DINMICA POBLACIONAL
a. Crecimiento poblacional centro poblado
ESTRUCTURA POBLACIONAL 2014
Grupo de edad
Menores de 1
De 1 a 4
De 5 a 14
De 15 a 64
De 65 y m s
Valor absoFrecuencia
8
2%
26
6%
85
20%
264
63%
35
8%
RESUMEN
Valor absoluto
a 2007
a 1993
8
6
14
26
43
63
85
121
153
264
284
262
35
36
19
418
490
511
Grupo de edad
Menores de 1
De 1 a 4
De 5 a 14
De 15 a 64
De 65 y m s
TOTAL
a 2014
Habitantes
300
200
100
0
a 1993
a 2007
a 2010
a2
29753
31506
0.41
630.87
61% Chacra
4
77% Solo vivienda
97% Propia
90% Adobe
100%
23%
53%
2018
423
22%
ESTRUCTURA POBLACIONA
Grupo de edad
Menores de 1
De 1 a 4
De 5 a 14
De 15 a 64
De 65 y m s
POR TOTALES
a 1993
Poblacin
a 2007
a 2010
a 2013
a 2014
511
490
417
451
Poblacin total
2010
a 2013
a 2014
418
2019
425
Pen
2020
427
2021
428
2022
430
2023
432
2024
434
2025
435
I. PARMETROS NORMATIVOS
VA
Ancho de va principal
Ancho de va secundaria
Pendiente mxima de vas secundarias
Ancho de veredas
Bombeo
SECCION
3.6
2.7
12%
1.2
1%
USUARIOS
0
1
2
3
4
5
6
7
8
9
10
IMD
418 NO APLICA
420
421
423
425
427
428
430
432
434
435
SITUACIN ACTUAL
Calle/pasaje
Francisco Luna
Progreso
Atahualpa
Amazonas
Tiwinza
Libertad
Bolvar
Calle del parque
Pasaje pacherres
Longitud (m)
Ancho (m)
450.43
14.51
140.47
11.32
393.95
12.04
172
12.07
82.34
12.48
265.16
11.82
154.11
13.34
49.05
5.5
32.17
5.32
Caractersticas
Carretera afirmada
Superficie muy irregular, sin drenaje
Superficie irregular, sin drenaje
Superficie muy irregular, sin drenaje, trazo indefinido
Superficie muy irregular, sin drenaje, trazo indefinido
Superficie irregular, sin drenaje
Superficie muy irregular, sin drenaje, trazo indefinido, presencia de agua en superficie
Superficie irregular, sin drenaje
Superficie irregular, sin drenaje
DE TRANSITABILIDAD
META
Pavimento rgido en calzada
Pavimento en veredas
Cuneta de concreto simple, protegida con rejilla
Cobertura arbrea de calles
UNID. MED
m2
m2
m
m
CANT.
13302.47
591
1458.41
1289
AO 0
4
5
6
7
8
FASE DE INVERSIN
10
11
12
AO 1
AO 2
AO 3
EXP. TEC.
CONV.
INST. PAVIMEN
ARBOR.
CAPACIT
FAS
Operacin y Mante
AO 4
AO 5
AO 6
AO 7
AO 8
AO 9
AO 10
Item
1
1.1
1.2
2
2.1
2.2
3
3.1
3.2
3.3
3.4
3.5
3.6
4
4.1
4.1.1
4.2
4.2.1
4.2.2
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.4
4.4.1
4.5
4.5.1
4.5.2
4.6
4.6.1
4.6.2
4.6.3
5
5.1
5.1.1
5.2
5.2.1
5.2.2
5.2.3
5.2.4
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.4
5.4.1
5.4.2
6
6.1
6.1.1
6.2
6.2.1
6.2.2
6.2.3
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.4
6.4.1
6.5
6.5.1
7
7.1
7.1.1
7.1.2
7.1.3
7.2
7.2.1
7.2.2
8
8.1
8.2
8.3
8.4
9
9.1
9.1.1
9.2
9.2.1
9.3
9.3.1
9.4
9.4.1
9.5
9.6
Descripcin
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40 x 3.60M
CASETA PROVISIONAL DE 80 M2 INC. ALMACEN Y OFICINA (K-LAMINON)
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
SEALlZACION y DESVIO DEL TRANSITO
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y SALUD EN EL
TRABAJO
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TERMPORAL DE SEGURIDAD
CAPACITACIN EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL
TRABAJOTRANSFORMADORES
DE CORRIENTE DE 2 NU
PAVIMENTOS
TRABAJOS
PRELIMINARES
TRAZO, NIVELACION
Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA CON MAQUINARIA
ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE
PAVIMENTO RIGIDO
PERFILADO Y COMPACTADO DE SUB-RASANTE
MEJORAMIENTO DE SUB-RASANTE (OVER) e=8"
BASE DE AFIRMADO e= 8"
LOSA DE CONCRET e = 8"; fc = 210 Kg/cm2
ENCOFRADO Y DESENCOFRADO
CURADO DE LOSA
DOWEL- ACERO LISO 1" (JUNTAS ASFALTICAS)
SEALIZACION
SEALIZACIN HORIZONTAL EN PAVIMENTO
JUNTAS
JUNTA DE CONTRACCION
JUNTA DE DILATACION e=1"
VARIOS
NIVELACION DE BUZONES
SUMINISTRO E INSTALACION DE MARCO Y TAPA DE REGISTRO ALCANTARILLADO PRE FABRICADA (*)
SUMINISTRO E INSTALACION CAJA PORTAMEDIDOR PRE FABRICADA (*)
VEREDAS
TRABAJOS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
DEMOLICION DE VEREDAS DE CONCRETO e=10cm C/E INC. SARDINELES
EXCAVACION MANUAL DE ZANJA P/SARDINEL (VEREDAS Y RAMPAS) h=0.45 m
EXCAVACION A NIVEL DE SUBRASANTE MANUAL (VEREDAS Y RAMPAS)
ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE
VEREDAS DE CONCRETO
NIVELACION Y COMPACTACION PARA VEREDAS CON EQUIPO
DISEO DE MEZCLA
DISEO DE MEZCLA
LIMPIEZA FINAL DE OBRA
PLACA RECORDATORIA DE BRONCE
COSTO DIRECTO
Und.
Metrado
Precio S/.
Parcial S/.
2,023.97
1,300.00
1,300.00
723.97
723.97
63,487.40
43,487.40
43,487.40
20,000.00
20,000.00
12,997.00
3,547.00
3,547.00
4,200.00
4,200.00
750.00
750.00
1,900.00
1,900.00
300.00
300.00
2,300.00
2,300.00
3,267,843.15
glb
glb
1.00
1.00
glb
glb
1.00
1.00
glb
glb
glb
glb
glb
glb
1.00
1.00
1.00
1.00
1.00
1.00
m2
13,302.47
0.96
m3
m3
5,986.11
7,482.64
8.16
23.84
m2
m2
m2
m2
m2
m2
kg
13,302.47
13,302.47
13,302.47
13,302.47
18,570.00
1,448.77
32,586.40
3.35
72.86
26.74
71.94
25.30
1.98
4.71
m2
905.10
15.70
7,243.85
482.32
6.06
7.45
und
und
und
14.00
115.00
115.00
201.64
57.06
35.77
m2
2,956.94
0.96
m2
m
m3
m3
105.84
214.03
1,330.62
2,063.12
20.44
37.27
2.77
23.84
m2
2,956.94
3.48
m
m
12,770.37
12,770.37
227,232.80
48,846.66
178,386.14
2,952,640.49
44,563.27
969,217.96
355,708.05
956,979.69
469,821.00
2,868.56
153,481.94
14,210.07
14,210.07
47,491.02
43,897.73
3,593.28
13,498.41
2,822.96
6,561.90
4,113.55
285,000.13
2,838.66
2,838.66
63,010.87
2,163.37
7,976.90
3,685.82
49,184.78
217,409.73
10,290.15
m2
m2
m2
m
m2
m2
2,956.94
2,956.94
591.00
214.03
28.00
356.72
9.89
20.88
30.44
424.34
20.75
18.90
m2
m
591.00
83.11
1.86
7.72
m2
1,232.06
0.96
m3
m2
m3
259.56
492.82
128.17
11.42
7.64
23.84
m3
m2
kg
m2
141.69
1,971.30
4,412.33
2,340.31
99.32
17.95
5.27
14.33
1,232.06
24.33
523.36
3.04
und
und
und
322.25
322.25
322.25
6.60
4.00
3.30
evento
kit
2.00
1.00
500.00
1,200.00
mes
3.00
500.00
glb
glb
und
1.00
1.00
2.00
500.00
1,500.00
500.00
und
3.00
127.12
und
100.00
30.00
und
40.00
50.85
29,244.14
61,740.91
17,990.04
90,821.49
581.00
6,742.01
1,740.87
1,099.26
641.61
148,781.81
1,182.78
1,182.78
9,784.89
2,964.18
3,765.14
3,055.57
106,247.11
14,072.65
35,384.84
23,252.98
33,536.64
29,976.02
29,976.02
1,591.01
1,591.01
6,676.86
4,476.86
2,125.24
1,289.00
1,062.62
2,200.00
1,000.00
1,200.00
4,500.00
1,500.00
500.00
1,500.00
1,000.00
8,304.99
381.36
381.36
3,000.00
3,000.00
2,034.00
2,034.00
und
m2
und
3.00
4,065.00
1.00
211.86
0.37
750.00
635.58
635.58
1,504.05
750.00
3,799,615.31
COD.
I.
1.1.
1.1.1.
1.1.2.
1.1.3.
1.2.
1.2.1.
1.2.2.
1.3.
1.3.1.
1.4.
1.4.1.
1.4.2.
1.5.
1.6.
II.
VII.
VIII.
IX.
COMPONENTE/ACCIN/ACTIVIDAD
COSTO DIRECTO
Obras generales
Obras provisionales
Trabajos preliminares
Seguridad y salud
Adecuada calzada para trnsito vehcular y peatonal
Pavimentos
Drenaje pluvial
Facilidades peatonales
Veredas
Adecuadas condiciones de urbanismo
Instalacin de cobertura en las calles
Fortalecimiento de capacidades para el mantenimiento de vas urbanas
Medidas de mitigacin de impacto ambiental
Otras actividades
GASTOS GENERALES (7% CD)
UTILIDAD (8% CD)
SUBTOTAL
IGV (18% SUB TOTAL)
VALOR REFERENCIAL (ST+IGV)
INTANGIBLES
Estudios definitivos (3% CD)
Supervisin (2% VR)
SUB TOTAL
Administracin del proyecto (1% VR)
MONTO DE LA INVERSIN
COSTO
TOTAL
###
78,508.37
2,023.97
63,487.40
12,997.00
###
3,267,843.15
148,781.81
285,000.13
285,000.13
6,676.86
4,476.86
2,200.00
4,500.00
8,304.99
FC
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
COSTO
SOCIAL
###
62,021.61
1598.94
50155.05
10267.63
###
2581596.09
117537.63
225,150.10
225150.10
5,274.72
3536.72
1738.00
3555.00
6560.94
265,973.07
303,969.22
###
786,520.37
###
210,118.73
240,135.69
###
621,351.09
###
217,110.02
113,988.46
103,121.56
###
51,560.78
###
171,516.91
0.79
90050.88
0.79
81466.03
###
0.79
40733.02
###
COD.
I.
II.
0.409
MANTENIMIENTO
Descolmata
do de
cunetas y
retiro de
escombros
en vas
Jornal
40
320
0.901
Repintado
de
sealizacin
de trfico
Jornal
40
120
0.901
Podas de
rboles en
calles
Jornal
40
320
0.901
Pintura de
trfico
amarilla y
blanca
Gln
45
90
0.842
Reparacin
de fisuras y
grietas en
veredas y
pavimentos Glb
500
500
3270
0.842
TOTAL
3270.0
3270.0
3270.0
3270.0
3270.0
TOTAL AO
1966.8
1966.8
1966.8
1966.8
1966.8
PRECIO SOCIAL
785.28
288.32
108.12
288.32
75.78
421
1966.82
AOS
5
1920
1350
6
1920
1350
7
1920
1350
8
1920
1350
9
1920
1350
10
1920
1350
AOS
5
6
7
8
9
10
785.28 785.28 785.28 785.28 785.28 785.28
1181.5 1181.5 1181.5 1181.5 1181.5 1181.5
COD.
I.
DESCRIPCION
UND. MED CANTIDAD P. UNITARIOPARCIAL
OPERACIN
Limpieza rutinaria de calles Jornal
48
40
1920
II.
MANTENIMIENTO
Limpieza de acequias
Jornal
20
40
800
2720
TOTAL
1920
800.0
1
1920.0
800.0
TOTAL AO
3
1920
800
1920
800
2720.0
2720.0
2720.0
2720.0
0
785.28
327.2
1
785.3
327.2
2
785.28
327.2
3
785.28
327.2
TOTAL AO
1112.5
1112.5
1112.5
1112.5
FC
PRECIO SOCIAL
0.409
785.28
0.409
327.2
1112.48
AOS
5
1920
800
1920
800
1920
800
1920
800
1920
800
1920
800
2720.0
2720.0
2720.0
2720.0
2720.0
2720.0
785.28
327.2
6
785.28
327.2
7
785.28
327.2
8
785.28
327.2
9
785.28
327.2
1112.5
1112.5
1112.5
1112.5
1112.5
CIOS SOCIALES
4
785.28
327.2
1112.5
AOS
5
10
1920
800
2720.0
10
785.28
327.2
1112.5
COSTOS INCREMENTALES
A PRECIOS DE MERCADO
FASE DE
FASE DE POST INVERSION (B)
INVERSION
AO
(A)
CR
CO
CM
TOTAL
0
5,424,748.8
5,424,748.8
1
1,920.0
1,350.0
3,270.0
2
1,920.0
1,350.0
3,270.0
3
1,920.0
1,350.0
3,270.0
4
1,920.0
1,350.0
3,270.0
5
1,920.0
1,350.0
3,270.0
6
1,920.0
1,350.0
3,270.0
7
1,920.0
1,350.0
3,270.0
8
1,920.0
1,350.0
3,270.0
9
1,920.0
1,350.0
3,270.0
10
1,920.0
1,350.0
3,270.0
COSTOS SOCIALES
FASE INCREMENTALES
DE
FASE DE POST INVERSION (B)
INVERSION
AO
(A)
CR
CO
CM
TOTAL
0
4,285,551.5
1
785.3
1,181.5
1,966.8
2
785.3
1,181.5
1,966.8
3
785.3
1,181.5
1,966.8
4
785.3
1,181.5
1,966.8
5
785.3
1,181.5
1,966.8
6
785.3
1,181.5
1,966.8
7
785.3
1,181.5
1,966.8
8
785.3
1,181.5
1,966.8
9
785.3
1,181.5
1,966.8
10
785.3
1,181.5
1,966.8
VP
###
###
SITUACION SIN PY
CTI
CO (C)
CM (D)
(A+B-C-D)
1,920.0
800.0 5,422,028.8
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
1,920.0
800.0
550.0
SITUACION SIN PY
CTI
CO (C)
CM (D)
TOTAL
(A+B-C-D)
785.3
327.2
1,112.5 4,284,439.1
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
785.3
327.2
1,112.5
854.3
S/. 7,139.5
S/. 5,483
TOTAL
EVALUACIN SOCIAL
METODOLOGA COSTO EFECTIVIDAD
DESCRIPCIN
Situacin Sin Proyecto
Alternativa nica
COSTO DE INVERSION
0.0
4285551.5
Costos Incrementales
Alternativa nica
TOTAL BENEFICIARIOS
INDICADOR C/E (S/ X beneficiario)
S/. 4,285,552
4275.4
S/. 1,003.66
PAVIMENTO
EVALUACIN SOCIAL
METODOLOGA COSTO EFECTIVIDAD
DESCRIPCIN
Situacin Sin Proyecto
Alternativa nica
COSTO DE INVERSION
0.0
3267843.1
Costos Incrementales
Alternativa nica
M2 PAVIMENTO
INDICADOR C/E (S/ X beneficiario)
S/. 3,267,843
13302.5
S/. 246.07
VEREDA
EVALUACIN SOCIAL
METODOLOGA COSTO EFECTIVIDAD
DESCRIPCIN
Situacin Sin Proyecto
Alternativa nica
Costos Incrementales
Alternativa nica
M2 VEREDA
INDICADOR C/E (S/ X beneficiario)
COSTO DE INVERSION
0.0
285000.1
S/. 285,000
2956.9
S/. 98.24
OCIAL
EFECTIVIDAD
VP.CO&M
VP.Costo Total
7139.5
7139.5
12622.4
4298173.9
S/. 5,482.9
S/. 4,291,034
OCIAL
EFECTIVIDAD
VP.CO&M
VP.Costo Total
7139.5
7139.5
12622.4
3280465.5
S/. 5,482.9
S/. 3,273,326
OCIAL
EFECTIVIDAD
VP.CO&M
VP.Costo Total
7139.5
7139.5
12622.4
297622.5
S/. 5,482.9
S/. 290,483
ESCENARIO I
EVALUACIN SOCIAL
METODOLOGA COSTO EFECTIVIDAD
DESCRIPCIN
Situacin Sin Proyecto
Alternativa nica
Costos Incrementales
Alternativa nica
TOTAL BENEFICIARIOS
INDICADOR C/E (S/ X beneficiario)
VAR
Factor variacin
S/. 4,499,829
4275.4
S/. 1,053.78
S/. 0.05
VAC
S/. 5,482.9
S/M2
ESCENARIO II
EVALUA
METODOLOGA
VP.Costo Total
7139.5
4512451.5
S/. 4,505,312
Lnea corte
DESCRIPCIN
Situacin Sin Proyecto
Alternativa nica
Costos Incrementales
Alternativa nica
TOTAL BENEFICIARIOS
INDICADOR C/E (S/ X beneficiario)
EVALUACIN SOCIAL
METODOLOGA COSTO EFECTIVIDAD
COSTO DE INVERSION
0.0
4714106.7
S/. 4,714,107
4275.4
S/. 1,103.90
VP.CO&M
VP.Costo Total
7139.5
7139.5
12622.4
4726729.1
S/. 5,482.9
S/. 4,719,590
0(2015)
1
2
3
4
5
6
7
8
9
10
COSTO MANTENIMIENTO
COSTO
INCREMENTAL
SIN PROYECTOCON PROYECT
INVERSION
FA
5,424,748.77
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
2,720.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
3,270.00
1.0000
0.9174
0.8417
0.7722
0.7084
0.6499
0.5963
0.5470
0.5019
0.4604
0.4224
550.00
550.00
550.00
550.00
550.00
550.00
550.00
550.00
550.00
550.00
SUMATORIA
VALOR RESIDUAL
VALOR ACTUAL DE COSTOS TOTALES (VACT)
PROMEDIO DE POBLACION BENEFICIADA
ICE (S/ x POBLACION BENEFICIADA)
0(2013)
1
2
3
4
5
6
7
8
9
10
INVERSION
COSTO MANTENIMIENTO
COSTO
SIN PROYECTOCON PROYECT INCREMENTAL
4,285,551.53
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,112.48
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
1,966.82
SUMATORIA
VALOR RESIDUAL
VALOR ACTUAL DE COSTOS TOTALES (VACT)
PROMEDIO DE POBLACION BENEFICIADA
ICE (S/ x POBLACION BENEFICIADA)
854.34
854.34
854.34
854.34
854.34
854.34
854.34
854.34
854.34
854.34
FA
1.0000
0.9174
0.8417
0.7722
0.7084
0.6499
0.5963
0.5470
0.5019
0.4604
0.4224
0(2013)
1
2
3
4
5
6
7
8
9
10
COSTO MANTENIMIENTO
COSTO
SIN PROYECTOCON PROYECT INCREMENTAL
INVERSION
2,699,133.72
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,584.33
1,584.33
1,584.33
1,584.33
3,757.53
1,584.33
1,584.33
1,584.33
1,584.33
3,757.53
257.56
257.56
257.56
257.56
2,430.76
257.56
257.56
257.56
257.56
2,430.76
FA
1.0000
0.9174
0.8417
0.7722
0.7084
0.6499
0.5963
0.5470
0.5019
0.4604
0.4224
SUMATORIA
VALOR RESIDUAL
VALOR ACTUAL DE COSTOS TOTALES (VACT)
PROMEDIO DE POBLACION BENEFICIADA
ICE (S/ x POBLACION BENEFICIADA)
M2 DE PAVIMENTO
ICE (S/ x M2)
0(2013)
1
2
3
4
5
6
7
8
9
10
INVERSION
COSTO MANTENIMIENTO
COSTO
INCREMENTAL
SIN PROYECTOCON PROYECT
0.00
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
1,326.77
7,573.60
7,573.60
7,573.60
7,573.60
27,958.61
7,573.60
7,573.60
7,573.60
7,573.60
27,958.61
6,246.84
6,246.84
6,246.84
6,246.84
26,631.84
6,246.84
6,246.84
6,246.84
6,246.84
26,631.84
FA
1.0000
0.9174
0.8417
0.7722
0.7084
0.6499
0.5963
0.5470
0.5019
0.4604
0.4224
SUMATORIA
VALOR RESIDUAL
VALOR ACTUAL DE COSTOS TOTALES (VACT)
PROMEDIO DE POBLACION BENEFICIADA
ICE (S/ x POBLACION BENEFICIADA)
M2 DE PAVIMENTO
ICE (S/ x M2)
0(2013)
1
2
3
4
5
6
7
8
9
10
INVERSION
COSTO MANTENIMIENTO
COSTO
INCREMENTAL
SIN PROYECTOCON PROYECT
225,150.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
926.05
926.05
926.05
926.05
2,315.13
926.05
926.05
926.05
926.05
2,315.13
SUMATORIA
VALOR RESIDUAL
VALOR ACTUAL DE COSTOS TOTALES (VACT)
PROMEDIO DE POBLACION BENEFICIADA
ICE (S/ x POBLACION BENEFICIADA)
M2 DE PAVIMENTO
ICE (S/ x M2)
926.05
926.05
926.05
926.05
2,315.13
926.05
926.05
926.05
926.05
2,315.13
FA
1.0000
0.9174
0.8417
0.7722
0.7084
0.6499
0.5963
0.5470
0.5019
0.4604
0.4224
COSTOS
ACTUALIZADO
S
###
504.59
462.92
424.70
389.63
357.46
327.95
300.87
276.03
253.24
232.33
###
0.00
###
4,275
1,269.66
COSTOS
ACTUALIZADO
S
###
783.77
719.10
659.72
605.21
555.24
509.44
467.32
428.79
393.34
360.87
###
0.00
###
4,275
1,003.66
5428278.48
COSTOS
ACTUALIZADO
S
###
236.29
216.79
198.89
182.46
1,579.75
153.58
140.89
129.27
118.58
1,026.75
###
0.00
###
4,275
632.25
14,534.53
185.98
COSTOS
ACTUALIZADO
S
0.00
5,730.85
5,257.96
4,823.81
4,425.26
17,308.03
3,724.99
3,417.02
3,135.29
2,876.04
11,249.29
61,948.53
0.00
61,948.53
4,275
14.49
1.00
61948.53
COSTOS
ACTUALIZADO
S
225,150.10
849.56
779.46
715.10
656.01
1,504.60
552.20
506.55
464.78
426.35
977.91
232,582.63
0.00
232,582.63
4,275
54.40
2,956.94
78.66
54.4
2935428.75
A PRECIOS SOCIALES
TOTAL
RATIO C/E
20.00
1,204.40
15.00
1,154.21
10.00
1,104.03
5.00
1,053.85
0.00
1,003.66
-5.00
953.48
-10.00
903.30
-15.00
853.11
-20.00
802.93
Variacin
1400.00
1200.00
1000.00
800.00
Valor Relativo
600.00
400.00
200.00
0.00
1
-200.00
802.93
800.00
Valor Relativo
600.00
400.00
200.00
0.00
1
-200.00
-20.00
2
AO 0
ETAPA
ITEMS
COMPONENTES
MES 1
MES 2
MES 3
SEMANAS
SEMANAS
SEMANAS
TANGIBLES
3,799,615.31
1.00
COSTO DIRECTO
2.00
265,973.07
3.00
UTILIDAD (8%)
303,969.22
4.00
I. G. V. (18%)
786,520.37
759,923.06
759,923.06
53,194.61
53,194.61
60,793.84
60,793.84
157,304.07
157,304.07
20,624.31
20,624.31
10,312.16
10,312.16
1,084,949.75
1,084,949.75
20.00%
20.00%
INTANGIBLES
1.00
113,988.46
2.00
103,121.56
3.00
4.00
113,988.46
51,560.78
5,424,748.77
COSTO TOTAL
INCIDENCIA
TOTAL PRESUPUESTO DEL PROYECTO
100.00%
5,424,748
150 DI
COMPONENTES
MES 1
MES 2
MES 3
SEMANAS
SEMANAS
SEMANAS
TANGIBLES
1.00
COSTO DIRECTO
GLB
20.00%
20.00%
2.00
GLB
20.00%
20.00%
3.00
UTILIDAD (5%)
GLB
20.00%
20.00%
4.00
I. G. V. (18%)
GLB
20.00%
20.00%
0.00%
0.00
INTANGIBLES
1.00
ESTUDIO
100.00%
2.00
GLB
20.00%
20.00%
3.00
COSTO TOTAL
GLB
20.00%
20.00%
ERNATIVA SELECCIONADA
AO 0
MES 3
MES 4
MES 5
MES 6
SEMANAS
SEMANAS
SEMANAS
SEMANAS
759,923.06
759,923.06
759,923.06
759,923.06
53,194.61
53,194.61
53,194.61
53,194.61
60,793.84
60,793.84
60,793.84
60,793.84
157,304.07
157,304.07
157,304.07
157,304.07
20,624.31
20,624.31
20,624.31
20,624.31
10,312.16
10,312.16
10,312.16
10,312.16
1,084,949.75
1,084,949.75
1,084,949.75
1,084,949.75
20.00%
20.00%
20.00%
20.00%
5,424,748.77
LA ALTERNATIVA SELECCIONADA
AO 0
MES 3
MES 4
MES 5
MES 6
SEMANAS
SEMANAS
SEMANAS
SEMANAS
TOTAL
COMPONENTE
S
20.00%
20.00%
20.00%
20.00%
100.00%
20.00%
20.00%
20.00%
20.00%
100.00%
20.00%
20.00%
20.00%
20.00%
100.00%
20.00%
20.00%
20.00%
20.00%
100.00%
0.00
0.00
0.00
0.00
100.00%
20.00%
20.00%
20.00%
20.00%
100.00%
20.00%
20.00%
20.00%
20.00%
100.00%
OK
OK
OK
OK
OK
OK
OK