OBRAS PROVISIONALES
PARTIDA N
01
01.01
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02
01.02.01
01.02.02
01.03
01.03.01
01.04
01.04.01
01.05
01.05.01
01.05.02
01.07
01.07.01

ESPECIFICACIONES
OBRAS PROVISIONALES
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES
CONSTRUCCIN PROVISIONAL DE OFICINAS Y ALMACENES
CASETA DE GUARDIANIA
SERVICIOS HIGIENICOS
CERCO PROVISIONAL DE OBRA
CARTEL DE OBRA 3.60x7.20
INSTALACIONES PROVISIONALES
ELECTRICIDAD PARA LA OBRA
AGUA PARA LA CONSTRUCCION
TRABAJOS PRELIMINARES
TRANSPORTE VERTICAL DE MATERIALES
DEMOLICIONES
DEMOLICIN DE BUNGAL EXISTENTE
REMOCIONES
REMOCION DE RBOLES
REMOCION DE CAJAS DE REGISTRO
TRAZO, NIVELES Y REPLANTEO
LIMPIEZA DE TERRENO NATURAL

UND

CANT.

m2
m2
m2
m2
und

1
1
1
1
1

mes
mes

6
6

glb

m2

und
und

23
1

m2
Area 1
Area 2
Area 3

01.07.02

TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO

m2
Area 1
Area 2
Area 3

01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.08.07

SEGURIDAD Y SALUD
ELABORACIN DE DEL PLAN DE SEGURIDAD Y SALUD
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TEMPORAL
CAPACITACIN EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS
MITIGACIN AMBIENTAL

glb
glb
glb
glb
glb
glb
glb

1
1
1
1
1
1
1

1 de 373

DE METRADOS
ADMINISTRATIVOS)

S PARA EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

VISIONALES
N DE
VECES

MEDIDAS
ANCHO
ALTURA

PARCIAL

TOTAL

65.25
3.75
7.56
625
1

65.25
3.75
7.56
625
1

1
1

6
6

6
6

20

20

23
1

23
1

1
1
1
1
1

LARGO

14.50
2.5
2.7
250

1
1

4.50
1.5
2.8
2.5

1410
Area=
Area=
Area=

405
175
830

405
175
830

Area=
Area=
Area=

405
175
830

405
175
830

1410

1
1
1
1
1
1
1

1
1
1
1
1
1
1

1
1
1
1
1
1
1

2 de 373

PLANILL

PRI
PROYECTO:
UBICACION:
FECHA:

PARTIDA N

01
01.01
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02
01.02.01
01.02.02
01.03
01.03.01
01.04
01.04.01
01.05
01.05.01
01.05.02
01.07
01.07.01
01.07.02
01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.08.07

PLANILLA DE METRADOS
PRIMER PISO

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU
SETIEMBRE DEL 2015

RESUMEN
ESPECIFICACIONES

UND

OBRAS PROVISIONALES
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES
CONSTRUCCIN PROVISIONAL DE OFICINAS Y ALMACENES
CASETA DE GUARDIANIA
SERVICIOS HIGIENICOS
CERCO PROVISIONAL DE OBRA
CARTEL DE OBRA 3.60x7.20
INSTALACIONES PROVISIONALES
ELECTRICIDAD PARA LA OBRA
AGUA PARA LA CONSTRUCCION
TRABAJOS PRELIMINARES
TRANSPORTE VERTICAL DE MATERIALES
DEMOLICIONES
DEMOLICIN DE BUNGAL EXISTENTE
REMOCIONES
REMOCION DE RBOLES
REMOCION DE CAJAS DE REGISTRO
TRAZO, NIVELES Y REPLANTEO
LIMPIEZA DE TERRENO NATURAL
TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO
SEGURIDAD Y SALUD
ELABORACIN DE DEL PLAN DE SEGURIDAD Y SALUD
EQUIPOS DE PROTECCIN INDIVIDUAL
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TEMPORAL
CAPACITACIN EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS
MITIGACIN AMBIENTAL

m2
m2
m2
m2
und
mes
mes
glb
m2
und
und
m2
m2
glb
glb
glb
glb
glb
glb
glb

TRADOS

SO
MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

METRADO

65.25
3.75
7.56
625.00
1.00
6
6
1
20
23
1
1410
1410
1
1
1
1
1
1
1

PROYECTO:

UBICACION:
FECHA:

PARTIDA N
02
02.01.02
02.01.02.01

02.01.02.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.01.02.03

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.01.02.04

02.01.04
02.01.04.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.01.04.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N
02.01.05
02.01.05.01

02.01.06
02.01.06.01

02.02
02.02.01
02.02.01.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.01.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.02
02.02.02.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.02
02.02.02.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.02.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.03
02.02.03.01

02.02.03.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.09
02.02.09.01

02.02.10
02.02.03.01

02.02.03.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03
02.03.06
02.02.06.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.02.06.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.03.03
02.03.02
02.03.02.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.02.03
02.03.03
02.03.03.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.03.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.03.03
02.03.03.04

02.03.06.02
02.03.06.01.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.06.01.02

02.03.06.01.03
02.03.07
02.03.07.01
02.03.07.01.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.07.01.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.07.01.03
02.03.07.02
02.03.07.01.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.07.01.02

02.03.07.01.03

PROYECTO:

UBICACION:
FECHA:

PARTIDA N
02.03.08
02.03.08.01

02.03.08.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.08.03
02.03.09
02.03.09.01
02.03.08.01.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.08.01.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.08.01.03

02.03.09.02
02.03.08.01.01

02.03.08.01.02

02.03.08.01.03
02.03.10.02
02.03.10.02.01

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.10.02.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.10.02.03
02.03.10.02.04

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.10.02.05

02.03.11
02.03.11.01.01

02.03.11.01.02

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

02.03.12
02.03.12.01

02.03.12.02

02.03.12.03

02.03.12.04

PROYECTO:

UBICACION:
FECHA:

PARTIDA N

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

ESTRUCTURAS
EXCAVACIONES
EXCAVACIONES MASIVAS

m3

EXCAVACION PARA VIGA DE CIMENTACIN

m3
CIMENTACION AULAS 01, 02, 03
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A - C
CIMENTACION AULAS + SS.HH.
Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11
Eje D entre 11 - 12
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D
CIMENTACION AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje F entre 1-3
Eje E entre 1-3

HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Ejes C-C y Eje D-D
Ejes 13-13 y 14-14
Placa
EXCAVACION DE CIMIENTOS Y ZAPATAS

m3
AULAS 01, 02, 03
Z-1
Z-2
Z-3
Z-4
AULAS 04, 05 + SS.HH.
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
AUDITORIO Y OFICINAS
Z-1
Z-2
Z-3
HALL PRINCIPAL
Z-1
Z-2
HALL ESCALERA
Z-1
CIMIENTOS DE PORTICOS

PLACA DE ESCALERA
Placa en escalera
Placa en hall de escalera
PLACA DE AUDITORIO MAS OFICINAS

ESCALERAS
Escaleras Tipo I y II
RAMPA

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

EXCAVACION PARA CISTERNAS

m3
Cisterna de 5000 lts

Cisterna de 10000 lts

RELLENOS
RELLENO MANUAL CON MATERIAL DE PPRESTAMO, C/COMPACT. 4HP
AULAS 01, 02, 03

m3
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 4 entre C-D
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A-C
Eje 7 entre C-D

CIMENTACION AULAS + SS.HH.


Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 8 entre C-D
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 11 entre A - C
Eje 12 entre A - C
Eje 12 entre C - D
Eje horizontal entre 10-11
Eje vertical entre 10-11
Eje horizontal entre 11-12
Eje vertical entre 11-12
AUDITORIO MAS OFICINAS
Eje 3-3 entre G-F
Eje 3-3 entre E-F

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3

ESCALERA TIPO I
Cimiento corrido
ESCALERA TIPO II
Cimiento corrido
RAMPA
CISTERNAS
Cisterna de 5000 lts

Cisterna de 10000 lts

ESCALERA

Varios

RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO

m3

EN VIGAS DE CIMENTACION
AULAS 01, 02, 03
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A - C
AULAS 04, 05 + SS.HH.
Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje D entre 11 - 12
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D

AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Ejes C-C y Eje D-D
Ejes 13-13 y 14-14
Placa
EN CIMENTACION
AULAS 01, 02, 03
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 4 entre C-D
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A-C
Eje 7 entre C-D
CIMENTACION AULAS + SS.HH.

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 8 entre C-D
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 11 entre A - C
Eje 12 entre A - C
Eje 12 entre C - D
Eje horizontal entre 10-11
Eje vertical entre 10-11
Eje horizontal entre 11-12
Eje vertical entre 11-12

AUDITORIO MAS OFICINAS


Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
EN SOBRECIMIENTO
AULAS 01, 02, 03
Ejes A-A
Entre 4-5
Entre 5-6
Entre 6-7
Ejec C-C
Entre 4-5
Entre 5-6
Entre 6-7
Ejes 4-4 y 7-7
Entres A-C
Ejes 5-5 y 6-6
Entres A-C

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

AULAS 04, 05 Y SS.HH.


Ejes A-A
Entre 8-9
Entre 9-10
Entre 10-11
Entre 11-12
Entre 12-13
Ejec C-C
Entre 8-9
Entre 9-10
Entre 10-11
Entre 11-12

Ejes 8-8 y 9-9


Entre A-C
Ejes 10-10 y 11-11
Entre A-C
Entre ejes 10-12 y A-C

AUDITORIO MAS OFICINAS


Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
CIMIENTOS DE PORTICOS
Cimientos para porticos de acero
columnas
EN PLACAS
Placa de e=20 cm
Placa de e=30 cm
Placa de e=15cm

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

NIVELACIN INTERIOR Y APISONADO


NIVELACION INTERIOR APISONADO

m2
AULAS 01, 02, 03

AULAS 04, 05 Y SS.HH.

AUDITORIO Y OFICINAS

ver planos de Arquitectura


Circulacin
Aula 01
Aula 02
Aula 03
En exterior de Aulas
ver planos de Arquitectura
Circulacin
Aula 04
Aula 05
SS.HH. Mujeres
SS.HH. Varones
En exterior de Aulas
ver planos de Arquitectura
Sala de profesores
SS.HH. Damas
SS.HH. Varones

HALL PRINCIPAL

CL
Director de Area 1
Director de Area 2
Director de Area 3
Capellania
Psicologia
Coordinador general
Secretaria
ver planos de Arquitectura

HALL ESCALERA

ver planos de Arquitectura

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCEDENTE

m3
Excavacion para vigas de cimentacion
Excavacion para cimientos y zapatas
Excavacion en cisternas
Relleno con material propio

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS
CONCRETO F'C=100 KG/CM2 EN CIMIENTO

m3
AULAS 01, 02, 03
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 4 entre C-D
Eje 5 entre A - C

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A-C
Eje 7 entre C-D

CIMENTACION AULAS + SS.HH.


Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 8 entre C-D
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 11 entre A - C
Eje 12 entre A - C
Eje 12 entre C - D
Eje horizontal entre 10-11
Eje vertical entre 10-11
Eje horizontal entre 11-12
Eje vertical entre 11-12
AUDITORIO MAS OFICINAS
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
ESCALERA TIPO I
Cimiento corrido
ESCALERA TIPO II
Cimiento corrido
RAMPA

Varios
ENCOFRADO Y DESENCOFRADO DE CIMIENTOS

m2
AULAS 01, 02, 03

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 4 entre C-D
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A-C
Eje 7 entre C-D

AULAS 04, 05 + SS.HH.


Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 8 entre C-D
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 11 entre A - C
Eje 12 entre A - C
Eje 12 entre C - D
Eje horizontal entre 10-11
Eje vertical entre 10-11
Eje horizontal entre 11-12
Eje vertical entre 11-12
AUDITORIO MAS OFICINAS
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
SUB ZAPATA
SUB ZAPATA CONCRETO 1:12+30% PG

m3
AULAS 01, 02, 03
Z-1
Z-2

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Z-3
Z-4

AULAS 04, 05 + SS.HH.


Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
AUDITORIO Y OFICINAS
Z-1
Z-2
Z-3
HALL PRINCIPAL
Z-1
Z-2
HALL ESCALERA
Z-1
CIMIENTO PARA PORTICOS
CIMIENTO PARA PORTICOS
Desperdicios

SUB CIMIENTO
SUB CIMIENTO CONCRETO 1:12+30% PG

m3
AULAS 01, 02, 03
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A - C
AULAS 04, 05 + SS.HH.
Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11
Eje D entre 11 - 12
Eje C entre 8 - 9

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D

AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Ejes C-C y Eje D-D
Ejes 13-13 y 14-14
Placa
Desperdicios
ENCOFRADO Y DESENCOFRADO DE SUB CIMIENTO

m2
AULAS 01, 02, 03
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A - C
AULAS 04, 05 + SS.HH.

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11
Eje D entre 11 - 12
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D

AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Ejes C-C y Eje D-D
Ejes 13-13 y 14-14
Placa

Varios

SOLADOS DE CONCRETO
CONCRETO CICLOPEO C:H 1:12 DE E=4"

m3
ESCALERA TIPO II Y II
RAMPA

ENCOFRADO Y DESENCOFRADO DE SOLADOS

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

FALSOPISOS
FALSO PISO CONCRETO 1:12 + 30% PG

m2
AULAS 01, 02, 03

AULAS 04, 05 Y SS.HH.

AUDITORIO Y OFICINAS

ver planos de Arquitectura


Circulacin
Aula 01
Aula 02
Aula 03
En exterior de Aulas
ver planos de Arquitectura
Circulacin
Aula 04
Aula 05
SS.HH. Mujeres
SS.HH. Varones
En exterior de Aulas
ver planos de Arquitectura
Sala de profesores
SS.HH. Damas
SS.HH. Varones

HALL PRINCIPAL

CL
Director de Area 1
Director de Area 2
Director de Area 3
Capellania
Psicologia
Coordinador general
Secretaria
ver planos de Arquitectura

HALL ESCALERA

ver planos de Arquitectura


Desperdicios

CUNETAS
CONCRETO F'C=140KG/CM2 PARA CUNETAS

m3
Al costado del pasadizo

Al costado del pabellon de aulas

Al costado del oficinas


Desperdicios
ENCOFRADO Y DESENCOFRADO DE CUNETAS

m2

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Al costado del pasadizo

Al costado del pabellon de aulas

Al costado del oficinas


Varios
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTOS
CONCRETO F'C=140KG/CM2 PARA SOBRECIMIENTOS

m3
AULAS 01, 02, 03
Ejes A-A
Entre 4-5
Entre 5-6
Entre 6-7
Ejec C-C
Entre 4-5
Entre 5-6
Entre 6-7
Ejes 4-4 y 7-7
Entres A-C
Ejes 5-5 y 6-6
Entres A-C

AULAS 04, 05 Y SS.HH.


Ejes A-A
Entre 8-9
Entre 9-10
Entre 10-11
Entre 11-12
Entre 12-13
Ejec C-C
Entre 8-9
Entre 9-10
Entre 10-11
Entre 11-12

Ejes 8-8 y 9-9


Entre A-C
Ejes 10-10 y 11-11

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Entre A-C
Entre ejes 10-12 y A-C

AUDITORIO MAS OFICINAS


Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
ESCALERA TIPOI II y I

RAMPA

Desperdicios
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS
AULAS 01, 02, 03

m2
Ejes A-A
Entre 4-5
Entre 5-6
Entre 6-7
Ejec C-C
Entre 4-5
Entre 5-6
Entre 6-7
Ejes 4-4 y 7-7
Entres A-C
Ejes 5-5 y 6-6
Entres A-C

AULAS 04, 05 Y SS.HH.


Ejes A-A
Entre 8-9

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Entre 9-10
Entre 10-11
Entre 11-12
Entre 12-13
Ejec C-C
Entre 8-9
Entre 9-10
Entre 10-11
Entre 11-12

Ejes 8-8 y 9-9


Entre A-C
Ejes 10-10 y 11-11
Entre A-C
Entre ejes 10-12 y A-C

AUDITORIO MAS OFICINAS


Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje 3-3 entre G-F
Eje 3-3 entre E-F
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
ESCALERA TIPOI II

RAMPA

ACERO DE REFUERZO EN SOBRECIMIENTOS REFORZADOS

kg

ZAPATAS
CONCRETO F'C=210 KG/CM2 EN ZAPATAS

m3
AULAS 01, 02, 03
Z-1

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Z-2
Z-3
Z-4

AULAS 04, 05 + SS.HH.


Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
AUDITORIO Y OFICINAS
Z-1
Z-2
Z-3
HALL PRINCIPAL
Z-1
Z-2
HALL ESCALERA
Z-1
CIMIENTOS DE PORTICOS

Desperdidios

ACERO DE REFUERZO EN ZAPATAS

kg

VIGAS DE CIMENTACION
CONCRETO F'C=210 KG/CM2 EN VIGAS DE CIMENTACION
CIMENTACION AULAS

m3
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D
Eje 7 entre A - C

CIMENTACION AULAS + SS.HH.


Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11
Eje D entre 11 - 12

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D

AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Eje C entre 13 y 14
Eje D entre 13 y 15
Eje 13 entre C y D
Eje 14 entre C y D
Desperdicios
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
CIMENTACION AULAS

m2
Eje D entre 4 - 5
Eje D entre 5 - 6
Eje D entre 6 - 7
Eje C entre 4 - 5
Eje C entre 5 - 6
Eje C entre 6 - 7
Eje A entre 4 - 5
Eje A entre 5 - 6
Eje A entre 6 - 7
Eje 4 entre A - C
Eje 5 entre A - C
Eje 5 entre C - D
Eje 6 entre A - C
Eje 6 entre C - D

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje 7 entre A - C

CIMENTACION AULAS + SS.HH.


Eje D entre 8 - 9
Eje D entre 9 - 10
Eje D entre 10 - 11
Eje D entre 11 - 12
Eje C entre 8 - 9
Eje C entre 9 - 10
Eje C entre 10 - 11
Eje C entre 11 - 12
Eje A entre 8 - 9
Eje A entre 9 - 10
Eje A entre 10 - 11
Eje A entre 11 - 12
Eje 8 entre A - C
Eje 9 entre A - C
Eje 9 entre C - D
Eje 10 entre A - C
Eje 10 entre C - D
Eje 12 entre A - C
Eje 12 entre C - D
AUDITORIO Y OFICINAS
Eje 1 entre H-G
Eje 1 entre G-F
Eje 1 entre F-E
Eje 3 entre H-G
Eje 3 entre G-F
Eje 3 entre F-E
Eje H entre 1-3
Eje G entre 1-3
Eje F entre 1-3
Eje E entre 1-3
HALL PRINCIPAL
Eje 1 entre B-D
Eje 3 entre B-D
Eje B entre 1-3
Eje D entre 1-4
HALL ESCALERA
Eje C entre 13 y 14
Eje D entre 13 y 15
Eje 13 entre C y D
Eje 14 entre C y D

ACERO DE REFUERZO EN VIGAS DE CIMENTACION

kg

TECNOPOR E=4" EN VIGAS DE CIMENTACION

m2
Entre auditorio mas oficinas y Hall principal
Entre Hall y aulas
Entre aulas 01,02,03 y Aulas 04, 05 - SS.HH.
Entre aulas 04, 05 - SS.HH. Y escalera metalica

PLACAS
CONCRETO F'C=210 KG/CM2 EN PLACAS

0
m3
HALL ESCALERA e=20cm

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

OFICINAS MAS AUDITORIO e=15cm


ESCALERA METALICA e=30cm

ESCALERA METALICA e= 20cm

Desperdicios

ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS


HALL ESCALERA

m2

OFICINAS MAS AUDITORIO


ESCALERA METALICA
ESCALERA METALICA e= 20cm

Desperdicios

ACERO DE REFUERZO EN PLACAS

kg

COLUMNAS Y COLUMNETAS
COLUMNAS
CONCRETO F'C= 210 KG/CM2 EN COLUMNAS

m3
AULAS 01, 02, 03
PRIMER PISO
C-1
C-2
C-3
SEGUNDO PISO
C-1
C-2
C-3
TERCER PISO
C-1
C-2
C-3
AULAS 04, 05 Y SS.HH.
PRIMER PISO
C-1
C-2

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
C-3
C-4
C-5
C-6
SEGUNDO PISO
C-1
C-2
C-3
C-4
C-5
C-6
TERCER PISO
C-1
C-2
C-3
C-4
C-5
C-6

AUDITORIO MAS OFICINAS


PRIMER PISO
C-1
SEGUNDO Y TERCER PISO
C-1
HALL PRINCIPAL
PRIMER PISO
C-1
C-2
C-3
SEGUNDO PISO
C-1
C-2
C-3
TERCER PISO
C-1
C-2
C-3
HALL ESCALERA

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
PRIMER PISO
C-1
C-2
SEGUNDO PISO
C-1
C-2
TERCER PISO
C-1
C-2

COLUMNAS EN CIMIENTOS DE PORTICO

Desperdicios
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2
AULAS 01, 02, 03
PRIMER PISO
C-1
C-2
C-3
SEGUNDO PISO
C-1
C-2
C-3
TERCER PISO
C-1
C-2
C-3
AULAS 04, 05 Y SS.HH
PRIMER PISO
C-1
C-2
C-3
C-4
C-5
C-6
SEGUNDO PISO
C-1
C-2
C-3

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
C-4
C-5
C-6
TERCER PISO
C-1
C-2
C-3
C-4
C-5
C-6

HALL PRINCIPAL
PRIMER PISO
C-1
C-2
C-3
SEGUNDO PISO
C-1
C-2
C-3
TERCER PISO
C-1
C-2
C-3
HALL ESCALERA
PRIMER PISO
C-1
C-2
SEGUNDO PISO
C-1
C-2
TERCER PISO
C-1
C-2
COLUMNAS EN CIMIENTOS DE PORTICO

ACERO DE REFUERZO EN COLUMNAS

kg

COLUMNETAS
CONCRETO F'C= 210 KG/CM2 EN COLUMNETAS
AULAS 01, 02, 03, 04, 05 Y SS.HH.

m3
PRIMER PISO

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Columnetas en SS.HH.
SEGUNDO PISO
Columnetas en SS.HH.
En aulas
TERCER PISO
Columnetas en SS.HH.
En aulas

AUDITORIO MAS OFICINAS


PRIMER PISO
En todo el bloque en general
SEGUNDO PISO
En todo el bloque en general
TERCER PISO
En SS.HH.

Desperdicios
ENCOFRADO Y DESENCOFRADO EN COLUMNETAS
AULAS 01, 02, 03, 04, 05 Y SS.HH.

m2
PRIMER PISO
Columnetas en SS.HH.
SEGUNDO PISO
Columnetas en SS.HH.
En aulas
TERCER PISO
Columnetas en SS.HH.
En aulas

AUDITORIO MAS OFICINAS


PRIMER PISO
En todo el bloque en general
SEGUNDO PISO
En todo el bloque en general
TERCER PISO
En SS.HH.

ACERO DE REFUERZO EN COLUMNETAS

kg

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

DINTELES
CONCRETO F'C= 210 KG/CM2 EN DINTELES

m3
AULAS 01, 02, 03, 04, 05 Y SS.HH.
PRIMER PISO
En SS.HH.
V-04
V-05
SEGUNDO PISO
En SS.HH.
V-04
V-05
En aulas
V-06
V-07
TERCER PISO
En SS.HH.
V-04
V-05
En aulas
V-06
V-07
AUDITORIO MAS OFICINAS
PRIMER PISO
En el bloque en general
V-03
V-02
SEGUNDO PISO
En el bloque en general
V-03
V-02
TERCER PISO
En SS.HH.
V-10
V-11
V-12
Desperdicios

ENCOFRADO Y DESENCOFRADO EN DINTELES


AULAS 01, 02, 03, 04, 05 Y SS.HH.

m2
PRIMER PISO
En SS.HH.
V-04
V-05
SEGUNDO PISO
En SS.HH.
V-04
V-05
En aulas
V-06
V-07
TERCER PISO
En SS.HH.
V-04

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
V-05
En aulas
V-06
V-07

AUDITORIO MAS OFICINAS


PRIMER PISO
En el bloque en general
V-03
V-02
SEGUNDO PISO
En el bloque en general
V-03
V-02
TERCER PISO
En SS.HH.
V-10
V-11
V-12
ACERO DE REFUERZO EN DINTELES

kg

VIGAS
VIGAS PERALTADAS, CHATAS Y SOLERAS
CONCRETO F'C= 210 KG/CM2 EN VIGAS

m3
AULAS 01, 02, 03, 04, 05 Y SS.HH.
PRIMER PISO Y SEGUNDO PISO
V-101, V-201

EJES 4 - 4, EJES 5 - 5

V-102, V202

EJES 5 - 5, EJES 6 - 6

V-103, V203

EJES A, C, D

V-B

VC
AZOTEA
V-301

EJES 4 - 4, EJES 5 - 5

V-302

EJES 5 - 5, EJES 6 - 6

V-303

EJES A, C, D

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

V-B

VC

AUDITORIO MAS OFINAS


PRIMER PISO
V - 101
V - 102
V - 103
V - 104
V - 105
SEGUNDO PISO
V - 201
V - 202
V - 203
V - 204
AZOTEA
V - 301
V - 302
V - 303
HALL PRINCIPAL
V-101, 201, 301 EJE D-D
V-102, 202, 202 EJE D-D ENTRE 1-2
V-102, 202, 202 EJE D-D ENTRE 2-3
V-103, 203, 303 EJES 1-1 ENTRE D-B
V-103, 203, 303 EJES 3-3 ENTRE D-B
HALL ESACALERA
V-101, 201, 301 EJE C-C
V-102, 202, 302 EJE C-C
Desperdicios
ENCOFRADO Y DESENCOFRADO EN VIGAS

m2
AULAS 01, 02, 03, 04, 05 Y SS.HH.
PRIMER PISO Y SEGUNDO PISO
V-101, V-201

EJES 4 - 4, EJES 5 - 5

V-102, V202

EJES 5 - 5, EJES 6 - 6

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

V-103, V203

EJES A, C, D

V-B

VC

AZOTEA
V-301

EJES 4 - 4, EJES 5 - 5

V-302

EJES 5 - 5, EJES 6 - 6

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

V-303

EJES A, C, D

V-B

VC

AUDITORIO
PRIMER PISO
V - 101

V - 102

V - 103

V - 104

SEGUNDO PISO
V - 201

V - 202

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

V - 203

AZOTEA
V - 301

V - 302

HALL PRINCIPAL
V-101, 201, 301 EJE D-D

V-102, 202, 202 EJE D-D ENTRE 1-2

V-102, 202, 202 EJE D-D ENTRE 2-3

V-103, 203, 303 EJES 1-1 ENTRE D-B

V-103, 203, 303 EJES 3-3 ENTRE D-B

ACERO DE REFUERZO EN VIGAS

kg

VIGAS DE AMARRE EN TABIQUERIA Y PARAPETOS


CONCRETO F'C= 210 KG/CM2 EN VIGAS DE AMARRE

m3

ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARRE

m2

ACERO DE REFUERZO EN VIGAS DE AMARRE

kg

LOSAS ALIGERADAS CONVENCIONALES NERVADA EN UN SOLO SENTIDO


CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA EN UN SOLO SENTIDO

m3
factor

AULAS 01, 02, 03


TECHO 1 - 2
TECHO A

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7

AZOTEA
TECHO A
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7
AULAS 04, 05 Y SS.HH.
AULAS 04, 05 Y SS.HH.
TECHO 1er - 2o PISO
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12
AZOTEA
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12
AUDITORIO Y OFICINAS

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

1er, 2do Y AZOTEA


Eje H-G entre 1-3
Eje H-G entre 1-4
Eje H-G entre 1-5
HALL PRINCIPAL

HALL ESCALERA
1er, 2do y 3er PISO
Desperdicios
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA EN UN SOLO SENTIDO
TECHO 1 - 2

m2
TECHO A
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7

AZOTEA
TECHO A
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7
AULAS 04, 05 Y SS.HH.
TECHO 1er - 2o PISO
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12

AZOTEA
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12
AUDITORIO Y OFICINAS
1er, 2do Y AZOTEA
Eje H-G entre 1-3
Eje H-G entre 1-4
Eje H-G entre 1-5
HALL PRINCIPAL

Varios

ACERO DE REFUERZO PARA EN LOSA ALIGERADA EN UN SOLO SENTIDO

kg

LADRILLO HUECO DE ARCILLA 20X30X30 CM PARA LOSA ALIGERADA EN UN SENTIDO


AULAS 01, 02, 03
TECHO 1er - 2do PISO

und

TECHO A
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7

AZOTEA
TECHO A
Entre Eje A y Ejes 4-5
Entre Eje A y Ejes 5-6
Entre Eje A y Ejes 6-7
Entre Eje A-C y Ejes 4-5
Entre Eje A-C y Ejes 5-6
Entre Eje A-C y Ejes 6-7
TECHO B
Entre Eje C-D y Ejes 4-5
Entre Eje C-D y Ejes 5-6
Entre Eje C-D y Ejes 6-7
AULAS 04, 05 Y SS.HH.
TECHO 1er - 2o PISO
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12
AZOTEA
TECHO A
Entre Eje A y Ejes 8-9
Entre Eje A y Ejes 9-10
Entre Eje A y Ejes 10-11
Entre Eje A y Ejes 11-12
Entre Eje A-C y Ejes 8-9
Entre Eje A-C y Ejes 9-10
Entre Eje A-C y Ejes 10-11
Entre Eje A-C y Ejes 11-12
TECHO B
Entre Eje C-D y Ejes 8-9
Entre Eje C-D y Ejes 9-10
Entre Eje C-D y Ejes 10-11
Entre Eje C-D y Ejes 11-12
AUDITORIO Y OFICINAS
1er, 2do Y AZOTEA
Eje H-G entre 1-3
Eje H-G entre 1-4

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
Eje H-G entre 1-5

HALL PRINCIPAL

HALL ESCALERA
1er, 2do y 3er PISO
Desperdicios

LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA EN UN SENTIDO

und

LOSA PARA LAVATORIO EN SS.HH.


CONCRETO F'C=210 KG/CM2 EN LOSA PARA LAVATORIO
EN AUDITORIO MAS OFICINAS

m3
SS.HH. Mujeres
SS.HH. Varones
Murete

EN ULAS
SS.HH. Mujeres
SS.HH. Varones
Murete
LAVAMOPAS EN SS.HH. DE AULAS
A nivel + 1.05

A nivel + 0.55
Desperdicios
ENCOFRADO Y DESENCOFRADO EN LOSA PARA LAVATORIO
EN AUDITORIO MAS OFICINAS

m2
SS.HH. Mujeres
SS.HH. Varones
Murete

EN ULAS
SS.HH. Mujeres

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND
SS.HH. Varones
Murete

LAVAMOPAS EN SS.HH. DE AULAS


En el area de aulas
A nivel + 1.05

A nivel + 0.55
En el area de Uditorio mas oficinas
A nivel + 1.05

A nivel + 0.55
CISTERNA
CONCRETO DE F'C=140KG/CM2 EN FONDO DE CISTERNA

m3
Cisterna de 5 000 lts

Cisterna de 10 000 lts

Desperdicios

CONCRETO F'C=210 KG/CM2 EN TAPA DE LOSA

m3
Cisterna de 5 000 lts

Cisterna de 10 000 lts

Desperdicios
ENCOFRADO Y DESENCOFRADO EN TAPA DE LOSA

m2
Cisterna de 5 000 lts
En fondo de tapa
A los costados
Cisterna de 10 000 lts
En fondo de tapa
A los costados

LADRILLO DE 20x30X30 EN CISTERNA

und
Cisterna de 5 000 lts
En fondo de tapa
Cisterna de 10 000 lts
En fondo de tapa
Desperdicios

PLANILLA DE METRADOS
EDIFICACIN N 01 (ADMINISTRATIVOS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO


SETIEMBRE DEL 2015

ESTRUCTURAS
ESPECIFICACIONES

UND

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

517.17

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65
2.90

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

15.00
16.35
15.00
12.30
12.30
12.30
12.30
12.30
12.30
8.70
9.90
1.95
9.90
1.95
8.70

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.60
1.85
1.70
4.10
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

15.00
16.80
5.55
5.10
12.30
12.30
1.80
3.60
12.30
12.30
2.25
3.90
8.70
9.90
1.95
9.90
2.40
12.75
2.55

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

7.95
7.35
4.95
7.95
7.35
4.95
23.70
21.60

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
1.00
1.00

CANT.

N DE
VECES

1
1

1
1

LARGO
7.20
5.60

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00

3.36
9.00
17.10
16.50

1
1
1
1

2
2
1
1

1.28
1.78
4.90
0.45

1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00

7.68
10.68
14.70
1.35

ALTURA
3.00
3.00

PARCIAL

TOTAL

21.60
16.80

1347.51
1
1
1
1

2
2
4
4

2.00
2.80
2.20
4.20

2.00
2.50
4.40
4.00

3.00
3.00
3.00
3.00

24.00
42.00
116.16
211.68

1
1
1
1
1
1
1
1
1
1

1
1
2
4
1
1
1
2
1
1

2.00
2.80
2.20
4.20
2.50
2.10
1.50
1.70
2.60
2.90

2.00
2.50
4.40
4.00
2.20
1.70
1.50
3.40
2.90
2.60

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00

12.00
21.00
58.08
211.68
16.50
10.71
6.75
34.68
22.62
22.62

1
1
1

2
4
2

3.40
4.10
3.00

2.70
3.40
3.00

3.00
3.00
3.00

55.08
167.28
54.00

1
1

2
3

2.70
2.00

3.40
2.00

3.00
3.00

55.08
36.00

1.50

1.50

3.00

27.00

4.10

1.50

3.00

36.90

1
1

2
2

5.35
4.80

1.00
1.00

3.00
3.00

32.10
28.80

6.20

1.00

3.00

37.20

0.85

0.85

1.75

5.06

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.85

CANT.

N DE
VECES

LARGO
0.85

Diametro
2.70

1.75

73.04

2.70

3.00

125.21

ALTURA
1.75

PARCIAL

TOTAL

2.53
198.26

Factor de esponjamiento =

1.20

61.48

1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.80
7.05
6.80
6.80
7.05
6.80
6.30
3.10
7.00
3.10
7.00
3.10
6.30
3.10

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.98
1.02
0.98
0.98
1.02
0.98
0.91
0.45
1.01
0.45
1.01
0.45
0.91
0.45

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.80
6.80
3.50
3.45
6.80
6.80
3.10
3.10
6.30
3.10
6.30
3.10
6.30
3.10
7.10
7.00
3.10
2.45
0.93
1.65
2.45
0.85
1.65

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.98
0.98
0.50
0.50
0.98
0.98
0.45
0.45
0.91
0.45
0.91
0.45
0.91
0.45
1.02
1.01
0.45
0.35
0.13
0.24
0.35
0.12
0.24

1
1

1
1

6.05
5.95

0.40
0.40

0.30
0.30

0.87
0.86

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.40
0.40

CANT.

N DE
VECES

1
1

1
1

LARGO
6.05
5.95

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60

2.76
2.76
2.76
2.76

3.65

0.50

0.30

0.66

1
1

1
2

3.65
0.85

0.80
0.85

0.30
0.30

1.05
0.52

0.85

0.85

0.30

0.52

9.30

0.30

1.65

5.52

9.30

0.30

2.80

9.37

0.85

0.85

0.30

1.04

ALTURA
0.30
0.30

PARCIAL

TOTAL

0.87
0.86

2.93

433.45
Factor de esponjamiento =

1.20

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65
2.90

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

5.46
5.95
5.46
4.48
4.48
4.48
4.48
4.48
4.48
3.17
3.60
0.71
3.60
0.71
3.17

1
1
1

1
1
1

5.00
5.60
1.85

0.70
0.70
0.70

1.30
1.30
1.30

5.46
6.12
2.02

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
1.70
4.10
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20
7.20
5.60

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

2.89
2.68
1.80
2.89
2.68
1.80
8.63
7.86
7.86
6.12

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

0.70
0.70
0.70
0.70

1.30
1.30
1.30
1.30

1.22
3.28
6.22
6.01

1
1
1
1

2
2
1
1

1.28
1.78
4.90
0.45

0.70
0.70
0.70
0.70

1.30
1.30
1.30
1.30

2.80
3.89
5.35
0.49

1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.80
7.05
6.80
6.80
7.05
6.80
6.30
3.10
7.00
3.10
7.00
3.10
6.30
3.10

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

4.41
4.57
4.41
4.41
4.57
4.41
4.08
2.01
4.54
2.01
4.54
2.01
4.08
2.01

ALTURA
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

PARCIAL
1.86
4.48
4.48
0.66
1.31
4.48
4.48
0.82
1.42
3.17
3.60
0.71
3.60
0.87
4.64
0.93

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
6.80
6.80
3.50
3.45
6.80
6.80
3.10
3.10
6.30
3.10
6.30
3.10
6.30
3.10
7.10
7.00
3.10
2.45
0.93
1.65
2.45
0.85
1.65

1
1
1
1

1
1
1
1

6.05
5.95
6.05
5.95

0.60
0.60
0.60
0.60

0.90
0.90
0.90
0.90

3.92
3.86
3.92
3.86

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.60
0.60
0.60
0.60

0.90
0.90
0.90
0.90

6.22
6.22
6.22
6.22

1
1
1

1
1
1

6.80
7.10
6.80

0.75
0.75
0.75

0.20
0.20
0.20

1.22
1.28
1.22

1
1
1
1
1
1

1
1
1
1
1
1

4.10
2.70
4.10
3.00
4.10
2.70

0.75
0.75
0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20
0.20
0.20

0.74
0.49
0.74
0.54
0.74
0.49

6.30

0.75

0.20

2.27

7.00

0.75

0.20

2.52

ALTURA
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

PARCIAL
4.41
4.41
2.27
2.24
4.41
4.41
2.01
2.01
4.08
2.01
4.08
2.01
4.08
2.01
4.60
4.54
2.01
1.59
0.60
1.07
1.59
0.55
1.07

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

LARGO

1
1
1
1
1

1
1
1
1
1

6.80
7.10
6.80
3.15
3.10

0.75
0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20
0.20

1.22
1.28
1.22
0.57
0.56

1
1
1
1
1
1
1

1
1
1
1
1
1
1

4.10
2.70
4.10
3.00
3.50
1.20
2.30

0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.74
0.49
0.74
0.54
0.63
0.22
0.41

6.30

0.75

0.20

2.27

6.30

0.75

0.20

2.27

1
1
1
1
1
1

1
1
1
1
1
1

1.45
1.60
1.20
1.20
1.70
1.00

0.75
0.75
0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20
0.20
0.20

0.26
0.29
0.22
0.22
0.31
0.18

1
1

1
1

1.35
1.20

0.75
0.75

0.20
0.20

0.24
0.22

1
1
1
1

1
1
1
1

6.05
5.95
6.05
5.95

0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20

1.09
1.07
1.09
1.07

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.75
0.75
0.75
0.75

0.20
0.20
0.20
0.20

1.73
1.73
1.73
1.73

1
-3

2
2

4.10
0.95

1.50
0.40

1.90
1.90

28.04
-5.20

1
1
1

1
1
1

5.35
4.80
6.20

0.70
0.80
0.85

1.90
1.90
1.90

8.54
8.76
12.02

ALTURA

PARCIAL

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL
909.94

1
1
1
1
1

1
1
1
1
1

25.00
8.40
8.25
8.40
25.00

3.70
8.15
8.15
8.15
1.00

92.50
68.46
67.24
68.46
25.00

1
1
1
1
1
1

1
1
1
1
1
1

25.00
8.40
8.10
4.00
3.90
24.40

3.70
8.15
8.15
8.00
8.00
1.00

92.50
68.46
66.02
32.00
31.20
24.40

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1

11.30
2.60
1.50
2.60
1.50
1.20
4.15
4.15
4.15
4.10
4.10
4.10
4.10

6.50
1.45
0.70
1.45
0.70
1.30
3.15
3.20
3.25
3.10
3.10
3.20
3.25

73.45
3.77
1.05
3.77
1.05
1.56
13.07
13.28
13.49
12.71
12.71
13.12
13.33

85.70

85.70

3.70

11.66

AREA =
1

3.15

2042.06
Factor de esponjamiento = 1.20
620.60
1617.01
237.91
-433.45

66.65

1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1

6.80
7.05
6.80
6.80
7.05
6.80
6.30
3.10
7.00

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1.63
1.69
1.63
1.63
1.69
1.63
1.51
0.74
1.68

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.40
0.40
0.40
0.40
0.40

CANT.

N DE
VECES

1
1
1
1
1

1
1
1
1
1

LARGO
3.10
7.00
3.10
6.30
3.10

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

6.80
6.80
3.50
3.45
6.80
6.80
3.10
3.10
6.30
3.10
6.30
3.10
6.30
3.10
7.10
7.00
3.10
2.45
0.93
1.65
2.45
0.85
1.65

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

1.63
1.63
0.84
0.83
1.63
1.63
0.74
0.74
1.51
0.74
1.51
0.74
1.51
0.74
1.70
1.68
0.74
0.59
0.22
0.40
0.59
0.20
0.40

1
1
1
1

1
1
1
1

6.05
5.95
6.05
5.95

0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60

1.45
1.43
1.45
1.43

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.40
0.40
0.40
0.40

0.60
0.60
0.60
0.60

2.30
2.30
2.30
2.30

3.65

0.50

0.80

1.46

1
1

1
2

3.65
0.85

0.80
0.85

0.85
0.80

2.48
1.16

0.85

0.85

0.80

1.16

ALTURA
0.60
0.60
0.60
0.60
0.60

PARCIAL

TOTAL

0.74
1.68
0.74
1.51
0.74

3.17
71.53

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2

LARGO
6.80
7.05
6.80
6.80
7.05
6.80
6.30
3.10
7.00
3.10
7.00
3.10
6.30
3.10

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

6.80
6.80
3.50
3.45
6.80
6.80
3.10
3.10
6.30
3.10
6.30
3.10
6.30
3.10
7.10
7.00
3.10
2.45
0.93
1.65
2.45
0.85
1.65

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

8.16
8.16
4.20
4.14
8.16
8.16
3.72
3.72
7.56
3.72
7.56
3.72
7.56
3.72
8.52
8.40
3.72
2.94
1.12
1.98
2.94
1.02
1.98

1
1
1
1

2
2
2
2

6.05
5.95
6.05
5.95

0.60
0.60
0.60
0.60

7.26
7.14
7.26
7.14

1
1
1
1

2
2
2
2

9.60
9.60
9.60
9.60

0.60
0.60
0.60
0.60

11.52
11.52
11.52
11.52

ALTURA
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

PARCIAL

TOTAL

8.16
8.46
8.16
8.16
8.46
8.16
7.56
3.72
8.40
3.72
8.40
3.72
7.56
3.72

219.81
1
1

2
2

2.00
2.80

2.00
2.50

0.50
0.50

4.00
7.00

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
4.40
4.00

CANT.

N DE
VECES

1
1

4
4

LARGO
2.20
4.20

1
1
1
1
1
1
1
1
1
1

1
1
2
4
1
1
1
2
1
1

2.00
2.80
2.20
4.20
2.50
2.10
1.50
1.70
2.60
2.90

2.00
2.50
4.40
4.00
2.20
1.70
1.50
3.40
2.90
2.60

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

2.00
3.50
9.68
35.28
2.75
1.79
1.13
5.78
3.77
3.77

1
1
1

2
4
2

3.40
4.10
3.00

2.70
3.40
3.00

0.50
0.50
0.50

9.18
27.88
9.00

1
1

2
3

2.70
2.00

3.40
2.00

0.50
0.50

9.18
6.00

1.50

1.50

0.50

4.50

4.10

1.50

0.50

8.52

ALTURA
0.50
0.50

PARCIAL

TOTAL

19.36
35.28

10.47

30.11
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65
2.90

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.75
0.82
0.75
0.62
0.62
0.62
0.62
0.62
0.62
0.44
0.50
0.10
0.50
0.10
0.44

1
1
1
1
1

1
1
1
1
1

5.00
5.60
1.85
1.70
4.10

0.30
0.30
0.30
0.30
0.30

0.50
0.50
0.50
0.50
0.50

0.75
0.84
0.28
0.26
0.62

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20
7.20
5.60

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

0.60
0.55
0.37
0.60
0.55
0.37
1.78
1.62
1.62
1.26

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

0.30
0.30
0.30
0.30

0.50
0.50
0.50
0.50

0.17
0.45
0.86
0.83

1
1
1
1

2
2
1
1

1.28
1.78
4.90
0.45

0.25
0.25
0.25
0.25

0.50
0.50
0.50
0.50

0.32
0.45
0.61
0.06
1.43

ALTURA
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

PARCIAL

TOTAL

0.62
0.09
0.18
0.62
0.62
0.11
0.20
0.44
0.50
0.10
0.50
0.12
0.64
0.13

21.55
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Factor de Uso =
5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65
2.90

4.00
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

2.50
2.73
2.50
2.05
2.05
2.05
2.05
2.05
2.05
1.45
1.65
0.33
1.65
0.33
1.45

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
5.00
5.60
1.85
1.70
4.10
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20
7.20
5.60

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

1.33
1.23
0.83
1.33
1.23
0.83
3.95
3.60
3.60
2.80

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

0.50
0.50
0.50
0.50

0.56
1.50
2.85
2.75

1
1
1
1

2
2
1
1

1.28
1.78
4.90
0.45

0.50
0.50
0.50
0.50

1.28
1.78
2.45
0.23

ALTURA
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

PARCIAL

TOTAL

2.50
2.80
0.93
0.85
2.05
2.05
0.30
0.60
2.05
2.05
0.38
0.65
1.45
1.65
0.33
1.65
0.40
2.13
0.43

4.34
2

0.85

0.85

2.89

0.85

0.85

1.45

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

238.86
1
1
1
1
1

1
1
1
1
1

25.00
8.40
8.25
8.40
25.00

3.70
8.15
8.15
8.15
1.00

92.50
68.46
67.24
68.46
25.00

1
1
1
1
1
1

1
1
1
1
1
1

25.00
8.40
8.10
4.00
3.90
24.40

3.70
8.15
8.15
8.00
8.00
1.00

92.50
68.46
66.02
32.00
31.20
24.40

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1

11.30
2.60
1.50
2.60
1.50
1.20
4.15
4.15
4.15
4.10
4.10
4.10
4.10

6.50
1.45
0.70
1.45
0.70
1.30
3.15
3.20
3.25
3.10
3.10
3.20
3.25

73.45
3.77
1.05
3.77
1.05
1.56
13.07
13.28
13.49
12.71
12.71
13.12
13.33

85.70

85.70

3.15

3.70

11.66
45.50

0.15
0.15
0.15
0.15

11.53
1.58
1.56
0.31

AREA =
1

44.43
1
1
1
1

1
1
1
1

45.20
6.20
6.10
1.20

Perimetro
1.70
1.70
1.70
1.70

1
1

1
1

1.85
53.40

1.70
1.70

0.15
0.15

0.47
13.62

52.00

1.70

0.15

13.26
2.12
98.28

Factor de uso = 4

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
2.30
2.30
2.30
2.30

CANT.

N DE
VECES

1
1
1
1

1
1
1
1

LARGO
45.20
6.20
6.10
1.20

1
1

1
1

1.85
53.40

2.30
2.30

4.26
122.82

52.00

2.30

119.60

ALTURA

PARCIAL

TOTAL

103.96
14.26
14.03
2.76

11.45

15.32

1
1
1

1
1
1

6.80
7.10
6.80

0.15
0.15
0.15

0.45
0.45
0.45

0.46
0.48
0.46

1
1
1
1
1
1

1
1
1
1
1
1

4.10
2.70
4.10
3.00
4.10
2.70

0.15
0.15
0.15
0.15
0.15
0.15

0.45
0.20
0.45
0.20
0.45
0.20

0.28
0.08
0.28
0.09
0.28
0.08

6.30

0.15

0.45

0.85

7.00

0.15

0.45

0.95

1
1
1
1
1

1
1
1
1
1

6.80
7.10
6.80
3.15
3.10

0.15
0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45
0.45

0.46
0.48
0.46
0.21
0.21

1
1
1
1
1
1
1

1
1
1
1
1
1
1

4.10
2.70
4.10
3.00
3.50
1.20
2.30

0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.45
0.20
0.45
0.20
0.45
0.45
0.20

0.28
0.08
0.28
0.09
0.24
0.08
0.07

6.30

0.15

0.20

0.38

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.45

CANT.

N DE
VECES

LARGO
6.30

1
1
1
1
1
1

1
1
1
1
1
1

1.45
1.60
1.20
1.20
1.70
1.00

0.20
0.20
0.20
0.20
0.20
0.20

0.15
0.15
0.15
0.15
0.15
0.15

0.04
0.05
0.04
0.04
0.05
0.03

1
1

1
1

1.35
1.20

0.15
0.15

0.45
0.45

0.09
0.08

1
1
1
1

1
1
1
1

6.05
5.95
6.05
5.95

0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45

0.41
0.40
0.41
0.40

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.15
0.15
0.15
0.15

0.45
0.20
0.20
0.20

0.65
0.29
0.29
0.29

0.80

0.50

0.85

1.36

0.80

0.50

0.85

0.68

ALTURA
0.25

PARCIAL

TOTAL

1.42

0.73
40.52

2
2
2

1
1
1

6.80
7.10
6.80

0.45
0.45
0.45

6.12
6.39
6.12

2
2
2
2
2
2

1
1
1
1
1
1

4.10
2.70
4.10
3.00
4.10
2.70

0.45
0.20
0.45
0.20
0.45
0.20

3.69
1.08
3.69
1.20
3.69
1.08

6.30

0.45

11.34

7.00

0.45

12.60

6.80

0.45

6.12

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

2
2
2
2

1
1
1
1

LARGO
7.10
6.80
3.15
3.10

2
2
2
2
2
2
2

1
1
1
1
1
1
1

4.10
2.70
4.10
3.00
3.50
1.20
2.30

0.45
0.20
0.45
0.20
0.45
0.45
0.20

3.69
1.08
3.69
1.20
3.15
1.08
0.92

6.30

0.20

5.04

6.30

0.25

6.30

2
2
2
2
2
2

1
1
1
1
1
1

1.45
1.60
1.20
1.20
1.70
1.00

0.15
0.15
0.15
0.15
0.15
0.15

0.44
0.48
0.36
0.36
0.51
0.30

2
2

1
1

1.35
1.20

0.45
0.45

1.22
1.08

2
2
2
2

1
1
1
1

6.05
5.95
6.05
5.95

0.45
0.45
0.45
0.45

5.45
5.36
5.45
5.36

2
2
2
2

1
1
1
1

9.60
9.60
9.60
9.60

0.45
0.20
0.20
0.20

8.64
3.84
3.84
3.84

0.80

0.85

5.44

0.80

0.85

2.72

ALTURA
0.45
0.45
0.45
0.45

PARCIAL

TOTAL

6.39
6.12
2.84
2.79

260.78
1

2.00

2.00

0.60

4.80

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
2.50
4.40
4.00

CANT.

N DE
VECES

1
1
1

2
4
4

LARGO
2.80
2.20
4.20

1
1
1
1
1
1
1
1
1
1

1
1
2
4
1
1
1
2
1
1

2.00
2.80
2.20
4.20
2.50
2.10
1.50
1.70
2.60
2.90

2.00
2.50
4.40
4.00
2.20
1.70
1.50
3.40
2.90
2.60

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60

2.40
4.20
11.62
42.34
3.30
2.14
1.35
6.94
4.52
4.52

1
1
1

2
4
2

3.40
4.10
3.00

2.70
3.40
3.00

0.60
0.60
0.60

11.02
33.46
10.80

1
1

2
3

2.70
2.00

3.40
2.00

0.60
0.60

11.02
7.20

1.50

1.50

0.60

5.40

4.10

1.50

0.60

7.38

ALTURA
0.60
0.60
0.60

PARCIAL

TOTAL

8.40
23.23
42.34

12.42

76.34
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65
2.90

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

1.95
2.13
1.95
1.60
1.60
1.60
1.60
1.60
1.60
1.13
1.29
0.25
1.29
0.25
1.13

1
1
1
1

1
1
1
1

5.00
5.60
1.85
1.70

0.30
0.30
0.30
0.30

1.30
1.30
1.30
1.30

1.95
2.18
0.72
0.66

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
4.10
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20
7.20
5.60

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

1.55
1.43
0.97
1.55
1.43
0.97
4.62
4.21
4.21
3.28

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

0.30
0.30
0.30
0.30

1.30
1.30
1.30
1.30

0.44
1.17
2.22
2.15

1
1
1
1

1
1
1
1

3.15
3.15
3.10
3.10

0.25
0.25
0.25
0.25

0.60
0.60
0.60
0.60

0.47
0.47
0.47
0.47

ALTURA
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

PARCIAL

TOTAL

1.60
1.60
0.23
0.47
1.60
1.60
0.29
0.51
1.13
1.29
0.25
1.29
0.31
1.66
0.33

3.64
Factor de Uso =
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.45
5.00
4.10
4.10
4.10
4.10
4.10
4.10
2.90
3.30
0.65
3.30
0.65

4.00

54.17
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

6.50
7.09
6.50
5.33
5.33
5.33
5.33
5.33
5.33
3.77
4.29
0.85
4.29
0.85

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

LARGO
2.90

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5.00
5.60
1.85
1.70
4.10
4.10
0.60
1.20
4.10
4.10
0.75
1.30
2.90
3.30
0.65
3.30
0.80
4.25
0.85

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

6.50
7.28
2.41
2.21
5.33
5.33
0.78
1.56
5.33
5.33
0.98
1.69
3.77
4.29
0.85
4.29
1.04
5.53
1.11

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1

2.65
2.45
1.65
2.65
2.45
1.65
7.90
7.20
7.20
5.60

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

3.45
3.19
2.15
3.45
3.19
2.15
10.27
9.36
9.36
7.28

1
1
1
1

1
1
1
1

1.12
3.00
5.70
5.50

1.30
1.30
1.30
1.30

1.46
3.90
7.41
7.15

1
1
1
1

1
1
1
1

3.15
3.15
3.10
3.10

0.60
0.60
0.60
0.60

1.89
1.89
1.86
1.86

1
1
1
1

1
1
1
1

11.70
12.10
12.00
12.00

1.30
1.30
1.30
1.30

15.21
15.73
15.60
15.60

ALTURA
1.30

PARCIAL

TOTAL

3.77

62.14

459.24

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.20

CANT.

N DE
VECES

LARGO
4.90

5.90

0.15

12.95

156.70

4.75

0.30

12.95

130.80

1
1

1
1

2.48
2.22

0.20
0.20

12.95
12.95

69.41
62.68

ALTURA
18.15

5% total

PARCIAL

TOTAL

17.79

21.87

634.95
1

4.90

0.20

18.15

185.13

5.90

0.15

12.95

156.70

4.75

0.30

12.95

130.80

1
1

1
1

2.48
2.22

0.20
0.20

12.95
12.95

69.41
62.68

5% total

30.24

311.26

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

8.05
8.05
8.05
8.05
8.05

5.80
11.59
6.76
10.14
6.76

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50

3.24
6.48
3.78
5.67
3.78

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50

3.24
6.48
3.78
5.67
3.78

1
1

5
2

0.60
1.20

0.30
0.30

8.05
8.05

7.25
5.80

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

CANT.

N DE
VECES

1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
1
1

LARGO
0.70
1.05
0.70
1.35
0.70
1.00
0.35
0.65
0.35

1
1
1
1
1
1
1
1
1
1
1

5
4
4
4
4
2
2
2
2
1
1

0.60
1.20
0.70
1.05
0.70
1.35
0.70
1.00
0.35
0.65
0.35

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50

4.05
6.48
3.78
5.67
3.78
3.65
1.89
2.70
0.95
0.88
0.47

1
1
1
1
1
1
1
1
1
1
1

4
4
4
4
4
2
2
2
2
1
1

0.60
1.20
0.70
1.05
0.70
1.35
0.70
1.00
0.35
0.65
0.35

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50

3.24
6.48
3.78
5.67
3.78
3.65
1.89
2.70
0.95
0.88
0.47

1.00

0.50

8.05

32.20

1.00

0.50

4.50

36.00

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

8.05
8.05
8.05
8.05

2.51
2.40
2.34
2.20

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

4.50
4.50
4.50
4.50

1.80
1.69
1.63
1.49

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

4.50
4.50
4.50
4.50

1.80
1.69
1.63
1.49

ALTURA
8.05
8.05
8.05
8.05
8.05
8.05
8.05
8.05
8.05

PARCIAL
3.38
5.07
3.38
6.52
3.38
4.83
1.69
1.57
0.85

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

LARGO

1
1

2
2

0.60
0.65

0.25
0.25

7.35
7.35

2.24
2.25

1
1

2
2

0.60
0.65

0.25
0.25

4.50
4.50

1.67
1.68

1
1

2
2

0.60
0.65

0.25
0.25

4.50
4.50

1.67
1.68

0.99

0.40

2.10

1.70

ALTURA

PARCIAL

TOTAL

9.07
563.91
Factor de Uso =

4.00

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

7.35
7.35
7.35
7.35
7.35

52.92
88.20
58.80
79.38
58.80

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50

32.40
54.00
36.00
48.60
36.00

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50

32.40
54.00
36.00
48.60
36.00

1
1
1
1
1
1
1
1
1
1
1

4
4
4
4
4
2
2
2
2
1
1

0.60
1.20
0.70
1.05
0.70
1.35
0.70
1.00
0.35
0.65
0.35

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

7.35
7.35
7.35
7.35
7.35
8.05
8.05
8.05
8.05
8.05
8.05

52.92
88.20
58.80
79.38
58.80
53.13
32.20
41.86
20.93
15.30
10.47

1
1
1
1
1

4
4
4
4
4

0.60
1.20
0.70
1.05
0.70

0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50

32.40
54.00
36.00
48.60
36.00

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.30
0.30
0.30
0.30
0.30
0.30

CANT.

N DE
VECES

1
1
1
1
1
1

2
2
2
2
1
1

LARGO
1.35
0.70
1.00
0.35
0.65
0.35

1
1
1
1
1
1
1
1
1
1
1

4
4
4
4
4
2
2
2
2
1
1

0.60
1.20
0.70
1.05
0.70
1.35
0.70
1.00
0.35
0.65
0.35

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50

32.40
54.00
36.00
48.60
36.00
29.70
18.00
23.40
11.70
8.55
5.85

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

7.35
7.35
7.35
7.35

44.10
27.93
19.11
13.97

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

4.50
4.50
4.50
4.50

27.00
17.10
11.70
8.55

1
1
1
1

2
2
2
1

1.00
0.65
0.35
0.65

0.50
0.30
0.30
0.30

4.50
4.50
4.50
4.50

27.00
17.10
11.70
8.55

1
1

2
2

0.60
0.65

0.25
0.25

7.35
7.35

24.99
26.46

1
1

2
2

0.60
0.65

0.25
0.25

4.50
4.50

15.30
16.20

1
1

2
2

0.60
0.65

0.25
0.25

4.50
4.50

15.30
16.20

0.99

0.40

2.10

34.90

ALTURA
4.50
4.50
4.50
4.50
4.50
4.50

PARCIAL

TOTAL

29.70
18.00
23.40
11.70
8.55
5.85

5.89

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO

CANT.

N DE
VECES

LARGO

0.25

0.13

3.85

0.75

0.25

0.13

3.85

0.75

0.25

0.13

2.20

0.36

0.25

0.13

3.85

0.75

0.25

0.13

2.20

0.36

0.25

0.13

3.85

0.88

0.25

0.13

3.85

1.00

0.25

0.13

3.85

0.88

ALTURA

PARCIAL

TOTAL

0.17
33.44
Factor de uso=

4.00

0.25

0.13

3.85

17.56

0.25

0.13

3.85

17.56

0.25

0.13

2.20

8.36

0.25

0.13

3.85

17.56

0.25

0.13

2.20

8.36

0.25

0.13

3.85

20.48

0.25

0.13

3.85

23.41

0.25

0.13

3.85

20.48

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL
7.14

1
1

2
2

3.13
3.10

0.13
0.13

0.25
0.25

0.20
0.20

1
1

2
2

3.13
3.10

0.13
0.13

0.25
0.25

0.20
0.20

2
3

2
2

5.70
5.43

0.13
0.13

0.25
0.25

0.74
1.06

1
1

2
2

3.13
3.10

0.13
0.13

0.25
0.25

0.20
0.20

2
3

2
2

5.70
5.43

0.13
0.13

0.25
0.25

0.74
1.06

1
2

2
2

9.60
1.45

0.13
0.13

0.25
0.25

0.62
0.19

1
2

2
2

9.60
1.45

0.13
0.13

0.25
0.25

0.62
0.19

1
1
1

2
2
2

1.42
2.10
2.05

0.13
0.13
0.13

0.25
0.25
0.25

0.09
0.14
0.13
0.34
26.56

Factor de uso=

4.00

1
1

2
2

3.13
3.10

0.13
0.13

0.25
0.25

3.19
3.17

1
1

2
2

3.13
3.10

0.13
0.13

0.25
0.25

3.19
3.17

2
3

2
2

5.70
5.43

0.13
0.13

0.25
0.25

11.53
16.49

3.13

0.13

0.25

3.19

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.13

CANT.

N DE
VECES

LARGO
3.10

2
3

2
2

5.70
5.43

0.13
0.13

0.25
0.25

11.53
16.49

1
2

2
2

9.60
1.45

0.13
0.13

0.25
0.25

9.67
3.03

1
2

2
2

9.60
1.45

0.13
0.13

0.25
0.25

9.67
3.03

1
1
1

2
2
2

1.42
2.10
2.05

0.13
0.13
0.13

0.25
0.25
0.25

1.49
2.17
2.12

ALTURA
0.25

PARCIAL

TOTAL

3.17

220.86

2
2

4
4

6.30
3.10

0.30
0.30

0.65
0.65

9.83
4.84

2
2

5
5

6.30
3.10

0.30
0.30

0.65
0.65

12.29
6.05

2
2
2

4
4
4

6.80
7.10
6.80

0.30
0.30
0.30

0.60
0.60
0.60

9.79
10.22
9.79

2
2
2

2
2
2

7.93
7.95
7.93

0.30
0.30
0.30

0.60
0.60
0.60

5.71
5.72
5.71

2
2
2

2
2
2

7.93
7.95
7.93

0.15
0.15
0.15

0.70
0.70
0.70

3.33
3.34
3.33

1.00

0.30

0.30

1.62

1
1

4
4

6.30
3.10

0.30
0.30

0.65
0.65

4.91
2.42

1
1

5
5

6.30
3.10

0.30
0.30

0.65
0.65

6.14
3.02

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.30
0.30
0.30

CANT.

N DE
VECES

1
1
1

4
4
4

LARGO
6.80
7.10
6.80

1
1
1

2
2
2

7.93
7.95
7.93

0.30
0.30
0.30

0.60
0.60
0.60

2.85
2.86
2.85

1
1
1

2
2
2

7.93
7.95
7.93

0.15
0.15
0.15

0.30
0.30
0.30

0.71
0.72
0.71

1.00

0.30

0.30

0.81

1
1
1
1
1

1
1
1
1
1

9.60
9.60
9.60
9.60
9.60

0.50
0.50
0.50
0.50
0.50

0.95
0.95
0.95
0.95
0.95

4.56
4.56
4.56
4.56
4.56

1
1
1
1

1
1
1
1

9.60
9.60
9.60
9.60

0.50
0.50
0.50
0.50

0.95
0.95
0.95
0.95

4.56
4.56
4.56
4.56

1
1
1

1
1
1

9.60
9.60
9.60

0.50
0.50
0.50

0.95
0.95
0.95

4.56
4.56
4.56

3
3
3
3
3

1
1
1
1
1

9.30
5.15
3.80
3.87
5.30

0.50
0.30
0.30
0.30
0.30

0.95
0.50
0.50
0.45
0.45

13.25
2.32
1.71
1.57
2.15

2
2

3
3

3.15
3.10

0.25
0.25

0.45
0.45

2.13
2.09
6.43

Facto de uso =

4.00

ALTURA
0.60
0.60
0.60

PARCIAL

TOTAL

4.90
5.11
4.90

287.82

2
2
2
2
2
2

4
4
4
4
4
4

6.30
6.30
6.30
3.10
3.10
3.10

0.65
0.35
0.30
0.65
0.35
0.30

32.76
17.64
15.12
16.12
8.68

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

2
2
2
2
2
2

5
5
5
5
5
5

LARGO
6.30
6.30
6.30
3.10
3.10
3.10

6.80

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

4
4
4
4
4
4
2
2
2
2
2
2
2
2
2

7.10
7.10
7.10
6.80
6.80
6.80
7.93
7.93
7.93
7.95
7.95
7.95
7.93
7.93
7.93

2
2
2
2
2
2

2
2
2
2
2
2

7.93
7.93
7.93
7.95
7.95
7.95

2
2
2

2
2
2

7.93
7.93
7.93

2
2
2

9
9
9

1.10
1.10

1
1
1
1
1
1

4
4
4
4
4
4

6.30
6.30
6.30
3.10
3.10
3.10

1
1
1
1

5
5
5

6.30
6.30
6.30
3.10

MEDIDAS
ANCHO

ALTURA
0.65
0.35

0.30
0.65
0.35
0.30
0.30

40.95
22.05
18.90
20.15
10.85
9.30

0.60

4.90

0.60
0.30

34.08
17.04
17.04
32.64
16.32
16.32
19.03
9.52
9.52
19.08
9.54
9.54
19.03
9.52
9.52

0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.70
0.40
0.15
0.70
0.40
0.15

22.20
12.69
4.76
22.26
12.72
4.77

0.70
0.40

22.20
12.69
4.76

0.30
0.30
0.30

5.94
5.94
1.62

0.65
0.35

16.38
8.82
7.56
8.06
4.34
3.72

0.15

0.30

PARCIAL

0.30
0.65
0.35
0.30
0.65
0.35
0.30
0.65

4.10
11.03
9.45
10.08

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

1
1

5
5

LARGO
3.10
3.10

1
1
1
1
1
1
1
1
1

2
2
2
4
4
4
4
4
4

6.80
6.80
6.80
7.10
7.10
7.10
6.80
6.80
6.80

1
1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2
2

7.93
7.93
7.93
7.95
7.95
7.95
7.93
7.93
7.93

1
1
1
1
1
1

2
2
2
2
2
2

7.93
7.93
7.95
7.95
7.93
7.93

1
1
1

9
9
9

1.10
1.10

1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1

9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60

1
1
1
1
1

1
1
1
1
1

9.60
9.60
9.60
9.60
9.60

MEDIDAS
ANCHO

ALTURA
0.35

0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30
0.60
0.30
0.30

0.30
0.15
0.30
0.15
0.30
0.15

0.30

PARCIAL
5.43
4.65
8.16
4.08
4.08
17.04
8.52
8.52
16.32
8.16
8.16
9.52
4.76
4.76
9.54
4.77
4.77
9.52
4.76
4.76

4.76
2.38
4.77
2.39
4.76
2.38

0.30
0.30
0.30

2.97
2.97
0.81

0.95
0.65

9.12
6.24
4.80
9.12
6.24
4.80
9.12
6.24
4.80
9.12
6.24
4.80

0.50
0.95
0.65
0.50
0.95
0.65
0.50
0.95
0.65
0.50
0.95
0.65
0.50
0.95
0.65

9.12
6.24
4.80
9.12
6.24

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

1
1
1
1

1
1
1
1

1
1
1

1
1
1

9.60
9.60
9.60
9.60
9.60
9.60

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

9.30
9.30
9.30
5.15
5.15
5.15
3.80
3.80
3.80
3.87
3.87
3.87
5.30
5.30
5.30

LARGO
9.60
9.60
9.60
9.60

MEDIDAS
ANCHO
0.50

ALTURA
0.95
0.65

0.50
0.95
0.65
0.50
0.95
0.65
0.50
0.95
0.65
0.50
0.50
0.20
0.30
0.50
0.20
0.30
0.45
0.15
0.30
0.45
0.15
0.30

PARCIAL

TOTAL

4.80
9.12
6.24
4.80
9.12
6.24
4.80
9.12
6.24
4.80
0.00
26.51
18.14
13.95
7.73
3.09
4.64
5.70
2.28
3.42
5.22
1.74
3.48
7.16
2.39
4.77

480.80
factor de vol. Concrt. En m3 por m2 de losa de h=0.20m

0.15

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.90
0.90
0.90
7.70
7.70
7.70

CANT.

N DE
VECES

2
2
2
2
2
2

1
1
1
1
1
1

LARGO
7.93
7.95
7.93
7.93
7.95
7.93

2
2
2

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

0.30
0.30
0.30

2.36
2.36
2.36

1
1
1
1
1
1

1
1
1
1
1
1

7.93
7.95
7.93
7.93
7.95
7.93

0.90
0.90
0.90
7.70
7.70
7.70

0.30
0.30
0.30
0.30
0.30
0.30

0.32
0.32
0.32
2.75
2.75
2.75

1
1
1

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

0.30
0.30
0.30

1.18
1.18
1.18

2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1

7.93
7.95
3.80
3.85
7.93
7.95
3.80
3.85

0.90
0.90
0.90
0.90
7.70
7.70
7.70
7.70

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

4.28
4.29
2.05
2.08
36.64
36.73
17.56
17.79

2
2
2
2

1
1
1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

0.30
0.30
0.30
0.30

15.70
15.74
7.52
7.62

1
1

1
1

1
1
1

1
1
1

7.93
7.95
3.80
3.85
7.93
7.95
3.80
3.85

0.90
0.90
0.90
0.90
7.70
7.70
7.70
7.70

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

2.14
2.15
1.03
1.04
18.32
18.36
8.78
8.89

1
1

1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

0.30
0.30
0.30
0.30

7.85
7.87
3.76
3.81

ALTURA
0.30
0.30
0.30
0.30
0.30
0.30

PARCIAL
0.64
0.64
0.64
5.50
5.51
5.50

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

3
3
3

1
1
1

5.90
6.05
5.95

AREA=

3.15

MEDIDAS
ANCHO

ALTURA

PARCIAL

11.00
11.00
11.00

0.25
0.25
0.25

48.68
49.91
49.09

50.60

0.25

12.65

3.10

0.25

7.32

TOTAL

22.90
757.68
Factor de uso =

4.00

2
2
2
2
2
2

1
1
1
1
1
1

7.93
7.95
7.93
7.93
7.95
7.93

0.90
0.90
0.90
7.70
7.70
7.70

14.27
14.31
14.27
122.12
122.43
122.12

2
2
2

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

52.34
52.47
52.34

1
1
1
1
1
1

1
1
1
1
1
1

7.93
7.95
7.93
7.93
7.95
7.93

0.90
0.90
0.90
7.70
7.70
7.70

7.14
7.16
7.14
61.06
61.22
61.06

1
1
1

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

26.17
26.24
26.17

2
2
2

1
1
1

7.93
7.95
3.80

0.90
0.90
0.90

14.27
14.31
6.84

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.90
7.70
7.70
7.70
7.70

CANT.

N DE
VECES

2
2
2
2
2

1
1
1
1
1

LARGO
3.85
7.93
7.95
3.80
3.85

2
2
2
2

1
1
1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

52.34
52.47
25.08
25.41

1
1

1
1

1
1
1

1
1
1

7.93
7.95
3.80
3.85
7.93
7.95
3.80
3.85

0.90
0.90
0.90
0.90
7.70
7.70
7.70
7.70

7.14
7.16
3.42
3.47
61.06
61.22
29.26
29.65

1
1

1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

26.17
26.24
12.54
12.71

3
3
3

1
1
1

5.90
6.05
5.95

11.00
11.00
11.00

194.70
199.65
196.35

50.60

50.60

AREA=

ALTURA

PARCIAL

TOTAL

6.93
122.12
122.43
58.52
59.29

0.30% Total =

699.40

20655.54
Lad/m2 =
2
2

1
1

7.93
7.95

0.90
0.90

8.33
118.95
119.25

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.90
7.70
7.70
7.70

CANT.

N DE
VECES

2
2
2
2

1
1
1
1

LARGO
7.93
7.93
7.95
7.93

2
2
2

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

436.15
437.25
436.15

1
1
1
1
1
1

1
1
1
1
1
1

7.93
7.95
7.93
7.93
7.95
7.93

0.90
0.90
0.90
7.70
7.70
7.70

59.48
59.63
59.48
508.84
510.13
508.84

1
1
1

1
1
1

7.93
7.95
7.93

3.30
3.30
3.30

218.08
218.63
218.08

2
2
2
2
2
2
2
2

1
1
1
1
1
1
1
1

7.93
7.95
3.80
3.85
7.93
7.95
3.80
3.85

0.90
0.90
0.90
0.90
7.70
7.70
7.70
7.70

118.95
119.25
57.00
57.75
1017.68
1020.25
487.67
494.08

2
2
2
2

1
1
1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

436.15
437.25
209.00
211.75

1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1

7.93
7.95
3.80
3.85
7.93
7.95
3.80
3.85

0.90
0.90
0.90
0.90
7.70
7.70
7.70
7.70

59.48
59.63
28.50
28.88
508.84
510.13
243.83
247.04

1
1
1
1

1
1
1
1

7.93
7.95
3.80
3.85

3.30
3.30
3.30
3.30

218.08
218.63
104.50
105.88

3
3

1
1

5.90
6.05

11.00
11.00

1622.50
1663.75

ALTURA

PARCIAL
118.95
1017.68
1020.25
1017.68

TOTAL

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO
5.95

AREA=

3.15

MEDIDAS
ANCHO
11.00

ALTURA

PARCIAL

TOTAL

1636.25

50.60

421.67

3.10

244.13
983.60

2.91
1
1
1

1
1
4

1.70
1.70
0.60

0.60
0.60
0.10

0.10
0.10
0.90

0.10
0.10
0.22

3
3
3

1
1
6

3.60
3.60
0.60

0.60
0.60
0.10

0.10
0.10
0.90

0.65
0.65
0.97

1
1

1
1

0.70
0.40

0.10
0.10

0.20
1.05

0.01
0.04

0.60

0.10

0.40

0.02

5% del Total=

0.14
35.38

1
1
1

1
1
4

1.70
1.70
0.60

0.60
0.60
0.10

0.10
0.10
0.90

1.19
1.19
2.64

3.60

0.60

0.10

7.56

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
MEDIDAS
ANCHO
0.60
0.10

CANT.

N DE
VECES

3
3

1
6

LARGO
3.60
0.60

3
3

1
1

0.68
0.40

0.10
0.10

0.20
1.05

0.82
1.50

0.58

0.10

0.40

1.04

2
2

1
1

0.70
0.40

0.10
0.10

0.20
1.05

0.56
1.00

0.60

0.10

0.40

0.72

Diametro
2.70

0.15

6.26

Diametro
2.70

0.15

6.26

ALTURA
0.10
0.90

PARCIAL

TOTAL

7.56
11.88

13.15

5% del total

0.63

18.40
1

Diametro
3.25

Diametro
3.25

0.10

8.76

0.10

8.76

5% del total

0.88
30.44

1
1

1
1

Factor de uso =4
Diametro
2.95
9.30

1
1

1
1

Diametro
2.95
9.30

0.15

59.48
1.40

0.15

59.48
1.40

Lad/m2 =

8.33

48.83

9.30

0.30

23.25

9.30

0.30

23.25
2.33

ETRADOS
NISTRATIVOS)

EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

S
CANT.

N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

PLAN
METRAD
PROYECTO:
UBICACION:
FECHA:

PARTIDA N
02
02.01
02.01.02
02.01.02.01
02.01.02.02
02.01.02.03
02.01.02.04
02.01.04
02.01.04.01
02.01.04.02
02.01.05
02.01.05.01
02.01.06
02.01.06.01
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.02
02.02.02.01
02.02.02
02.02.02.01
02.02.02.02
02.02.03
02.02.03.01
02.02.03.02
02.02.09
02.02.09.01
02.02.10
02.02.03.01
02.02.03.02
02.03
02.03.06
02.02.06.01
02.02.06.02
02.03.03.03
02.03.02
02.03.02.01
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.03.04
02.03.06.02
02.03.06.01.01
02.03.06.01.02
02.03.06.01.03
02.03.07
02.03.07.01
02.03.07.01.01
02.03.07.01.02
02.03.07.01.03
02.03.07.02

PARTIDA N
02.03.07.01.01
02.03.07.01.02
02.03.07.01.03
02.03.08
02.03.08.01
02.03.08.02
02.03.08.03
02.03.09
02.03.09.01
02.03.08.01.01
02.03.08.01.02
02.03.08.01.03
02.03.09.02
02.03.08.01.01
02.03.08.01.02
02.03.08.01.03
02.03.10
02.03.10.02
02.03.10.02.01
02.03.10.02.02
02.03.10.02.03
02.03.10.02.04
02.03.10.02.05
02.03.11
02.03.11.01.01
02.03.11.01.02
02.03.11.01.03
02.03.12
02.03.12.01
02.03.12.02
02.03.12.03
02.03.12.04
02.03.12.05

PLANILLA DE METRADOS
METRADOS DE ESTRUCTUTAS

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPe
SETIEMBRE DEL 2015

RESUMEN
ESPECIFICACIONES
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACIONES MASIVAS
EXCAVACION PARA VIGA DE CIMENTACIN
EXCAVACION DE CIMIENTOS Y ZAPATAS
EXCAVACION PARA CISTERNAS
RELLENOS
RELLENO MANUAL CON MATERIAL DE PPRESTAMO, C/COMPACT. 4HP
RELLENO COMPACTADO C/EQUIPO, MATERIAL PROPIO
NIVELACIN INTERIOR Y APISONADO
NIVELACION INTERIOR APISONADO
ELIMINACION DE MATERIAL EXCEDENTE
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CONCRETO F'C=100 KG/CM2 EN CIMIENTO
ENCOFRADO Y DESENCOFRADO DE CIMIENTOS
SUB ZAPATA
SUB ZAPATA CONCRETO 1:12+30% PG
SUB CIMIENTO
SUB CIMIENTO CONCRETO 1:12+30% PG
ENCOFRADO Y DESENCOFRADO DE SUB CIMIENTO
SOLADOS DE CONCRETO
CONCRETO CICLOPEO C:H 1:12 DE E=4"
ENCOFRADO Y DESENCOFRADO DE SOLADOS
FALSOPISOS
FALSO PISO CONCRETO 1:12 + 30% PG
CUNETAS
CONCRETO F'C=140KG/CM2 PARA CUNETAS
ENCOFRADO Y DESENCOFRADO DE CUNETAS
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTOS
CONCRETO F'C=140KG/CM2 PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS
ACERO DE REFUERZO EN SOBRECIMIENTOS REFORZADOS
ZAPATAS
CONCRETO F'C=210 KG/CM2 EN ZAPATAS
ACERO DE REFUERZO EN ZAPATAS
VIGAS DE CIMENTACION
CONCRETO F'C=210 KG/CM2 EN VIGAS DE CIMENTACION
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
ACERO DE REFUERZO EN VIGAS DE CIMENTACION
TECNOPOR E=4" EN VIGAS DE CIMENTACION
PLACAS
CONCRETO F'C=210 KG/CM2 EN PLACAS
ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS
ACERO DE REFUERZO EN PLACAS
COLUMNAS Y COLUMNETAS
COLUMNAS
CONCRETO F'C= 210 KG/CM2 EN COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO DE REFUERZO EN COLUMNAS
COLUMNETAS

ESPECIFICACIONES
CONCRETO F'C= 210 KG/CM2 EN COLUMNETAS
ENCOFRADO Y DESENCOFRADO EN COLUMNETAS
ACERO DE REFUERZO EN COLUMNETAS
DINTELES
CONCRETO F'C= 210 KG/CM2 EN DINTELES
ENCOFRADO Y DESENCOFRADO EN DINTELES
ACERO DE REFUERZO EN DINTELES
VIGAS
VIGAS PERALTADAS, CHATAS Y SOLERAS
CONCRETO F'C= 210 KG/CM2 EN VIGAS
ENCOFRADO Y DESENCOFRADO EN VIGAS
ACERO DE REFUERZO EN VIGAS
VIGAS DE AMARRE EN TABIQUERIA Y PARAPETOS
CONCRETO F'C= 210 KG/CM2 EN VIGAS DE AMARRE
ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARRE
ACERO DE REFUERZO EN VIGAS DE AMARRE
LOSAS
LOSAS ALIGERADAS CONVENCIONALES NERVADA EN UN SOLO SENTIDO
CONCRETO F'C=210 KG/CM2 EN LOSA ALIGERADA EN UN SOLO SENTIDO
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA EN UN SOLO SENTIDO
ACERO DE REFUERZO PARA EN LOSA ALIGERADA EN UN SOLO SENTIDO
LADRILLO HUECO DE ARCILLA 20X30X30 CM PARA LOSA ALIGERADA EN UN SENTIDO
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA EN UN SENTIDO
LOSA PARA LAVATORIO EN SS.HH.
CONCRETO F'C=210 KG/CM2 EN LOSA PARA LAVATORIO
ENCOFRADO Y DESENCOFRADO EN LOSA PARA LAVATORIO
ACERO DE REFUERZO EN LOSA PARA LAVATORIO
CISTERNA
CONCRETO DE F'C=140KG/CM2 EN FONDO DE CISTERNA
CONCRETO F'C=210 KG/CM2 EN TAPA DE LOSA
ENCOFRADO Y DESENCOFRADO EN TAPA DE LOSA
LADRILLO DE 20x30X30 EN CISTERNA
ACERO DE REFUERZO EN TAPA DE LOSA

ETRADOS
TRUCTUTAS

ORAMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

UND

METRADO

m3
m3
m3
m3

517.17
1347.50625

m3
m3

61.48
433.45

m2

909.94

m3

2042.06

m3
m2

66.65
71.53

m3

219.81

m3
m2

30.11
21.55

m3
m2

4.34

m2

238.86

m3
m2

44.43
98.28

m3
m2
kg

15.32
40.52
2957.80

m3
kg

260.78
7133.63

m3
m2
kg
m2

76.34
54.17
28478.44

m3
m2
kg

459.24
634.95
4710.21

m3
m2
kg

311.26
563.91
54384.68

UND

METRADO

m3
m2
kg

5.89
33.44
1497.77

m3
m2
kg

7.14
26.56
789.58

m3
m2
kg

220.86
287.82
42480.94

m3
m2
kg

m3
m2
kg
und
und

480.80
757.68
28365.45
20655.54

m3
m2
kg

2.91
35.38
100.53

m3
m3
m2
und
kg

13.15
18.40
30.44
48.83
51.11

DESCRIPCION

02.03.06.01.03

DISEO DEL AC

ACERO DE REFUERZO EN PLACAS


DESCRIPCION

DISEO DEL AC

PLACA EN AREA DE AUDITOR

PLACA EN HALL DE ESC

L = 11.00 m

L = 0.78 m

L = 1.03 m

PLACA EN ESCALER

02.03.03.03

ACERO DE REFUERZO EN SOBRECIMIEN

DESCRIPCION
AULAS 01, 02, 03

DISEO DEL AC

AULAS 04, 05 Y SS.HH.

AUDITORIOS MAS OFICINAS

ESCALERA TIPO II

RAMPA

02.03.07.01.03

ACERO DE REFUERZO EN COLUMNETA


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03


PRIMER PISO
C-1

C-2

C-3

SEGUNDO PISO
C-1

C-2

C-3

AZOTEA
C-1

C-2

C-3

AULAS 04, 05 Y SS.HH.


PRIMER PISO
C-1

C-2

C-3

C-4

C-5

C-6

SEGUNDO PISO
C-1

C-2

C-3

C-4

C-5

C-6

TERCER PISO
C-1

C-2

C-3

C-4

C-5

C-6

AUDITORIO MAS OFICINAS

C-1 EJE H-H

1er Piso
2do Piso

C-1 EJE G-G

1er Piso
2do Piso

3er Piso

C-1 EJE F-F

1er Piso
2do Piso

C-1 EJE E-E

1er Piso
2do Piso
HALL PRINCIPAL
C-1

1er Piso
2do y 3er Piso
C-2

1er Piso

2do Piso

C-3

1er Piso
2do Piso
HALL ESCALERA
C-1

1er PISO

2do y 3er Piso

C-2

1er PISO

2do y 3er Piso

EN CIMIENTOS DE COLUMNAS

02.03.07.01.03

ACERO DE REFUERZO EN COLUMNETAS


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03,04, 05 Y SS.HH.

PRIMER PIS

SEGUNDO PIS

TERCER PIS

AUDITORIO MAS OFICINAS

PRIMER PIS

SEGUNDO PIS

TERCER PIS

02.03.08.03

ACERO DE REFUERZO EN DINTELES


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03,04, 05 Y SS.HH.

PRIMER PIS

SEGUNDO PIS

TERCER PIS

AUDITORIO MAS OFICINAS

PRIMER PIS

SEGUNDO PIS

TERCER PIS

02.03.08.01.03

ACERO DE REFUERZO EN VIGAS


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03, 04, 05 Y SS.HH.


PRIMER Y SEGUNDO PISO

V-101, V-201 EJE 4-4

L = 0.25 m
L = 2.26 m
L = 0.25 m
L = 2.26 m

L = 0.25 m

41/2

L = 0.25 m

Estribos tramo A-C


Estribos tramo C-D

V-102, V-202 EJE 5-5


L = 8.56 m
L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

Estribos tramo A-C


Estribos tramo C-D

V-103, V-203 EJE A


L = 0.25 m

L = 0.25 m

L = 0.25 m

Estribos tramo 4-5


Estribos tramo 5-6
Estribos tramo 6-7

VB (0.15x0.70
L = 0.25 m

VC 0.30x0.30
L = 0.25 m

AZOTEA

V-301 EJE 4-4, E

L = 0.25 m
L = 2.26 m
L = 0.25 m
L = 2.26 m
L = 0.57 m

L = 0.25 m

V-302 EJE 5-5, E

L = 8.56 m
L = 0.25 m

L = 0.25 m

L = 0.57 m

L = 0.25 m

Estribos tramo A-C


Estribos tramo C-D

V-303 EJE A, C
L = 0.52 m

L = 0.25 m

L = 0.25 m

VB (0.15x0.70
L = 0.25 m

VC 0.30x0.30
L = 0.25 m

AUDITORIO MAS OFICINAS


PRIMER PISO

V - 101 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 102 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 103 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 104 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 105 (0.30x0
L=3.81 m
L = 0.25 m

L = 0.25 m

L = 0.25 m
L=3.81 m

L=7.28 m

SEGUNDO PISO

V - 201 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 202 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 203 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 203 (0.30x0
L=3.81 m

L = 0.25 m

L = 0.25 m

L = 0.25 m
L=3.81 m

L=7.28 m

AZOTEA

V - 301 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 302 (0.50x0

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

V - 303 (0.30x0

L=3.81 m
L = 0.25 m

L = 0.25 m
L=3.81 m

L=7.28 m

25/8+ 31/2

HALL PRINCIPAL

V-101, 201, 301 (0.5


L = 6.16 m
L = 0.25 m

43/4

L = 0.25 m

L = 0.25 m

L = 0.25 m
L = 6.16 m

43/4 + 25/8

V-102, 202, 302 (0.3

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m
L = 3.49 m

55/8

V-

L = 0.25 m

L = 0.25 m

L = 0.25 m

V-1

L = 0.25 m

L = 0.25 m

L = 0.25 m

HALL ESCALERA

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

L = 0.25 m

02.03.10.02.03

ACERO DE REFUERZO PARA EN LOSA A


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03


PISO 1 - 2
TECHO B

L = 0.25 m

L = 0.25 m

TECHO A

L = 0.25 m

15/8 + 11/2
L = 0.25 m

AZOTEA

TECHO B

L = 0.25 m

L = 0.25 m

TECHO A

L = 0.25 m

L = 0.25 m

AULAS 04, 05 Y SS.HH.


PRIMER Y SEGUNDO PISO
TECHO B
L = 8.64 m
L = 0.25 m

L = 0.25 m

L = 1.56 m

TECHO A
L = 0.25 m

L = 0.25 m

L = 0.25 m

AZOTEA
TECHO B
L = 8.64 m
L = 0.25 m

L = 0.25 m

L = 1.56 m

TECHO A
L = 0.25 m

L = 0.25 m

AUDITORIO
PRIMER PISO
L = 0.25 m

L = 0.25 m
15/8 + 13/8

SEGUNDO PISO
L = 1.96 m
L = 0.25 m

L = 0.25 m
15/8 + 13/8

AZOTEA
L = 0.25 m

L = 0.25 m

HALL PRINCIPAL

L = 0.25 m

L = 2.06 m

HALL ESCALERA

L = 0.25 m

L = 1.21 m

02.03.02.03

ACERO DE REFUERZO EN ZAPATAS


DESCRIPCION

DISEO DEL AC

AULAS 01, 02,

2.00

AULAS 04, 05 + S

2.00

2.20

2.50

1.70

2.10

1.50

1.50

2.60

2.90

AUDITORIO Y OFI

3.00

3.00

3.00

HALL PRINCIP

3.40

2.70

2.00

2.00

HALL ESCALE

1.50

1.50

EN CIMIENTOS DE P

EN CIMIENTOS DE PLAC
2.52

2.83

1.00

EN CIMIENTOS DE PLAC
4.81

02.03.03.03

ACERO DE REFUERZO EN VIGAS DE CIM


DESCRIPCION

DISEO DEL AC

AULAS 01, 02, 03, 04, 0


Ejes 4, 5, 6, 7, 8, 9
L = 4.41 m
L = 0.25 m

L = 4.41 m
L = 0.25 m

L = 0.25 m

L = 4.41 m

Ejes A,C , D
L = 4.52 m
L = 0.25 m

L = 4.52 m
L = 0.25 m

L = 4.52 m
L = 0.25 m

AUDITORIO Y OFI

L = 6.06 m
L = 0.25 m

L = 0.25 m

125/8

61/2

L = 0.25 m

61/2

L = 0.25 m
61/2

L = 3.40 m

L = 6.50 m

L = 0.25 m

HALL PRINCIP

L = 0.25 m

L = 0.25 m
L = 0.25 m

L = 0.25 m

L = 0.25 m
L = 0.25 m

L = 0.25 m

L = 0.25 m

155/8

61/2

L = 0.25 m

L = 5.95 m
75/8

L = 3.19 m
155/8

L = 0.25 m

L = 3.19 m
155/8

L = 0.25 m
L = 0.25 m

L = 3.19 m

HALL ESCALE

L = 0.25 m

L = 0.25 m
L = 0.25 m

L = 0.25 m

L = 0.25 m
L = 0.25 m

02.03.11.01.03

ACERO DE REFUERZO EN LOSA PARA L


DESCRIPCION

DISEO DEL AC
EN AUDITORIO MAS

EN AULAS

02.03.12.05

ACERO DE REFUERZO EN TAPA DE LOS


DESCRIPCION

02.03.12.05

DISEO DEL AC

ACERO DE REFUERZO EN TAPA DE LOS


DESCRIPCION

DISEO DEL AC

02.03.12.05

ACERO DE REFUERZO EN TAPA DE LOS


DESCRIPCION

Err:509

DISEO DEL AC

Err:509
DESCRIPCION

DISEO DEL AC

Err:509

Err:509
DESCRIPCION

Err:509

DISEO DEL AC

Err:509
DESCRIPCION

Err:509

DISEO DEL AC

Err:509
DESCRIPCION

DISEO DEL AC

Err:509

Err:509
DESCRIPCION

Err:509

DISEO DEL AC

Err:509
DESCRIPCION

DISEO DEL AC

Err:509

Err:509

Err:509

Err:509
DESCRIPCION

Err:509

DISEO DEL AC

Err:509
DESCRIPCION

DISEO DEL AC

Err:509

Err:509

DISEO DEL ACERO

CANT.

N DE VECES

# DE

LONG.

ELEM.

ELEM.

O DE REFUERZO EN PLACAS
# DE

LONG.

N DE VECES

ELEM.

ELEM.

1
1

2
2

69
60

14.10
14.25

3/8

90

11.00

3/8

90

0.78

3/8

90

1.03

3/8

90

1.08

3/8

60

18.75

Transversales

3/8

56

5.60

Longitudinales

3/8

26

29.00

DISEO DEL ACERO

CANT.

3/8
3/8

PLACA EN AREA DE AUDITORIO MAS OFICINAS

3/8 @ .20

3/8 @ .20
PLACA EN HALL DE ESCALERA e=0.30

3/8 @ .20

11.00 m

L = 0.78 m

L = 0.25 m

3/8 @ .20
L = 0.25 m

3/8 @ .20

L = 1.03 m

L = 1.08 m

L = 0.25 m

PLACA EN ESCALERA e=0.20

E REFUERZO EN SOBRECIMIENTOS REFORZADOS

Desperdicios

3% del total =

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

# DE

LONG.

N DE VECES

ELEM.

ELEM.

26.20

3/8
3/8
3/8

1
1
1

1
1
1

31
31
31

2.24
2.24
2.24

Eje C-C entre 4-5


Acero corrido

1/2

4.38

Estribos
Entre ejes 4-5

3/8

21

2.24

Eje C-C entre 5-6


Acero corrido

1/2

4.35

Estribos
Entre ejes 5-6

3/8

21

2.24

Eje C-C entre 6-7


Acero corrido

1/2

4.38

Estribos
Entre ejes 6-7

3/8

21

2.24

Ejes 4-4 y 7-7 entre A-C


Acero corrido

1/2

6.60

Estribos
Entre ejes A-C

3/8

21

2.24

1/2
1/2

1
1

1
1

6
6

1.50
1.80

3/8
3/8

1
1

1
1

9
11

2.24
2.24

Ejes C-C entre 5-6


Acero corrido

1/2

1.80

Estribos
Entre ejes 5-6

3/8

2.24

1/2
1/2

1
1

1
1

6
6

1.50
1.80

DISEO DEL ACERO

CANT.

Acero corrido

1/2

Estribos
Entre ejes 4-5
Entre ejes 5-6
Entre ejes 6-7

Corte 1-1
Eje A-A entre 4-7

Corte 2-2
Ejes C-C entre 4-5
Acero corrido

Estribos
Entre ejes 4-5

Ejes C-C entre 6-7


Acero corrido

Estribos
Entre ejes 6-7

3/8
3/8

1
1

1
1

9
11

2.24
2.24

Eje 5-5 y 6-6 entre A-C


Acero corrido

1/2

7.30

Estribos
Entre ejes A-C

3/8

32

2.24

Acero corrido

1/2

26.20

Estribos
Entre ejes 8-9
Entre ejes 9-10
Entre ejes10-11
Entre ejes11-12

3/8
3/8
3/8
3/8

1
1
1
1

1
1
1
1

31
31
17
17

2.24
2.24
2.24
3.24

Eje C-C entre 8-9


Acero corrido

1/2

4.38

Estribos
Entre ejes 8-9

3/8

21

2.24

Eje C-C entre 9-10


Acero corrido

1/2

4.35

Estribos
Entre ejes 9-10

3/8

21

2.24

Eje C-C entre 10-11


Acero corrido

1/2

3.80

Estribos
Entre ejes 10-11

3/8

18

2.24

Eje C-C entre 11-12


Acero corrido

1/2

3.75

Estribos
Entre ejes 11-12

3/8

18

2.24

Corte 2-2
Ejes 8-8 y 9-9 entre A-C
Acero corrido

1/2

6.60

Estribos
Entre ejes A-C

3/8

21

2.24

1/2
1/2
1/2

1
1
1

1
1
1

6
6
6

1.57
2.00
1.00

Corte 1-1
Eje A-A entre 8-12

En Zapata C-10
Acero corrido

Estribos

En Zapata C-11
Acero corrido

3/8
3/8
3/8

1
1
1

1
1
1

11
13
9

0.84
0.84
0.84

1/2
1/2
1/2

1
1
1

1
1
1

6
6
6

1.35
1.80
1.65

3/8
3/8
3/8

1
1
1

1
1
1

10
12
11

0.84
0.84
0.84

1/2

2.95

3/8

10

2.24

1/2

6.60

3/8

29

2.44

1/2

7.30

3/8

32

2.44

1/2

9.90

3/8

43

2.24

1/2
1/2

1
1

2
2

6
6

6.35
6.25

3/8
3/8

1
1

2
2

28
28

2.24
2.24

1/2

9.90

3/8

43

0.84

Estribos

Corte 3-3
En Zapata C-12
Acero corrido
Estribos

Corte 4-4
En eje 10-10 y 11-11 entre A-C
Acero corrido
Estribos

Corte 5-5
En eje 12-2 entre A-C
Acero corrido
Estribos

Corte 1-1
Ejes H-H
Acero corrido
Estribos

Ejes 1-1 y 3-3 entre G-F y F-E


Acero corrido

Estribos

Corte 2-2
Ejes E-E, F-F y G-G
Acero corrido
Estribos

Estribos

1/2
1/2
3/8
3/8
3/8

2
2
2
2
2

2
2
2
2
2

2
2
7
5
5

1.80
1.80
0.84
0.71
0.71

Estribos

1/2
1/2
3/8
3/8
3/8

2
2
2
2
2

1
1
1
1
1

2
2
7
5
5

1.80
1.80
0.84
0.71
0.71

Desperdicios
Alambre N 16
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN COLUMNETAS
DISEO DEL ACERO

# DE

LONG.

N DE VECES

ELEM.

ELEM.

10

8.88

1/2

8.98

3/8
3/8

4
4

1
1

57
57

1.94
1.14

5/8

16

8.88

3/4

10

8.98

3/8
3/8

4
4

1
1

57
57

3.14
2.74

CANT.

5/8

C-1

Estribos
Refuerzos

C-2

Estribos

C-3

Estribos

5/8

10

8.88

3/4

12

8.98

3/8
3/8

4
4

1
1

57
57

2.84
2.74

5/8

10

5.10

1/2

5.30

3/8
3/8

4
4

1
1

38
38

1.94
1.14

5/8

16

5.10

3/4

10

5.30

3/8
3/8

4
4

1
1

38
38

3.14
2.74

5/8

10

5.10

3/4

12

5.30

3/8
3/8

4
4

38
38

2.84
2.74

C-1

Estribos

C-2

Estribos

C-3

Estribos

C-1

Estribos

5/8

10

4.80

1/2

4.90

3/8
3/8

4
4

38
38

1.94
1.14

5/8

16

4.80

3/4

10

4.90

3/8
3/8

4
4

38
38

3.14
2.74

5/8

10

4.80

3/4

12

4.90

3/8
3/8

4
4

1
1

38
38

2.84
2.74

5/8

10

8.88

1/2

8.98

3/8
3/8

6
6

1
1

57
57

1.94
1.14

C-2

Estribos

C-3

Estribos

C-1

Estribos
Refuerzo

C-2

Estribos

5/8

16

8.88

3/4

10

8.98

3/8
3/8

2
2

1
1

57
57

3.14
2.74

5/8

10

8.88

3/4

12

8.98

3/8
3/8

2
2

1
1

57
57

2.84
2.74

5/8

28

8.88

1/2

8.98

3/8
3/8

2
2

1
1

57
57

3.44
2.74

5/8

24

8.88

C-3

Estribos

C-4

Estribos

C-5

Estribos

3/8
3/8

2
2

1
1

57
57

2.74
2.04

5/8

16

8.88

3/8
3/8

2
2

1
1

57
57

2.04
2.04

5/8

10

5.10

1/2

5.30

3/8
3/8

6
6

1
1

38
38

1.94
1.14

5/8

16

5.10

3/4

10

5.30

3/8
3/8

2
2

1
1

38
38

3.14
2.74

5/8

10

5.10

3/4

12

5.30

C-6

Estribos

C-1

Estribos
Refuerzo

C-2

Estribos

C-3

Estribos

3/8
3/8

2
2

1
1

38
38

2.84
2.74

5/8

28

5.10

1/2

5.30

3/8
3/8

2
2

1
1

38
38

3.44
2.74

5/8

24

5.10

3/8
3/8

2
2

1
1

38
38

2.74
2.04

5/8

16

5.10

3/8
3/8

2
2

1
1

38
38

2.04
2.04

5/8

10

4.80

C-4

Estribos

C-5

Estribos

C-6

Estribos

C-1

Estribos
Refuerzo

1/2

4.90

3/8
3/8

6
6

1
1

38
38

1.94
1.14

5/8

16

5.10

3/4

10

5.30

3/8
3/8

2
2

1
1

38
38

3.14
2.74

5/8

10

5.10

3/4

12

5.30

3/8
3/8

2
2

1
1

38
38

2.84
2.74

5/8

28

5.10

1/2

5.30

3/8
3/8

2
2

1
1

38
38

3.44
2.74

C-2

Estribos

C-3

Estribos

C-4

Estribos

C-5

Estribos

5/8

24

5.10

3/8
3/8

2
2

1
1

38
38

2.74
2.04

5/8

16

5.10

3/8
3/8

2
2

1
1

38
38

2.04
2.04

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

8.88
8.98
8.78

1/2
1/2

2
2

2
2

57
57

3.14
3.65

5/8
3/4
1/2

2
2
2

2
2
2

8
12
10

5.10
5.30
4.90

3/8
3/8

2
2

2
2

42
42

3.14
3.65

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

8.88
8.98
8.78

1/2
1/2

2
2

1
1

57
57

3.15
3.65

C-6

Estribos

C-1 EJE H-H


1er Piso

Estribos
Refuerzo
2do y 3er Piso

Estribos
Refuerzo
C-1 EJE G-G
1er Piso

Estribos
Refuerzo
2do Piso

Estribos
Refuerzo

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

5.10
5.30
4.90

3/8
3/8

2
2

1
1

42
42

3.14
3.65

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

5.10
5.30
4.90

3/8
3/8

2
2

1
1

38
38

3.14
3.65

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

8.88
8.98
8.78

1/2
1/2

2
2

1
1

57
57

3.14
3.65

5/8
3/4
1/2

2
2
2

2
2
2

8
12
10

5.10
5.30
4.90

3/8
3/8

2
2

2
2

42
42

3.14
3.65

5/8
3/4
1/2

2
2
2

1
1
1

8
12
10

8.88
8.98
8.78

1/2
1/2

2
2

1
1

57
57

3.14
3.65

5/8
3/4
1/2

2
2
2

2
2
2

8
12
10

5.10
5.30
4.90

3/8
3/8

2
2

2
2

42
42

3.14
3.65

3/4
5/8
1/2

2
2
2

1
1
1

12
8
10

8.98
8.88
8.78

1/2

57

3.14

3er Piso

Estribos
Refuerzo
C-1 EJE F-F
1er Piso

Estribos
Refuerzo
2do y 3er Piso

Estribos
Refuerzo

C-1 EJE E-E


1er Piso

Estribos
Refuerzo
2do y 3er Piso

Estribos
Refuerzo

C-1
1er Piso

Estribos

Refuerzo

1/2

57

3.65

3/4
5/8
1/2

2
2
2

2
2
2

12
8
10

5.30
5.10
4.90

3/8
3/8

2
2

2
2

38
38

3.14
3.65

5/8

23

8.98

1/2
3/8

2
2

1
1

57
57

2.04
2.04

5/8

23

5.10

3/8
3/8

2
2

2
2

38
38

2.04
2.04

5/8
1/2

1
1

1
1

10
6

8.88
8.78

3/8
3/8

1
1

1
1

57
57

2.04
1.59

5/8
1/2

1
1

2
2

10
6

5.10
4.90

3/8
3/8

1
1

2
2

38
38

2.04
1.59

Estribos

5/8
1/2
3/8

2
2
2

1
1
1

10
6
57

8.88
8.78
1.84

Refuerzo

3/8

57

1.59

2do y 3er Piso

Estribos
Refuerzo

C-2
1er Piso

Estribos

2do y 3er Piso

Estribos

C-3
1er Piso

Estribos
Refuerzo
2do y 3er Piso

Estribos
Refuerzo

C-1
1er Piso

2do y 3er Piso

Estribos

5/8
1/2
3/8

2
2
2

2
2
2

10
6
38

5.10
4.90
1.84

Refuerzo

3/8

38

1.59

Estribos

5/8
1/2
3/8

2
2
2

1
1
1

10
6
57

8.88
8.78
1.84

Refuerzo

3/8

57

1.59

Estribos

5/8
1/2
3/8

2
2
2

2
2
2

10
6
38

5.10
4.90
1.84

Refuerzo

3/8

38

1.59

5/8

16

2.52

3/8

13

2.54

C-2
1er Piso

2do y 3er Piso

Estribos

Varios
Alambre N 16

1539.19
1539.19
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

E REFUERZO EN COLUMNETAS
DISEO DEL ACERO

CANT.

1/2
3/8

1
1

N DE VECES

# DE
ELEM.

LONG.
ELEM.

6
6

4
26

4.50
0.90

PRIMER PISO
En SS.HH.
Acero corrido
Estribos
SEGUNDO PISO

En SS.HH.
Acero corrido
Estribos
En aulas
Acero corrido
Estribos

1/2
3/8

1
1

6
6

4
26

4.50
0.90

1/2
3/8

1
1

5
5

4
26

2.50
0.90

1/2
3/8

1
1

6
6

4
26

4.50
0.90

1/2
3/8

1
1

5
5

4
26

2.50
0.90

En el bloque en general
Acero corrido
Estribos

1/2
3/8

1
1

6
6

4
26

4.50
0.90

En el bloque en general
Acero corrido
Estribos

1/2
3/8

1
1

7
7

4
26

4.50
0.90

En SS.HH.
Acero corrido
Estribos

1/2
3/8

1
1

7
7

4
26

4.50
0.90

TERCER PISO
En SS.HH.
Acero corrido
Estribos
En aulas
Acero corrido
Estribos
PRIMER PISO

SEGUNDO PISO

TERCER PISO

Varios
Alambre N 16

42.39
42.39
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN DINTELES
DISEO DEL ACERO

N DE VECES

# DE
ELEM.

LONG.
ELEM.

1.00
1.00

1.00
1.00

4.00
21.00

3.43
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
21.00

3.40
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
21.00

3.43
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
21.00

3.40
0.90

1/2
3/8

2.00
2.00

1.00
1.00

6.00
34.00

3.43
0.90

1/2
3/8

3.00
3.00

1.00
1.00

5.70
33.00

3.40
0.90

CANT.

1/2
3/8

PRIMER PISO
En SS.HH.
V-04
Acero corrido
Estribos
V-05
Acero corrido
Estribos
SEGUNDO PISO
En SS.HH.
V-04
Acero corrido
Estribos
V-05
Acero corrido
Estribos
En aulas
V-06
Acero corrido
Estribos
V-07
Acero corrido
Estribos
TERCER PISO
En SS.HH.

V-04
Acero corrido
Estribos
V-05
Acero corrido
Estribos
En aulas
V-06
Acero corrido
Estribos
V-07
Acero corrido
Estribos

1/2
3/8

1.00
1.00

1.00
1.00

4.00
21.00

3.43
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
21.00

3.40
0.90

1/2
3/8

2.00
2.00

1.00
1.00

6.00
34.00

3.43
0.90

1/2
3/8

3.00
3.00

1.00
1.00

5.70
33.00

3.40
0.90

1/2
3/8

2.00
2.00

1.00
1.00

4.00
12.00

1.75
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
53.00

9.90
0.90

1/2
3/8

2.00
2.00

1.00
1.00

4.00
12.00

1.75
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
53.00

9.90
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
12.00

1.75
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
16.00

2.40
0.90

1/2
3/8

1.00
1.00

1.00
1.00

4.00
15.00

2.35
0.90

PRIMER PISO
En el bloque en general
V-02
Acero corrido
Estribos
V-03
Acero corrido
Estribos
SEGUNDO PISO
En el bloque en general
V-02
Acero corrido
Estribos
V-03
Acero corrido
Estribos
TERCER PISO
En SS.HH.
V-10
Acero corrido
Estribos
V-11
Acero corrido
Estribos
V-12
Acero corrido
Estribos
Varios
Alambre N 16

22.35
22.35
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN VIGAS
DISEO DEL ACERO

# DE

LONG.

N DE VECES

ELEM.

ELEM.

4
4

2
2

3
4

8.81
4.11

2.51

CANT.

5/8
5/8

5/8

V-101, V-201 EJE 4-4, EJE 7-7


L = 8.56 m

35/8

L = 3.86 m
45/8

L = 0.25 m

L = 2.26 m
55/8
L = 2.26 m

41/2
L = 3.90 m

1/2

2.51

5/8

3.90

1/2

3.90

5/8

1.41

5/8

14.14

5/8
1/2

4
4

2
2

4
1

5.00
5.00

5/8

2.10

3/8

38

2.04

3/8

21

2.04

3/4
3/4

5
5

2
2

3
4

8.81
4.11

3/4

10

2.51

1/2

2.51

3/4

3.90

3/4

3.90

1/2

3.90

3/4

1.41

3/4
3/4

5
5

2
2

5
3

8.81
4.11

3/4
1/2

5
5

2
2

2
3

5.00
5.00

55/8
L = 3.90 m
41/2
L = 1.16 m
35/8

L = 0.25 m
L = 0.25 m

L = 12.52 m
45/8
L = 5.00 m
45/8 + 11/2
L = 2.10 m
45/8

V-102, V-202 EJE 5-5, EJE 6-6


L = 3.86 m

L = 8.56 m

43/4

33/4

L = 0.25 m

L = 2.26 m
= 0.25 m

L = 0.25 m

L = 0.25 m

103/4
L = 2.26 m
21/2
L = 3.90 m
53/4
L = 3.90 m
53/4
L = 3.90 m
21/2
L = 1.16 m
43/4

L = 0.25 m

L = 8.56 m

53/4
L = 5.00 m
23/4+ 31/2
L = 2.10 m

L = 0.25 m

L = 3.86 m
33/4

L = 2.10 m

3/4

2.10

3/8

66

2.04

3/8

21

2.04

5/8

26.02

5/8

2.61

5/8

5.20

5/8

5.20

5/8

2.51

5/8

26.62

5/8

4.00

5/8

3.85

5/8

4.10

3/8

36

1.94

3/8

38

1.94

3/8

37

1.94

1/2

25.82

1/4
1/4
1/4

2
2
2

2
2
2

37
37
37

2.16
2.16
2.16

33/4

V-103, V-203 EJE A, C, D


L = 25.52 m

35/8

L = 0.25 m

L = 2.36 m
L = 0.25 m

55/8
L = 5.20 m
55/8
L = 5.20 m
55/8
L = 2.26 m
55/8

L = 26.12 m

L = 0.25 m

L = 0.25 m

45/8
L=4.00 m
45/8
L=3.85 m
45/8
L = 4.10 m
45/8

VB (0.15x0.70)
L = 25.32 m

61/2
Estribos Entre ejes 4-5
Estribos Entre ejes 4-6
Estribos Entre ejes 4-7

VC 0.30x0.30
L = 1.56 m

5/8

1.81

3/8

10

1.34

5/8
5/8

1
1

4
4

3
4

8.81
4.11

5/8

2.51

1/2

2.51

5/8

3.90

1/2

3.90

5/8

1.41

5/8

12.92

5/8

5.00

5/8

2.10

Estribos tramo A-C

3/8

38

2.04

Estribos tramo C-D

3/8

21

2.04

3/4
3/4

5
5

1
1

3
5

8.81
4.11

3/4

2.51

5/8

2.51

65/8

L = 0.25 m

Estribos

V-301 EJE 4-4, EJE 7-7


L = 3.86 m

L = 8.56 m

45/8

35/8

L = 0.25 m

L = 2.26 m
55/8
L = 2.26 m
21/2
L = 3.90 m
55/8
L = 3.90 m
21/2
L = 1.16 m
35/8

L = 0.25 m
L = 0.25 m

L = 12.42 m
45/8
L = 5.00 m
45/8
L = 2.10 m
45/8

V-302 EJE 5-5, EJE 6-6

L = 8.56 m

33/4
L = 2.26 m
53/4
L = 0.25 m

L = 0.57 m

L = 3.86 m
53/4
L = 0.25 m

L = 2.26 m
15/8

L = 3.90 m

3/4

3.90

5/8

3.90

3/4

1.41

5/8

12.92

5/8

5.00

5/8

5.00

5/8

2.10

3/8

39

2.10

3/8

21

2.10

5/8

25.96

5/8

2.61

5/8

5.20

5/8

5.20

5/8

2.51

5/8

26.62

5/8

4.00

5/8

3.85

5/8

4.10

53/4
L = 3.90 m
15/8
L = 1.16 m
43/4

L = 0.25 m

L = 12.42 m

55/8
L = 5.00 m
55/8
L = 5.00 m
15/8

L = 2.10 m

45/8

V-303 EJE A, C, D
L = 24.92 m

35/8

L = 0.52 m

L = 2.36 m
L = 0.25 m

55/8
L = 5.20 m
55/8
L = 5.20 m
55/8
L = 2.26 m
55/8

L = 26.12 m

L = 0.25 m

L = 0.25 m

45/8
L=4.00 m
45/8
L=3.85 m
45/8
L = 4.10 m
45/8

Estribos tramo 4-5

3/8

36

2.00

Estribos tramo 5-6

3/8

38

2.00

Estribos tramo 6-7

3/8

37

2.00

1/2

25.82

1/4
1/4
1/4

2
2
2

1
1
1

37
37
37

2.16
2.16
2.16

5/8

1.81

3/8

10

1.34

3/4

6.31

43/4

3/4

2.81

L = 2.56 m

5/8

2.81

3/4

6.31

3/4
5/8

1
1

1
1

5
2

2.81
2.81

5/8

2.81

3/4
5/8

1
1

1
1

4
2

6.31
6.31

3/4
5/8

1
1

1
1

4
2

8.20
8.20

3/4
5/8

1
1

1
1

4
2

6.31
6.31

VB (0.15x0.70)
L = 25.32 m

61/2
Estribos Entre ejes 4-5
Estribos Entre ejes 4-6
Estribos Entre ejes 4-7
VC 0.30x0.30
L = 1.56 m
65/8

L = 0.25 m

Estribos

V - 101 (0.50x095)
L = 6.06 m
33/4

L = 2.56 m
= 0.25 m

= 0.25 m

35/8
L = 6.06 m
33/4

L = 0.25 m

L = 2.56 m

53/4+ 25/8

L = 0.25 m

L = 2.56 m
15/8

L = 0.25 m

L = 6.06 m
43/4 + 25/8
L = 8.20 m

43/4 + 25/8
L = 6.06 m

43/4 + 25/8

L = 0.25 m

L = 11.92 m

1/2

11.92

1/2

51

3.04

3/4

6.31

73/4

3/4

2.81

L = 2.56 m

5/8

2.81

3/4

6.31

3/4

2.81

5/8

2.81

3/4

6.31

3/4

8.20

5/8

8.20

3/4

6.31

1/2

11.92

1/2

52

3.04

41/2

Estribos

V - 102 (0.50x0.95)
L = 6.06 m
43/4

L = 2.56 m
= 0.25 m

= 0.25 m

55/8
L = 6.06 m
43/4

L = 0.25 m

L = 2.56 m

73/4

L = 0.25 m

L = 2.56 m
55/8

L = 0.25 m

L = 6.06 m
63/4
L = 8.20 m

73/4
L = 8.20 m

35/8
L = 8.20 m

L = 0.25 m

63/4
L = 11.92 m

41/2

Estribos

V - 103 (0.50x0.95)
L = 6.06 m

3/4

6.31

73/4

3/4

2.81

L = 2.56 m

5/8

2.81

3/4

6.31

3/4

2.81

5/8

2.81

3/4

6.31

3/4

8.20

5/8

8.20

3/4

6.31

1/2

11.92

1/2

50

3.04

43/4

L = 2.56 m
= 0.25 m

= 0.25 m

65/8
L = 6.06 m
43/4

L = 0.25 m

L = 2.56 m

73/4

L = 0.25 m

L = 2.56 m
65/8

L = 0.25 m

L = 6.06 m
63/4
L = 8.20 m

73/4
L = 8.20 m

25/8
L = 6.06 m

L = 0.25 m

63/4
L = 11.92 m

41/2

Estribos

V - 104 (0.50x095)
L = 6.06 m

5/8

6.31

75/8

5/8

2.81

L = 2.56 m

5/8

2.81

5/8

6.31

5/8

2.81

5/8

2.81

5/8

6.31

5/8

8.20

5/8

6.31

1/2

11.92

1/2

51

3.04

3/4
3/4
3/4
3/4

2
2
2
2

1
1
1
1

4
4
4
4

4.06
7.28
7.30
4.09

3/4

1.71

3/4

3.50

3/4

3.50

45/8

L = 2.56 m
= 0.25 m

35/8

= 0.25 m

L = 6.06 m
45/8

L = 0.25 m

L = 2.56 m

75/8

L = 0.25 m

L = 2.56 m
35/8

L = 0.25 m

L = 6.06 m
65/8
L = 8.20 m

75/8
L = 0.25 m

L = 6.06 m

65/8
L = 11.92 m

41/2

Estribos

V - 105 (0.30x0.55)
L=3.84 m

L=7.28 m
43/4

L=7.30 m

L = 0.25 m

L = 1.46 m
L = 0.25 m

43/4
L = 3.50 m

43/4
L = 3.50 m

43/4
L = 3.50 m

L = 3.50 m

43/4
L = 1.46 m
43/4

L = 0.25 m
L = 0.25 m
L=3.84 m

L=7.28 m
55/8

L=7.30 m

3/4

3.50

3/4

1.71

5/8
5/8
5/8
5/8

2
2
2
2

1
1
1
1

5
5
5
5

4.06
7.28
7.30
4.09

5/8

3.90

5/8

3.65

5/8
1/2

2
2

1
1

1
4

2.90
2.90

5/8

3.95

3/8
3/8
3/8

2
2
2

1
1
1

31
32
32

1.84
1.84
1.84

3/4

6.31

3/4
5/8

1
1

1
1

4
2

2.81
2.81

5/8

2.81

3/4

6.31

3/4
5/8

1
1

1
1

5
2

2.81
2.81

5/8

2.81

3/4
5/8

1
1

1
1

4
2

6.31
6.31

3/4
5/8

1
1

1
1

4
2

8.20
8.20

L = 3.90 m

55/8
L = 3.65 m

55/8
L = 2.90 m

15/8+ 41/2
L = 3.95 m

55/8

Estribos entre ejes G-G y H-H


Estribos entre ejes G-G y F-F
Estribos entre ejes F-F y E-E

V - 201 (0.50x095)
L = 6.06 m
33/4

L = 2.56 m
= 0.25 m 53/4 + 25/8

L = 2.56 m
= 0.25 m

15/8
L = 6.06 m
33/4

L = 0.25 m

L = 2.56 m

53/4+ 25/8

L = 0.25 m

L = 2.56 m
15/8

L = 0.25 m

L = 6.06 m
43/4 + 25/8
L = 8.20 m

43/4 + 25/8

L = 6.06 m

L = 0.25 m

3/4
5/8

1
1

1
1

4
2

6.31
6.31

1/2

11.92

1/2

51

3.04

3/4

6.31

73/4

3/4

2.81

L = 2.56 m

5/8

2.81

3/4

6.31

3/4

2.81

5/8

2.81

3/4

6.31

3/4

8.20

5/8

8.20

3/4

6.31

1/2

11.92

43/4 + 25/8
L = 11.92 m

41/2

Estribos

V - 202 (0.50x0.95)
L = 6.06 m
43/4

L = 2.56 m
= 0.25 m

= 0.25 m

55/8
L = 6.06 m
43/4

L = 0.25 m

L = 2.56 m

73/4

L = 0.25 m

L = 2.56 m
55/8

L = 0.25 m

L = 6.06 m
63/4
L = 8.20 m

73/4
L = 8.20 m

35/8
L = 6.06 m

63/4
L = 11.92 m

41/2

L = 0.25 m

Estribos

1/2

52

3.04

5/8

6.31

85/8

5/8

2.81

L = 2.56 m

5/8

2.81

5/8

6.31

5/8

2.81

5/8

2.81

5/8

6.31

5/8

8.20

5/8

6.31

1/2

11.92

1/2

51

3.04

3/4

4.06

V - 203 (0.50x0.95)
L = 6.06 m
45/8

L = 2.56 m
= 0.25 m

= 0.25 m

25/8
L = 6.06 m
45/8

L = 0.25 m

L = 2.56 m

85/8

L = 0.25 m

L = 2.56 m
25/8

L = 0.25 m

L = 6.06 m
85/8
L = 8.20 m

85/8
L = 6.06 m

L = 0.25 m

85/8
L = 11.92 m

41/2

Estribos

V - 203 (0.30x0.55)
L=7.28 m

L=3.84 m

L=7.30 m

43/4

L = 0.25 m

3/4
3/4
3/4

2
2
2

1
1
1

4
4
4

7.28
7.30
4.09

3/4

1.71

3/4

3.50

3/4

3.50

3/4

3.50

3/4

1.71

5/8
5/8
5/8
5/8

2
2
2
2

1
1
1
1

5
5
5
5

4.06
7.28
7.30
4.09

5/8

3.90

5/8

3.65

5/8
1/2

2
2

1
1

1
4

2.90
2.90

5/8

3.95

3/8
3/8
3/8

2
2
2

1
1
1

31
32
32

1.84
1.84
1.84

5/8

6.31

5/8

2.81

5/8

6.31

5/8

2.81

5/8

6.31

L = 1.46 m
43/4

L = 0.25 m

L = 3.50 m

43/4
L = 3.50 m

43/4
L = 3.50 m

43/4
L = 1.46 m
43/4

L = 0.25 m
L = 0.25 m
L=3.84 m

=7.28 m
55/8

L=7.30 m

L = 3.90 m

55/8
L = 3.65 m

55/8
L = 2.90 m

15/8+ 41/2
L = 3.95 m

55/8

Estribos entre ejes G-G y H-H


Estribos entre ejes G-G y F-F
Estribos entre ejes F-F y E-E

V - 301 (0.50x095)
L = 6.06 m
45/8
L = 2.56 m
= 0.25 m

85/8
L = 6.06 m

45/8

L = 0.25 m

L = 2.56 m

85/8

L = 0.25 m

L = 6.06 m

55/8

L = 8.20 m

5/8

8.20

5/8

6.31

1/2

11.92

1/2

52

3.04

3/4

6.31

43/4 + 35/8

3/4
5/8

2
2

1
1

4
3

2.81
2.81

L = 2.56 m

5/8

2.81

3/4

6.31

3/4
5/8

2
2

1
1

4
3

2.81
2.81

5/8

2.81

5/8

6.31

1/2

8.20

5/8

8.20

5/8

6.31

1/2

11.92

75/8
L = 6.06 m

L = 0.25 m

55/8
L = 11.92 m

41/2

Estribos

V - 302 (0.50x0.95)
L = 6.06 m
43/4

L = 2.56 m
= 0.25 m

= 0.25 m

25/8
L = 6.06 m
43/4

L = 0.25 m

L = 2.56 m

43/4 + 35/8

L = 0.25 m

L = 2.56 m
25/8

L = 0.25 m

L = 6.06 m
75/8
L = 8.20 m

11/2
L = 8.20 m

75/8
L = 6.06 m

75/8
L = 11.92 m

L = 0.25 m

41/2

Estribos

1/2

51

3.04

5/8

4.06

1/2
5/8
1/2
5/8
1/2
5/8
1/2

2
2
2
1
1
1
1

1
1
1
1
1
1
1

3
2
3
2
3
2
3

4.06
7.28
7.28
7.30
7.30
4.09
4.09

5/8
1/2
5/8
1/2
5/8
1/2
5/8
1/2

2
2
2
2
1
1
1
1

1
1
1
1
1
1
1
1

2
3
2
3
2
3
2
3

4.06
4.06
7.28
7.28
7.30
7.30
4.09
4.09

3/8
3/8
3/8

2
2
2

1
1
1

31
32
32

1.84
1.84
1.84

3/4

6.41

43/4

3/4

2.81

L = 2.56 m

5/8

2.81

3/4

2.81

5/8

2.81

V - 303 (0.30x0.55)
L=3.84 m

L=7.28 m

25/8+ 31/2

L=7.30 m

L = 0.25 m

L = 0.25 m
L=3.84 m

L=7.28 m
L=7.30 m

25/8+ 31/2

= 0.25 m

= 0.25 m

Estribos entre ejes G-G y H-H


Estribos entre ejes G-G y F-F
Estribos entre ejes F-F y E-E

V-101, 201, 301 (0.50x0.95)


L = 6.16 m

43/4

L = 0.25 m

L = 2.56 m

35/8
L = 2.56 m
43/4

L = 0.25 m

L = 2.56 m
35/8

L = 0.25 m

L = 0.25 m
L = 6.16 m

43/4 + 25/8
L = 6.80 m

43/4 + 25/8

Estribos

3/4
5/8

2
2

3
3

4
2

6.41
6.41

3/4
5/8

1
1

3
3

4
2

6.80
6.80

1/2

46

3.04

5/8
5/8

1
1

3
3

3
3

3.74
7.54

5/8

1.86

5/8

1.86

5/8

2.95

5/8

2.95

5/8

1.51

5/8
5/8

1
1

3
3

5
5

3.74
7.54

5/8

3.55

5/8

2.30

3/8
3/8

1
1

3
3

28
23

1.84
1.84

5/8

5.47

V-102, 202, 302 (0.30x0.50)


L = 7.29 m

L = 3.49 m

35/8

35/8

L = 0.25 m

L = 1.61 m
55/8

L = 0.25 m

L = 1.61 m
15/8

L = 0.25 m

L=2.95 m

55/8
L=2.95 m

35/8
L = 1.26 m
55/8

L = 0.25 m
L = 0.25 m
L = 7.29 m

55/8
L= 3.55 m

55/8
L= 2.30 m

45/8
Estribos entre ejes 1-1 y 2-2
Estribos entre ejes 2-2 y 3-3

V-103, 203, 303 (0.30x0.45)

EJE 1-1

L = 4.97 m

25/8

L = 0.25 m

L = 0.25 m
L = 2.06 m
45/8

L = 0.25 m

5/8

2.31

5/8

2.31

5/8

5.47

5/8

1.10

3/8

23

1.64

5/8

6.87

5/8

2.31

5/8

2.31

5/8

6.87

5/8

2.50

3/8

29

1.64

5/8

4.07

5/8

1.46

5/8

1.46

L = 2.06 m
45/8

L = 0.25 m
L = 0.25 m

L = 4.97 m

45/8
L= 1.10 m

45/8

Estribos Eje 1-1

V-103, 203, 303 (0.30x0.45)

EJE B-B

L = 6.37 m

25/8

L = 0.25 m

L = 2.06 m
45/8

L = 0.25 m

L = 2.06 m
45/8

L = 0.25 m
L = 0.25 m

L = 6.37 m

45/8
L= 2.50 m

45/8

Estribos Eje 3-3

V-101, 201, 301


L = 3.57 m

25/8

L = 0.25
m

L = 1.21 m
L = 0.25 m

0.25 m

45/8
L = 1.21 m
45/8

L = 0.25 m
L = 0.25 m

0.25 m

L = 0.25 m

L = 3.57 m

5/8

4.07

5/8

1.75

3/8

20

1.64

5/8

4.02

5/8

1.46

5/8

1.46

5/8

4.02

5/8

1.75

3/8

20

1.64

45/8
L= 1.75 m

45/8

Estribos

V-102, 202, 302


L = 3.52 m

25/8

L = 0.25
m

L = 1.21 m
L = 0.25 m

45/8
L = 1.21 m
45/8

.25 m

L = 0.25 m

L = 3.52 m

L = 0.25 m

45/8
L= 1.70 m

45/8

Estribos

Varios
Alambre N 16

1202.29
1202.29
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO PARA EN LOSA ALIGERADA EN UN SOLO SENTIDO


DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

TECHO B
L = 8.79 m

25/8
L = 9.15 m
15/8 + 13/8

5/8

9.40

5/8

9.15

15/8 + 13/8
L = 8.79 m
15/8

L = 0.25 m

L = 1.56 m

3/8

9.15

5/8

9.4

5/8

1.85

5/8

4.3

5/8

4.3

0.625

1.85

5/8
1/2

1
1

2
2

27
27

9.04
9.04

5/8
3/8

1
1

2
2

27
27

9.15
9.15

5/8
1/2

1
1

2
2

27
27

9.04
9.04

5/8

27

1.85

5/8
3/8

2
1

2
2

27
27

4.30
4.30

5/8
3/8

2
1

2
2

27
27

4.30
1.85

5/8

27

1.85

5/8
3/8

1
1

1
1

8
8

9.04
9.04

5/8

9.15

5/8
3/8

1
1

1
1

8
8

9.04
9.04

1/2

1.85

5/8
1/2

1
1

1
1

8
8

4.30
4.30

15/8
L = 4.30 m
35/8
L = 4.30 m
35/8
L = 1.56 m

15/8

L = 0.25 m

TECHO A
L = 8.79 m

15/8 + 11/2
L = 9.15 m
15/8 + 13/8
L = 8.79 m

15/8 + 11/2

L = 0.25 m

L = 1.56 m

15/8
L = 4.30 m

25/8 + 13/8
L = 4.30 m
35/8
L = 1.56 m

15/8

L = 0.25 m

TECHO B
L = 8.79 m

15/8 + 13/8
L = 9.15 m

15/8
L = 8.79 m

15/8 + 13/8
L = 0.25 m
L = 1.56 m

11/2
L = 4.30
15/8 + 11/2

L = 4.30 m

15/8 + 11/2
L = 1.56 m

11/2

L = 0.25 m

5/8
1/2

1
1

1
1

8
8

4.30
4.30

1/2

1.85

5/8
3/8

1
1

1
1

27
27

9.04
9.04

5/8

27

9.15

5/8
3/8

1
1

1
1

27
27

9.04
9.04

1/2

27

1.85

5/8
1/2

1
1

1
1

27
27

4.30
4.30

5/8
1/2

1
1

1
1

27
27

4.30
4.30

1/2

27

1.85

5/8

8.89

5/8
3/8

8
8

2
2

1
1

8.85
8.85

5/8

8.89

5/8

1.81

5/8

4.30

5/8

4.30

5/8

2.70

5/8

1.81

5/8

27

1.81

TECHO A
L = 8.79 m

15/8 + 13/8
L = 9.15 m

15/8
L = 8.79 m

15/8 + 13/8
L = 0.25 m
L = 1.56 m

11/2
L = 4.30
15/8 + 11/2
L = 4.30 m

15/8 + 11/2
L = 1.56 m

11/2

L = 0.25 m

TECHO B

8.64 m

25/8
L = 8.85 m
15/8 + 13/8
L = 8.64 m
15/8

L = 0.25 m

L = 1.56 m

15/8
L = 4.30 m
35/8
L = 4.30 m
35/8
L = 2.70 m
15/8
L = 0.25 m

L = 1.56 m

15/8
TECHO A
L = 1.56 m

15/8

15/8
L = 4.30 m
25/8 + 13/8
L = 4.30 m

25/8 + 13/8
L = 2.70 m
15/8
L = 1.56 m

15/8
L = 8.64 m
15/8 + 11/2
L = 8.85 m
15/8 + 13/8
L = 8.64 m

L = 0.25 m

L = 0.25 m

5/8
3/8

27
27

2
2

2
1

4.30
4.30

5/8
3/8

27
27

2
2

2
1

4.30
4.30

5/8

27

2.70

5/8

27

1.81

5/8
1/2

27
27

2
2

1
1

8.89
8.89

5/8
3/8

27
27

2
2

1
1

8.85
8.85

5/8

27

8.89

5/8
3/8

8
8

1
1

1
1

8.89
8.89

5/8
3/8

8
8

1
1

1
1

8.85
8.85

5/8

8.89

1/2

1.81

5/8
1/2

8
8

1
1

1
1

4.30
4.30

5/8
1/2

8
8

1
1

1
1

4.30
4.30

5/8

2.70

1/2

1.81

1/2

27

1.81

5/8
1/2

27
27

1
1

1
1

4.30
4.30

15/8
TECHO B

8.64 m

15/8 13/8
L = 8.85 m
15/8
L = 8.64 m
15/8

L = 0.25 m

L = 1.56 m

11/2
L = 4.30 m
15/8 + 11/2
L = 4.30 m

15/8 + 11/2
L = 2.70 m
15/8
L = 0.25 m

L = 1.56 m

11/2
TECHO A
L = 1.56 m

11/2
L = 4.30 m
15/8 + 11/2
L = 4.30 m

L = 4.30 m

5/8
1/2

27
27

1
1

1
1

4.30
4.30

5/8

27

2.70

5/8

27

1.81

5/8
3/8

27
27

1
1

1
1

8.89
8.89

5/8

27

8.85

5/8

27

8.89

1/2

27

2.21

15/8 + 11/2

5/8
1/2

27
27

1
1

1
1

3.50
3.50

L = 3.50 m

5/8

27

3.50

1/2

27

1.96

5/8
3/8

27
27

1
1

1
1

7.16
7.16

5/8

27

7.15

5/8
3/8

27
27

1
1

1
1

7.21
7.21

1/2

27

2.21

5/8

27

3.50

5/8

27

3.50

1/2

27

2.21

15/8 + 11/2
L = 2.70 m
15/8
L = 1.56 m

11/2

L = 0.25 m

L = 8.64 m
15/8 + 13/8
L = 8.85 m
15/8
L = 0.25 m

L = 8.64 m

15/8

L = 1.96 m

11/2
L = 3.50 m

15/8
L = 1.96 m
11/2

L = 0.25 m

L = 6.91 m
15/8 + 13/8
L = 7.15 m
15/8
L = 6.96 m
15/8 + 13/8

L = 1.96 m

L = 0.25 m

11/2
L = 3.50 m
25/8
L = 3.50 m

25/8
L = 1.96 m
11/2

L = 0.25 m

L = 6.91 m
15/8 + 13/8
L = 7.15 m
15/8 + 13/8
L = 6.96 m

L = 0.25 m

15/8 + 13/8

L = 1.96 m

11/2

5/8
3/8

27
27

1
1

1
1

7.16
7.16

5/8
3/8

27
27

1
1

1
1

7.15
7.15

5/8
3/8

27
27

1
1

1
1

7.21
7.21

1/2

27

2.21

5/8
3/8

27
27

1
1

1
1

3.50
3.50

5/8
3/8

27
27

1
1

1
1

3.50
3.50

1/2

27

2.21

5/8

27

7.16

5/8

27

7.15

5/8

27

7.21

5/8
3/8

23
23

3
3

1
1

5.92
5.92

5/8

23

2.31

5/8

23

2.31

5/8

5.92

5/8

2.31

5/8

2.31

L = 3.50 m
15/8 + 13/8
L = 3.50 m

15/8 + 13/8
L = 1.96 m
11/2

L = 0.25 m

L = 6.91 m
15/8
L = 7.15 m
15/8
L = 6.96 m

L = 0.25 m

15/8
L = 5.92 m
15/8 + 13/8
L = 2.06 m

L = 0.25 m

15/8
L = 0.25 m

L = 2.06 m
15/8

L = 3.57 m
15/8
L = 1.21 m

L = 0.25 m

15/8
L = 0.25 m

L = 1.21 m
15/8

Varios
Alambre N 16

802.80
802.80
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML

PESO TOTAL EN KG POR

E REFUERZO EN ZAPATAS

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

AULAS 01, 02, 03

Acero Longitudinal

5/8

14

1.86

Acero Transversal

5/8

10

1.86

Acero Longitudinal

5/8

13

2.66

Acero Transversal

5/8

15

2.36

Acero Longitudinal

5/8

22

2.06

Acero Transversal

5/8

16

4.26

Acero Longitudinal

5/8

23

4.06

Acero Transversal

5/8

22

3.86

Acero Longitudinal

5/8

14

1.86

Acero Transversal

5/8

10

1.86

Acero Longitudinal

5/8

13

2.66

2.00

AULAS 04, 05 + SS.HH.

2.00

Acero Transversal

5/8

15

2.36

Acero Longitudinal

5/8

22

2.06

Acero Transversal

5/8

16

4.26

Acero Longitudinal

5/8

23

4.06

Acero Transversal

5/8

22

3.86

Acero Longitudinal

5/8

12

2.36

Acero Transversal

5/8

13

2.06

Acero Longitudinal

5/8

1.96

Acero Transversal

5/8

11

1.56

Acero Longitudinal

5/8

1.36

Acero Transversal

5/8

1.36

Acero Longitudinal

5/8

14

1.56

2.50

2.10

1.50

1.50

Acero Transversal

5/8

11

3.26

Acero Longitudinal

5/8

15

2.46

Acero Transversal

5/8

14

2.76

Acero Longitudinal

5/8

14

2.76

Acero Transversal

5/8

15

2.46

Acero Longitudinal

5/8

14

3.26

Acero Transversal

5/8

17

2.56

Acero Longitudinal

5/8

21

3.96

Acero Transversal

5/8

21

3.26

Acero Longitudinal

5/8

20

2.86

2.60

2.90

AUDITORIO Y OFICINAS

3.00

3.00

Acero Transversal

5/8

18

2.86

Acero Longitudinal

5/8

17

2.56

Acero Transversal

5/8

14

3.26

Acero Longitudinal

5/8

14

1.86

Acero Transversal

5/8

10

1.86

Acero Longitudinal

5/8

1.36

Acero Transversal

5/8

1.36

3.00

HALL PRINCIPAL

3.40

2.00

2.00

HALL ESCALERA

1.50

.50

5/8@0.2
0

EN CIMIENTOS DE PORTICOS

5/8@0.2
0
5/8@0.20
Acero Longitudinal

5/8

3.96

Acero Transversal

5/8

21

1.36

Acero Longitudinal

5/8

5.27

Acero Transversal

5/8

28

0.92

Acero Longitudinal

5/8

4.75

Acero Transversal

5/8

25

0.92

EN CIMIENTOS DE PLACA e=0.20cm


2.52

1.00

1.00

EN CIMIENTOS DE PLACA e=0.30cm


4.81

1.00

Varios
Alambre N 16
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

E REFUERZO EN VIGAS DE CIMENTACION


DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

15

4.66

AULAS 01, 02, 03, 04, 05 Y SS.HH.


Ejes 4, 5, 6, 7, 8, 9, 10, 12
L = 4.41 m
L = 0.25 m

5/8
155/8

L = 6.3 m

5/8

15

6.30

5/8

15

2.56

1/2

4.66

1/2

6.30

1/2

2.56

5/8

4.66

5/8

6.30

5/8

2.56

Estribos entre los A-C

3/8

35

3.40

Estribos entre los C-D

3/8

18

3.40

5/8

15

15

4.66

155/8
L = 2.31 m
155/8

L = 0.25 m

L = 4.41 m
61/2

L = 0.25 m

L = 6.3 m

61/2
L = 2.31 m

61/2

L = 0.25 m

.41 m
75/8
L = 6.3 m
75/8
L = 2.31 m

L = 0.25 m

75/8

Ejes A,C , D
L = 4.52 m
L = 0.25 m

155/8

L = 8.84 m

5/8

15

15

6.30

5/8

15

15

6.30

5/8

15

15

2.56

5/8

15

4.66

5/8

15

6.30

5/8

15

6.30

5/8

15

2.56

5/8

15

4.66

5/8

15

8.84

5/8

15

6.80

5/8

15

6.81

Estribos entre los 4-5

3/8

42

3.40

Estribos entre los 5-6

3/8

42

3.40

Estribos entre los 6-7

3/8

42

3.40

Estribos entre los 8-9

3/8

42

3.40

Estribos entre los 9-10

3/8

42

3.40

Estribos entre los 10-11

3/8

22

3.40

Estribos entre los 11-12

3/8

22

3.40

L = 0.25 m

5/8
5/8

4
4

12
12

6.06
6.06

L = 0.25 m

1/2

6.06

155/8
L = 6.80 m
155/8
L = 6.56 m
155/8

L = 0.25 m

L = 4.52 m
61/2

L = 0.25 m

L = 8.84 m

61/2
L = 6.80 m

61/2
L = 6.56 m
L = 0.25 m

61/2
L = 4.52 m
L = 0.25 m

75/8
L = 8.84 m
75/8
L = 6.80 m
75/8
L = 6.56 m
75/8

L = 0.25 m

AUDITORIO Y OFICINAS
Ejes H, G, F, E
L = 6.06 m
125/8

L = 6.06 m
61/2

L = 6.06 m
125/8

L = 6.06 m
61/2

61/2

1/2

6.06

5/8
5/8

4
4

10
10

6.06
6.06

5/8
5/8
5/8
5/8

2
2
2
2

12
12
12
12

3.65
6.50
6.50
3.45

Estribos entre 1-3

3/8

48

3.70

Estribos entre H-G

3/8

31

3.70

Estribos entre G-F

3/8

32

3.70

Estribos entre G-F

3/8

32

3.70

5/8

15

5.42

1/2

5.42

5/8

5.42

5/8

15

6.84

1/2

6.84

5/8

6.84

5/8

15

6.20

1/2

6.20

L = 0.25 m
L = 6.06 m
61/2

61/2

Ejes 1 - 3
L = 3.45 m

L = 6.50 m
L = 6.50 m

L = 0.25 m

125/8

HALL PRINCIPAL
Eje 1-1
L = 4.92 m
155/8

L = 0.25 m

L = 4.92 m
61/2

L = 4.92 m

L = 0.25 m
L = 0.25 m

75/8

Eje 3-3
L = 6.34 m
155/8

L = 0.25 m

L = 6.34 m
61/2

L = 6.34 m

L = 0.25 m
L = 0.25 m

75/8

Eje B-B
L = 5.95 m
155/8

L = 5.95 m
61/2

L = 5.95 m
155/8

L = 0.25 m

L = 5.95 m
61/2

L = 0.25 m

L = 0.25 m

5/8

6.20

5/8
5/8
5/8

1
1
1

1
1
1

15
15
15

3.44
5.13
2.16

1/2
1/2
1/2

1
1
1

1
1
1

6
6
6

3.44
5.13
2.16

5/8
5/8
5/8

1
1
1

1
1
1

7
7
7

3.44
5.13
2.16

Estribos Ejes 1-1

3/8

22

3.34

Estribos Ejes 3-3

3/8

29

3.34

Estribos Ejes B-B

3/8

49

3.34

Estribos Ejes C-C

3/8
3/8

1
1

28
22

3.34
3.34

5/8

4.05

1/2

4.05

5/8

4.05

5/8

4.75

1/2

4.75

5/8

4.75

Estribos Ejes 13-13 y 14-14

3/8

18

3.34

Estribos Ejes C-C y D-D

3/8

18

3.34

L = 5.95 m

L = 5.95 m

75/8

75/8

Eje C-C
L = 5.13 m

L = 2.16 m
155/8

155/8

L = 0.25 m

L = 5.13 m

L = 2.16 m
155/8

155/8

L = 0.25 m
L = 0.25 m

L = 5.13 m

3.19 m

L = 2.16 m
155/8

155/8

HALL ESCALERA
Ejes C-C y D-D
L = 3.55 m
85/8

L = 0.25 m

L = 3.55 m
41/2

L = 3.55 m

L = 0.25 m
L = 0.25 m

45/8

Ejes 13-13 y 14-14


L = 4.25 m
85/8

L = 0.25 m

L = 4.25 m
41/2

L = 4.25 m

L = 0.25 m
L = 0.25 m

45/8

Varios
Aalmbre N 16

805.99
805.99

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN LOSA PARA LAVATORIO

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

EN AUDITORIO MAS OFICINAS


En losa
Acero de 3/8 transversalmente
Acero de 3/8 longitudinalmente

3/8
3/8

1.00
1.00

1.00
1.00

9
3

0.75
2.00

Acero en los muretes


Acero de 3/8 transversalmente
Acero de 3/8 longitudinalmente

3/8
3/8

2.00
2.00

2.00
2.00

5
3

0.90
1.20

En losa
Acero de 3/8 transversalmente
Acero de 3/8 longitudinalmente

3/8
3/8

3.00
3.00

1.00
1.00

18
3

0.75
3.90

Acero en los muretes


Acero de 3/8 transversalmente
Acero de 3/8 longitudinalmente

3/8
3/8

3.00
3.00

2.00
2.00

5
3

0.90
1.20

EN AULAS

Acero N 16
Varios

3%Total
3%Total
PESO EN KG POR METRO LINEAL
LONGITUD TOTAL POR EN ML

2.85
2.85

PESO TOTAL EN KG POR

DE REFUERZO EN TAPA DE LOSA

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

Cisterna de 5000 lts


0.15m

3/8

14

3.17

3/8

14

3.17

Cisterna de 10 000 lts

Desperdicios

1.4885052

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN TAPA DE LOSA


DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DE REFUERZO EN TAPA DE LOSA


DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

PESO TOTAL EN KG POR

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

# DE

LONG.

ELEM.

ELEM.

# DE

LONG.

ELEM.

ELEM.

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

DISEO DEL ACERO

CANT.

PESO TOTAL EN KG POR

PESO EN KG POR METRO LINEAL


LONGITUD TOTAL POR EN ML
PESO TOTAL EN KG POR

LONGITUD POR EN ML
1/4"

3/8"

1/4"

3/8"

1/2"

5/8"

LONGITUD POR EN ML
1/2"
5/8"

3/4"

3/4"

1945.80
1710.00

990.00
70.20
92.70
97.20
1125.00

627.20

1508.00

137.19

0.25

0.56
8166.10

1
0.00

1.56
0.00

2.24
0.00

4573.016

TOTAL
KG
4710.21

1/4"

3/8"

LONGITUD POR EN ML
1/2"
5/8"

209.60

69.44
69.44
69.44

35.04

47.04

34.80

47.04

35.04

47.04

105.60

94.08

9.00
10.80

20.16
24.64

21.60

40.32

9.00
10.80

3/4"

20.16
24.64

43.80

143.36

209.60

69.44
69.44
38.08
55.08

35.04

47.04

34.80

47.04

30.40

40.32

30.00

40.32

79.20

94.08

9.42
12.00
6.00

9.24
10.92
7.56

8.10
10.80
9.90

8.40
10.08
9.24

23.60

44.80

52.80

141.52

58.40

156.16

79.20

96.32

76.20
75.00

125.44
125.44

178.20

108.36

14.40
14.40
23.52
14.20
14.20

7.20
7.20
11.76
7.10
7.10

83.71
83.71
0.25

1/4"

0.56
2149.00

1
1586.94

1.56
0.00

2.24
0.00

1203.44

1586.94

3/8"

LONGITUD POR EN ML
1/2"
5/8"

3/4"

355.20
215.52
442.32
259.92

568.32
359.20
715.92
624.72

TOTAL
KG
2957.80

355.20
431.04
647.52
624.72

204.00
127.20
294.88
173.28

326.40
212.00
477.28
416.48

204.00
254.40
431.68
416.48

192.00
117.60
294.88
173.28

307.20
196.00
477.28
416.48

192.00
235.20
431.68
416.48

532.80
323.28
663.48
389.88

284.16
179.60
357.96
312.36

177.60
215.52
323.76
312.36

497.28
35.92
392.16
312.36

426.24

312.36
232.56

284.16
232.56
232.56

306.00
190.80
442.32
259.92

163.20
106.00
238.64
208.24

102.00
127.20

215.84
208.24

285.60
21.20
261.44
208.24

244.80
208.24
155.04

163.20
155.04
155.04

288.00

176.40
442.32
259.92

163.20
106.00
238.64
208.24

102.00
127.20
215.84
208.24

285.60
21.20
261.44
208.24

244.80
208.24
155.04

163.20
155.04
155.04

142.08
215.52
175.6
715.92
832.2

163.20
254.40
196
527.52
613.2

142.08
215.52
175.6
359.1
416.1

81.60
127.20
98
263.76
306.6

81.60
127.20
98
238.64
277.4

142.08
215.52
175.6
357.96
416.1

163.20
254.40
196
527.52
613.2

142.08
215.52
175.6
357.96
416.1

163.20
254.40
196
527.52
613.2

215.52
142.08
175.6
357.96

416.1

254.40
163.20
196
477.28
554.8

413.08
232.56
232.56

469.20
310.08
310.08

88.80
52.68
116.28
90.63

102.00
58.8
155.04
120.84

177.60
105.36
209.76
181.26

204.00
117.6
279.68
241.68

177.60
105.36
209.76
181.26

204.00
117.6
279.68
241.68

241.92
198.12

0.25
0.00
0

0.56
26141.15
14639.044

1/4"

3/8"

1
8522.58
8522.58

LONGITUD POR EN ML
1/2"
5/8"

108.00
140.4

1.56
11022.76
17195.5056

2.24
4898.96
10949.18

3/4"

TOTAL
KG
54384.68

108.00
140.4
50.00
117

108.00
140.4
50.00
117

108.00
140.4

126.00
163.8

126.00
163.8

0.25
0

0.56
1123.20
628.992

1/4"

3/8"

1
784.00
784

2.24

0.00

LONGITUD POR EN ML
1/2"
5/8"

13.72
18.9
13.60
18.9

13.72
18.9
13.60
18.9

41.16
61.2
58.14
89.1

1.56

3/4"

TOTAL
KG
1497.77152

13.72
18.9
13.60
18.9

41.16
61.2
58.14
89.1

14.00
21.6
39.60
47.7

14.00
21.6
39.60
47.7

7.00
10.8
9.60
14.4
9.40
13.5

0.25
0

0.56
591.30
331.128

1/4"

3/8"

1
413.76
413.76

1.56
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

211.44
131.52

100.40

2.24
0.00
0.00

3/4"

TOTAL
KG
789.58

80.32

156.00

124.80

33.84

452.48

160.00
40.00
67.20

620.16
342.72

264.30
164.40
251.00

50.20

195.00

195.00

78.00

56.40

440.50
123.30
100.00
150.00

63.00

1346.40
428.40

936.72

156.60

312.00

312.00

150.60

1277.76

192.00

184.80

196.80

838.08
884.64
861.36

619.68

319.68
319.68
319.68

195.48

241.20

105.72
65.76

50.20

20.08

78.00

31.20

16.92

206.72

20.00

8.40

77.52
42.84

132.15
102.75

62.75

12.55

97.50

19.50

28.20

323.00
125.00

25.00

42.00

409.50
220.50

467.28

78.30

156.00

156.00

75.30

638.88

96.00

92.40

98.40

432.00
456.00
444.00

309.84
159.84
159.84
159.84

195.48

241.20

18.93

11.24

8.43

18.93

14.05
5.62

2.81

25.24
12.62
32.80
16.40

25.24
12.62

95.36

155.04

25.24

19.67

14.05

25.24

19.67

14.05

37.86

57.40

24.60

37.86

95.36

158.08

25.24

19.67

16.86

25.24

19.67

16.86

37.86

57.40

16.40

37.86

95.36

152.00

25.24

19.67

8.43

25.24

19.67

8.43

37.86

57.40

37.86

95.36

155.04

32.48
58.24
58.40
32.72
13.68
28.00

28.00

28.00

13.68
40.60
72.80
73.00
40.90

39.00
36.50
5.80
23.20
39.50

114.08
117.76
117.76

18.93

11.24
5.62
8.43

18.93

14.05
5.62

2.81

25.24
12.62
32.80
16.40

25.24
12.62
95.36

155.04

50.48

39.34

28.10

50.48

39.34

28.10

75.72

114.80

49.20

75.72

190.72

158.08

25.24

22.48

5.62

25.24

22.48

5.62

50.48

65.60

50.48

95.36

155.04

32.48

58.24
58.40
32.72
13.68
28.00

28.00

28.00

13.68
40.60
72.80
73.00
40.90

39.00
36.50
5.80
23.20
39.50

114.08
117.76
117.76

50.48

44.96

50.48

44.96

63.10

114.80

63.10
190.72

316.16

50.48

22.48
16.86

11.24

50.48

22.48
16.86

11.24

88.34

16.40

114.80

88.34

190.72

310.08

16.24
24.36
29.12
43.68
14.60
21.90
8.18
12.27

16.24
24.36
29.12
43.68
14.60
21.90
8.18
12.27

114.08
117.76
117.76

153.84

33.72
33.72

33.72

33.72

153.84
76.92

81.60
40.80

419.52

33.66
67.86
27.90

27.90

44.25
26.55

22.65

56.10
113.10

53.25

27.60

154.56
126.96

32.82

27.72

27.72
65.64

13.20

113.16

41.22

27.72

27.72
82.44

30.00

142.68

24.42

17.52

17.52

48.84

21.00

98.40

48.24

35.04

35.04

96.48

42.00

196.80

0.25

1/4"

0.56
9767.88

1
5049.74

1.56
12284.65

2.24
4649.91

5470.0128

5049.74

19164.054

10392.54885

3/8"

LONGITUD POR EN ML
1/2"
5/8"

300.80

146.40

3/4"

TOTAL
KG
42480.94

146.40
300.80

29.60

206.40
206.40

29.60

488.16
488.16

494.10
494.10
488.16
488.16

99.90

464.40
232.20
464.40
99.90
99.90

72.32
72.32

73.20
72.32
72.32

14.80
34.40
34.40

34.40
34.40
14.80

244.08
244.08

247.05
244.08
244.08

49.95
116.10
116.10
116.10
116.10
49.95

284.48

141.60
141.60

142.24

28.96
206.40

206.40

43.20

28.96

97.74

464.40
232.20
464.40
232.20
145.80

97.74

480.06
480.06

477.90
477.90
480.06

71.12
71.12
70.80
70.80
71.12

14.48

34.40
34.40
34.40
34.40
21.60

14.48

48.87

116.10
116.10

116.10
116.10
72.90

48.87

240.03
240.03

238.95

240.03

59.67

94.50
94.50
94.50

52.92

193.32
193.32

193.05
194.67
194.67

59.67

189.00

189.00

59.67

193.32
193.32
193.05
193.05

194.67
194.67

59.67

94.50
94.50
94.50
94.50
59.67

193.32

193.05

194.67

408.48
408.48
159.39

159.39

159.84
62.37

62.37

0.22
0

0.56
4637.76

1
2711.48

1.56
13750.79

2.24
0.00

TOTAL
KG

2597.1456

2711.48

21451.2324

28365.45

1/4"

3/8"

LONGITUD POR EN ML
1/2"
5/8"

52.08

69.16

70.80

181.28

272.64

373.52

339.68

26.04

18.60

34.58

3/4"

35.40

90.64

136.32

373.52

339.68

28.32

26.78

17.64

17.16

10.88

10.88

43.68

71.72

36.90

38.64

38.64

36.90

91.28

87.04

332.64

273.84

114.40

102.96

87.04

91.28

78.12

55.80

43.52

43.52

63.36

57.12

31.62

25.76

28.50

23.00
201.90
201.90
0.25

1/4"

0.56
0

3/8"

1.56
4314.00

2.24

6729.84

LONGITUD POR EN ML
1/2"
5/8"

559.20

3/4"

TOTAL
KG
7133.63

756.00
307.20

223.68

302.40

122.88

260.96

352.80
143.36

952.00

489.60

1048.50

1417.50

1417.50

576.00

419.40

567.00

567.00

230.40

489.30

928.20

714.00

715.05

428.40
428.40
428.40
428.40
428.40
224.40
224.40

290.88
290.88

145.44

145.44
242.40
242.40

87.60
156.00
156.00
82.80

710.40
458.80
473.60
473.60

81.30

32.52
37.94

102.60

41.04
47.88

186.00

74.40

86.80

51.60
76.95
32.40
20.64
30.78
12.96
24.08
35.91
15.12

73.48
96.86
163.66
93.52
73.48

64.80

32.40

32.40

76.00

38.00

38.00

60.12
60.12

0.25
0

0.56
6770.04

3791.2224

1/4"

3/8"

1
1222.58
1222.58

1.56
14008.11
21852.6516

LONGITUD POR EN ML
1/2"
5/8"

2.24
0.00
0.00

TOTAL
KG
28478.44

3/4"

6.75
6.00

18.00
14.40

40.50
35.10

27.00
21.60

0.25
0

0.56
169.35

1
0.00

1.56
0.00

2.24
0.00

TOTAL
KG

1/4"

94.836

3/8"

LONGITUD POR EN ML
1/2"
5/8"

0.00

100.53

3/4"

44.38

44.38

0.25

1/4"

0.559
88.76

49.61684

3/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

2.24
0.00
0.00

3/4"

TOTAL
KG
51.11

0.25
0

0.559
0

1/4"

3/8"

0.25

0.56

1/4"

3/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

1
0.00
0

1.56

LONGITUD POR EN ML
1/2"
5/8"

2.24
0.00
0.00

TOTAL
KG
0.00

3/4"

2.24

3/4"

TOTAL
KG
1269.87

0.25
0

0.56
0

1/4"

3/8"

0.25

0.56

1.56

LONGITUD POR EN ML
1/2"
5/8"

1.56

2.24

3/4"

2.24

0
0

1/4"

3/8"

0.25

1/4"

0.559
0

3/8"

LONGITUD POR EN ML
1/2"
5/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

TOTAL
KG
0.00

TOTAL
KG
0.00

3/4"

2.24
0.00
0.00

3/4"

TOTAL
KG
0.00

0.11
0

0.017
0

1/4"

3/8"

0.25

1/4"

0.017
0

3/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

2.24
0.00
0.00

TOTAL
KG
0.00

3/4"

2.24
0.00
0.00

3/4"

TOTAL
KG
0.00

0.00

0.00

0.559
0

0.993
0.00
0

1.55
0.00
0

2.24
0.00
0.00

TOTAL
KG
0.00

0.25

1/4"

3/8"

0.25
0

0.559
0

1/4"

3/8"

LONGITUD POR EN ML
1/2"
5/8"

0.993
0.00
0

1.55
0.00
0

LONGITUD POR EN ML
1/2"
5/8"

3/4"

2.24
0.00
0.00

3/4"

TOTAL
KG
0.00

0.00

0.00

0.559
0

0.993
0.00
0

1.55
0.00
0

2.24
0.00
0.00

TOTAL
KG
0.00

0.25

DESCRIPCION

DISEO DEL ACERO

METRADO DE ESTRUCTURAS DE
ACERO
ELEMENTO ESTRUCTURAL 1

ESCALERA - HALL PR
Escalera tramo 1

Escalera tramo 2 y 4

Escalera tramo 3

ACERO TUBULAR DE 2"

ACERO TUBULAR DE 1"

ACERO RECTANGULAR DE 50x150 mm E=9.174 mm

ACERO RECTANGULAR DE 50x150 mm E=5.560 mm

PERNOS DE 3/8

Ver detalle 2
ACERO RECTANGULAR DE 400x400x5/8
0 6 Tuer cas de nivel 5/8 ''
P LANCHA METALICA
40 0 mm x 4 00mm x 5/8"

P LANCHA METALICA
400 mm x 40 0mm x 5/8 "

.60
2 ANCLAJ ES 1" X 12"
A-3 6 (P AS ANTE)

.50

TUERCAS DE NIVEL DE 5/8

Tuercas de nivel

Ver detalle 1
S ol dadur a
Tuer cas de nivel 5/8''

S ol dadur a
Tuer cas de nivel 5/8''
1 ANCLAJ ES 1" X 12"
Tubo r ect angul ar
50mm x 150 mm
E=9 .174mm

Ver detalle 3
01 ANCLAJ
E 1" X 12"
ANCLAJES
DE 1"x12"
A-36 (P AS ANTE)

04 Tuer cas de nivel 5/8''

Anclajes

Losa e= 0.30m

P LANCHA METALICA
200 mm x 300mm x 5/8"

P LANCHA METALICA
200 mm1x 300mm x 5/8"
Ver detalle

Ver detalle 3

PLANCHA METALICA DE 200x300x5/8


Plancha metalica

Ver detalle 3

MADERA DE 1"x10"x4"

SOLDADURA

ELEMENTO ESTRUCTURAL 2
ESCALERA - HALL PR
Escalera tramo 1

Escalera tramo 2 y 4

Escalera tramo 3

ACERO RECTANGULAR DE 2"

ACERO RECTANGULAR DE 1"

ACERO RECTANGULAR DE 50x150 mm E=9.174 mm

ACERO RECTANGULAR DE 50x100 E=5.560 mm

PERNOS DE 3/8"

PLANCHA METALICA DE 400x400x5/8


06 Tuer cas de nivel 5/8''
P LANCHA METALICA
400 mm x 400mm x 5/8"

PLANCHA METALICA
400 mm x 400mm x 5/8"

.60
2 ANCLAJ ES 1" X 12"
A-36 (PASANTE)

.50

ANCLAJES DE 1x12"
Anclajes

TUERCAS DE NIVEL DE 5/8"

Tuercas de nivel

S ol dadur a

Ver detalle 1 y 4

Tuer cas de nivel 5/8''


1 ANCLAJ ES 1 " X 12"
Tubo r ect angul ar
Ver mm
detalle 3
50mm x 150
E=9.174mm
0 1 ANCLAJDE
E 200x300x5/8
1" X 12"
PLANCHA METALICA
A-36 (P AS ANTE)

04 Tuer cas de nivel 5/8''

Plancha metalica

Losa e= 0.30m

ACERO RECTANGULAR DE 100x200 E=9.174 mm

P LANCHA METALICA
200 mm x 300mm x 5/8"

P LANCHA METALICA
200 mm x 3 00mm x 5/8"

Elevacion columnas
metalicas
MADERA DE 1"x10"x4"

SOLDADURA

ELEMENTO ESTRUCTURAL 3

RAMPA

Pefil rectangular 2x4

ACERO TUBULAR DE 2"

Perfil tunular de 2"

ACERO TUBULAR DE 1"

PERFIL DE 2"x4"
Perfil de 2x4

CALAMINON DE 800mm 3 mm E=0.45mm

70mm

1200mm

70mm

1200mm

70mm

36mm
0.36mm

25mm

25mm

25mm

Detalle de Calaminon
CONCRETO EN LOSA MACISA

PLANCHA METALICA DE 400x400x5/8"


Plancha metalica

ANCLAJES DE 1"x12" A-36

Anclajes metalicos

TUERCAS DE NIVEL DE 5/8

Tuercas de nivel

SOLDADURA
ELEMENTO ESTRUCTURAL 4

TORRE DE ESTRUC
PERFIL RECTANGULAR DE 8"x8"x4.5mm (3/16")

Seccion A

PERFIL RECTANGULAR DE 4"x4"x3mm

ANCLAJES METALICOS
SOLDADURA
ELEMENTO ESTRUCTURAL 5

MURO CORTINA- HALL P


PERFIL RECTANGULAR DE 4"x4"x3mm

Seccion A

ANCLAJES METALICOS

SOLDADURA
ELEMENTO ESTRUCTURAL 6

MURO CORTINA- ADMINIS


PERFIL REACTANGULAR DE 4"x2"x2.5mm

ANCLAJES METALICOS

SOLDADURA
ELEMENTO ESTRUCTURAL 7

MURO CORTINA-PABELL
PERFIL REACTANGULAR DE 4"x2"x2.5mm

ANCLAJES METALICOS

ELEMENTO ESTRUCTURAL 8

FACHADA PR
PERFIL REACTANGULAR DE 4"x2"x3mm

Seccion A

Seccion B

PERFIL REACTANGULAR DE 4"x4"

PERFIL REACTANGULAR DE 4"x6"x4mm

PERFIL REACTANGULAR DE 8"X4"x4mm

ANCLAJES METALICOS

SOLDADURA
ELEMENTO ESTRUCTURAL 9
ESTRUCTURA DE PANELES - RAMPA

ACERO RECTANGULAR DE 4"x2"

ACERO RECTANGULAR DE 8"x4"

SOLDADURA

ELEMENTO ESTRUCTURAL 10 -COBERTURA


TUBO CUADRADO DE ACERO ASTM A-500 2"x2"

Techo de escalera

Techo de escalera
PERFIL U DE ACERO ASTM A-500 3"x5"

CLAVO LISO O TORINILLO MAS PROTECTOR PLASTICO


PERNO AUTOPERFORANTE MAS PROTECTOR PLASTICO

TORNILLO 1 1/4"
TUBO PBC 1 1/2"

ELEMENTO ESTRUCTURAL 11 COBERTURA


TUBO CUADRADO DE ACERO ASTM A-500 2"x2"

Techo de escalera
Principal

PERFIL U DE ACERO ASTM A-500 3"x5"

CLAVO LISO O TORINILLO MAS PROTECTOR PLASTICO


PERNO AUTOPERFORANTE MAS PROTECTOR PLASTICO

TORNILLO 1 1/4"

TUBO PBC 1 1/2"

DISEO DEL ACERO

ELEMENTO ESTRUCTURAL 1
ESCALERA - HALL PRINCIPAL Tipo 2

Ver lmina A-18

Escalera tramo 1

Escalera tramo 2 y 4

Escalera tramo 3

ml
Escalera tramo 1
Tubos horizontales
Tubos verticales
Tubos diagonales
Escalera tramo 2 y 4
Tubos horizontales
Tubos verticales
Tubos diagonales
Escalera tramo 3
Tubos horizontales
Tubos verticales

Tubos diagonales

E 1"

ml
Escalera tramo 1
Tubos horizontales
Tubos diagonales
Escalera tramo 2 y 4
Tubos horizontales
Tubos diagonales
Escalera tramo 3
Tubos horizontales
Tubos diagonales

LAR DE 50x150 mm E=9.174 mm

ml
Escalera tramo 1
Tubo rectangular 50x150 mm E=9.174 mm
Escalera tramo 2 y 4
Tubo rectangular 50x150 mm E=9.174 mm
Escalera tramo 3
Tubo rectangular 50x150 mm E=9.174 mm

LAR DE 50x150 mm E=5.560 mm

ml
Tubo rectangular debajo de Pasos 50x100mm E=5.560 mm

Ver detalle 2

und
Pernos de 3/8

LAR DE 400x400x5/8

ml
Plancha metalica 400x400x5/8

06 Tuer cas de nivel 5/8''

P LANCHA METALICA
40 0 mm x 4 00mm x 5/8"

Ver detalle 1

.50

und
Tuercas de nivel 5/8

Ver detalle 1
S ol dadur a
Tuer cas de nivel 5/8''

S ol dadur a
Tuer cas de nivel 5/8''

Tuercas de nivel 5/8

1" X 12"
Tubo r ect angul ar
50mm x 150 mm
E=9.174mm

E 1" X 12"
(P AS ANTE)

und

04 Tuer cas de nivel 5/8''

Anclajes de 1x12"

a e= 0.30m

METALICA
0mm x 5/8"

Anclajes 1x1/2

P LANCHA METALICA
200 mm1x 300mm x 5/8"
Ver detalle

Ver detalle 3

A DE 200x300x5/8

und
Plancha metalica 200x300x5/8

m2
Madera de 1"x10"x4"
Descanso

ELEMENTO ESTRUCTURAL 2
ESCALERA - HALL PRINCIPAL Tipo 2
Escalera tramo 1

Escalera tramo 2 y 4

Ver lmina A-19

Escalera tramo 3

ml
Escalera tramo 1
Tubos horizontales
Tubos verticales
Tubos diagonales
Escalera tramo 2 y 4
Tubos horizontales
Tubos verticales
Tubos diagonales
Escalera tramo 3
Tubos horizontales
Tubos verticales
Tubos diagonales
ml
Escalera tramo 1
Tubos horizontales
Tubos diagonales
Escalera tramo 2 y 4
Tubos horizontales
Tubos diagonales
Escalera tramo 3
Tubos horizontales
Tubos diagonales

LAR DE 50x150 mm E=9.174 mm

ml
Escalera tramo 1
Tubo rectangular 50x150 mm E=9.174 mm

Escalera tramo 2 y 4
Tubo rectangular 50x150 mm E=9.174 mm
Escalera tramo 3
Tubo rectangular 50x150 mm E=9.174 mm

LAR DE 50x100 E=5.560 mm

ml
Tubo rectangular debajo de Pasos 50x100mm E=5.560 mm

Ver detalle 1
und
Pernos de 3/8

Ver detalle 1

A DE 400x400x5/8

und
Plancha metalica 400x400x5/8

06 Tuer cas de nivel 5/8''

PLANCHA METALICA
400 mm x 4 00mm x 5/8"

.50

und
Anclajes de 1x12"
Anclajes de 1x12"
Anclajes de 1x12"

Ver detalle 1

Ver detalle 3

Ver detalle 4
und
Tuercas de nivel 5/8

Tuercas de nivel 5/8

S ol dadur a

Ver detalle 1 y 4

Tuer cas de nivel 5/8''

S 1" X 12"
Tubo r ect angul ar
Ver mm
detalle 3
50mm x 150
E=9.174mm

E 200x300x5/8
1" X 12"
AAJDE
-36 (P AS ANTE)

04 Tuer cas de nivel 5/8''

und
Plancha metalica 200x300x5/8

Losa e= 0.30m

LAR DE 100x200 E=9.174 mm

HA METALICA
300mm x 5/8"

ml

P LANCHA METALICA
200 mm x 3 00mm x 5/8"

Tubo rectangular de 100x200mm E=9.174mm

Tubo rectangular

Ver detalle 4

cion columnas
metalicas
m2
Madera de 1"x10"x4"
Descanso

ELEMENTO ESTRUCTURAL 3

RAMPA
Baranda de tubo negro 2"
Baranda de tubo negro 1"

Detalle 1

Pefil tubular 2"

Tubo rectangular 150x200 E=9.174mm

Detalle 2

ml
Baranda de tubo negro 2"

Debajo de Rampa
.) Perfil tubular de 2" longitudinalmente
Perfil tunular de 2"

Verticales

Horizontales

Diagonales
.) Perfil tubular de 2" transversalmente
Diagonales
Horizontales
Verticales
Desperdicios

ml
Baranda de tubo
negro 1"
ml
Perfil transversalmente
Longitudinalmente
Desperdicios

mm 3 mm E=0.45mm

0mm

1200mm

m2

70mm

1200mm

70mm

Desperdicios

0.36mm

5mm

25mm

25mm

m3

A DE 400x400x5/8"

Und
Plancha metalica de 400x400x5/8
Und

Anclajes de 1"x12"

lajes metalicos

und
Tuercas de nivel de 5/8"

ELEMENTO ESTRUCTURAL 4
TORRE DE ESTRUCTURA METALICA

Ver lamina 25

LAR DE 8"x8"x4.5mm (3/16")

ml
Verticales

Horizontales

Seccion B

LAR DE 4"x4"x3mm

ml
Verticales

Diagonales

Horizontales

COS

und
Anclajes

ELEMENTO ESTRUCTURAL 5
MURO CORTINA- HALL PRINCIPAL

Ver lamina 26

LAR DE 4"x4"x3mm

ml
Verticales

Horizontales

Seccion B

und
Anclajes

ELEMENTO ESTRUCTURAL 6
MURO CORTINA- ADMINISTRACION

Ver lamina 27

ULAR DE 4"x2"x2.5mm

ml

Verticales

Horizontales

und
Anclajes

ELEMENTO ESTRUCTURAL 7
MURO CORTINA-PABELLON DE AULAS

Ver lamina 28

ULAR DE 4"x2"x2.5mm

ml
SECCION A
Verticales
Horizontales
SECCION B
Verticales
Horizontales
Soldaduras

und
Anclajes Seccion A
Anclajes Seccion B
ELEMENTO ESTRUCTURAL 8
FACHADA PRINCIPAL

Ver lamina 29

ULAR DE 4"x2"x3mm

ml
SECCION A
Horizontales

Seccion A
Verticales

SECCION B
Horizontales
Verticales

ULAR DE 4"x4"

ml
SECCION A
Horizontales
Verticales

ULAR DE 4"x6"x4mm

ml

Seccion C

SECCION C
Perfil rectangula 4"X6"x4mm
Horizontales

Elevacion de Marco estructural

Verticales
Planta de Marco estructural

ULAR DE 8"X4"x4mm

ml
SECCION C
Perfil rectangula 8"X4"x4mm
Diagonales
Verticales
Horizontales
und
SeccionB
Seccion A

ELEMENTO ESTRUCTURAL 9
ESTRUCTURA DE PANELES - RAMPA

LAR DE 4"x2"

ml
Horizontales

LAR DE 8"x4"

ml
Verticales
Diagonales

ELEMENTO ESTRUCTURAL 10 -COBERTURA

DE ACERO ASTM A-500 2"x2"

ml

Tubo cuadrado de acero ASTM A-500 2"x2" para


cobertura

Verticales

Techo de escalera

Techo de escalera

O ASTM A-500 3"x5"


Horizontales

NILLO MAS PROTECTOR PLASTICO

und
Uniones entre calaminas

ORANTE MAS PROTECTOR PLASTICO

und
Uniones entre calaminas
und
Uniones entre calaminas
ml

ELEMENTO ESTRUCTURAL 11 COBERTURA

DE ACERO ASTM A-500 2"x2"

ml

Tubo cuadrado de acero ASTM A-500 2"x2" para


cobertura

Verticales

Techo de escalera
Principal

O ASTM A-500 3"x5"

Horizontales

NILLO MAS PROTECTOR PLASTICO


Uniones entre calaminas

ORANTE MAS PROTECTOR PLASTICO


Uniones entre calaminas

Uniones entre calaminas

CANT.

N DE
VECES

# DE

LONG.

ELEM.

ELEM.

Parcial

Total

238.40
2

1.85

3.70

1.00

10.00

4.30

8.60

1.85

3.70

1.00

10.00

4.30

8.60

1.85

7.40

1.00

20.00

17.60

4.40

1.85

11.10

4.30

25.80

1.85

11.10

4.30

25.80

1.85

22.20

4.40

52.80
37.40

50x150

6.40

12.80

50x150

6.20

12.40

50x150

6.10

12.20
84.50

50x100

13

3.25

84.50

676.00
3/8

104

3.25

676.00

2.00
400x400x5/8

2.00

14.00
5/8

6.00

5/8

8.00

4.00

8.00
1x1/2

1x1/2

4.00

2.00
200x300x5/8

2.00

40.52

Ancho
48

0.30

1.80

2.00

3.65

25.92
14.60

90.60
2

1.85

3.70

1.00

10.00

4.40

8.80

1.85

7.40

1.00

20.00

4.40

17.60

1.85

3.70

1.00

10.00

4.70

9.40

151.80
1

1.85

11.10

4.40

26.40

1.85

22.20

4.40

52.80

1.85

11.10

4.70

28.20
18.30

6.10

6.10

6.10

6.10

6.10

6.10

84.50
50x100

13

3.25

84.50

676.00
3/8

104

3.25

676.00

2.00
400x400x5/8

2.00

12.00
1x1/2

4.00

1x1/2

4.00

1x1/2

4.00

20.00
5/8

12.00

5/8

8.00

2.00
200x300x5/8

2.00

28.20
100x200

6.90

13.80

7.20

14.40

40.52

Ancho
48

0.30

1.80

2.00

3.65

25.92
14.60

826.93
4

20.80

83.20

4.85

19.40

19.10

76.40

20

0.40

64.00

0.34

2.72

0.24

1.92

23

0.63

115.92

0.60

19.20

1.93

15.44

0.58

4.64

40

0.60

192.00

0.60

57.60

2.15

137.60

0.40

12.80

3% del total =

24.09

537.00
4

20.80

249.60

4.85

58.20

19.10

229.20
430.54

30

2.13

255.60

20.30

162.40

3% del total =

12.54

231.57
Ancho
4

2.5

###

Espesor
4
4

18.70

187.00

4.85
3% del total =

37.83
6.74

67.45

Ancho

0.3

2.5

18.70

56.10

0.3

###

4.85

11.35
4.00

400x400x5/8

4.00
8.00

1"x12"

8.00
24.00

5/8

24.00

407.50
8x8

18.65

223.80

8x8

2.70

10.80

8x8

1.60

6.40

8x8

9.20

147.20

8x8

3.70

14.80

8x8

0.75

4.50

339.60
4x4

2.70

21.60

4x4

1.60

12.80

4x4

13

3.00

156.00

4x4

2.50

90.00

4x4

1.85

59.20

176.00
2

44

176.00

256.60
4x4

13.70

137.00

4x4

2.80

11.20

4x4

11.70

46.80

4x4

7.70

61.60

64.00
1

64

64.00
0.00

320.32

4x2

10

15.60

156.00

4x2

12.30

36.90

4x2

1.98

9.90

4x2

23.16

46.32

4x2

3.20

16.00

4x2

17.00

17.00

6.30

6.30

4x2

4x2

2.70

5.40

4x2

0.80

0.80

4x2

14.50

14.50

11.20

11.20

4x2

118.00
1

118

118.00

339.20

4x2

17

8.80

149.60

4x2

24.80

49.60

4x2

12

8.80

105.60

4x2

17.20

34.40

56.00
1
1

34

34.00

22

22.00

184.20

4x2

2.30

11.50

4x2
4x2

1
1

11.25

11.25

15.90

15.90

4.65

4.65

4x2

4x2

12.30

24.60

2.00

8.00

4x2

4x2

10.30

20.60

2x4

29.85

59.70

2x4

14

2.00

28.00
59.00

4x4

4.65

18.60

4x4

10.30

10.30

4x6

12.15

24.30

4x6

0.90

1.80

4x6

2.00

4.00
34.90

8x4

2.50

17.50

8x4

2.00

12.00

8x4

0.90

5.40
80.00

28

28.00

52

52.00

252.00
1

12

3.00

252.00
546.00

12

10.50

252.00

12

3.50

294.00

265.35

2X2

29

9.15

265.35

89.95
2X2

12.85

89.95
2400.00

100

2400.00

24

2400.00
100

2400.00

24

2400.00
100

24

2400.00

12.85

25.70

25.70
2

374.10

2X2

29

12.90

374.10

91.35
2X2

13.05

91.35
3360.00

140

24

3360.00
3360.00

140

24

3360.00
3360.00

140

24

3360.00
25.70

12.85

25.70

DESCRIPCION

DISEO DEL ACERO

METRADO DE ESTRUCTURAS DE
ACERO
ELEMENTO ESTRUCTURAL 12

ACERO RECTANGULAR DE 8"x4"

Desperdicios

DISEO DEL ACERO

Unidad

ELEMENTO ESTRUCTURAL 12

Elevacion 2

Elevacion 1

RO RECTANGULAR DE 8"x4"
Elecacion 1

Elevacion 2

Desperdicios

CANT.
N DE VECES

# DE

LONG.

ELEM.

ELEM.

Parcial

Total

100.07
1

5.10

25.50

11.50

23.00

5.10

25.50

10.65

21.30
4.77

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N
04
04.01
04.01.01
04.01.01.01

ESPECIFICACIONES

UND

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
SUMINISTRO DE APARATOS SANITARIOS
INODORO TIPO NOVARA FLUX

pza
Primer Piso
Segundo Piso
Tercer Piso

04.01.01.02

URINARIO TIPO BAMBI

pza
Primer Piso
Segundo Piso
Tercer Piso

04.01.01.03

LAVADERO TIPO OVALINE SONNET

pza
Primer Piso
Segundo Piso
Tercer Piso

04.01.01.04

04.01.02
04.01.02.01

AGARRADERA PARA IMPEDIDOS FISICOS (TIPO ESQUINERO)

und

SUMINISTRO DE ACCESORIOS
DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS

und
Primer Piso
Segundo Piso
Tercer Piso

04.01.02.02

GRIFO DE 1/2" PARA URINARIO

und
Primer Piso
Segundo Piso
Tercer Piso

04.01.02.03

GRIFO DE 1/2" PARA LAVATORIO

und
Primer Piso
Segundo Piso
Tercer Piso

04.01.02.04

MEDIDOR DE AGUA

und
Primer Piso

04.01.02.06

JABONERA DE LOSA COLOR BLANCO

und
Primer Piso

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N

ESPECIFICACIONES

UND
Segundo Piso
Tercer Piso

04.01.02.07

PAPELERA DE LOZA BLANCA DE 13 X 15

und
Primer Piso
Segundo Piso
Tercer Piso

04.01.02.08

ESPEJO EN SS.HH.

m2
Espejo tipo 1= 3.60x0.90
Espejo tipo 2= 1.70x0.90

04.02
04.02.01
04.02.01.01

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

pto
Primer Piso
Segundo Piso
Tercer Piso

04.02.02
04.02.02.01

REDES DE DISTRIBUCIN
TUBERIA PVC SAP CLASE A-10 DE 1/2"

m
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.02.02.02

TUBERIA PVC SAP CLASE A-10 DE 3/4"

m
Primer Piso
Segundo Piso
Tercer Piso

04.02.02.03

TUBERIA PVC SAP CLASE A-10 DE 1"

m
Primer Piso

04.02.04
04.02.04.01
04.02.04.01.02

ACCESORIOS DE REDES
UNIONES
UNION UNIVERSAL DE PVC 3/4"

pza
Primer Piso

04.02.04.02
04.02.04.02.01

CODOS
CODO PVC SAP 1/2"X90 P/AGUA
Primer Piso

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N

ESPECIFICACIONES

UND
Segundo Piso
Tercer Piso
Asotea

04.02.04.02.02

CODO PVC SAP 3/4"X90 P/AGUA

pza
Primer Piso
Segundo Piso
Tercer Piso

04.02.04.03
04.02.04.03.01

TEES
TEE PVC-SAP 1/2" P/AGUA

pza
Primer Piso
Segundo Piso
Tercer Piso

04.02.04.03.02

TEE PVC-SAP 3/4" P/AGUA

pza
Primer Piso
Segundo Piso
Tercer Piso

04.02.04.03.03

TEE PVC-SAP 1" P/AGUA

pza
Asotea

04.02.04.04
04.02.04.04.01

REDUCTORES
REDUCCION PVC-SAP 3/4" A 1/2"

pza
Primer Piso
Segundo Piso
Tercer Piso

04.02.05
04.02.05.02

LLAVES VLVULAS
VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"

pza
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.02.05.03

VALVULA SHECK DE 3/4"

pza
Primer Piso

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N
04.02.06
04.02.06.01

ESPECIFICACIONES

UND

PIEZAS VARIAS
CAJA PARA VALVULAS COMPUERTAS DE UNION ROSCADA DE 1/2",3/4" Y1"

pza
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.02.06.02

REJILLA METALICA DE 6"x6'

pza
Asotea

04.02.07
04.02.07.01
04.02.08.01.07
04.02.08.01.08

INSTALACIONES HIDRAULICAS DE CISTERNA


CISTERNA CAP= 5000 lt
CISTERNA ACI - CAP= 5 000 lt
ACCESORIOS DE CISTERNA ACI - TARAPOTO

und
glb

04.02.07.02
04.02.09.02.07
04.02.09.02.08

CISTERNA ACI - CAP= 10 000 lt


CISTERNA ACI - CAP= 10 000 lt
ACCESORIOS DE CISTERNA ACI - TARAPOTO

und
glb

04.02.07.04
04.02.08

ELECTROBOMBA
PRUEVA HIDRAULICA

glb
m

04.05
04.05.01
04.05.01.02

SISTEMA DE AGUA DE LLUVIA


RED DE RECOLECCIN
MONTANTE CIRCULAR PVC DE 4"

m
Primer Piso

04.06
04.06.01
04.06.01.01

DESAGE Y VENTILACION
SALIDAS DE DESAGE
SALIDA DE DESAGUE PVC-SAL 2"

pto
Primer Piso
Segundo Piso
Tercer Piso

04.06.01.02

SALIDA DE DESAGUE PVC-SAL 4"

pto
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.06.01.04

SALIDA PARA VENTILACION PVC-SAL 2"

pto
Primer Piso

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N

ESPECIFICACIONES

UND
Asotea

04.06.02
04.06.02.03

REDES DE DERIVACION
RED DE DERIVACION PVC SAL-SAP PARA DESAGUE DE 2"

m
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.06.02.05

RED DE DERIVACION PVC SAL-SAP PARA DESAGUE DE 4"

m
Primer Piso
Segundo Piso
Tercer Piso
Asotea

04.06.02.06

RED DE DERIVACION PVC SAL-SAP PARA VENTILACIONE DE 2"

m
Primer Piso
Tercer Piso

04.06.04
04.06.04.01
04.06.04.01.01

ACCESORIOS DE REDES COLECTORAS


CODOS
CODO PVC SAL 4"X45 P/DESAGUE

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.04.01.02

CODO PVC SAL 2"X90 P/DESAGUE

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.04.03
04.06.04.03.01

YEES
YEE PVC SAL 2" P/DESAGUE

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.04.03.02

YEE PVC SAL 4" P/DESAGUE

pza
Primer Piso
Segundo Piso

PLANILLA DE METRADO
EDIFICACIN 1er PIS
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD E


SETIEMBRE DEL 2015

INSTALACIONES SANITAR
PARTIDA N

ESPECIFICACIONES

UND
Tercer Piso

04.06.04.04
04.06.04.04.03

REDUCTORES
REDUCCIONES PVC SAL 4" A 2" P/DESAGUE

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.05
04.06.05.02

ADITAMENTOS VARIOS
REGISTRO DE BRONCE 4", PROVISION Y COLOCACION

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.07
04.06.07.01

INSTALACIONES ESPECIALES
TRAMPA PVC SAL DE 2" P/DESAGUE

pza
Primer Piso
Segundo Piso
Tercer Piso

04.06.08

CAMARAS DE INSPECCION
Primer Piso

04.06.08.01

CAJA DE REGISTRO DE ALBAILERIA 12"x24" CON TAPA DE CONCRETO

pza
Primer Piso

04.06.09
04.06.09.01

INSTALACIONES ESPECIALES
PRUEBA HIDRAULICA

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

38.00
12.00

12.00

12.00

12.00

14.00

14.00
13.00

4.00

4.00

4.00

4.00

5.00

5.00
32.00

10.00

10.00

10.00

10.00

12.00

12.00
6.00

2.00

3.00

6.00

6.00
2.00

2.00

2.00

2.00

2.00

2.00
13.00

4.00

4.00

4.00

4.00

5.00

5.00
36.00

12.00

12.00

12.00

12.00

12.00

12.00
1.00

1.00

1.00
24.00

8.00

8.00

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

8.00

8.00

8.00

8.00

TOTAL

38.00
12.00

12.00

12.00

12.00

14.00

14.00
22.50

3.00
1.00

2.00
2.00

3.60
1.70

0.90
0.90

19.44
3.06

30.00
10.00

10.00

10.00

10.00

12.00

10.00
201.72

1.00

60.14

60.14

1.00

42.54

42.54

1.00

49.35

49.35

1.00

49.69

49.69
89.11

1.00

59.18

59.18

1.00

16.39

16.39

1.00

13.54

13.54
40.95

1.00

40.95

40.95

2.00
2.00

2.00

40.00

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

14.00

14.00

12.00

12.00

12.00

12.00

2.00

2.00

TOTAL

10.00
4.00

4.00

3.00

3.00

3.00

3.00
76.00

24.00

24.00

24.00

24.00

28.00

28.00
13.00

5.00

5.00

4.00

4.00

4.00

4.00
3.00

3.00

3.00
18.00

6.00

6.00

6.00

6.00

6.00

6.00

21.00
7.00

7.00

6.00

6.00

6.00

6.00

2.00

2.00
2.00

2.00

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

21.00
7

7.00

6.00

6.00

6.00

6.00

2.00

2.00
6.00

6.00

6.00

1
1

1.00
1.00

1.00
1.00

1
1

1.00
1.00

1.00
1.00

2.00
331.78

2.00
331.78

2
1

331.78

81.90
6

13.65

81.90

35.00
12.00

12.00

12.00

12.00

11.00

11.00
35.00

12.00

12.00

12.00

12.00

5.00

5.00

6.00

6.00
28.00

5.00

5.00

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

23.00

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

23.00
75.57

1.00

19.47

19.47

1.00

19.47

19.47

1.00

17.02

17.02

1.00

19.61

19.61
244.34

1.00

122.62

122.62

1.00

44.62

44.62

1.00

46.02

46.02

1.00

31.08

31.08
68.70

4.00

15.55

62.20

1.00

6.50

6.50

13.00
9

9.00

2.00

2.00

2.00
66.00

22.00

22.00

22.00

22.00

22.00

22.00
12.00

4.00

4.00

4.00

4.00

4.00

4.00
40.00

20.00

20.00

A DE METRADOS
ACIN 1er PISO

O DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ONES SANITARIAS
CANT.

N DE VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

10.00

10.00

10.00

10.00

TOTAL

30.00
10

10.00

10.00

10.00

10.00

10.00

42.00
14.00

14.00

14.00

14.00

14.00

14.00

16.00
4.00

4.00

6.00

6.00

6.00

6.00

6.00
6.00

6.00

1.00

388.61

388.61

PLANILLA DE METRADOS
PRIMER PISO
PROYECTO:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD


DE UPeU - FT"

UBICACION:
FECHA:

JR. HUASCAR N120


SETIEMBRE DEL 2015

RESUMEN
PARTIDA N
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.01.04
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.02.04
04.01.02.06
04.01.02.07
04.01.02.08
04.02
04.02.01
04.02.01.01
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.04
04.02.04.01
04.02.04.01.02
04.02.04.02
04.02.04.02.01
04.02.04.02.02
04.02.04.03
04.02.04.03.01
04.02.04.03.02
04.02.04.03.03
04.02.04.04
04.02.04.04.01
04.02.05
04.02.05.02
04.02.05.03
04.02.06
04.02.06.01
04.02.06.02
04.02.07
04.02.07.01
04.02.08.01.07
04.02.08.01.08
04.02.07.02
04.02.09.02.07
04.02.09.02.08
04.02.07.04
04.02.08
04.05
04.05.01
04.05.01.02
04.06
04.06.01
04.06.01.01

ESPECIFICACIONES
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
SUMINISTRO DE APARATOS SANITARIOS
INODORO TIPO NOVARA FLUX
URINARIO TIPO BAMBI
LAVADERO TIPO OVALINE SONNET
AGARRADERA PARA IMPEDIDOS FISICOS (TIPO ESQUINERO)
SUMINISTRO DE ACCESORIOS
DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS
GRIFO DE 1/2" PARA URINARIO
GRIFO DE 1/2" PARA LAVATORIO
MEDIDOR DE AGUA
JABONERA DE LOSA COLOR BLANCO
PAPELERA DE LOZA BLANCA DE 13 X 15
ESPEJO EN SS.HH.
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
REDES DE DISTRIBUCIN
TUBERIA PVC SAP CLASE A-10 DE 1/2"
TUBERIA PVC SAP CLASE A-10 DE 3/4"
TUBERIA PVC SAP CLASE A-10 DE 1"
ACCESORIOS DE REDES
UNIONES
UNION UNIVERSAL DE PVC 3/4"
CODOS
CODO PVC SAP 1/2"X90 P/AGUA
CODO PVC SAP 3/4"X90 P/AGUA
TEES
TEE PVC-SAP 1/2" P/AGUA
TEE PVC-SAP 3/4" P/AGUA
TEE PVC-SAP 1" P/AGUA
REDUCTORES
REDUCCION PVC-SAP 3/4" A 1/2"
LLAVES VLVULAS
VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"
VALVULA SHECK DE 3/4"
PIEZAS VARIAS
CAJA PARA VALVULAS COMPUERTAS DE UNION ROSCADA DE 1/2",3/4" Y1"
REJILLA METALICA DE 6"x6'
INSTALACIONES HIDRAULICAS DE CISTERNA
CISTERNA CAP= 5000 lt
CISTERNA ACI - CAP= 5 000 lt
ACCESORIOS DE CISTERNA ACI - TARAPOTO
CISTERNA ACI - CAP= 10 000 lt
CISTERNA ACI - CAP= 10 000 lt
ACCESORIOS DE CISTERNA ACI - TARAPOTO
ELECTROBOMBA
PRUEVA HIDRAULICA
SISTEMA DE AGUA DE LLUVIA
RED DE RECOLECCIN
MONTANTE CIRCULAR PVC DE 4"
DESAGE Y VENTILACION
SALIDAS DE DESAGE
SALIDA DE DESAGUE PVC-SAL 2"

UND

pza
pza
pza
und
und
und
und
und
und
und
m2

pto
m
m
m

pza
pza
pza
pza
pza
pza
pza
pza
pza
pza
pza

und
glb
glb
und
glb
glb
m

pto

04.06.01.02
04.06.01.04
04.06.02
04.06.02.03
04.06.02.05
04.06.02.06
04.06.04
04.06.04.01
04.06.04.01.01
04.06.04.01.02
04.06.04.03
04.06.04.03.01
04.06.04.03.02
04.06.04.04
04.06.04.04.03
04.06.05
04.06.05.02
04.06.07
04.06.07.01
04.06.08
04.06.08.01
04.06.09
04.06.09.01

SALIDA DE DESAGUE PVC-SAL 4"


SALIDA PARA VENTILACION PVC-SAL 2"
REDES DE DERIVACION
RED DE DERIVACION PVC SAL-SAP PARA DESAGUE DE 2"
RED DE DERIVACION PVC SAL-SAP PARA DESAGUE DE 4"
RED DE DERIVACION PVC SAL-SAP PARA VENTILACIONE DE 2"
ACCESORIOS DE REDES COLECTORAS
CODOS
CODO PVC SAL 4"X45 P/DESAGUE
CODO PVC SAL 2"X90 P/DESAGUE
YEES
YEE PVC SAL 2" P/DESAGUE
YEE PVC SAL 4" P/DESAGUE
REDUCTORES
REDUCCIONES PVC SAL 4" A 2" P/DESAGUE
ADITAMENTOS VARIOS
REGISTRO DE BRONCE 4", PROVISION Y COLOCACION
INSTALACIONES ESPECIALES
TRAMPA PVC SAL DE 2" P/DESAGUE
CAMARAS DE INSPECCION
CAJA DE REGISTRO DE ALBAILERIA 12"x24" CON TAPA DE CONCRETO
INSTALACIONES ESPECIALES
PRUEBA HIDRAULICA

pto
pto
m
m
m

pza
pza
pza
pza
pza
pza
pza
pza
m

A DE METRADOS
IMER PISO

N DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA

METRADO

38.00
13.00
32.00
6.00

36.00
13.00
24.00
24.00
38.00
22.50

30.00
201.72
89.11
40.95

2.00
40.00
10.00
76.00
13.00
3.00
18.00
21.00
2.00
21.00
6.00

0.00
Err:509
Err:509
2.00
331.78

81.90

35.00

35.00
28.00
75.57
244.34
68.70

13.00
66.00
12.00
40.00
30.00
42.00
16.00
6.00
388.61

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N
05
05.01
05.01.01
05.01.01.01

ESPECIFICACIONES

UND

INSTALACIONES ELECTRICAS
SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DBILES
SALIDA
SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE

CANT.

pto
Primer piso
29
Segundo piso
29
Tercer piso
31

05.01.01.02

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DOBLE

pto
Primer piso
24
Segundo piso
24
Tercer piso
27

05.01.01.03

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR TRIPLE

pto
Primer piso
45
Segundo piso
45
Tercer piso
45

05.01.01.04

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DE CONMUTACION

pto
Primer piso
2
Segundo piso
7
Tercer piso
7

05.01.01.05

SALIDA PARA TOMACORRIENTE MONOFASICO SIMPLE CON P/T

pto
Primer piso
37
Segundo piso
72
Tercer piso
72

05.01.01.06

SALIDA PARA TOMACORRIENTE UNIVERSAL EN ALTURA ESPECIAL CON P/T

pto
Primer piso
10
Segundo piso
10
Tercer piso
10

05.01.02
05.01.02.01

CANALIZACIONES, CONDUCTOS O TUBERAS


TUBERIA PVC SEL-ELECTRICAS DE 20 mm

m
Primer piso

TD1
C-1 CELESTE
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO
C-6 AZUL

1
1
1
1
1
1

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N

ESPECIFICACIONES

UND

CANT.

C-7 NEGRO

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD2

SALIDA PARA AIRE ACONDICIONADO


PARA TOMACORRIENTES
TD2
C-4
C-5
C-6
C-7
TD1
C-9
C-10, C-11
MORADO

1
1
1
1
1
1
1

PARA COMPUTO
1
1
PARA TELEFONO
1
Segundo piso
TD3
C-2 ROJO
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO
C-6 AZUL
C-7 NEGRO

1
1
1
1
1
1
1

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD4

SALIDA PARA AIRE ACONDICIONADO


PARA TOMACORRIENTES
TD4
C-4
C-5
C-6
TD3
C-8
C-9
C-10
C-11
C-12
C-13
C-9, C-10, C-11 , C-12 Y C-13

1
1
1
1
1
1
1
1
1
1

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N

ESPECIFICACIONES

UND

CANT.

PARA COMPUTO
1
1
PARA TELEFONO
1

Tercer piso
TD5
C-1 CELESTE
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO
C-6 AZUL
C-7 NEGRO

1
1
1
1
1
1
1

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD6

SALIDA PARA AIRE ACONDICIONADO


PARA TOMACORRIENTES
TD6
C-4
C-5

1
1

TD5
C-8
C-9
C-10
C-11
C-12
C-13
C-9, C-10, C-11 , C-12 Y C-13

1
1
1
1
1
1
1

PARA COMPUTO
1
PARA TELEFONO
1
Asotea
1
05.01.03
05.01.03.01

CONDUCTORES Y CABLES DE ENERGA EN TUBERAS


CABLE ELECTRICO 2.5mm NH-80

m
Primer piso

TD1
C-1 CELESTE
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO

1
1
1
1
1

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N

ESPECIFICACIONES

UND

CANT.

C-6 AZUL
C-7 NEGRO

1
1

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD2

SALIDA PARA AIRE ACONDICIONADO

1
Segundo piso

TD3
C-1 CELESTE
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO
C-6 AZUL
C-7 NEGRO

1
1
1
1
1
1
1

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD4

SALIDA PARA AIRE ACONDICIONADO

Tercer piso
TD1
C-1 CELESTE
C-2 ROJO
C-3 MORADO
C-4 MARRON
C-5 ROSADO
C-6 AZUL
C-7 NEGRO

1
1
1
1
1
1
1

C-1 CELESTE
C-2 ROJO
C-3 MORADO
De Conmutadores
Entre TD, Pozo a tierra y caja de pase

1
1
1
1
1

TD2

SALIDA PARA AIRE ACONDICIONADO

1
Asotea
1

05.01.03.02

CABLE ELECTRICO 4mm NH-80

m
Primer piso

PARA TOMACORRIENTES
TD2

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N

ESPECIFICACIONES

UND

C-4
C-5
C-6
C-7
TD1
C-9
C-10 Y C-11
MORADO

CANT.
1
1
1
1
1
1
1

Segundo piso
PARA TOMACORRIENTES
TD4
C-4
C-5
C-6
TD3
C-8
C-9
C-10
C-11
C-12
C-13
C-9, C-10, C-11 , C-12 Y C-13

1
1
1
1
1
1
1
1
1
1

Tercer piso
PARA TOMACORRIENTES
TD4
C-4
C-5
C-6
TD2-TD3
C-9
C-10
C-11
C-12
C-13
C-9, C-10, C-11 , C-12 Y C-13

1
1
1
1
1
1
1
1
1
1

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N
05.01.05
05.01.05.01

ESPECIFICACIONES

UND

TABLEROS DE DISTRIBUCIN
TABLERO ELECTRICO P/DISTRIBUCION DE CIRCUITOS TD-01 T/RIEL INC. LLAVE

CANT.

pza
Primer piso
3
Segundo piso
3
Tercer piso
3

05.04
05.04.01
05.04.01.01

ARTEFACTOS
LMPARAS
LUMINARIA FLUORESCENTE TIPO E1 PARA ADOSAR

und
Primer piso
29
Segundo piso
34
Tercer piso
36

05.04.01.02

LUMINARIA SPOT LIGHT

und
Primer piso
71
Segundo piso
71
Tercer piso
74

06
06.01
06.01.01
06.01.01.01

INSTALACIONES DE COMUNICACIONES
CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS
CANALETAS, CONDUCTOS Y/O TUBERIASS
TUBERIA PVC SEL-ELECTRICAS DE 20 mm

m
Primer piso

PARA TELEFONO
PARA COMPUTO

1
1
1
Segundo piso

PARA TELEFONO
PARA COMPUTO

1
1
1
Tercer piso

PARA TELEFONO
PARA COMPUTO

06.01.02
06.01.02.01

1
1

SALIDAS DE COMUNICACIONES
SALIDA PARA TOMA DE REDES

pto
Primer piso

En sala de Prodesores
En Director de area
Capellania
En Psicologia
En Coordinador General
En Secretaria

3
6
2
2
2
2
Segundo piso

PLANILLA DE METRADOS
EDIFICACIN N01
PROYECTO:
UBICACION:
FECHA:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDU


SETIEMBRE 2015

INSTALACIONES ELECTRICAS
PARTIDA N

ESPECIFICACIONES

UND

En sala de Prodesores
En Director de area
Capellania
En Psicologia
En Coordinador General
En Secretaria
Aula 1
Aula 2
Aula 3
Aula 4

CANT.
3
6
2
2
2
2
2
2
2
2

Tercer piso
En sala de grados y titulos
Aula 1
Aula 2
Aula 3
Aula 4
06.01.03

2
2
2
2
2

CONDUCTORES DE COMUNICACIONESS
Primer piso
Segundo piso
Tercer piso

06.01.03.01

CABLE RJ45 UTP CAT. 6 PARA ETHERNET

m
Primer piso
1
Segundo piso
1
Tercer piso
1

06.01.04
06.01.04.01
06.01.04.02
06.01.05
06.01.05.01

PATCH PANEL
SWITCH DE 24 PUERTOS PARA CABLE RJ45
SWITCH DE 08 PUERTOS PARA CABLE RJ45
RACK DE COMUNICACIONES
CAJA METALICA DE ANCHO NORMALIZADA DE 19"

und
und

3
3

und

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

89.00
29.00
29.00
31.00
75.00
24.00
24.00
27.00
135.00
45.00
45.00
45.00
16.00
2.00
7.00
7.00
181.00
37.00
72.00
72.00
30.00
10.00
10.00
10.00
4145.33

1
1
1
1
1
1

57.42
31.54
23.42
23.42
41.72
69.63

57.42
31.54
23.42
23.42
41.72
69.63

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

MEDIDAS
ANCHO

ALTURA

PARCIAL

LARGO
32.29

1
1
1
1
1

26.21
28.83
26.59
15.86
83.46

26.21
28.83
26.59
15.86
83.46

76.11

76.11

1
1
1
1

23.87
59.05
50.60
12.60

23.87
59.05
50.60
12.60

1
1
1

71.50
91.80
67.50

71.50
91.80
67.50

1
1

79.31
12.00

79.31
12.00

87.25

87.25

1
1
1
1
1
1
1

57.42
31.54
23.42
23.42
41.72
79.23
32.29

57.42
31.54
23.42
23.42
41.72
79.23
32.29

1
1
1
1
1

26.21
28.83
26.59
15.86
33.66

26.21
28.83
26.59
15.86
33.66

145.41

145.41

1
1
1

23.87
59.05
50.60

23.87
59.05
50.60

1
1
1
1
1
1
1

74.10
73.10
74.60
74.60
75.00
45.60
75.20

74.10
73.10
74.60
74.60
75.00
45.60
75.20

32.29

TOTAL

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
MEDIDAS
ANCHO

N DE
VECES

LARGO

1
1

170.51
12.00

170.51
12.00

174.35

174.35

1
1
1
1
1
1
1

57.42
31.54
23.42
23.42
41.72
95.93
25.89

57.42
31.54
23.42
23.42
41.72
95.93
25.89

1
1
1
1
1

30.91
51.96
62.80
15.86
42.50

30.91
51.96
62.80
15.86
42.50

148.40

148.40

1
1

32.70
121.60

32.70
121.60

1
1
1
1
1
1
1

74.10
73.10
74.60
74.60
75.00
45.60
75.20

74.10
73.10
74.60
74.60
75.00
45.60
75.20

108.30

108.30

64.50

64.50

34.10

34.10

ALTURA

PARCIAL

TOTAL

1787.97

1
1
1
1
1

57.42
31.54
23.42
23.42
41.72

57.42
31.54
23.42
23.42
41.72

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

MEDIDAS
ANCHO

ALTURA

PARCIAL

1
1

LARGO
69.63
32.29

1
1
1
1
1

26.21
28.83
26.59
15.86
83.46

26.21
28.83
26.59
15.86
83.46

76.11

76.11

1
1
1
1
1
1
1

57.42
31.54
23.42
23.42
41.72
79.23
32.29

57.42
31.54
23.42
23.42
41.72
79.23
32.29

1
1
1
1
1

26.21
28.83
26.59
15.86
33.66

26.21
28.83
26.59
15.86
33.66

145.41

145.41

1
1
1
1
1
1
1

57.42
31.54
23.42
23.42
41.72
95.93
25.89

57.42
31.54
23.42
23.42
41.72
95.93
25.89

1
1
1
1
1

30.91
51.96
62.80
15.86
42.50

30.91
51.96
62.80
15.86
42.50

148.40

148.40

34.10

34.10

TOTAL

69.63
32.29

1628.36

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

MEDIDAS
ANCHO

ALTURA

PARCIAL

1
1
1
1

LARGO
23.87
59.05
50.60
12.60

1
1
1

71.50
91.80
67.50

71.50
91.80
67.50

1
1
1

23.87
59.05
50.60

23.87
59.05
50.60

1
1
1
1
1
1
1

74.10
73.10
74.60
74.60
75.00
45.60
75.20

74.10
73.10
74.60
74.60
75.00
45.60
75.20

1
1
1

23.87
59.05
50.60

23.87
59.05
50.60

1
1
1
1
1
1
1

74.10
73.10
74.60
74.60
75.00
45.60
75.20

74.10
73.10
74.60
74.60
75.00
45.60
75.20

23.87
59.05
50.60
12.60

TOTAL

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL
9.00

3.00
3.00
3.00

63.00
29.00
34.00

142.00
71.00
71.00

663.38
1
1
1

79.31
42.41
12.00

79.31
42.41
12.00

1
1
1

174.35
170.51
12.00

174.35
170.51
12.00

1
1

64.50
108.30

64.50
108.30

52.00
3.00
6.00
2.00
2.00
2.00
2.00

A DE METRADOS
CACIN N01

AMIENTO DE LA CAPACIDAD EDUCATIVA DE UPeU - FT"

ELECTRICAS
N DE
VECES

LARGO

MEDIDAS
ANCHO

ALTURA

PARCIAL

TOTAL

3.00
6.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.00
2.00
2.00
2.00

541.66
1

12.00

12.00

356.86

356.86

172.80

172.80
3.00
3.00

3.00
3.00

3.00

3.00

PLANILLA DE METRADOS
EDIFICACIN 01 / AMB. COMPLEMENTARIOS
PROYECTO:

"CONSTRUCCION DEL NUEVO PABELLON DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDA


UPeU - FT"

UBICACION:
FECHA:

SETIEMBRE DEL 2015

RESUMEN
PARTIDA N
05
05.01
05.01.01

ESPECIFICACIONES
INSTALACIONES ELECTRICAS
SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DBILES
SALIDA

05.01.01.01

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE

05.01.01.02

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DOBLE

05.01.01.03

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR TRIPLE

05.01.01.04

SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DE CONMUTACION

05.01.01.05

SALIDA PARA TOMACORRIENTE MONOFASICO SIMPLE CON P/T

05.01.01.06

SALIDA PARA TOMACORRIENTE UNIVERSAL EN ALTURA ESPECIAL CON P/T

05.01.02
05.01.02.01
05.01.03
05.01.03.01
05.01.03.02
05.01.05
05.01.05.01
05.04
05.04.01

CANALIZACIONES, CONDUCTOS O TUBERAS


TUBERIA PVC SEL-ELECTRICAS DE 20 mm
CONDUCTORES Y CABLES DE ENERGA EN TUBERAS
CABLE ELECTRICO 2.5mm NH-80
CABLE ELECTRICO 4mm NH-80
TABLEROS DE DISTRIBUCIN
TABLERO ELECTRICO P/DISTRIBUCION DE CIRCUITOS TD-01 T/RIEL INC. LLAVE
ARTEFACTOS
LMPARAS

05.04.01.01

LUMINARIA FLUORESCENTE TIPO E1 PARA ADOSAR

05.04.01.02

LUMINARIA SPOT LIGHT

06
06.01
06.01.01
06.01.01.01
06.01.02
06.01.02.01
06.01.03
06.01.03.01
06.01.04

INSTALACIONES DE COMUNICACIONES
CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS
CANALETAS, CONDUCTOS Y/O TUBERIASS
TUBERIA PVC SEL-ELECTRICAS DE 20 mm
SALIDAS DE COMUNICACIONES
SALIDA PARA TOMA DE REDES
CONDUCTORES DE COMUNICACIONESS
CABLE RJ45 UTP CAT. 6 PARA ETHERNET
PATCH PANEL

06.01.04.01

SWITCH DE 24 PUERTOS PARA CABLE RJ45

06.01.04.02

SWITCH DE 08 PUERTOS PARA CABLE RJ45

06.01.05
06.01.05.01

RACK DE COMUNICACIONES
CAJA METALICA DE ANCHO NORMALIZADA DE 19"

LA DE METRADOS
AMB. COMPLEMENTARIOS

DE AULAS PARA EL MEJORAMIENTO DE LA CAPACIDAD EDUCATIVA DE

UND

METRADO

pto

pto

89.00
75.00
135.00
16.00
181.00
30.00

4145.33

m
m

1787.97
1628.36

pza

9.00

und
und

63.00
142.00

663.38

pto

52.00

541.66

und
und

3.00
3.00

und

3.00

pto
pto
pto
pto

Вам также может понравиться