Вы находитесь на странице: 1из 2

IJM Construction

Sdn Bhd

The Proposed Plantation Hotel, Sheraton Desaru Resort And Convention


Centre at Desaru, Johor Darul Takzim
(CP 01 Substructure Work)

METHOD STATEMENT
MECHANICAL & ELECTRICAL
PRESSURE TEST
PROJECT

DOC. TYPE

TRADE

SUB-TRADE

NUMBER

REV

DSR

MS

M&E

SPS

003

00

SIGNATURE

DATE

COMPANY

ACTIVITY

DESIGNATION

IJM
Construction
Sdn Bhd

Prepared
By

QAQC

WSP Ng Pte
Ltd

Reviewed
By

M&E
Consultant

NAME
Ashare Ghazi

Remarks/ Comments By Consultant :


(if Applicable)

FOR PEREMBA S USE


Peremba

Reviewed
By
Remarks/ Comments :

08/03/2014

IJM Construction
Sdn Bhd

The Proposed Plantation Hotel, Sheraton Desaru Resort And Convention


Centre at Desaru, Johor Darul Takzim
(CP 01 Substructure Work)

Method Statement for Pressure Test


For Underground Soil Pipe and Car Park Drain
General
- Pipes shall be tested section by section.
- Short branches shall be tested separated with the main drain pipe
- Test Plug shall be plug on at both side.
- This pressure test are by gravity pressure at 1m from finishing level.
- Fill pipe section with water, ensuring that pipe is thoroughly ventilated.
- Hold for 30 minutes and record results of the pressure test.
- Water Level drop shall not be more than 5mm
- Test is considered successful if no leakage is detected and pressure drop is within
accep

ta

ble
range

Вам также может понравиться