To analyze the various causes of LoadUnload variance in Sewing section
Objective:
Reduction of re-cutting due to missing parts
To develop the Order tracking sheet individually according to style
and color wise
To find the reasons for variance and provide suggestions to control
them
Methodology
Tracking and recording of loading and output receipts for one
batch and one style
Data collection for each line
Finding the reasons for variance between load and unload
Graphical representation of Load and unload variance
Create an appropriate OTS.
Future Scope
Re-cutting reduction
On-time delivery and lead time reduction
Improvement of controlling on workers
Quality improvement and low stress on operators
Optimization of cutting room efficiency
Objective: To improve overall efficiency of the cutting room and to reduce the wastage of the fabric. To streamline the material flow in the cutting room. To use various tools and calculate the present capacity of the cutting section. To reduce the fabric wastage
Methodology
Time study for each and every activity done.
Man power allocation for each and every process
Material movement tracking and analysis
Identifying the bottleneck operations
Capacity analysis
Use of Value stream mapping tool for analyzing current scenario.
Sorting of the cutting room
Future Scope
Proper material flow along with a proper cut order plan
Reduction of Lead time and wastage of fabric
A better material flow consuming less movement and time
Process improvement from cut to load
Improvement of cutting room efficiency and Manpower balancing
Merchandise Re-Planning- A Replenishment
Plan For Optimum Output Objective:
To re-plan the existing merchandise plan for optimum output
To develop a replenishment plan to lower the sales loss due to
stock out.
Implementation of these plan as SOP in the company.
Methodology
Analysis of last few years data
Customer profiling survey
Develop the Merchandise and Replenishment Plan
Locate Re-order Point
Implementation of Merchandise and Replenishment Plan