construction of Western
High Speed Diameter, stage IV and V
Manager (QM)
(CE)
PREPARED BY
APPROVED BY
,
ICA ASTALDI IC ICTAS WHSD INSAAT
ANONIM SIRKETI
. ICA ASTALDI IC
ICTAS WHSD INSAAT ANONIM SIRKETI
- IV V .
/ 2/12
APPROVED BY
.
Confidential
This
document
contains
proprietary
information, which is owned by ICA
ASTALDI IC ICTAS WHSD INSAAT ANONIM
SIRKETI and is subject to copyright. ICA
ASTALDI IC ICTAS WHSD INSAAT ANONIM
SIRKETI has contributed such information
for the purpose of performance of the
Western High Speed Diameter Project
Stage IV & Stage V Project only, and any
use or reproduction for any other purpose
is strictly prohibited.
____________________________________________________________________________________
ICA-WHSD-PPP-CQCP-000 .0 21/02/2013
:
,
,
.
: 3-
-
6-
.
.
:
1) (
, , )
(
,
:
-
2%
- 2,5%
-
2%
admixtures;
Weighing
accuracy
of
batchers
of
continuously action is tested on samples,
selected
during
30sec.
of
batcher
continuously action. In case the accuracy of
batcher exceeds the valid value, then it is
required to be corrected.
, 30.
.
,
3) Concrete mix quality is depended on
,
mixing operation quality.
.
time is set by laboratory based on its
experience.
:
(1520% , ),
,
The minimal duration of concrete mixing
. with solid aggregates (SNiP III 15-76, table
1.7) in seconds
.
Volume
In gravity batch
In mixers of
of
mixer
at
enforced
action
finished
mixture
( III-15-76,
1.7) .
batch, l
500
500
2-6
2
6
10
75
60
0
15
0
12
0
90
60
60
.
4)
,
,
.
,
,
,
:
- , ..
0,61%;
-
()
,
( 0,05)- 1%
;
- :
800 25-30;
1000 35-40;
1200 45 ;
-
:
5-10
25-40%
10-20
60-75%
Below
500
Above
500
mobility, cm
bel
abo
ow
2-6
ve
2
6
10
75
60
0
15
12
90
0
0
60
60
26633-91 (.5).
5)
:
,
30
70 300.
6)
.
(,
, )
.
Classification of concrete mix according to
Type of
The standard of workability acc.to
workabilit
following indices:
,
Stiffness,
Mobility, cm
y
,
sec.
.
Cone
Cone flow
slump
.
( 747394)
,
, .
4
3
2
1
31-60
21-30
11-20
5-10
Harsh mix
H
H
H
H
4
3
2
1
31-60
21-30
11-20
5-10
Below 4
-
1-4
5-9
10-15
16-20
Above 21
26-30
Above 31
are following:
. ,
- .
9)
.
:
9.1)
,
..
9.2)
-
7473-94,
10181-2000:
-
10181.01- 10181.4;
- ;
- ;
-
.
9.3) :
9.3.1)
20 30 (
18-20)
2-1
1
2
3-5
, /
30
30
30
30
, .
210
210
150
90
Average speed of
transportation,
km/h
30
30
30
30
Duration of
transportatio
n, min.
210
210
150
90
9.3.2)
4-5.
.
.
10.
.
9.3.3)
9.3.3.1)
.
9.3.3.2)
( )
1, 2 3
.
:
1.
.
2.
()
,
10.
.
9.3.3.3)
16:
-25, -56
:
cm
1. 4 5
10 .
Note:
2.
1. If after the taking out the cone form,
0,5.
:
1.
,
In case there is big difference between
results, then evaluation is redone with new
sample once again.
.
2. ,
0,67
9.3.3.7)
0,5.
9.3.3.8) ( )
.
10
.
9.3.4)
9.3.4.1)
10,
,
:
1 9
2 =10-15
3 16
,
.
9.3.4.2)
1,0,
,
3.
.
9.3.5)
,
:
-
;
- (
7473-94);
-
;
- ;
- ;
- ;
-
.
9.3.6)
( 7473-94):
-
;
-, , ;
-
(.,
25,
2,
F200,
W4);
- ;
- ;
-
,
(/2);
- / ,
/;
- ,
, ,
.
.
10.
.
,
.
.
.
.
.
,
,
6%.
.
tests execution.
.
11.1.
.
.
(6 -)
50 3 .
11.2.
,
,
1-2 .
( 101802000).
:
- 101010 (
30 )
- 151515 (
40 )
- 303030 (
80 )
11.3.
30
.
2-
+15
90%.
, .
,
,
+15
20 90%.
3-
7
(~70% ,
),
28
.
.
11.4
:
-
;
-
, ;
-