Вы находитесь на странице: 1из 1

JHA PARTNERSHIP

Consulting Civil & Structural Engineers

Job No.:

J1008

Project:

TP

Designed by:

DH

Date:

13-Oct-15

Cantilever Slab Design to CP65: 1999


Slab Mark: Cantilever Slab (N1S4)
Basic Data:
Slab Thickness, h
fcu
fy
fyv
Cover
Span Length, l
Effective Depth, d
Basic Span-effective Depth Ratio

=
=
=
=
=
=
=
=

175
35
460
460
25
1.6
145
7

mm
N/mm2
N/mm2
N/mm2
mm
m
mm

=
=
=

5.4 kN/m2
0.5 kN/m2
8.36 kN/m2

1.6 m

Loading:
Dead Load
Live Load
Ultimate Load
For 1 m width of slab,
M

10.70 kNm

Span-Effective Depth Ratio:


M/bd2
From Table 3.11,
the span depth modification factor
therefore
limiting span/depth
actual span/depth
Thus d

0.51

1.67

=
=
=

11.70
11.0
145 mm

is

adequate

Bending Reinforcement:
M/fcubd2 =
z/d =
z =
As =
Provide T 10

0.015
0.95
137.75 mm
194 mm2
at
250

mm, As =
==>

314
OK

mm2/m

Shear:
At the face of support,
Shear V =
Shear Stress, v =
100As/bd =
From Table 3.9, vc =
Asv/Sv =
Provide T 10
Distribution Steel:
Area of transverse reinforcement =
Provide T 10

13.4 kN
0.09 N/mm2

<

0.8(fcu)0.5 =

4.73 N/mm2

==>
OK
0.216662 2.75862069 2.75862069

0.22
1.40 N/mm2
==>
no links required
0
mm, As =
at
0
0
mm2/m

227.5
at

250

mm, As =

314

mm2/m

Вам также может понравиться