ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
NCR

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
CAR

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION I

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

554,016.63

993,087.81

588,137.30

1,008,364.61

549,350.94

969,822.83

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

479,305.61

944,892.75

489,971.96

934,051.21

557,312.87

1,001,600.14

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

349,931.54

871,021.32

363,508.18

860,076.30

429,301.67

923,366.02

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

291,088.69

706,913.20

298,569.56

709,221.29

354,017.88

761,263.99

without craneway

B.

C.

with structural
craneway

without craneway

with structural
craneway

without craneway

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

795,886.75

1,172,397.72

841,011.04

1,167,904.78

852,924.70

1,195,589.90

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

670,424.97

1,059,912.90

682,349.33

1,131,185.07

745,078.37

1,117,820.06

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

684,821.01

1,130,071.39

740,517.53

1,166,088.31

749,449.43

1,176,818.32

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

610,735.30

1,081,756.03

642,359.24

1,091,696.47

711,689.42

1,162,827.89

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

479,915.11

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

494,164.28

502,710.27

add 15% to the New Construction of Bridge


add 15% to the New Construction of Bridge

a. Retrofitting of Superstucture

422,542.55

410,686.88

416,233.98

b. Retrofitting of Substructure and Superstucture

582,661.12

567,169.73

573,336.10

2.) REPLACEMENT OF SUPERSTRUCTURE

406,275.72

413,131.55

420,583.21

3.) REDECKING

217,627.67

224,811.40

233,928.26

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION II

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION III

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION IV-A

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

611,287.89

1,031,523.94

507,101.79

944,441.32

552,180.76

972,836.93

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

573,208.32

1,017,244.35

447,200.64

908,594.46

522,102.82

966,669.52

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

413,334.33

910,081.28

316,507.47

830,421.81

410,093.46

908,305.09

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

339,444.14

747,075.58

266,669.84

658,553.45

330,909.33

746,820.59

without craneway

B.

C.

with structural
craneway

without craneway

with structural
craneway

without craneway

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

846,638.48

1,170,645.83

784,885.95

1,126,450.33

833,933.61

1,165,536.12

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

710,655.46

1,108,191.41

659,500.50

1,083,419.10

741,907.25

1,128,308.90

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

735,554.11

1,161,119.45

661,855.01

1,104,596.40

723,951.65

1,149,976.03

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

697,481.59

1,146,761.41

601,960.91

1,068,671.10

693,880.76

1,143,730.18

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

534,090.32

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

456,941.18

485,702.38

add 15% to the New Construction of Bridge


add 15% to the New Construction of Bridge

a. Retrofitting of Superstucture

409,213.08

403,254.26

413,305.29

b. Retrofitting of Substructure and Superstucture

576,554.30

551,910.55

580,026.03

2.) REPLACEMENT OF SUPERSTRUCTURE

444,671.42

393,884.47

385,806.75

3.) REDECKING

225,800.62

207,305.91

220,250.70

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION IV-B

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION V

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION VI

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

588,539.60

1,004,408.28

569,354.48

990,611.04

598,485.86

1,019,373.07

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

556,053.56

995,720.21

563,255.10

1,008,436.38

572,453.42

1,017,139.84

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

412,410.34

904,957.18

417,174.14

915,161.17

428,258.69

926,248.64

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

330,728.31

747,062.35

336,614.55

747,039.81

350,014.75

761,990.79

without craneway

B.

C.

with structural
craneway

without craneway

with structural
craneway

without craneway

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

841,314.75

1,163,934.46

821,827.08

1,155,604.16

854,750.78

1,179,682.21

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

709,347.79

1,110,476.61

707,216.48

1,102,367.42

723,630.83

1,124,510.01

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

728,577.14

1,149,777.00

709,719.97

1,136,306.07

738,828.94

1,165,070.47

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

696,098.16

1,141,010.49

732,134.44

1,154,052.96

712,803.56

1,162,758.80

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

513,003.65

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE
III. BRIDGE REPAIR

508,668.32

528,496.70

add 15% to the New Construction of Bridge


add 15% to the New Construction of Bridge

1.) BRIDGE RETROFITTING


a. Retrofitting of Superstucture

408,476.29

408,137.24

412,826.69

b. Retrofitting of Substructure and Superstucture

570,518.28

583,906.00

596,930.82

2.) REPLACEMENT OF SUPERSTRUCTURE

428,498.56

426,613.67

433,982.97

3.) REDECKING

223,412.14

221,698.75

229,023.80

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION VII

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION VIII

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION IX

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

604,487.51

1,013,672.15

599,062.17

1,013,574.81

601,514.30

1,010,970.21

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

552,394.19

985,457.41

532,841.99

972,191.52

550,648.66

983,929.10

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

421,620.35

907,637.97

401,541.51

894,355.70

418,063.30

904,342.57

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

330,582.77

765,533.44

326,248.07

742,232.90

328,256.99

759,180.10

without craneway

B.

C.

with structural
craneway

without craneway

with structural
craneway

without craneway

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

861,650.19

1,179,407.11

881,209.02

1,201,514.00

859,785.30

1,177,722.61

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

707,116.90

1,119,046.08

729,809.41

1,120,983.01

710,827.25

1,107,072.78

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

754,060.53

1,168,604.13

763,390.17

1,183,233.23

750,268.35

1,165,068.28

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

730,489.52

1,140,310.94

725,643.21

1,141,771.50

727,899.04

1,137,948.73

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

511,396.53

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

520,199.71

546,422.21

add 15% to the New Construction of Bridge


add 15% to the New Construction of Bridge

a. Retrofitting of Superstucture

412,697.21

413,337.46

410,388.43

b. Retrofitting of Substructure and Superstucture

578,682.30

585,902.32

596,713.58

2.) REPLACEMENT OF SUPERSTRUCTURE

418,836.91

422,929.31

419,611.98

3.) REDECKING

224,827.95

230,185.33

224,899.40

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION X

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION XI

DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION XII

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

627,824.05

1,037,132.57

589,006.00

1,013,706.38

605,064.99

1,023,263.42

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

553,750.40

986,897.89

538,638.93

987,193.44

573,652.36

1,015,657.54

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

425,208.38

910,720.08

369,654.83

870,617.23

427,262.68

921,804.83

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

339,352.97

770,106.56

302,260.31

716,392.83

346,901.90

763,925.98

without craneway

B.

C.

with structural
craneway

without craneway

with structural
craneway

without craneway

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

869,599.19

1,191,799.90

827,599.21

1,154,552.68

862,425.76

1,182,528.08

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

712,890.80

1,119,338.17

692,050.46

1,090,810.60

721,858.92

1,124,329.84

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

776,802.80

1,191,450.91

704,668.84

1,134,737.12

741,977.88

1,160,177.13

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

731,221.15

1,141,137.79

682,824.97

1,108,145.74

739,067.82

1,152,575.75

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

538,960.82

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE
III. BRIDGE REPAIR
1.) BRIDGE RETROFITTING

527,909.22

525,738.46

add 15% to the New Construction of Bridge


add 15% to the New Construction of Bridge

a. Retrofitting of Superstucture

416,122.23

404,312.70

411,320.31

b. Retrofitting of Substructure and Superstucture

596,520.45

565,782.31

578,529.82

2.) REPLACEMENT OF SUPERSTRUCTURE

427,196.17

454,908.58

435,190.00

3.) REDECKING

232,814.41

211,645.97

226,221.30

ESTIMATED COST OF BRIDGE STRUCTURE PER LINEAR METER (PESOS)

ITEM

TYPE OF BRIDGE STRUCTURE

BRIDGE SITE CONDITION


DRY OR LOW
HIGH OR DEEP
WATER LEVEL
WATER LEVEL
REGION XIII

I. NEW CONSTRUCTION
A.
CONCRETE BRIDGE STRUCTURE
1.) PSC GIRDER BRIDGE WITH BORED PILE FOUNDATION

673,322.46

1,087,164.73

2.) PSC GIRDER BRIDGE WITH R. C. PILE FOUNDATION

616,445.87

1,054,104.65

3.) RCDG BRIDGE WITH R. C. PILE FOUNDATION

452,087.28

942,336.97

4.) SINGLE SPAN RCDG BRIDGE WITH R. C. PILE FOUNDATION

368,252.85

790,113.70

without craneway

B.

C.

with structural
craneway

STEEL BRIDGE STRUCTURE


1.) STEEL TRUSS WITH BORED PILE FOUNDATION

889,654.22

1,209,306.77

2.) STEEL TRUSS WITH R. C. PILE FOUNDATION

765,326.95

1,172,024.41

3.) STEEL GIRDER WITH BORED PILE FOUNDATION

788,682.50

1,202,525.60

4.) STEEL GIRDER WITH R. C. PILE FOUNDATION

760,287.59

1,169,470.02

CONCRETE FLYOVER
1.) CONCRETE FLYOVER, PSCG TYPE IV, L =30M/35M PER SPAN

596,824.39

II. REPLACEMENT/RECONSTRUCTION
1.) RCD GIRDER BRIDGE
2.) STEEL BRIDGE

add 15% to the New Construction of


Bridge
add 15% to the New Construction of
Bridge

III. BRIDGE REPAIR


1.) BRIDGE RETROFITTING
a. Retrofitting of Superstucture

418,907.80

b. Retrofitting of Substructure and Superstucture

603,530.66

2.) REPLACEMENT OF SUPERSTRUCTURE

477,654.05

3.) REDECKING

243,008.70

Note:
1.) The cost estimate high/deep water level condition includes Structural Steel Craneway, Structural Steel T-Platform and Cofferdamming of the footing
foundation.
2.) Cost of Replacement/Reconstruction work may be increased by 15% of the new construction cost due to removal of existing bridge structure and
provision of detour and traffic management.
3.) The price of construction materials are based on the regional average prices plus 15% mark-up for the hauling cost (3rd Quarter of CY-2012),
equipment rates are based from the latest ACEL Rates (24th Edition) and labor rates are based on the approved labor rates (July 2012).
4.) The estimated unit cost was derived from the assumed typical design of Bridge Structure and may be vary depending on the actual design.
5.) The retrofitting works is assumed to be designed using glass fiber reinforcement on girders.