EVENT
ANALYSIS
1. Event No. 3
REPORT
UNIT NO. 2
Date 14/02/09
Oil Support
180 MW
A,B,C,D,F
Nil
5. Analysis Fluid coupling oil temp found increased due to churning. After dismantling it is observed
that suction pipe of scoop tube found detached from welding.
6. Works carried out by maintenance section ID Fan scoop replaced with new one. One spare
coupling is always kept ready for replacement.
7. Works carried out for the restoration by operation :
Boiler lighted up
Time - -----------
Date ------------
Time - -----------
Date ------------
b) Long term During overhauls fluid couplings having oil leakage is replaced.
9.
Remarks
Gener
al Manager-I